This document is a Statement of Work (SOW) for the replacement of flooring at the Spokane Agency Building 249, a single-floor correctional facility. The SOW details the scope of work, which includes removing and replacing approximately 1,300 square feet of tile flooring in the central and north parts of the building, removing and replacing 240 square feet of dilapidated vinyl sheet flooring in the south end, and cleaning, filling cracks, and applying epoxy coating to approximately 800 square feet of concrete flooring in the south end. The contractor is responsible for all materials, equipment, labor, and disposal of waste. The work must be completed during normal business hours, Monday through Friday, 7:00 AM to 4:30 PM. The contractor must coordinate with the Spokane Tribe's TERO, Public Works, and Planning offices for permits and waste disposal. The related federal contract opportunity is Solicitation Number 140A1224Q0020 for the Spokane Agency Building 249 Flooring Project, issued by the Department of the Interior Bureau of Indian Affairs Northwest Region.

View the file

Other files for this federal contract opportunity

Other files attached to Spokane Agency Bldg 249 Flooring Project, newest first.
File Type Posted
Sol_140A1224Q0020.pdf PDF
2_-_B03_WD_Stevens_CO_05-23-2024.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

Spokane Agency

Building 249 Flooring Replacement

1. INTRODUCTION

Building 249 is a single floor correctional facility, with an estimated square footage of 4,397 SF. The tile flooring in the center and North parts of the building require replacement approximately 1300 SF. The concrete flooring in the South end of the building has 4’x 8” tile sheet, approximately 240 SF, that is dilapidated. The rest of the concrete flooring, approximately 600 SF, in the South end of the building requires cleaning and resurfaced.

Address:

Spokane Agency Building 249 Agency Loop Rd.

Wellpinit, WA 99040

(Ref: Para 4, Picture 1)

Upon completion of work, the flooring for the central and north part of the building will have new white colored tile, with new base cove. The flooring in the South end of the building will be stripped of dilapidated sheet tile, cleaned, cracks filled, and the concrete covered with 2 coats of high-quality concrete Epoxy. New base cove is installed where concrete flooring joins with walls.

2. SCOPE OF WORK

The Contractor shall provide all materials, tools, equipment, transportation, supervision, and labor required to repair deficiencies as stated in the Scope of Work. The contractor is responsible for all costs associated with this project, including all travel, per-diem, and the disposal of all waste generated by this project. The contractor is responsible for all permits and compliance inspections, to perform the work as indicated in paragraph 2.1.

2.1

a. Conduct Site Visit.

b. Manipulate furniture in the performance of flooring work.

c. Remove and replace approximately 1300 SF of tile.

d. Replace all Base Cove on the perimeter of the newly installed white tile.

e. Remove approximately 240 SF of dilapidated vinyl sheet flooring.

f. Strip, Clean, and Fill Cracks in Concrete in the South end flooring of building approximately 800 SF.

g. Prepare and apply approximately 800 SF of Epoxy to concrete floor. Apply at least 2 coats.

h. Install new Base Cove on walls that adjoin to the newly Epoxied concrete floor.

i. Dispose of all debris created from this project in accordance with Washington State Department of Ecology regulations.

j. Work hours are Monday thru Friday 0700-1630 hours.

3. TASK IDENTIFICATION

3.1 TRIBAL CONTACTS.

The Contractor shall communicate with the Spokane Tribe TERO, Public Works and Planning Office for requisite permits and waste disposal plans. Contacts for all three offices are shown below.

Spokane Tribe Tribal Employee Rights Office 6195 Ford-Wellpinit Rd Wellpinit, Washington 99040 Office: (509) 258-7100 Fax: (509) 458-6556 E-mail Address: Rhonda.thurman@spokanetribe.com

Spokane Tribe Public Works

6195 Ford-Wellpinit Rd Wellpinit, Washington 99040

Office: (509) 458-6529 E-mail Address: mariac@spokanetribe.com

Spokane Tribe Planning

6195 Ford-Wellpinit Rd Wellpinit, Washington 99040

Office: (509) 458-6520 E-mail Address: francis.sijohn@spokanetribe.com

3.2 SAFETY REQUIREMENTS

General: The Contractor must comply with the Occupational Safety and Health Administration requirements of 29 CFR 1910, 1926, 1960 throughout the administration of work for this project.

a. Emergency Medical & Accident Reporting: In the event of an emergency / medical incident, the Contractor shall Dial 911 as needed.

mailto:Rhonda.thurman@spokanetribe.com mailto:mariac@spokanetribe.com mailto:francis.sijohn@spokanetribe.com

3.3 QUALITY REQUIREMENTS

General: The Contractor is responsible for all quality control to guard against defects and deficiencies in the work. Inspect and test work as needed to ensure that the quality of materials, workmanship, construction, finishes, and functional performance comply with applicable specifications, drawings, codes, and standards.

4. PICTURES

Picture 1: Building 249 Agency Loop Rd.

Picture 2: Control Room Flooring

BLDG

Picture 3: Hallway

Picture 4: Hallway #2

File details come from the government source that posted it. Updated .