1-810 26-03-09 (REV) 100% Bid Set WDs .pdf
PDF 17 MB Posted
- Solicitation number
- Not on record
- Issued by
- Monroe County, Pennsylvania
About this file
This is a 100% Bid Set drawing package for the Pocono Mountain School District East Transportation Building Alterations project, prepared by Breslin Architects and Snyder Hoffman Associates MEP Engineers. The project encompasses alterations to the East Transportation Building located in Swiftwater, Monroe County, Pennsylvania, and includes work across four separate prime contracts: General Construction, HVAC Construction, Plumbing Construction, and Electrical Construction. Bid documents became available on March 9, 2026, via the PennBid platform at no cost. A pre-bid conference was scheduled for March 12, 2026, at 10:00 AM at the Pocono Mountain School District Administration Office located at 135 Pocono Mountain School Road, Swiftwater, Pennsylvania, with site tours available immediately following the conference. Sealed bids were due by 2:00 PM prevailing time on April 7, 2026, and public bid opening occurred electronically at the School District Administration Building with results posted on the PennBid site.
The drawing package includes civil site plans with detailed specifications for above-ground liquid propane tank installations, concrete utility pads, chainlink fence enclosures, bollard installations, and asphalt paving repairs. Comprehensive architectural, mechanical, plumbing, and electrical drawings detail demolition plans, floor plans, reflected ceiling plans, ductwork, piping systems, and electrical distribution across multiple floors and roof areas. Proposal security requirements included a bid bond from an acceptable surety company or a certified check equal to 10% of the total proposal amount for the Base Bid. All bids were required to include complete documentation as specified in the Instructions to Bidders and PennBid Bid forms, with questions submitted through the PennBid platform's "Ask a Question/Messages" feature.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SWIFTWATER TOWNSHIP, MONROE COUNTY, PA 18370
POCONO MOUNTAIN SCHOOL DISTRICT
EAST TRANSPORTATION BUILDING ALTERATIONS
LIST OF DRAWINGS
CIVIL
C101 SITE PLANS
March 9, 2026
ALLENTOWN, PENNSYLVANIA
AD101
A101 A102
FIRST FLOOR DEMOLITION PLAN
FLOOR PLANS & SCHEDULES
REFLECTED CEILING PLANS & ENLARGED PLANS
ARCHITECTURAL
M000
MD101
MD102
M101 M102 M500 M600
COVERSHEET - MECHANICAL
FIRST & SECOND FLOOR DEMOLITION PLANS - MECHANICAL
ROOF DEMOLTION PLAN - MECHANICAL
FIRST & SECOND FLOOR PLANS - MECHANICAL
ROOF PLAN - MECHANICAL
DETAILS - MECHANICAL
SCHEDULES - MECHANICAL
MECHANICAL
P000
PD101
P101 P102 P601
COVERSHEET - PLUMBING
FIRST FLOOR DEMOLITION PLAN - PLUMBING
FIRST FLOOR DRAIN AND VENT PIPING - PLUMBING
SUPPLY PIPING, PARTIAL SITE PLAN AND DETAILS - PLUMBING
DETAILS - PLUMBING
PLUMBING
E000
ED101
ED102
ED103
E101 E201 E202 E601 E602
COVERSHEET - ELECTRICAL
FLOOR PLANS - DEMOLITION - LIGHTING
FLOOR PLANS - DEMOLITION - POWER
ROOF PLAN - DEMOLITION - ELECTRICAL
FLOOR PLANS - LIGHTING
ROOF PLANS - POWER
ROOF PLAN POWER & AREA CLASSIFICATION PLANS
SCHEDULES & DETAILS - ELECTIRCAL
SCHEDULES & DETAILS - ELECTRICAL
ELECTRICAL
POCONO MOUNTAIN SCHOOL DISTRICT
FOR THE
s e.
0- I -I-
C101
1226 Union Boulevard
(610) 437-9626
(610) 437-4769
Tel Fax
BRESLIN ARCHITECTS
DRAWN
Allentown, Pennsylvania 18109
MKA / SJB
DESIGNED
CHECKED
SHEET NO.
COMMISSION NO.
DATE
SCALE
03/09/2026
AS NOTED
NO. BY YYYY.MM.DD REVISION
SWIFTWATER, MONROE COUNTY, PENNSYLVANIA
POCONO MOUNTAIN SCHOOL DISTRICT-
EAST TRANSPORATION BUILDING ALTERATIONS
Tel (610) 694-8020
SNYDER HOFFMAN ASSOCIATES
1005 West Lehigh Street Bethlehem, Pennsylvania 18018
MEP ENGINEERS
web: www.snyderhoffman.com SITE PLAN & DETAILS
SWIFTWATER
INTERMEDIATE SCHOOL
POCONO MOUNTAIN EAST
JUNIOR HIGH SCHOOL
POCONO MOUNTAIN EAST
TRANSPORATION BUILDING
POCONO MOUNTAIN EAST
HIGH SCHOOLPOCONO MOUNTAIN EAST
STADIUM
POCONO MOUNTAIN
SCHOOL
ROAD
C
AM
PU
S
DR
IV
E
POCONO MOUNTAIN SD
ADMINISTRATION
+/-24'-6" PAD
3' -0
3'
-0
4' -0
M
IN
4' -0
M
IN
4'-0"
MIN
4'-0"
MIN
THREE 1000 GALLON ABOVE GROUND
LIQUID PROPANE TANKS BY PC
CONCRETE UTILITY PAD
BY GC
CHAINLINK FENCE ENCLOSURE
BY GC
DASHED LINE DELINEATES THE APPROXIMATE
LOCATION OF A NON-EXTANT WASTEWATER
TREATEMENT FACILITY
EXISTING
ASPHALT
PAVEMENT
EXISTING
ASPHALT
PAVEMENT
EXISTING
LOOSE
PERMEABLE
PAVEMENT
ASPHALT REPAIR BY GC
A
LI
G N
BOLLARD BY GC
C101
C101
5&6 C101
C101
- 3
5' -0
-2 3'
-0 " P
A D
EAST TRANSPORTATION
BUILDING
6' -0
4'
-0
3"
2'-0"
1" 3"
10'-0" MAX 4'-0" GATE OPENING
1-5/8" ID PIPE TOP RAILS,
GALV W/ BLACK VINYL -
TYPICAL
2" ID PIPE LINE POSTS, GALV W/
BLACK VINYL - TYPICAL
2-1/2" ID END POSTS, GALV AND
BLACK VINYL - TYPICAL
2" MESH CHAIN LINK
FABRIC, 6 GAUGE, GALV
W/ BLACK VINYL,
KNUCKLED TOP AND
BOTTOM - TYPICAL
1-5/8" ID PIPE BRACE RAILS, GALV W/
BLACK VINYL - TYPICAL
1-5/8" ID PIPE BOTTOM RAILS, GALV W/
BLACK VINYL - TYPICAL
TIE WIRES @ 12" OC - TYPICAL
POST CAPS. GLAV W/ BLACK VINYL -
TYPICAL
TRUSS ROD W/ (GALV)
TURNBUCKLES, AT ENDS, CORNERS,
GATE PANELS - TYPICAL
1-5/8" ID GATE FRAME, GALV
W/ BLACK VINYL - TYPICAL
LOCKING HASP
STRETCHER BAR W/ BANDS AT ENDS
AND CORNERS - TYPICAL
4000 PSI CONCRETE FOOTING
GRADE:
VARIES
LINE OF UTILITY PAD
CROWN FOR DRAINAGE - TYPICAL
PAVEMENT INSTALLATION
3' -0
4'
-0
1'-4"
6" DIA, SCHEDULE 80
GALV STEEL PIPE W/
WELDED DOME CAP -
CONCRETE FILLED
CONCRETE PAD OR
PAVEMENT
COMPACTED SUBGRADE
4000 PSI CONCRETE
FOUNDATION
DIA
GRADE:
VARIES
NOTES:
1. SET BOLLARDS AT EQUAL DISTANCE, NOT MORE THAN 4'-0" - SEE
PLAN
2. SHOP PRIMER: PRIMER FORMULATEFOR EXTERIOR USE OVER ZINC-
COATED METAL AND COMPATIBLE WITH FINISH PAINT MATERIAL.
3. PROVIDE TWO (2) COATS OF SHERWIN WILLIAMS PRO INDUSTRIAL
WATERBASED ALKYD URETHANE ENAMEL, SEMI-GLOSS OR
APPROVED EQUAL.
EXPANSION FILLER STRIP -
SEAL W/ SELF LEVELING
URETHANE SEALANT
2" DIA CORED OPENING
COMPACTED 2A MODIFIED
GRAVEL FILL
4' -0
" M
IN
3"3"
1'-0"
8" 6"
EQUALLY SPACED, 20' MAX
3'-0" MIN
2" MIN
4000 PSI CONCRETE PAD W/
PERIMETER FROST WALL
6" 2A CRUSHED STONE
#4 BARS HORIZ @ 12" OC
COMPACTED SUB GRADE
#4 12 x 12 WELDED WIRE MESH
1/4" X 1 1/2" SAW CUT CONTROL
JOINT, UERATHANE SEALANT
#4 BARS VERT @ 12" OC
GRADE:
VARIES
LINE OF FROST WALL BEYOND
1/2" x 6" GRADE 8 GALVANIZED BOLTS
EACH LEG
LIQUID PROPANE TANK
1'-0" MIN
CUTBACK
1'-0"
1 - 1/2" WMA WEARING
COURSE / OVERLAY
NEW PAVING - FULL DEPTH -SEE
6/C101
EXISTING PAVEMENT
PG 64-22 SEALER
RECOMPACTED SUBGRADE (2A
STONE)
SEE PLUMBING DWGS FOR
TRENCHING, BACKFILL AND
PROPANE PIPE INSTALLATION
DETAILS
SUPERPAVE ASPHALT MIXTURE DESIGN, WMA WEARING
COURSE, PG 64-22, 0 T0 <.03 MILLION DESIGN ESALS,
9.5 MM MIXTURE, SR-L, 1 1/2" DEPTH
SUPERPAVE ASPHALT MIXTURE DESIGN, WMA BINDER
COURSE, PG 64-22, 0 T0 <.03 MILLION DESIGN ESALS, 19
MM MIXTURE, SR-L, 2" DEPTH
SUPERPAVE ASPHALT MIXTURE DESIGN, WMA BASE
COURSE, PG 64-22, 0 T0 <.03 MILLION DESIGN ESALS, 25
MM MIXTURE, SR-L, 4" DEPTH
COMPACTED SUBGRADE - COMPACT SUBGRADE TO AT
LEAST 95% OF ITS MAXIMUM DRY DENSITY
DETERMINED IN ACCORDANCE WITH ASTM D-1557 AND
WITHIN +/- OF OPTIMUM MOISTURE CONTENT
COMPACTED SUBBASE - 6" MIN 2A STONE
N
PLAN
NORTH
SCALE: 1" =100' 1AERIAL SITE PLAN
SCALE: 1/16" = 1'-0" 2LP TANK LOCATION (SEE NOTE BELOW)
SCALE: 1/2" = 1'-0" 3CHAINLINK ENCLOSURE DETAIL
SCALE: 1" = 1'-0" 7BOLLARD DETAILS
SCALE: 1" = 1'-0" 4CONCRETE UTILITY PAD DETAIL
SCALE: 1" = 1'-0" 5ASPHALT REPAIR @ OVERLAY DETAIL
SCALE: 1" = 1'-0" 6ASPHALT PAEMENT DETAIL
NOTE: TANK LOCATION IS APPROXIMATE. FINAL LOCATION TO BE DETERMINED,
BASED ON RESULTS OF GROUND PENETRATING RADAR SURVEY AND
COORDINATION WITH OWNER.
AD101
1226 Union Boulevard
(610) 437-9626
(610) 437-4769
Tel Fax
BRESLIN ARCHITECTS
DRAWN
Allentown, Pennsylvania 18109
MKA / SJB
DESIGNED
CHECKED
SHEET NO.
COMMISSION NO.
DATE
SCALE
03/09/2026
AS NOTED
NO. BY YYYY.MM.DD REVISION
SWIFTWATER, MONROE COUNTY, PENNSYLVANIA
POCONO MOUNTAIN SCHOOL DISTRICT-
EAST TRANSPORATION BUILDING ALTERATIONS
Tel (610) 694-8020
SNYDER HOFFMAN ASSOCIATES
1005 West Lehigh Street Bethlehem, Pennsylvania 18018
MEP ENGINEERS
web: www.snyderhoffman.com FIRST FLOOR DEMOLITON PLAN
1 1
1 1
1 1
4 4
3.1
9 8
8 8
8 8
4.1
2.16
A
B
C
1 2
3.1
2.1
4.1
GENERAL DEMOLITION NOTES
1. CONTRACTOR SHALL NOT CONSIDER DEMOLITION NOTES TO BE ALL INCLUSIVE. IT
IS THE CONTRACTORS' RESPONSIBILITY TO INSPECT AND ASSESS THE TRUE
CONDITION OF EACH AREA TO DETERMINE THE FULL EXTENT OF DEMOLITION
REQUIRED TO FULFILL THE INTENT OF THE WORK INDICATED BY THE CONTRACT
DOCUMENTS. CONTRACTOR SHALL VERIFY ALL CONDITIONS AND DIMENSIONS
WITHIN THE CONTRACT LIMITS AND COORDINATE ALL DEMOLITION INDICATED ON
THESE DRAWINGS WITH ALL OTHER CONTRACT DOCUMENTS. DEVIATIONS FROM
THE CONTRACT DOCUMENTS NECESSITATED BY FIELD CONDITIONS SHALL BE
BROUGHT TO THE ATTENTION OF THE ARCHITECT UPON DISCOVERY.
2. REFER TO ALL CONTRACT DRAWINGS, INCLUDING BUT NOT LIMITED TO, CIVIL ("C"),
ARCHITECTURAL ("A"), PLUMBING ("P"), HVAC ("H"), ELECTRICAL ("E"), FIRE
PROTECTION ("F") AND SPECIFICATIONS FOR ADDITIONAL INFORMATION
PERTINENT TO DEMOLITION AND REMOVAL REQUIRED.
3. SHOULD A CONTRACTOR ENCOUNTER A MATERIAL DURING THE DEMOLITION
REQUIRED BY THIS PROJECT THAT THEY SUSPECT CONTAINS A HAZARDOUS
MATERIAL (E.G. ASBESTOS) AND THAT REQUIRES REMOVAL TO ACCOMPLISH THE
WORK OF THE CONTRACT DOCUMENTS, THE CONTRACTOR SHALL IMMEDIATELY
NOTIFY OWNER AND ARCHITECT IN WRITING BEFORE ANY WORK ON THE
MATERIAL IS PERFORMED. THE OWNER WILL HAVE THE MATERIAL TESTED AND
HAVE IT REMOVED, UNDER SEPARATE CONTRACT, AS TEST RESULTS WARRANT.
4. MATERIALS RESULTING FROM DEMOLITION AND REMOVAL OPERATIONS SHALL
BECOME THE PROPERTY OF THE CONTRACTOR AND SHALL BE COMPLETELY
REMOVED FROM THE SITE UNLESS NOTED OTHERWISE IN THE CONTRACT
DOCUMENTS.
5. STORAGE OF DEBRIS AND OTHER MATERIALS RESULTING FROM DEMOLITION
OPERATIONS SHALL NOT BE PERMITTED TO REMAIN ON SITE UNLESS NOTED
OTHERWISE.
6. WHEN REMOVING AN EXISTING ITEM (E.G. WINDOWS, DOORS, HANDRAILS,
FRAMES, BACKBOARDS, MARKER BOARDS, ETC.), THE CONTRACTOR SHALL
REMOVE ASSOCIATED / ANCILLARY SEALANTS, ADHESIVES, ANCHORS,
FLASHINGS, BLOCKING AND / OR OTHER ITEMS NOT REQUIRED FOR INCLUSION IN
THE COMPLETED WORK.
7. WHERE REMOVAL OF EXISTING FINISHES OCCURS (E.G. VINYL TILE, TERRAZZO
FINISH, WOOD FLOORING, COVE BASE, ETC), CONTRACTOR SHALL REMOVE ALL
MASTIC, ADHESIVES, ANCHORS, ETC, AND PREPARE THE SUBSTRATE AS
REQUIRED FOR INSTALLATION OF NEW WORK.
8. WHERE REMOVAL OF A MASONRY WALL (INTERIOR OR EXTERIOR) IS INDICATED,
THE GENERAL CONTRACTOR SHALL REMOVE THE WALL TO A DEPTH BELOW THE
SURFACE OF ADJACENT FLOOR SLAB (AT LEAST 5") TO ALLOW FOR THE
SATISFACTORY INFILL / PATCH ACROSS THE AREA OF WALL REMOVAL AND THE
SATISFACTORY INSTALLATION OF INDICATED FINISHES.
9. WHERE ANY EXISTING CONSTRUCTION (E.G. PARTITIONS, FLOORS AND BASES,
DOOR AND WINDOW FRAMES, CEILINGS, VWC, CASEWORK, EQUIPMENT, HVAC,
ELECTRICAL DEVICES, JUNCTION BOXES, DATA OUTLETS, RECEPTACLES AND
PLUMBING FIXTURES) ARE REMOVED OR ALTERED, CONTRACTOR SHALL REPAIR
ADJACENT SURFACES DISTURBED BY REMOVAL OR ALTERATION WORK AND
PREPARE EXISTING SURFACES TO RECEIVE NEW CONSTRUCTION AND/OR NEW
SCHEDULED FINISHES. PATCH AND LEVEL FLOORS AT ALL PARTITION AND
FLOORING REMOVAL AS REQUIRED FOR THE COMPLETED WORK.
10.. CONTRACTOR(S) SHALL PROTECT AND PRESERVE ALL EXISTING CONSTRUCTION
(E.G. FLOORS, WALLS, CEILINGS, FURNISHINGS AND/OR OTHER ADJACENT
ELEMENTS) TO REMAIN IN THE COMPLETED WORK. PROTECTIONS INCLUDE BUT
ARE NOT LIMTED TO SHORING, BRACING, SUPPORT, WEATHER / WATER
BARRIERS, CONSTRUCTION OF TEMPORARY PARTITIONS, BARRIERS AND SHEDS,
BOARDING, PADDING, NETTING, MASKING, COVERING, DUST CONTROL,
VACUUMING, PEST CONTROL, AND AIR FILTRATION SYSTEMS AS WARRANTED. ANY
DAMAGE SHALL BE PATCHED / REPAIRED.
11. PATCHES / REPAIRS TO EXISTING CONSTRUCTION TO REMAIN IN THE COMPLETED
WORK SHALL MATCH EXISTING ADJACENT AND/OR SIMILAR SURFACES IN
MATERIALS, FINISH AND WORKMANSHIP.
12. ALL TEMPORARY FACILITIES AND/OR WORK INDICATED OR REQUIRED (E.G.
TEMPORARY EXIT DEVICES, TRANSITIONS, ETC.) SHALL BE REMOVED AT THE
APPROPRIATE TIME TO ACCOMMODATE THE CONSTRUCTION AND COMPLETION
OF THE WORK. ALL SURFACES/FINISHES AFFECTED BY TEMPORARY
CONSTRUCTION SHALL BE PATCHED/ REPAIRED/ OR REPLACED TO MATCH
ADJACENT SURFACES.
13. UNLESS OTHERWISE INDICATED, EACH PRIME CONTRACTOR SHALL BE
RESPONSIBLE FOR THE DEMOLITION AND REMOVAL OF EXISTING MATERIALS,
SYSTEMS OR EQUIPMENT THAT WOULD TYPICALLY BE HANDLED OR INSTALLED BY
THAT PRIME DURING THE COURSE OF MULTI-PRIME CONSTRUCTION AS
APPLICABLE.
DEMOLITION KEY NOTES
WINDOW OR DOOR, FRAME AND ACCESSORIES TO BE REMOVED
EXISTING CONSTRUCTION TO BE REMOVED
EXISTING CONSTRUCTION TO REMAIN
DEMOLITION KEYNOTE
DEMOLITION LEGEND
REMOVE AND DISPOSE OF FLOOR FINISH (INCLUDING WALL BASE) TO
CONCRETE SUBSTRATE; CLEAN AND PREPARE SUBSTRATE TO RECEIVE NEW
FLOOR FINISH SCHEDULED FOR THE COMPLETED WORK.
REMOVE AND DISPOSE OF CERAMIC TILE FLOOR (INCLUDING MORTAR BED IF
PRESENT) TO CONCRETE SUBSTRATE; CLEAN AND PREPARE SUBSTRATE TO
RECEIVE NEW FLOOR FINISH SCHEDULED FOR THE COMPLETED WORK.
REMOVE AND DISPOSE OF DOOR PANEL AND HARDWARE AND PREPARE
EXISTING DOOR FRAME FOR NEW DOOR ASSEMBLY SCHEDULED FOR THE
COMPLETED WORK.
REMOVE AND DISPOSE OF CONCRETE LOCKER BASE (LOCKERS PREVIOSULY
REMOVED)
REMOVE AND DISPOSE OF MASONRY WALL CONSTRUCTION
REMOVE AND DISPOSE OF CERAMIC TILE WAINSCOT (4'-0" AFF AND INCLUDING
MORTAR BED IF PRESENT) TO CONCRETE MASONRY SUBSTRATE; CLEAN AND
PREPARE SUBSTRATE TO RECEIVE NEW WALL FINISH SCHEDULED FOR THE
COMPLETED WORK.
REMOVE AND DISPOSE OF CERAMIC TILE WAINSCOT (6'-8" AFF & INCLUDING
MORTAR BED IF PRESENT) TO CONCRETE MASONRY SUBSTRATE; CLEAN AND
PREPARE SUBSTRATE TO RECEIVE NEW WALL FINISH SCHEDULED FOR THE
COMPLETED WORK.
REMOVE AND DISPOSE OF CERAMIC TILE SHOWER PAN / FLOOR AND CURB
(INCLUDING MORTAR BED IF PRESENT) TO CONCRETE SUBSTRATE; CLEAN AND
PREPARE SUBSTRATE TO RECEIVE NEW FLOOR FINISH SCHEDULED FOR THE
COMPLETED WORK.
REMOVE AND DISPOSE OF TOILET COMPARTMENTS / PARTITIONS AND TOILET /
TOILET / BATH ACCESSORIES
REMOVE AND DISPOSE OF ACOUSTIC PANEL CEILING, SUSPENSION SYSTEM
AND ACCESSORIES
REMOVE AND DISPOSE OF DOOR FRAME, DOOR PANEL AND HARDWARE;
PREPARE RO FOR NEW DOOR ASSEMBLY SCHEDULED FOR THE COMPLETED
WORK.
REMOVE AND SALVAGE WINDOW TREATMENTS; REINSTALL IN COMPLETED
WORK.
MIXED-USE, NON-SEPERATED PER 508.4
• BUSINESS - B
• STORAGE - S1
EXISTING BUILDING AREA - 10,300 SF
LEVEL 2 WORK AREA - 296 SF
10,300 / 300 = 3% OF EXISTING AREA
CLASSIFICATION OF WORK (IEBC)
• ALTERATIONS - LEVEL 2
• WORK AREA INCLUDES THE RECONFIGURATION OF SPACE IN AN AREA THAT IS
LESS THAN 50% OF THE EXISTING BUILDING AREA.
COMPLIANCE METHOD (IEBC)
• WORK AREA COMPLIANCE METHOD SELECTED FOR EVALUATION AND DESIGN
OF ALTERATIONS.
• ALL NEW CONSTRUCTION ELEMENTS, COMPONENTS, SYSTEMS, AND SPACES
WITHIN THE WORK AREA SHALL COMPLY WITH THE REQUIREMENTS OF THE
INTERNATIONAL BUILDING CODE.
CONSTRUCTION TYPE (IBC)
TYPE 2B - NON COMBUSTIBLE
BUILDING USE AND OCCUPANCY
CODES ENFORCED
ALL CONSTRUCTION HAS BEEN DESIGNED IN ACCORDANCE WITH THE
PENNSYLVANIA UNIFORM CONSTRUCTION CODE (UCC) AND PUBLISHED IN THE
PENNSYLAVNIA BULLETIN (VOLUME 55, NUMBER 45), NOVEMBER 8, 2025.
BUILDING CONSTRUCTION
MECHANICAL CONSTRUCTION
2021 ICC INTERNATIONAL MECHANICAL CODE
ENERGY CONSERVATION
2021 ICC INTERNATIONAL ENERGY CONSERVATION CODE
FIRE PROTECTION CONSTRUCTION
2021 ICC INTERNATIONAL FIRE CODE AS REFERENCED IN OTHER ICC CODES
ADOPTED BY PA UCC
ELECTRICAL CONSTRUCTION
2021 NATIONAL ELECTRIC CODE
NFPA-70
USE AND OCCUPANCY CLASSIFICATION
2021 ICC INTERNATIONAL EXISTING BUILDING CODE
2021 ICC INTERNATIONAL BUILDING CODE
2018 ICC INTERNATIONAL BUILDING CODE, CHAPTER 11, APPENDIX E, AND 2009
ICC A117.1 - ACCESSIBLE AND USABLE BUILDINGS AND FACILITIES (AS REF IN CH
35, IBC 2018)
ACCESSIBILTY
PLUMBING CONSTRUCTION
2021 ICC INTERNATIONAL PLUMBING CODE
PLAN
NORTH
SCALE: 1/8" = 1'-0" 2FIRST FLOOR DEMOLITION PLAN
A101
1226 Union Boulevard
(610) 437-9626
(610) 437-4769
Tel Fax
BRESLIN ARCHITECTS
DRAWN
Allentown, Pennsylvania 18109
MKA / SJB
DESIGNED
CHECKED
SHEET NO.
COMMISSION NO.
DATE
SCALE
03/09/2026
AS NOTED
NO. BY YYYY.MM.DD REVISION
SWIFTWATER, MONROE COUNTY, PENNSYLVANIA
POCONO MOUNTAIN SCHOOL DISTRICT-
EAST TRANSPORATION BUILDING ALTERATIONS
Tel (610) 694-8020
SNYDER HOFFMAN ASSOCIATES
1005 West Lehigh Street Bethlehem, Pennsylvania 18018
MEP ENGINEERS
web: www.snyderhoffman.com FLOOR PLANS & SCHEDULES
A305
A 101C
A
A301
G
OFFICE
4 A501
4'-11 3/8"
13'-4"
GENERAL NOTES
THE CONTRACTOR MUST NOTIFY THE ARCHITECT, IN WRITING OF ANY
AND ALL DISCREPENCIES & ERRORS WITH ANY AND ALL OF THE
CONSTRUCTION DRAWINGS PRIOR TO BEGINNING THE WORK. THIS
SHALL INCLUDE, BUT NOT BE LIMITED TO: ALL DIMENSIONS, FLOOR TO
FLOOR HEIGHTS, TOP OF STEEL ELEVATIONS, MASONRY OPENING
LOCATIONS AND SIZES, COLUMN LOCATIONS ETC.
THE CONTRACTOR SHALL COMPLY WITH, AND PERFORM ITS WORK IN
ACCORDANCE WITH, ALL APPLICABLE LAWS, STATUTES, ORDINANCES,
LAWFUL ORDERS OF GOVERNMENTAL AUTHORTIES, BUILDING CODES,
RULES AND REGULATIONS, UNLESS THE CONTRACT DOCUMENTS
REQUIRE A HIGHER OR GREATER STANDARD, IN WHICH CASE THE
CONTRACTOR SHALL CONFORM TO SUCH HIGHER OR GREATER
STANDARD IN ACCORDANCE WITH THE GENERAL CONDITIONS. IF THE
CONTRACTOR RECOGNIZES THAT PORTIONS OF THE CONTRACT
DOCUMENTS DO NOT MEET THE STANDARDS ESTABLISHED THEREBY,
THE CONTRACTOR SHALL PROMPTLY NOTIFY THE ARCHITECT, AND THE
OWNER IN WRITING BEFORE PROCEEDING WITH THE WORK.
EACH CONTRACTOR SHALL ACQUAINT HIMSELF WITH THE WORK TO
BE DONE AND MATERIALS AND EQUIPMENT TO BE INSTALLED BY
HIMSELF AND OTHERS AND COORDINATE, IN ADVANCE, PRIOR TO
INSTALLING ANY SYSTEM OR PORTION THEREOF.
EACH CONTRACTOR WHO FAILS TO COORDINATE THE INSTALLATION
OF HIS WORK WITH THE OTHER TRADES, SHALL BEAR ALL COSTS OF
EACH TRADE FOR DISCONNECTING, REMOVAL AND RE-INSTALLATION
OF AFFECTED SYSTEMS, EQUIPMENT OR PORTION THEREOF.
THE BUILDING PLAQUE IS NOT INDICATED ON PLANS. IT SHALL BE
LOCATED IN FIELD BY ARCHITECT.
ALL CONCRETE FLOORS NOT SCHEDULED TO RECEIVE A FINISH SHALL
BE SEALED IN ACCORDANCE WITH THE SPECIFICATIONS.
ALL MASONRY WALLS ARE DIMENSIONED TO THE NOMINAL FACE OF
MASONRY. ALL STUD WALLS ARE DIMENSIONED TO THE FACE OF
STUD. ALL TILE CEILINGS, SOFFITS, FASCIA, ETC. ARE DIMENSIONED
TO THE FINISH SURFACE. (UNLESS NOTED OTHERWISE)
ALL METAL STUD AND GYPSUM BOARD FASCIA SHALL HAVE THE
GYPSUM BOARD EXTEND A MINIMUM 6" ABOVE THE FINISHED CEILING..
ALL CMU WALLS SHALL HAVE CONTROL JOINTS AS SPECIFIED OR AS
SHOWN ON THE DRAWINGS. ALL LOCATIONS MUST BE REVIEWED
WITH THE ARCHITECT BEFORE STARTING MASONRY WORK. PROVIDE
CONTROL JOINT AT ALL LOCATIONS WHERE CMU REDUCES IN THICKNESS
TO PASS A COLUMN, PIPE, OR OTHER OBSTRUCTION.
UNLESS NOTED OTHERWISE, THE GENERAL CONTRACTOR IS
RESPONSIBLE FOR PROVIDING ALL STRUCTURAL STEEL,
MISCELLANEOUS STEEL, AND LOOSE LINTELS THAT ARE NECESSARY
TO SUPPORT ALL ROOF TOP MOUNTED EQUIPMENT, ALL MASONRY
OPENINGS, PASSAGES, WINDOWS, ETC., AND TO FRAME ALL ROOF,
WALL AND FLOOR OPENINGS. THE GENERAL CONTRACTOR IS
RESPONSIBLE FOR REVIEWING ALL DRAWINGS OF ALL CONTRACTS
TO DETERMINE THE QUANTITY, SIZE, AND LOCATIONS OF ALL ROOF
TOP EQUIPMENT, ALL MASONRY OPENINGS, AND ALL ROOF, WALL
AND FLOOR OPENINGS. OPENINGS IN GYPSUM BOARD PARTITIONS
SHALL BE NEATLY CUT TO THE PROFILE OF THE PIPE, CONDUIT, DUCTS,
ETC. ALL PENETRATIONS THROUGH WALLS SHALL BE SEALED WITH
FIRE STOPPING INSULATION & SEALANT BY THE CONTRACTOR
RESPONSIBLE FOR THE PENETRATION.
RECESSES FOR PANELBOARDS, CABINET HEATERS, DRINKING
FOUNTAINS, ETC. SHALL BE PROVIDED BY THE GENERAL CONTRACTOR
IN NEW CONSTRUCTION. EACH PRIME CONTRACTOR SHALL BE
RESPONSIBLE FOR THE OPENING REQUIREMENTS AND EQUIPMENT
INSTALLATION IN EXISTING CONSTRUCTION.
SEE WALL SECTIONS AND REFLECTED CEILING PLANS FOR ADDITIONAL
FASCIA AND SOFFITS NOT LISTED ON THE FINISH SCHEDULE OR SHOWN
ON THE PLANS.
REFER TO THE INTERIOR ELEVATIONS AND PLUMBING / HEATING
DRAWINGS FOR RECESSED/SEMI-RECESSED PLUMBING/ HEATING
EQUIPMENT AND WALL GRILLE LOCATIONS NOT SHOWN ON THE
ARCHITECTURAL PLANS. VERIFY EXACT LOCATION WITH THE ARCHITECT
PRIOR TO CONSTRUCTING WALLS.
WALL SECTION
DETAIL OR ENLARGED
PLAN REFERENCE
ROOM NUMBER
INTERIOR ELEVATION
Drawing Number
Interior Elevation Number & Direction of View
SHEET NUMBER
SECTION NUMBER
DETAIL NUMBER
SHEET NUMBER
PARTITION TYPE
WINDOW TYPE
DOOR NUMBER
SOFFIT OR CABINETRY
ABOVE
COLUMN GRID LINE
DATUM POINT /
ELEVATION MARK
TOILET ACCESSORY
ONE HOUR U.L.FIRE RATED
ASSEMBLY
TWO HOUR U.L.FIRE RATED
ASSEMBLY (2 HOUR FIRE
SEPARATION ASSEMBLY
WHERE NOTED)
CONCRETE
BRICK
CONCRETE BLOCK (CMU)
CAST STONE
FLOOR PLAN DRAWING LEGEND
ROOM NAME
TALL
STORAGE
NOTES
DIMENSIONSA100
AREA B
AREA A
MATCH
LINE
LAVATORY
PLUMBING FIXTURE
WC
ADA
WC
URINAL
ADA
URINAL
ADA
LAV
04.1A
1069'-6"
SERVICE / REPAIR
SERVICE / REPAIR
A102
A102
A102
07A
21B 04A
21C
20C
20B
15D
19A 18A 16A17A
15B
15B
22A
21D
20D
20E
22B
15A
10B
11A
03A06A
05A
21D
13A
14B
21A
09A 08A
11.1A
11.2B
11.3A
07.1A
03B
02A
20A
11.2A
12A
12C
12D
12B
12E
14A
20F
10A
1071'-6"
1070'-0"
R A
M P
UP
D N
UP SERVICE PIT
FD
FD
FD
FD
FD
RECEPTION
HALL
CUST
OFFICE
OFFICE
OFFICE
STOR
SERVICE / REPAIR
STOR
ELEC
PARTS
HALL
OFFICE
11.1
OFFICE
11.2 OFFICE
11.3
STOR
OFFICE
HALL
07.1
MEN
OFFICE
EQUIPMENT
WASH
STAFF
TLT
04.1
WOMEN
A
B
C
1 2
C
DN
PARTS MEZZ
14.1
DOOR SCHEDULE
DOOR
NUMBER
01A
02A
03A
03B
04.1A
04A
05A
06A
07.1A
07A
08A
09A
10A
10B
11.1A
11.2A
11.2B
11.3A
11A
12A
12B
12C
12D
12E
FRAME
elev
A
A mat ExHM
ExHM
ExHM
ExHM
HM
ExHM
ExHM
ExHM
HM
ExHM
ExHM
ExHM
ExHM
ExHM
ExWD
ExHM
ExWD
ExWD
ExHM
ExHM
ExSTL
ExSTL
ExSTL
ExHM size 5 3/4"
5 3/4"
5 3/4"
5 3/4"
5 3/4"
5 3/4"
5 3/4"
5 3/4"
5 3/4"
5 3/4"
5 3/4"
5 3/4"
5 3/4"
5 3/4"
5 3/4"
5 3/4"
5 3/4"
5 3/4"
5 3/4"
5 3/4"
0"
0"
0"
5 3/4" jamb jamb head glaz
DOOR
type
II
II
I
I
III
I
I
I
I
I
II
III
mat Ex HM
WD
WD
WD
HM
HM
HM
WD
WD
ExHM
WD
WD
HM
HM
ExWD
ExHM
ExWD
ExWD
WD
ExHM
ExSTL
ExSTL
ExSTL
ExHM size 3'-0" x 7'-0"
3'-0" x 7'-0"
3'-0" x 7'-0"
3'-0" x 6'-10"
3'-0" x 7'-0"
3'-0" x 7'-0"
3'-0" x 7'-0"
3'-0" x 7'-0"
3'-0" x 7'-0"
3'-0" x 7'-0"
2'-8" x 7'-0"
3'-0" x 7'-0"
3'-0" x 7'-0"
3'-0" x 7'-0"
3'-0" x 6'-8"
3'-0" x 7'-0"
3'-0" x 6'-8"
3'-0" x 6'-8"
3'-0" x 7'-0"
3'-0" x 7'-0"
12'-0" x 15'-6"
12'-0" x 15'-6"
12'-0" x 15'-6"
3'-0" x 6'-10"
Louver glazing
UL
label sill
ADA
Sign
REMARKS
PNT INTERIOR FRAME AND DOOR
VERIFY DOOR SIZE; PNT & PREPARE FRAME FOR HARDWARE
VERIFY DOOR SIZE; PNT & PREPARE FRAME FOR HARDWARE
VERIFY DOOR SIZE; PNT & PREPARE F.25RAME FOR HARDWARE
VERIFY DOOR SIZE; PNT & PREPARE FRAME FOR HARDWARE
VERIFY DOOR SIZE; PNT & PREPARE FRAME FOR HARDWARE
VERIFY DOOR SIZE; PNT & PREPARE FRAME FOR HARDWARE
VERIFY ROUGH OPENING SIZE
VERIFY DOOR SIZE; PNT & PREPARE FRAME FOR HARDWARE
PNT INTERIOR FRAME AND DOOR
VERIFY DOOR SIZE; PNT & PREPARE FRAME FOR HARDWARE
VERIFY DOOR SIZE; PNT & PREPARE FRAME FOR HARDWARE
VERIFY DOOR SIZE; PNT & PREPARE FRAME FOR HARDWARE
VERIFY DOOR SIZE; PNT & PREPARE FRAME FOR HARDWARE
PNT FRAME AND CASING
PNT INTERIOR FRAME AND DOOR
PNT FRAME AND CASING
PNT FRAME AND CASING
PNT FRAME
NO WORK
OVERHEAD DOOR; NO WORK
OVERHEAD DOOR; NO WORK
OVERHEAD DOOR; NO WORK
NO WORK
DOOR
NUMBER
01A
02A
03A
03B
04.1A
04A
05A
06A
07.1A
07A
08A
09A
10A
10B
11.1A
11.2A
11.2B
11.3A
11A
12A
12B
12C
12D
12E
S E
E S
C H
E D
U
LE
FO
R
D O
O R
S
IZ
E
2"
2"
SEE
SCHEDULE
FOR DOOR
SIZE
2"
8" 8"
8" 2'
-8
3' -4
6" 6"
6"
A
H M
F R
A M
E
TY
PE
S
III
D O
O R
T
YP
ES
III
24" X 24" SQUARE EDGED LAY-IN
FINISH SCHEDULE ABBREVIATIONS
ACOUSTIC PANEL TYPES
SEE INTERIOR ELEVATIONS AND ENLARGED PLANS FOR
LOCATIONS OF GWT TYPES AND PATTERNS.
AP
CARP T
CEM BACK
CMT
CMU
CMU-2
CONC
EIFS
ENT FL
EPX
EPX TER
EXP STRUCT
FAAF
GYP BD
HDT
ACOUSTICAL PANEL
CARPET TILE
CEMENTITIOUS BACKER UNIT
CERAMIC MOSAIC TILE
CONCRETE MASONRY UNIT
CENTER SCORED CONCRETE MASONRY UNIT
CONCRETE
EXTERIOR INSULATION FINISH SYSTEM
ENTRANCE FLOORING
EPOXY COATING
EPOXY TERRAZZO
EXPOSED STRUCTURE
FLUID APPLIED ATHLETIC FLOORING
GYPSUM BOARD
HEAVY DUTY RESILIENT TILE
PLY WD
PNT
POR T
PS CONC
QT
RB
RSIF
RT
SEAL C
SEP
SIE
SOL S
SPC
SRCP
VCT
WD
WD ATH FLR
WD PNL
WD ST FLR
PLYWOOD
PAINT
PORCELAIN TILE
POLISHED STAINED CONCRETE
QUARRY TILE
RUBBER BASE
RUBBER SPORTS IMPACT FLOORING
RUBBER TILE
SEALED CONCRETE
SEE ENLARGED PLAN FOR ADDITIONAL INFO.
SEE INTERIOR ELEVATION FOR ADDITIONAL INFO.
SOLID SURFACE
SYNTHETIC PLASTER CEILING
SEE REFLECTED CEILING PLAN FOR ADDITIONAL INFO.
VINYL COMPOSITION TILE
WOOD
WOOD ATHLETIC FLOORING
WOOD PANELING
OAK HARDWOOD STAGE FLOORING
VWF VINYL WALL FABRIC
SVT SOLID VINYL TILE
AP-1
AP-2 24" X 24" "CERAMAGUARD" SQUARE EDGED LAY-IN
CMU-3 ACOUSTIC BLOCK - VENEER
CMU-4 GROUND FACE BLOCK
SVAF SHEET VINYL ATHLETIC FLOORING
WD GRL WOOD GRILLE SYSTEM
LS LIMESTONE
TC TERRA COTTA CLAY TILE PANEL SYSTEM
CMU-3A ACOUSTIC BLOCK - REINFORCED
AC CMU ACOUSTICAL CONCRETE MASONRY UNIT
AC CMU-2 FLUTED ACOUSTICAL CONCRETE MASONRY UNIT
TB TACKBOARDGWT GLAZED WALL TILE*
Ex EXISTING
FB FACE BRICK
FINISH SCHEDULE
FIRST FLOOR
SECOND FLOOR
ROOM
NUMBER
04.1
07.1
11.1
11.2
11.3
14.1
ROOM NAME
OFFICE
OFFICE
OFFICE
STAFF
TLT
STOR
WOMEN
HALL
HALL
CUST
MEN
OFFICE
RECEPTION
OFFICE
OFFICE
OFFICE
SERVICE / REPAIR
OFFICE
PARTS
WASH
ELEC
STOR
STOR
HALL
SERVICE / REPAIR
SERVICE / REPAIR
EQUIPMENT
PARTS MEZZ
FLOOR
FIN
Ex
CARP T
CARP T
HDT / RES
CMT RES
HDT
CMT /
RES
RT
RT
HDT
CMT /
RES
HDT
HDT
CARP T
CARP T
CARP T
ExCONC
HDT
ExCONC
ExCONC
ExCONC
ExCONC
ExCONC
ExCONC
ExCONC
ExCONC
ExCONC
ExWD
BASE
mat
Ex
RB
RB
RB /RES
CMT /
RES
RB
CMT /
RES
RB
RB
RB
CMT /
RES
RB
RB
RB
RB
RB
RB
hgt
4"
4"
4"
4"
4"
4"
4"
4"
4"
4"
4"
4"
4"
4"
4"
4"
WALLS
mat'l
CMU
CMU
CMU
CMU
CMU / GYP BD
CMU
CMU
CMU / GYP BD
CMU / GYP BD
CMU
CMU
CMU
CMU / WD PNL
CMU / WD PNL
CMU / WD PNL
CMU / WD PNL
CMU / BRK
CMU
CMU
CMU
CMU
CMU
CMU
CMU
CMU
CMU
CMU
CMU
fin
PNT
PNT
PNT
PNT
PNT
PNT
PNT
PNT
PNT
PNT
PNT
PNT
PNT
PNT
PNT
PNT
PNT
SPECIAL FINISHES
NORTH WALL
mat'l fin
EAST WALL
mat'l fin
SOUTH WALL
mat'l fin
WEST WALL
mat'l fin
CEILING
mat'l
AP-1
AP-1
AP-1
AP-2
AP-2
AP-1
AP-2
AP-1
AP-1
AP-1
AP-2
AP-1
AP-1
AP-1
AP-1
AP-1
EXP STRUCT
/ PNT
AP-1
EXP STRUCT
EXP STRUCT
AP-1
AP-1
AP-1
AP-1
EXP STRUCT
/ PNT
EXP STRUCT
/ PNT
EXP STRUCT
/ PNT
EXP STRUCT
UL
Rating fin
FASCIA / SOFFITS
mat'l UL rating fin NOTES
SEE SCHEDULE
OF ALTERNATES
SEE SCHEDULE
OF ALTERNATES
SEE SCHEDULE
OF ALTERNATES
SEE SCHEDULE
OF ALTERNATES
SEE SCHEDULE
OF ALTERNATES
SEE SCHEDULE
OF ALTERNATES
SEE SCHEDULE
OF ALTERNATES
SEE SCHEDULE
OF ALTERNATES
ROOM
NUMBER
04.1
07.1
11.1
11.2
11.3
14.1
13A
14A
14B
15A
15B
15B
15D
16A
17A
18A
19A
20A
20B
20C
20D
20E
20F
21A
21B
21C
21D
21D
22A
22B
ExHM
ExHM
ExHM
ExHM
ExHM
ExSTL
ExSTL
ExHM
ExHM
ExHM
ExHM
ExHM
ExSTL
ExSTL
ExSTL
ExSTL
ExHM
ExHM
ExHM
ExSTL
ExHM
ExSTL
ExHM
ExHM
5 3/4"
5 3/4"
5 3/4"
5 3/4"
5 3/4"
0"
0"
5 3/4"
5 3/4"
5 3/4"
5 3/4"
5 3/4"
0"
0"
0"
0"
5 3/4"
5 3/4"
5 3/4"
0"
5 3/4"
0"
5 3/4"
5 3/4"
II
ExHM
ExHM
ExHM
ExHM
ExHM
ExSTL
ExSTL
ExHM
ExWD
ExWD
ExHM
ExHM
ExSTL
ExSTL
ExSTL
ExSTL
ExHM
ExHM
HM
ExSTL
ExHM
ExSTL
ExHM
ExHM
(2) 3'-0" x 6'-10"
3'-0" x 7'-0"
3'-0" x 2'-0"
3'-0" x 6'-10"
3'-0" x 6'-10"
12'-0" x 15'-6"
12'-0" x 15'-6"
3'-0" x 7'-0"
(2) 2'-6" x 7'-0"
3'-0" x 6'-10"
3'-0" x 6'-10"
3'-0" x 7'-0"
12'-0" x 15'-6"
12'-0" x 15'-6"
12'-0" x 15'-6"
12'-0" x 15'-6"
3'-0" x 7'-0"
3'-0" x 7'-0"
3'-0" x 7'-0"
12'-0" x 15'-6"
3'-0" x 7'-0"
12'-0" x 15'-6"
3'-0" x 7'-0"
3'-0" x 7'-0"
NO WORK
NO WORK
NO WORK
NO WORK
NO WORK
OVERHEAD DOOR
OVERHEAD DOOR
NO WORK
NO WORK
NO WORK
NO WORK
NO WORK
OVERHEAD DOOR; NO WORK
OVERHEAD DOOR; NO WORK
OVERHEAD DOOR; NO WORK
OVERHEAD DOOR; NO WORK
NO WORK
NO WORK
PNT & PREPARE FRAME FOR HARDWARE
OVERHEAD DOOR; NO WORK
NO WORK
OVERHEAD DOOR; NO WORK
NO WORK
NO WORK
13A
14A
14B
15A
15B
15B
15D
16A
17A
18A
19A
20A
20B
20C
20D
20E
20F
21A
21B
21C
21D
21D
22A
22B
DOOR SCHEDULE
DOOR
NUMBER
FRAME
elev mat size jamb jamb head glaz
DOOR
type mat size Louver glazing
UL
label sill ADA Sign REMARKS DOOR
NUMBER
S1 M1
6"6"
PARTITION TYPE GENERAL NOTES:
1. # DENOTES NOMINAL SIZE OF FRAMING OR MASONRY UNIT.
2. SEE INTERIOR ELEVATIONS AND FINISH SCHEDULE FOR FINISHES.
3. 5/8" TYPE X (UNLESS INDICATED OTHERWISE) GYPSUM BOARD SHALL BE USED IN CEILINGS, SOFFITS, FASCIAS, AND BULKHEADS CONSTRUCTION.
4. 1/2" BACKER BOARD SHALL BE USED IN WET LOCATIONS OR AS OTHERWISE INDICATED.
5. CERAMIC WALL TILE TO STOP AT THE CEILING / CEILING TRIM IN ROOMS W/ ACOUSTIC TILE OR GYPSUM BOARD CEILINGS. IN ROOMS WITH WOOD
GRILLE CEILING SYSTEM, CERAMIC WALL TILE SHALL EXTENDS PAST BOTTOM OF CEILING AS INDICATED ON THE CONSTRUCTION DOCUMENTS.
STEEL STUD RUNNER
STEEL STUD
DEFLECTION TRACK
LINE OF FINISHED
CEILING - SEE RCP
1/2" BACKER BOARD OR
5/8" GYP BOARD AND
FINISHES AS
SCHEDULED
REINFORCING PER
STRUCTURAL DRAWINGSSTEEL STUDS #
CMU # AND FINISHES AS
SCHEDULED
FLOOR STRUCTURE
UNDERSIDE FLOOR OR
ROOF STRUCTURE
LINE OF FINISHED
CEILING - SEE RCP
NON STRUCTURAL METAL STUD FRAMING NOTES:
1. FRAMING MEMBERS TO COMPLY WITH ASTM C754 AND AISI S220 FOR CONDITIONS INDICATED.
A. STEEL SHEET TO COMPLY WITH ASTM C645 REQUIREMENTS FOR METAL.
B. PROTECTIVE COATING TO COMPLY WITH ASTM A653, G40 HOT-DIP GALVANIZED ZINC COATING AS STANDARD WITH MANUFACTURER.
2. STEEL STUDS AND RUNNERS: ASTM C645, CONVENTIONAL MEMBERS, ROLL-FORMED INTO STANDARD SHAPES WITHOUT SURFACE DEFORMATIONS TO
STIFFEN FRAMING MEMBERS TO COMPLY WITH THE FOLLOWING FOR MINIMUM THICKNESS BASE (UNCOATED) METAL AND FOR DEPTH:
A. THICKNESS: 20 GA (18 MILS).
B. DEPTH: AS INDICATED.
3. SLOTTED DEFLECTION TRACK: ASTM C645 STEEL SHEET TOP TRACK; THICKNESS AND DEPTH TO MATCH / ACCOMODATE STUDS INDICATED.
4. U-CHANNEL: COLD- ROLLED, 0.0538-IN MINIMUM BASE-STEEL THICKNESS, W/ MIN 1/2" WIDE FLANGES.
5. FASTENERS OF TYPE, MATERIALS, SIZE, CORROSIVE RESISTANCE, HOLDING POWER REQUIRED TO FASTEN FRAMING AND FURRING MEMBERS SECURELY TO
SUBSTRATES; SHALL COMPLY WALLBOARD OR BACKER BOARD MFR RECOMMENDATIONS FOR APPLICATIONS INDICATED.
6. ISOLATION STRIPS: ASTM D226, TYPE I (#15 ASPHALT FELT), NON-PERFORATED.
7. INSTALL STEEL FRAMING TO COMPLY WITH ASTM C754.
8. INSTALL FRAMING AND ACCESSORIES PLUMB SQUARE AND TRUE TO LINE, W/ CONNECTIONS SECURELY FASTENED.
9. INSTALL SUPPLEMNTARY FRAMING, BLOCKING AND BRACING AT TERMINATIONS IN THE WORK AND FOR SUPPORT OF FIXTURES, EQUIOPMENT SERVICES, HEAVY TRIM, GRAB BARS, TOILET ACCESSORIES, FURNISHING AND SIMILAR CONSTRUCTION INDICATED AND PER WALLBOARD OR BACKER BOARD MFR
RECOMMENDATIONS.
10.INSTALL TRACKS AT FLOORS AND OVERHEAD SUPPORTS. EXTEND PARTITION FRAMING FULL HEIGHT TO STRUCTURAL SUPPORTS ABOVE CEILING UNLESS OTHERWISE INDICATED. CONTINUE FRAMING AROUND DUCTS PENETRATING PARTIIONS ABOVE CEILING.
11. WHERE STUDS ARE INSTALLED AGAINT EXTERIOR MASONRY OF DISSIMILAR METALS, INSTALL ISOLATION STRIPS BTW STUDS AND SUBSTRATE.
12. INSTALLATION TOLERANCE: INSTALL EACH FRAMING MEMBER SO FASTENING SURFACES VARY NOT MORE THAN 1/8" FROM PLANE FORMED BY FACES OF
ADJACENT MEMBERS.
BOND BEAM
PLAN
NORTH
SCALE: 1/8" = 1'-0" 1FIRST FLOOR PLAN
SCALE: 1/8" = 1'-0" 2PARTIAL SECOND FLOOR PLAN
SCALE: 1' = 1'-0" 4DOOR SCHEDULE
SCALE: 1/4" = 1'-0" 3DOOR AND FRAME TYPES
SCALE: 1' = 1'-0" 5FINISH SCHEDULE
NOT TO SCALE
6PARTITION TYPES
A102
1226 Union Boulevard
(610) 437-9626
(610) 437-4769
Tel Fax
BRESLIN ARCHITECTS
DRAWN
Allentown, Pennsylvania 18109
MKA / SJB
DESIGNED
CHECKED
SHEET NO.
COMMISSION NO.
DATE
SCALE
03/09/2026
AS NOTED
NO. BY YYYY.MM.DD REVISION
SWIFTWATER, MONROE COUNTY, PENNSYLVANIA
POCONO MOUNTAIN SCHOOL DISTRICT-
EAST TRANSPORATION BUILDING ALTERATIONS
Tel (610) 694-8020
SNYDER HOFFMAN ASSOCIATES
1005 West Lehigh Street Bethlehem, Pennsylvania 18018
MEP ENGINEERS
web: www.snyderhoffman.com REFL CEILING PLANS & ENLARGED PLANS
+8'-0"
+8'-0" +8'-0" +8'-0"
+8'-0"
+8'-6"
+8'-6"
+8'-6"
+8'-6" +8'-0" +8'-0"
+8'-0" +8'-0" +8'-0"
+8'-0"+8'-0"
+8'-0"
+8'-0"
EXP STRUCT
EXP STRUCT
EXP STRUCT
EXP STRUCT
EXP STRUCT
EXP STRUCT
EXP STRUCT
+18'-0"
+20'-6"
+20'-6"
OFFICE
HALL
07.1HALL
WOMEN
OFFICE
STORAGE
RECEPTION
11.1
OFFICE
11.4
OFFICE
11.3
OFFICE
11.2
SERVICE / REPAIR
TLT
04.1
STAFF
SERVICE / REPAIR
OFFICE
SERVICE / REPAIR
STOR
STOR
ELEC
EQUIPMENT
PARTS
OFFICE
WASH
OFFICE
HALL
MEN
A
B
C
1 2
A100
A600
ROOM TITLE &
NUMBER
OFFICE
REFLECTED CEILING
DETAIL
ACOUSTIC PANEL CEILING-
SEE FINISH SCHEDULE
FOR TYPE(S)
CEILING LEGEND
CEILINGS, SOFFITS -
GYPSUM WALLBOARD-
SEE FINISH SCHEDULE
RECESSED LIGHT
FIXTURES- SEE
ELECTRICAL
DRAWINGS FOR
TYPES
LINEAR RECESSED
LIGHT / COVE LIGHT
FIXTURES- SEE
ELECTRICAL DRAWINGS
FOR TYPES.
INDIRECT COVE LIGHT
FIXTURES- SEE
ELECTRICAL DRAWINGS
FOR TYPES
WALL MOUNTED LIGHT
FIXTURES - SEE
ELECTRICAL DRAWINGS
FOR TYPES
EXPOSED HVAC GRILLES -
SEE HVAC DRAWINGS
LINEAR SLOT DIFFUSER -
SEE HVAC DRAWINGS
EXPOSED STEEL LINTEL /
BEAM TO BE PAINTED
WOOD GRILLE SYSTEM
DETAIL NUMBER
SHEET NUMBER
PENDANT MOUNTED
LIGHT FIXTURES -
SEE ELECTRICAL
DRAWINGS FOR TYPES
CEILINGS, SOFFITS -
SYNTHETIC PLASTER
EIFS - SEE FINISH
SCHEDULE
STAGE EQUIPMENT -
SEE STAGE RIGGING
DRAWING
TYPICAL REVEAL /
CONTROL JOINT
(GYPSUM WALLBOARD
OR EIFS)
EXPOSED STEEL
STRUCTURE WITH
INTUMESCENT PAINT
ACOUSTICAL PLASTER
CEILING SYSTEM
SOFFIT / CEILING HEIGHT
ABOVE FINISH FLOOR
1. ALL ACOUSTIC PANEL CEILINGS ARE TO BE CENTERED IN
SPACES PROVIDED FOR PANEL CEILINGS WITH PANELS
EQUALLY CUT ON OPPOSITE SIDES UNLESS OTHERWISE
INDICATED ON THE DRAWINGS.
2. LIGHT FIXTURES ARE TO BE CENTERED IN EACH PANEL
UNLESS OTHERWISE INDICATED ON THE DRAWINGS. SEE
ELECTRICAL SPECIFICATIONS AND DRAWINGS FOR FIXTURE
TYPES AND SIZES.
7. ALL CONTROL JOINTS TO BE CONTINUOUS THROUGH, SOFFITS
AND FASCIA UNLESS NOTED OTHERWISE.
GENERAL REFLECTED
CEILING NOTES:
3. WHERE SURFACE MOUNTED LIGHT FIXTURES ARE USED,
ELECTRICAL CONTRACTOR SHALL CHECK THAT NO DOOR
SWING IS OBSTRUCTED BY ANY LIGHT FIXTURE, INCLUDING
EXIT SIGNS. ELECTRICAL CONTRACTOR SHALL NOTIFY
ARCHITECT PRIOR TO RELOCATING ANY LIGHT FIXTURE.
8. DETAILS, LEGENDS AND NOTES INDICATED ON THIS DRAWING
ARE TYPICAL FOR ALL REFLECTED CEILING PLANS.
4. REFER TO FINISH SCHEDULE FOR ALL CEILING TYPES .
5. REFER TO ELECTRICAL AND MECHANICAL DRAWINGs
FOR LIGHT FIXTURES AND DIFFUSERS NOT INDICATED
ON REFLECTED CEILING PLANS.
6. ALL SOFFIT AND FASCIA DIMENSIONS ON REFLECTED CEILING
PLANS ARE FINISH TO FINISH (UNLESS NOTED OTHERWISE).
4'x4' LAY-IN CEILING
ACOUSTIC SOUND
DIFFUSER PANEL
+14'-4" +12'-0"
C
EXP STRUCT
PARTS (UPPER)
PARTIAL
F
B
D
E
H C
8 A102
5' -2
2'
-1 0"
3' -9
5' -2
/2
3' -7
1'-4" 1'-4"
5' -1
1"
A
G
G
11A
09A
08A
F
B
D
E
H C
D
D
D
H
H
H
BE
6 A102
3' -9
2'
-1 1"
2' -1
1" 2'
-1 1"
1' -5
2'
-6
2' -6
2' -1
1" 2'
-1 1"
8' -8
1'-5"
5' -2
/2
A
G
A
G
A
03A06A
04.1A C
B
D
E
H
J K
L
M 9 A102
3' -9
1'-5"
5' -1
8'-1"
5' -2
/2
1' -1
0"
A
G
G
04A
H
EH
C B
K
B
G A A F
A
B
D
E
G
H
J
C
F
E
K
L
L
J
M
2' -6
3'-4"
6" 4'-0"
2' -7
2' -1
0"
1'-6"
3' -0
"35
3' -6
3' -6
3' -3
34"
3'-6" 4"
42" MIN.
2' -6
1' -1
0"
4' -0
" 5' -0
1' -6
PAPER TOWEL
DISPENSER
SANITARY
NAPKIN
DISPOSAL
B-354 - DOUBLE SIDED TO
MOUNT IN TOILET PARTITION
B-3544 - SINGLE UNIT TO
MOUNT SIDE WALL OF
SINGLE COMPATRMENT
ADA /
ACCESSIBLE
WATER CLOSET
ASSEMBLY
STANDARD
LAVATORY
STATION
ADA /
ACCESSIBLE
LAVATORY
STATION
SOAP
DISPENSER
TO
T
O P
O F
D
IS
P E
N S
IN
G
B U
TT
O
N
TO
T
O P
O F
D
IS
P E
N S
IN
G
O P
E N
IN
G
TO
B
O
TT
O M
O F
R E
LE
C
TI
V
E S
U R
FA
C
E
A
LI
G N
W
IT
H A
C C
E S
S
IB
LE
LA
V M
IR
R
O R
24" MIN TO 36" MAX
TO TP DISPENSER
OPENING
NOTE:
1. ALL ACCESSIBLE WATER CLOSETS SHALL HAVE FIXTURES AND ACCESSORIES INSTALLED IN COMPLIANCE WITH ANSI/ ICC A117-2009.
PAPER TOWEL DISPENSER
SANITARY NAPKIN DISPOSAL BOBRICK B-354 / B-3544 INSTALL IN GANG TOILETS
& SINGLE USER WHERE SHOWN
HAND SOAP DISPENSER
SEE FIXTURE AND
ACCESSORY ELEVATIONS
SYMBOL DESCRIPTION MFR MODEL # MOUNTING
HEIGHT REMARKS
TOILET ACCESSORY SCHEDULE
18" X 36" MIRROR
STRAIGHT GRAB BAR (42")
STRAIGHT GRAB BAR (18") SEE FIXTURE AND
ACCESSORY ELEVATIONS SATIN ENDS AND FLANGE
SATIN ENDS AND FLANGE
TOILET TISSUE DISPENSER
BOBRICK B-165-1836
BOBRICK B-5806 X 42"
STRAIGHT GRAB BAR (48") SATIN ENDS AND FLANGEBOBRICK B-5806 X 48"
SEE FIXTURE AND
ACCESSORY ELEVATIONS
SEE FIXTURE AND
ACCESSORY ELEVATIONS
SEE FIXTURE AND
ACCESSORY ELEVATIONS
SEE FIXTURE AND
ACCESSORY ELEVATIONS
SEE FIXTURE AND
ACCESSORY ELEVATIONS
30" TO BOT. OF DISPENSER
AT NON-ADA TOILETS
SEE FIXTURE AND
ACCESSORY ELEVATIONS
BOBRICK B-5806 X 18"
ADA BENCH SEAT
SUPPLIED BY OWNER
INSTALLED BY GC
ADA /
ACCESSIBLE
WATER CLOSET
ASSEMBLY
STANDARD
WATER
CLOSET
ADA / ACCESSIBLE
URINAL
STANDARD
URINAL
STANDARD
TOILET TISSUE
DISPENSER
SUPPLIED BY OWNER
INSTALLED BY GC
SUPPLIED BY OWNER
INSTALLED BY GC
COAT / STORAGE
COAT / STORAGE
GLARO - 8000B-SA-24
GLARO - 8000B-SA-78
STANDARD
COAT /
STORAGE
ADA /
ACCESSIBLE
COAT /
STORAGE
ADA /
ACCESSIBLE
BENCH
SEE FIXTURE AND
ACCESSORY ELEVATIONS
SEE FIXTURE AND
ACCESSORY ELEVATIONS
SEE FIXTURE AND
ACCESSORY ELEVATIONS
WB MANUFACTURING
LBSBKT20042
PEDESTAL BENCH SEAT N/AWB MANUFACTURING
LBSMP1260SS
STAINLESS STEEL BRACKETS
STAINLESS STEEL PEDESTALS
1'-3" 1'-7"1'-3"
AAA
G G F
1'-3" 1'-7"
A
G
F
1'-6"
F
1'-3" 1'-3"
A
G G
A
PLAN
NORTH
SCALE: 1/8" = 1'-0" 1FIRST FLOOR REFLECTED CEILING PLAN
SCALE: 1/8" = 1'-0" 2SECOND FLOOR REFLECTED CEILING
SCALE: 1/4" = 1'-0" 3ENLARGED PLAN: MEN 09
SCALE: 1/4" = 1'-0" 4ENLARGED PLAN: WOMEN 06
SCALE: 1/4" = 1'-0" 5STAFF 04, TLT 04.1
PLUMBING FIXTURE & ACCESSORY MOUNTING STANDARDS
SCALE: 1/4" = 1'-0" 6ELEVATION
SCALE: 1/4" = 1'-0" 9ELEVATION
SCALE: 1/4" = 1'-0" 7ELEVATION
SCALE: 1/4" = 1'-0" 8ELEVATION
ENLARGED PLAN:
DRAWN
DESIGNED
CHECKED
SHEET NO.
COMMISSION NO.
DATE
SCALE
NO. BY YYYY.MM.DD REVISION
SWIFTWATER, MONROE COUNTY, PENNSYLVANIA
POCONO MOUNTAIN SCHOOL DISTRICT-
EAST TRANSPORATION BUILDING ALTERATIONS
03/09/26
HOT WATER (H)
GAS (G)
HOT WATER RETURN (R)
TEMPERED WATER (T)
GAS (G 2psi)
COLD WATER (C)
WATER PIPING
LEGEND
VENT (V)
RAINWATER (RW)
CONDENSATE DRAIN (CD)
SANITARY (SAN)
WASTE (W)
DRAIN (D)
STORM WATER (ST)
DRAINAGE PIPING
LEGEND
COMPRESSED AIR (CA)
OIL SANITARY (OSAN)
AIR GAP FITTING
CLEANOUT - WALL CLEANOUT
FLOOR DRAIN - FUNNEL
FLOOR DRAIN - INDIRECT
FLOOR DRAIN - ROUND
FLOOR DRAIN - SQUARE
FLOOR SINK - FULL GRATE
FLOOR SINK - HALF GRATE
FLOOR SINK - NO GRATE
FLOOR SINK -3 4 GRATE
ROOF DRAIN - TYPICAL
ROOF DRAIN - EMERGENCY
PLUMBING DRAIN & VENT LEGEND
ADA SYMBOL
CONNECT TO EXISTING
DEMOLITION SYMBOL
CALLOUT TAG
DEMOLITION NOTE TAG
INVERT ELEVATION TAG
PLUMBING DRAWING NOTE TAG
PLUMBING FIXTURE TAG
CONSTRUCTION REVISION ITEM TAG
PLUMBING TAG LEGEND
FLOW ARROWS
PIPE CAP
PIPE CROSS
PIPE DROP
PIPE RISE
PIPE STACK
PIPE TEE RISE
PLUMBING MISC. PIPING LEGEND
DWG#
WCO
RD
ERD
ADDENDA REVISION ITEM TAG
CONSTRUCTION REVISION ITEM TAG#
PLUMBING/FIRE PROTECTION PIPING SPECIALTIES
LEGEND
ANCHOR - PIPE
VALVE - BALL VALVE - NORMALLY OPEN
VALVE - BALL VALVE - NORMALLY CLOSED
VALVE - BUTTERFLY VALVE
VALVE - CHECK VALVE
COMPRESSED AIR OUTLET
VALVE - CIRCUIT SETTER VALVE
VALVE - GAS COCK
GAS REGULATOR
VALVE - GATE VALVE
PRESSURE GAUGE W/VALVE
VALVE - GLOBE VALVE
GUIDE, PIPE
HOSE BIBB
MANUAL BALANCING VALVE
NON FREEZE WALL HYDRANT
VALVE - OS&Y VALVE
PRESSURE REGULATOR
RECIRCULATING PUMP
SHOCK ABSORBER
VALVE - SOLENOID VALVE
STRAINER
TEMPERING VALVE
THERMOMETER
UNION, PIPE
A
GA
G
TH
VALVE IN VERTICAL PIPING
BACKFLOW PREVENTER - DOUBLE CHECK ASSEMBLY
BACKFLOW PREVENTER - REDUCED PRESSURE ZONE
VENT THRU ROOF - TYPICAL
VENT THRU ROOF - ACID
EMERGENCY RAIN WATER OUTLET
CLEANOUT - FLOOR CLEANOUT
CLEANOUT - AB. CEILING CLEANOUT
EXPANSION FITTINGS
PIPE TEE DROP
CONTINUATION
FIXT
GREASE WASTE (GW)
GREASE SANITARY (GSAN)
PLUMBING GENERAL NOTES
1.
Provide all labor, material, and equipment required for the completion and operation of all systems specified within the Division 22 specification sections and Plumbing drawings of work in accordance with all applicable codes including but not limited to PA Uniform Construction Code (PA-UCC), International Plumbing Code (IPC), ICC/ANSI A117.1 - Accessible and Usable Buildings and Facilities, International Building Code (IBC), International Fuel Gas Code (IFGC). Verify the latest adopted code editions and any additional adopted amendments with the Local Authority Having Jurisdiction(AHJ) Prior to beginning work.
2.
Coordinate connection of all Water, Sewer, and Gas utility services with the associated Utility provider. Coordination includes but is not limited to: pre-installation verification of all required connection/ valving details, arrangements and performing of all required tests and inspections, supports/base pads for meter installation, and final service activation.
3. Provide a complete domestic water, gas and waste/vent systems to all fixtures and or equipment requiring such. verify all rough-in locations and coordinate piping locations with work under other divisions of the specifications to avoid conflicts.
4.
Provide all plumbing fixtures and appliances complete with all required supplies, stops, valves, faucets, drains, traps, tail pieces, escutcheons, etc. All fixture traps shall be semi-cast style, removable and/or provided with access for cleanout. All stops and shutoff valves shall be quarter turn style and installed in a readily accessible locations.
5. All plumbing fixtures, equipment, and materials shall be new and shall fit the space available. Verify dimensions at site are adequate prior to order of any materials.
6. All piping, apparatus, equipment, etc. shall be properly supported, braced vertically and horizontally in accordance with applicable codes and as required to prevent excessive movement during seismic conditions.
7. Do not scale the plans. See architectural plans for exact location of doors, windows, fixtures, wall dimensions, equipment, devices, etc. Coordinate exact locations of fixtures, equipment, specialties, and piping in field prior to rough-in.
8.
All valves, cleanouts, plumbing specialties, etc., shall be so located and installed to permit access for service without damage to building or finished materials. Where plumbing appurtenances are installed in inaccessible locations the P.C.
shall furnish access panels to the G.C. for installation in finished wall or ceiling construction to permit access.
9.
In addition to cleanouts indicated on the plumbing drawings, provide cleanouts at base of all waste and rainwater stacks, at all changes in direction of piping in excess of 45 degrees and every 50 feet. Floor cleanouts shall be installed flush with finished floor. All cleanouts shall be so located and installed to permit access for service without damage to building or finished materials, wall cleanouts shall be minimum 18" A.F.F. Wall cleanouts covers shall be stainless steel or where directed by architect provide primer painted steel cover plates to receive final painted finish, same as wall finish. (final paint by G.C.)
10.
All fixture trim, including faucets, flush valves, strainers, escutcheons, stops, drainage traps, tubular drainage piping or visible hangers shall be made of brass and shall be polished chrome plated. Plastic, zinc or white metal will not be acceptable. All tubular drain piping shall be min. 17 ga. thick or semi-cast chrome plated brass, with chrome plated brass nuts and escutcheons. All water supply connection tubing shall be flexible chrome plated copper with chrome plated commercial grade, quarter turn stops.
11. Drainage and vent piping systems, and water distribution piping systems shall be tested with air or water in accordance with IPC Section 312. Coordinate and schedule all required testing with local A.H.J. prior to testing.
12. Sanitize domestic water piping in accordance with IPC requirements, Local Health Department, and American Water Works Association's (AWWA) specifications. Provide Final reports and test results to Owner.
13. All domestic water piping shall be hung level without pitch unless noted otherwise on plans.
14.
Protect copper piping against contact with dissimilar metals. All hangers, supports, anchors, and clips shall be copper or copper plated. Where copper piping is carried on iron trapeze hangers with other piping, satisfactory and permanent electrolytic isolation material shall prevent contact with other metals.
15.
Protect copper piping against contact with all masonry. Where copper is sleeved through masonry, copper or red brass sleeves shall be used. Where copper must be concealed in or against masonry partitions, contact shall be prevented by coating the copper heavily with asphaltic enamel and #15 asphalt saturated felt between the pipe and the masonry partition.
16. Install piping in areas not subject to freezing temperatures. Water piping in exterior walls shall be installed on conditioned side of the wall insulation.
17. Provide shock absorbers, supplies and stops at each fixture as required by IPC and additionally as noted on the plans. All shock absorbers shall be installed in accessible locations.
18. Provide drain valves at all low points of domestic water piping systems for complete drainage and indicate location of same on record drawings.
19. Provide vacuum breakers as required by code.
20. Vent all plumbing fixture drains in accordance with all applicable codes.
21. Verify all fixture mounting heights with architectural interior elevations, schedules, etc. prior to fixture installation. Verify locations of Accessible fixtures and install in strict accordance with ICC/ANSI A117.1 requirements.
22.
Provide sleeves at all wall/floor penetrations. Coordinate sleeves with GC for installation in wall/floor construction. In exposed areas provide chrome plated escutcheons at pipe penetrations.
Seal all fire rated floor and wall penetrations with fire stopping materials as specified in the Div. 7 specifications. Where firestopping materials are not specified in Div. 7, provide firestopping materials U.L. listed for use and as manufactured by 3m or equal.
23. Shutoff valves installed in domestic water piping systems shall be ball valve style. Ball valves shall be furnished with full port design, blowout proof stem, insulated extension handles, and stainless steel or chrome plated ball.
24.
Insulate all domestic water piping as noted in Div. 22 specifications and in accordance with minimum thickness specified in IECC Section C404 and Table C403.11.3. Insulate all vertical and horizontal above slab rainwater and emergency rainwater piping as noted in Div. 22 specifications.
25. Seal all fixtures to walls, floor, counters, etc. using a sanitary-type one-part, mildew resistant, silicone sealant. match sealant color to fixture color.
26. Install all underground sanitary/storm piping at 2% slope unless noted otherwise).
27. Install all above ground waste, rainwater, emergency rainwater piping at 2% slope (unless noted otherwise).
28. Install all above ground vent piping at 1% slope (unless noted otherwise).
29. Install all above ceiling cleanouts in locations above accessible ceiling construction. Coordinate exact locations in field. No cleanouts shall be installed within plenum ceilings.
30.
Coordinate all equipment floor drain and floor sink locations with the work of all other trades and with associated equipment in filed prior to rough in. Coordinate all general area floor drains with architectural plans and with G.C. in field prior to rough-in.
31. Provide all floor drains with P-traps and trap seal protection. Provide mechanical trap seals as approved by IPC. Where required by local AHJ, provide trap primers and floor drains with threaded tap for primer connection.
32.
Install cleanouts to grade at all locations where storm and sanitary laterals exit building. Contractor shall coordinate required invert elevations with site contractor prior to installation, and make final connection to site Sanitary/Storm piping with all required fittings.
33.
Verify all "Accessible" toilet locations on Architectural plans. Installation of flushing lever actuator shall comply with ANSI A117.1 and shall be mounted on the accessible (wide) side of toilet areas no more than 44 inches above the finished floor.
Coordinate rough-ins of all supplies, flush valves, sensors, etc., to avoid conflict with grab bars or other toilet accessories.
34. All piping and materials installed within return air plenum spaces shall conform to the flame spread and smoke developed limits of ASTM E84 or must be wrapped with U.L. Listed plenum rated fireproofing material.
35.
In finished spaces with exposed structure, provide and install 1" thick "fiberglass insulation with all-service jacket" in lieu of insulation specified. Prep and paint pipe insulation in color selected by Architect. In finish spaces with exposed vertical insulated piping, provide stainless steel protective jacket to minimum 10ft. above finish floor.
36. All fixture trim, including faucets, strainers, escutcheons, stops, waste traps, visible waste piping or visible hangers shall be made of brass and shall be polished chrome plated. Plastic, zinc or white metal will not be acceptable.
37.
Install all horizontal and vertical piping in a neat arrangement in locations coordinated with the work of other trades. Vertical piping risers and drops to fixtures shall be coordinated and installed within chases, walls, soffits and coordinated with other mechanical / electrical feeds. All such locations are to be coordinated between all trades prior to installation. Locations requiring piping to be installed exposed in finished spaces shall be reviewed with the Owner Representative and Architect in field prior to installation.
38. Provide domestic water heater temperature / pressure relief valves with discharge piped full size to the nearest approved floor drain or waste receptor.
40. At all locations where indirect/special waste connections are indicted or called for by the plumbing drawings, the installation of such connections shall be in strict compliance with IPC Chapter 8.
41.
At all locations associated with fixtures, equipment, etc. which could discharge waste water in excess of 140F (Boiler Rooms, Commercial Kitchens, etc.), provide cast iron waste / sanitary piping (hub and spigot if below grade and no-hub if located above grade). Cast iron piping shall be installed minimum 25 ft. beyond the most downstream fixture connection.
43.
All rainwater and waste piping drops to below grade within the building shall start at minimum (-) 1’0” below finished floor elevation with the first elbow connection below bottom of floor slab (unless noted otherwise). Where floor cleanouts are provided minimum starting pipe elevation shall be (-) 1’6” (unless noted otherwise).
45.
All piping penetrations through exterior wall shall be sealed weathertight. Piping penetrations entering the building through foundation walls shall be sleeved and provided with Link Seal Thunderline annular space seals. Below slab piping penetrations though walls or wall footings shall be provided with sleeves that are minimum 2 nominal pipe sizes larger than the piping in accordance with IPC requirements.
46. Provide corrosion inhibiting epoxy paint and primer on all exterior gas piping. Clean and prep piping surface prior to application. Verify color to be used with architect prior to application.
PLUMBING ABBREVIATION LEGEND
AAC Above Accessible Ceiling G Gas
AFF Above Finished Floor G.C. General Contractor
AFG Above Finished Grade
AB Above
GV Gas Valve
H / HW Hot Water
H.C. Heating Contractor
HB Hose Bibb
HR Hose Reel
BF Below Floor
BFG Below Finished Grade
HWR / R Hot Water Return
BFP Backflow Preventer
I.E. / Inv. Invert Elevation
BV Balancing Valve
C / CW Cold Water
C.O. Clean Out
CA Compressed Air LAV Lavatory
LPG Liquid Petroleum Gas/Propane
MAX MaximumConn. Connection MIN MinimumCoord. Coordinate MR Mop ReceptorCTE Connect To Existing
NFWH Non-Freeze Wall Hydrant
NG Natural Gas
D Drain
NT Neutralizing Tank DBF Down Below Floor
OS Oil Sanitary
P.C. Plumbing Contractor
DN Down
DWG Drawing
DWH Domestic Water Heater
E.C. Electrical Contractor R Return Piping (Hot Water)
E.T.R. Existing To Remain RCP Re-circulating Pump
Ea. Each RD / ORD Roof Drain / Overflow Roof Drain
ES or EEW Emerg. Eyewash RW Rain Water
RWC Rainwater ConductorERD Emerg. Roof Drain
RWS Rain Water Stack
S.F./Sq. Ft. Square Foot
SA Shock Absorber
ETV Emerg. Tempering Valve
SAN Sanitary
EWC Electric Water Cooler
ST Storm
T.B.R. To Be Removed
FCO Floor Cleanout
TV Tempering Valve
FD Floor Drain
TYP. Typical
UR Urinal
V VentV.I.F. Verify In Field
V.T.R. Vent Through Roof
W Waste
WC Water Closet
WCO Wall Cleanout
(e) EXISTING PIPING
(n) NEW PIPING
SHOCK ABSORBER SCHEDULE
SIOUX CHIEF
PDI RATING FIXTURE
UNITS MODEL NUMBER
AA 1-3 660 Series
A 4 - 11 652-A / 6520-AS
B 12 - 32 653-B / 653-BS
C 33 - 60 654-C / 654-CS
D 61 - 113 655-D / 655-DS
E 114 - 154 656-E / 656-ES
F 155 - 330 657-F / 657-FS
SHOCK ABSORBER SCHEDULE
J.R. SMITH
PDI RATING FIXTURE
UNITS MODEL NUMBER
A 1 - 11 5005
B 12 - 32 5010
C 33 - 60 5020
D 61 - 113 5030
E 114 - 154 5040
F 155 - 330 5050
SHOCK ABSORBER SCHEDULE
ZURN
PDI RATING FIXTURE
UNITS MODEL NUMBER
A 1 - 11 10
B 12 - 32 200
C 33 - 60 300
D 61 - 113 400
E 114 - 154 500
F 155 - 330 600
NEMA NATIONAL ELECTRICAL MANUFACTURERS
ASSOCIATION
NFPA 13 NATIONAL FIRE PROTECTION ASSOCIATION -
STANDARD FOR THE INSTALLATION OF SPRINKLER
SYSTEMS; 2021 EDITION OR MOST RECENT EDITION
ADOPTED BY AUTHORITY HAVING JURISDICTION,
INCLUDING ALL APPLICABLE AMENDMENTS AND
SUPPLEMENTS.
NFPA 101 NATIONAL FIRE PROTECTION ASSOCIATION - CODE
FOR SAFETY TO LIFE FROM FIRE IN BUILDINGS AND
STRUCTURES; 2021 EDITION OR MOST RECENT
EDITION ADOPTED BY AUTHORITY HAVING
JURISDICTION, INCLUDING ALL APPLICABLE
AMENDMENTS AND SUPPLEMENTS.
REFERENCED DESIGN STANDARDS
PA - UCC PENNSYLVANIA UNIFORM CONSTRUCTION CODE;
IBC ICC - INTERNATIONAL BUILDING CODE; 2021
IFGC ICC - INTERNATIONAL FUEL GAS CODE; 2021
(LPG REQUIREMENTS SUPERCEDED BY THE REQUIREMENTS OF
PENNSYLVANIA'S PROPANE AND LIQUEFIED PETROLEUM GAS
ACT)
IMC ICC - INTERNATIONAL MECHANICAL CODE; 2021
IPC ICC - INTERNATIONAL PLUMBING CODE; 2021
IFC ICC - INTERNATIONAL FIRE CODE; 2021
(AS REFERENCED IN INTERNATIONAL BUILDING CODE)
IECC ICC - INTERNATIONAL ENERGY CONSERVATION CODE;
DESIGN CODE REFERENCES
P000
CX
CX AS NOTED
CX
W V C H
PLUMBING FIXTURES AND ROUGH-IN PLUMBING ROUGH - IN
P.C. SHALL FIELD VERIFY ALL ADA TOILET LOCATIONS. INSTALLATION OF FLUSHING LEVER ACTUATOR SHALL COMPLY WITH ANSI 117.1 FLUSH CONTROLS FOR FLUSH VALVES SHALL BE MOUNTED ON THE WIDE SIDE OF TOILET AREAS, NO MORE THAN 44 INCHES ABOVE THE FLOOR
See Specifications Refer to Architectural interior elevations for ADA requirements 1-1/2" 1/2" 1/2"
Women 06 Men 09
Locker 04 LAV-1 Vitreous China: White
FIXTURE
SYMBOL FIXTURE…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .