1-564-22 RFB 10-2026 Dwg Set.pdf
PDF 13 MB Posted
- Solicitation number
- US.258989
- Issued by
- Allegheny County, Pennsylvania
About this file
This is a drawing set for the Second Stage Final Clarifier Repairs project prepared by KLH Engineers, Inc. for the Pleasant Hills Authority in Allegheny County, Pennsylvania. The project involves the replacement of two clarifier drive assemblies and associated work at the Pleasant Hills Sewage Treatment Plant located at 628 Cochran Mill Road, Jefferson Hills, PA 15025. The drawings include a title sheet, existing site plan, photographs with notes and details, second stage clarifier plans, and a second stage clarifier section. Key components identified for work include the removal and replacement of clarifier drive assemblies, structural steel components, influent well assemblies, sludge withdrawal pipes, truss arm assemblies, primary drive assemblies with 12-inch worm gears, scum boxes, and joint sealants on both Second Stage Final Clarifier No. 1 and No. 2. Additional work involves blasting and coating of specified structural elements. The project is released for bid in October 2026, with sealed bids due November 24, 2026 at 10:00 a.m. via the PennBid Program. A mandatory pre-bid conference is scheduled for Thursday, November 12, 2026 at 10:00 a.m. at the treatment plant site. The expected project duration is 220 calendar days.
The drawing set emphasizes Pennsylvania underground utility line protection requirements, mandating that contractors notify all utility companies at least three working days prior to excavation through the Pennsylvania One Call System at 1-800-242-1776. Electrical work specifications require disconnection of power and control feeds to existing clarifier drives, reuse of existing conduit and wire for proposed clarifier drive installation without cable splicing, and full compliance with Division 16 specifications and applicable electrical codes. All work shown on photographs is noted as typical to each clarifier unit. The project site is located within the Lick Run Watershed (Chapter 93 - Trout Stocking Fishery) and requires coordination with multiple utility companies and regulatory agencies prior to construction commencement.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 2-564-22 2026-01 Bid Specs.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Drawing No.
Sheet No.
5313 Campbells Run Road, Suite 100 Pittsburgh, PA 15205
Phone: 412.494.0510 Fax: 412.494.0426 info@klhengineers.com
KLH
ENGINEERS, INCNOTE: IN ACCORDANCE WITH THE PENNSYLVANIA UNDERGROUND UTILITY LINE PROTECTION LAW, ACT 287 OF
1974 AS AMENDED BY ACT 50 OF 2017, THE CONTRACTOR MUST NOTIFY ALL UTILITY COMPANIES PRIOR TO EXCAVATION FOR FIELD LOCATION AND SIZE CONFORMATION. AT LEAST THREE (3) DAYS NOTIFICATION PRIOR TO THE ACTUAL START OF EXCAVATION IS REQUIRED. UTILITIES CAN BE NOTIFIED THROUGH THE
PENNSYLVANIA ONE CALL SYSTEM, INC. BY CALLING 1-800-242-1776. G1
Copyright © 2026 KLH Engineers, Inc., All Rights Reserved Worldwide.
No part of this document may be reproduced or transmitted in any form, by any means without written permission, except for brief excerpts in reviews or analysis.
TITLE SHEET
EXISTING SITE PLAN
PHOTOGRAPHS, NOTES & DETAILS
SECOND STAGE CLARIFIER PLAN
G1 C1 M1 M2 of 5
Order No.
DESCRIPTIONDWG. NO.SHEET NO.
DRAWING LIST
CONTRACT NO. 2026-02 GENERAL/MECHANICAL
SECOND STAGE FINAL CLARIFIER REPAIRS
564-22
CALL BEFORE YOU DIG!
PENNSYLVANIA LAW REQUIRES
3 WORKING DAYS NOTICE FOR
CONSTRUCTION PHASE
AND 10 WORKING DAYS
IN DESIGN STAGE-STOP CALL
1-800-242-1776
PE
NN
SY
LV
ANIA ONE CALL SYSTEM
, INC
STOP -CALL BEFORE YOU D
IG
RELEASED FOR BID
OCTOBER 2026
ALLEGHENY COUNTY, PENNSYLVANIA
PLEASANT HILLS AUTHORITY
SCALE: 1" = 2000'
PROJECT LOCATION
LOCATION MAP
N
SCALE: 1" = 2000'
5 of 5 M3
SECOND STAGE CLARIFIER SECTION
628 COCHRAN MILL ROAD
JEFFERSON HILLS, PA 15025
AutoCAD SHX Text S:\Active Clients\564 Pleasant Hills Authority\564-22 2nd Stage Final Clarifiers Survey\Dwg\G564-22-001.dwg 10/19/2026 10:29 AM Plotted By: Jason Antitomas 10/19/2026 10:29 AM Plotted By: Jason Antitomas10/19/2026 10:29 AM Plotted By: Jason Antitomas Plotted By: Jason AntitomasJason Antitomas
Lick Run
(Ch. 93 - T
SF)
Lick Run
(Ch. 93 - T
SF)
EXISTING UNDERGROUND ELECTRIC
EXISTING UNDERGROUND TELEPHONE
Legend
PA DOT INFORMATION
EXISTING SIGN
EXISTING LIGHTPOLE
EXISTING MAILBOX
EXISTING WELL
EXISTING 10' CONTOUR
EXISTING 2' CONTOUR
EXISTING PROPERTY LINE
EXISTING MONUMENT
EXISTING IRON PIN
EXISTING GAS VALVE
EXISTING GASLINE
EXISTING GAS CURB BOX
EXISTING GAS METER
EXISTING GRAVEL PAVING
EXISTING ASPHALT PAVING
EXISTING BUILDING
EXISTING STORM MANHOLE
EXISTING SANITARY MANHOLE
EXISTING EVERGREEN TREE
EXISTING DECIDUOUS TREE
EXISTING WATER CURB BOX
EXISTING WATERLINE
EXISTING STORM SEWER
EXISTING SANITARY SEWER
EXISTING HYDRANT
EXISTING GUY WIRE
EXISTING UTILITY POLE
EXISTING WATER METER
EXISTING WATER VALVE
EXISTING HEDGE ROW
EXISTING FENCE LINE
EXISTING SEPTIC TANK
STREET NAMES
EXISTING WATERCOURSE
PROPERTY OWNER INDEX (ALT)
EXISTING SANITARY CO
/ OBSERVATION PORT
EXISTING STORM INLETS
EXISTING GUIDE RAIL
Street Name
S.R XXXX
SEG. XXX
OFF. XXXX
Stream
AN
EXISTING GAS LINE MARKER
EXISTING TOP OF BANK
100YR FLOODPLAIN
50 FT FLOODWAY
Lic k R un Co ch ra n
M ill
R oa d
Wallace Road
Li ck
R un
C1
E X
IS
T
IN
G
S
IT
E P
LA
N
N
JM
G
K D
H G
G
JD
A
EXISTING CLARIFIERS SITE PLAN
SCALE: 1"=20'
Order No.
D es ig ne d B y:
C he ck ed B y:
A pp ro ve d
B y:
D at e:
Drawing No.
Sheet No.
C am pb el ls R un R oa d, S ui te
Pi tts bu rg h, P A
Ph on e:
.4
.0
Fa x:
.4
.0 in fo kl he ng in ee rs .c om
K L H
E N
G
IN
E E R
S
IN
C of 5Copyright © 2026 KLH Engineers, Inc., All Rights Reserved Worldwide
ITEMS IDENTIFIED WITH UPPER CASE TEXT ARE PROPOSED.
NOTE:
564-22
O ct ob er
S E
C O
N D
S T
A G
E F
IN
A
L C
LA
R
IF
IE
R R
E P
A
IR
S C
O N
T R
A C
T N
O . 2
6-
A
LL
E
G H
E N
Y C
O U
N T
Y , P
E N
N S
Y
LV
A N
IA
P
LE
A
S A
N T
H
IL
LS
A
U T
H O
R
IT
Y D ra w n B y:
D at e
Is su ed F or D at e
R ev is io ns
/2
R el ea se d
Fo r B id
SCALE: 1"=20'
20' 40'020'
OVERALL SITE PLAN
SCALE: 1"=150'
SCALE: 1"=150'
150' 300'0150'
AutoCAD SHX Text Asphalt Driveway
AutoCAD SHX Text Concrete Pad
AutoCAD SHX Text San Mh Top=899.97 Inv.El.=893.27(In) Inv.El.=893.27(In) 36" Inv.El.=893.27(Out)
AutoCAD SHX Text Gate
AutoCAD SHX Text
8" PVC
AutoCAD SHX Text Strm Pipe Outlet 8" Inv.El.=893.37(Out)
AutoCAD SHX Text Lawn
AutoCAD SHX Text Lawn
AutoCAD SHX Text Gabion Baskets
AutoCAD SHX Text N/F PLEASANT HILLS AUTH Tax Parcel 0769-G-00030-0000-01
AutoCAD SHX Text UV Building
AutoCAD SHX Text Conc. Sidewalk
AutoCAD SHX Text Conc. Wall
AutoCAD SHX Text Asphalt Driveway
AutoCAD SHX Text Concrete Pads
AutoCAD SHX Text Asphalt Driveway
AutoCAD SHX Text 2nd Stage Final Clarifier No.2
AutoCAD SHX Text 2nd Stage Final Clarifier No.1
AutoCAD SHX Text Return Sludge Pumping Station & Blower Building
AutoCAD SHX Text 2nd Stage Aeration Tanks No. 1,2,3 & 4
AutoCAD SHX Text Conc. Sidewalk
AutoCAD SHX Text Chain Link Fence
AutoCAD SHX Text Chain Link Fence
AutoCAD SHX Text Lawn
AutoCAD SHX Text Lawn
AutoCAD SHX Text Lawn
AutoCAD SHX Text Valve Chamber
AutoCAD SHX Text Chain Link Fence
AutoCAD SHX Text Chain Link Fence
AutoCAD SHX Text Chain Link Fence
AutoCAD SHX Text Plant Generator Building
AutoCAD SHX Text UV Building
AutoCAD SHX Text 2nd Stage Final Clarifier No.2
AutoCAD SHX Text w
AutoCAD SHX Text
S.R XXXX
AutoCAD SHX Text 2 Sty Brick Hse #555
AutoCAD SHX Text Septic Tank
AutoCAD SHX Text (Type Surface)
AutoCAD SHX Text Plant Generator Building
AutoCAD SHX Text UV Building
AutoCAD SHX Text 2nd Stage Aeration Tanks No.1,2,3 & 4
AutoCAD SHX Text Return Sludge Pumping Station & Blower Building
AutoCAD SHX Text 2nd Stage Final Clarifier No.2
AutoCAD SHX Text 2nd Stage Final Clarifier No.1
AutoCAD SHX Text Sludge Digester No.1
AutoCAD SHX Text Sludge Digester No.2
AutoCAD SHX Text Filter Building
AutoCAD SHX Text Primary Tanks No.1,2,3&4
AutoCAD SHX Text First Stage Aeration Tanks
AutoCAD SHX Text First Stage Final Clarifier No.1
AutoCAD SHX Text First Stage Final Clarifier No.2
AutoCAD SHX Text First Stage Final Clarifier No.5
AutoCAD SHX Text First Stage Final Clarifier No.4
AutoCAD SHX Text First Stage Final Clarifier No.3
AutoCAD SHX Text Maintenance Building
AutoCAD SHX Text Blower Building
AutoCAD SHX Text Equipment Building
AutoCAD SHX Text Items Identified with Mixed Case Text are Existing.
S:\Active Clients\564 Pleasant Hills Authority\564-22 2nd Stage Final Clarifiers Survey\Dwg\C564-22-001.dwg 10/16/2026 9:49 AM Plotted By: Jason Antitomas 10/16/2026 9:49 AM Plotted By: Jason Antitomas10/16/2026 9:49 AM Plotted By: Jason Antitomas Plotted By: Jason AntitomasJason Antitomas
M2-A
M2-A
REMOVE & REPLACE REMOVE & REPLACE
M 3-
H
M3-G
M 3-F
M 3-E
M3-A
M3-B
REMOVE & REPLACE
M3-C
M3-D
M 3-
I
M3-J
REMOVE & REPLACE
BLAST & COAT
BLAST & COAT
M3-K
REMOVE & REPLACE
REMOVE & REPLACE
REMOVE & REPLACE
REMOVE & REPLACE
REMOVE & REPLACE
REMOVE & REPLACE
REMOVE & REPLACE
REMOVE & REPLACE
M1
S E
C O
N D
F
IN
A L
C
LA
R
IF
IE
R
S P
LA
N
JM
G
K D
H G
G
JD
A
SECOND FINAL
CLARIFIERS PLAN M1-A
SCALE: 1/8" = 1'-0"
LEGEND
= ITEMS FOR DEMOLITION AND OR REMOVAL ON THIS DRAWING
Order No.
Drawing No.
Sheet No.
C am pb el ls R un R oa d, S ui te
Pi tts bu rg h, P A
Ph on e:
.4
.0
Fa x:
.4
.0 in fo kl he ng in ee rs .c om
K L H
E N
G
IN
E E R
S
IN
C of 5Copyright © 2026 KLH Engineers, Inc., All Rights Reserved Worldwide
ITEMS IDENTIFIED WITH UPPER CASE TEXT ARE PROPOSED.
NOTE:
D at e Is su ed
F or
D at e R ev is io ns
D es ig ne d B y:
C he ck ed B y:
A pp ro ve d
B y:
D at e:
564-22
O ct ob er
S E
C O
N D
S T
A G
E F
IN
A
L C
LA
R
IF
IE
R R
E P
A
IR
S C
O N
T R
A C
T N
O . 2
6-
A
LL
E
G H
E N
Y C
O U
N T
Y , P
E N
N S
Y
LV
A N
IA
P
LE
A
S A
N T
H
IL
LS
A
U T
H
IO
R
IT
Y D ra w n B y:
/2
R el ea se d
Fo r B id
MX-X
= PHOTOGRAPH LOCATION
SCALE: 1/8" = 1'-0"
048 4 826
= ITEMS FOR BLAST & COAT ON THIS DRAWING
AutoCAD SHX Text Second Stage Return Sludge Pumping Station & Blower Building
AutoCAD SHX Text Second Stage Final Clarifier No.1
AutoCAD SHX Text Second Stage Final Clarifier No.2
AutoCAD SHX Text 24" D.I. Effluent
AutoCAD SHX Text 24" D.I. Effluent
AutoCAD SHX Text 18" D.I. Sludge Return
AutoCAD SHX Text 18" D.I. Sludge Return
AutoCAD SHX Text 6" D.I. Waste Sludge Line Inv. El.888.02
AutoCAD SHX Text 8" D.I. Make-Up Line Inv. El.888.02
AutoCAD SHX Text 6" D.I. Waste Sludge Line Inv. El.888.02
AutoCAD SHX Text 8" D.I. Make-Up Line Inv. El.888.02
AutoCAD SHX Text 24" D.I. Effluent Inv. El. 887.41
AutoCAD SHX Text Walkway
AutoCAD SHX Text Aluminum Handrail
AutoCAD SHX Text Walkway
AutoCAD SHX Text Aluminum Handrail
AutoCAD SHX Text Direction Of Rotation
AutoCAD SHX Text Direction Of Rotation
AutoCAD SHX Text Clarifier Assembly
AutoCAD SHX Text Sludge Withdrawal Pipes (Typ.)
AutoCAD SHX Text Sludge Withdrawal Pipes (Typ.)
AutoCAD SHX Text Truss Arm Assembly, Flight & Squeegee
AutoCAD SHX Text Primary Drive Assembly & 12" Worm Gear
AutoCAD SHX Text Primary Drive Assembly & 12" Worm Gear
AutoCAD SHX Text Influent Well Assembly
AutoCAD SHX Text Influent Well Assembly
AutoCAD SHX Text Clarifier Assembly
AutoCAD SHX Text Scum Box
AutoCAD SHX Text Scum Box
AutoCAD SHX Text Flap Gate Valve (Typ. of 12)
AutoCAD SHX Text Flap Gate Valve (Typ. of 12)
AutoCAD SHX Text Joint Sealant (Typ.)
AutoCAD SHX Text Joint Sealant (Typ.)
AutoCAD SHX Text Joint Sealant (Typ.)
AutoCAD SHX Text Joint Sealant (Typ.)
AutoCAD SHX Text Joint Sealant (Typ.)
AutoCAD SHX Text Joint Sealant (Typ.)
AutoCAD SHX Text Joint Sealant (Typ.)
AutoCAD SHX Text Joint Sealant (Typ.)
AutoCAD SHX Text Items Identified with Mixed Case Text are Existing.
S:\Active Clients\564 Pleasant Hills Authority\564-22 2nd Stage Final Clarifiers Survey\Dwg\M564-22-001.dwg 10/19/2026 9:28 AM Plotted By: Jason Antitomas 10/19/2026 9:28 AM Plotted By: Jason Antitomas10/19/2026 9:28 AM Plotted By: Jason Antitomas Plotted By: Jason AntitomasJason Antitomas
REMOVE & REPLACE
REMOVE & REPLACE
BLAST & COAT
BLAST & COAT
BLAST & COAT
BLAST & COAT
M2
S E
C O
N D
F
IN
A L
C
LA
R
IF
IE
R
S E
C T
IO
N
JM
G
K D
H G
G
JD
A
= ITEMS FOR DEMOLITION AND OR REMOVAL ON THIS DRAWING
Order No.
Drawing No.
Sheet No.
C am pb el ls R un R oa d, S ui te
Pi tts bu rg h, P A
Ph on e:
.4
.0
Fa x:
.4
.0 in fo kl he ng in ee rs .c om
K L H
E N
G
IN
E E R
S
IN
C of 5Copyright © 2026 KLH Engineers, Inc., All Rights Reserved Worldwide
ITEMS IDENTIFIED WITH UPPER CASE TEXT ARE PROPOSED.
NOTE:
D at e Is su ed
F or
D at e R ev is io ns
D es ig ne d B y:
C he ck ed B y:
A pp ro ve d
B y:
D at e:
564-22
O ct ob er
S E
C O
N D
S T
A G
E F
IN
A
L C
LA
R
IF
IE
R R
E P
A
IR
S C
O N
T R
A C
T N
O . 2
6-
A
LL
E
G H
E N
Y C
O U
N T
Y , P
E N
N S
Y
LV
A N
IA
P
LE
A
S A
N T
H
IL
LS
A
U T
H
IO
R
IT
Y D ra w n B y:
/2
R el ea se d
Fo r B id
SECOND FINAL CLARIFIER NO.2
SECTION M2-A (TYPICAL TO EACH)
SCALE: 1/4" = 1'-0"
SCALE: 1/4" = 1'-0"
4' 8'04'
= ITEMS FOR BLAST & COAT ON THIS DRAWING
LEGEND
AutoCAD SHX Text Second Stage Final Clarifier No.2
AutoCAD SHX Text Clarifier
AutoCAD SHX Text Sludge Withdrawal Pipes (Typ.)
AutoCAD SHX Text El.911.00
AutoCAD SHX Text El.908.54
AutoCAD SHX Text Water Level El.908.02
AutoCAD SHX Text El.907.73
AutoCAD SHX Text El.905.67
AutoCAD SHX Text Primary Drive Assembly & 12" Worm Gear
AutoCAD SHX Text Spur Gear Drive Assembly
AutoCAD SHX Text Aluminum Handrail
AutoCAD SHX Text Bridge Assembly
AutoCAD SHX Text Scum Deflector
AutoCAD SHX Text Skimmer Boom
AutoCAD SHX Text Influent Well Assembly
AutoCAD SHX Text Clarifier Assembly (Typ.)
AutoCAD SHX Text Center Pier & Drive Cage
AutoCAD SHX Text Sight Box & Metal Sludge Pipes
AutoCAD SHX Text Scum Box
AutoCAD SHX Text Structural Steel
AutoCAD SHX Text Power & Control Conduits (Typ. of 3) (Shown Reflected)
AutoCAD SHX Text Bridge Mounted Light Post (Typ.)
AutoCAD SHX Text Items Identified with Mixed Case Text are Existing.
S:\Active Clients\564 Pleasant Hills Authority\564-22 2nd Stage Final Clarifiers Survey\Dwg\M564-22-002.dwg 10/16/2026 11:48 AM Plotted By: Jason Antitomas 10/16/2026 11:48 AM Plotted By: Jason Antitomas10/16/2026 11:48 AM Plotted By: Jason Antitomas Plotted By: Jason AntitomasJason Antitomas
M3
P H
O T
O G
R A
P H
S , N
O T
E S
D
E T
A
IL
S
JM
G
K D
H G
G
JD
A
Order No.
Drawing No.
Sheet No.
C am pb el ls R un R oa d, S ui te
Pi tts bu rg h, P A
Ph on e:
.4
.0
Fa x:
.4
.0 in fo kl he ng in ee rs .c om
K L H
E N
G
IN
E E R
S
IN
C of 5Copyright © 2026 KLH Engineers, Inc., All Rights Reserved Worldwide
ITEMS IDENTIFIED WITH UPPER CASE TEXT ARE PROPOSED.
NOTE:
D at e Is su ed
F or
D at e R ev is io ns
D es ig ne d B y:
C he ck ed B y:
A pp ro ve d
B y:
D at e:
564-22
O ct ob er
S E
C O
N D
S T
A G
E F
IN
A
L C
LA
R
IF
IE
R R
E P
A
IR
S C
O N
T R
A C
T N
O . 2
6-
A
LL
E
G H
E N
Y C
O U
N T
Y , P
E N
N S
Y
LV
A N
IA
P
LE
A
S A
N T
H
IL
LS
A
U T
H
IO
R
IT
Y D ra w n B y:
/2
R el ea se d
Fo r B id
SECOND STAGE FINAL CLARIFIERS
PHOTO NO.M3-A
SECOND STAGE FINAL CLARIFIERS
PHOTO NO.M3-B
SECOND STAGE FINAL CLARIFIERS
PHOTO NO.M3-C
SECOND STAGE FINAL CLARIFIERS
PHOTO NO.M3-D
SECOND STAGE FINAL CLARIFIERS
PHOTO NO.M3-K
SECOND STAGE FINAL CLARIFIERS
PHOTO NO.M3-G
SECOND STAGE FINAL CLARIFIERS
PHOTO NO.M3-E
SECOND STAGE FINAL CLARIFIERS
PHOTO NO.M3-I
SECOND STAGE FINAL CLARIFIERS
PHOTO NO.M3-F
SECOND STAGE FINAL CLARIFIERS
PHOTO NO.M3-J
SECOND STAGE FINAL CLARIFIERS
PHOTO NO.M3-H
BLAST & COAT
BLAST & COAT
BLAST & COAT
REMOVE & REPLACE
REMOVE & REPLACE
BLAST & COAT
BLAST & COAT
BLAST & COAT
REMOVE & REPLACE
BLAST & COAT
BLAST & COAT
REMOVE & REPLACE
REMOVE & REPLACE
ELECTRICAL NOTES:
1. CONTRACTOR SHALL DISCONNECT POWER AND CONTROL FEEDS TO
EXISTING CLARIFIER DRIVE.
2. ALL WIRING FOR THE PROPOSED CLARIFIER DRIVE SHALL BE INSTALLED
PER THE MANUFACTURERS REQUIREMENTS.
3. REUSE EXISTING CONDUIT AND WIRE FOR BOTH POWER AND CONTROL
FEEDERS TO THE PROPOSED CLARIFIER DRIVE. SPLICING OF FEEDER
CABLES IS NOT ACCEPTABLE.
4. ALL ELECTRICAL WORK REQUIRED FOR THE INSTALLATION OF THE
PROPOSED CLARIFIER DRIVE SHALL BE IN COMPLETE COMPLIANCE WITH
ALL STANDARDS AND CODES OUTLINED IN THE DIVISION 16
SPECIFICATIONS.
BLAST & COAT
BLAST & COAT
REMOVE & REPLACE
GENERAL NOTES:
1. WORK SHOWN ON PHOTOGRAPHS SHALL BE TYPICAL TO EACH CLARIFIER UNIT.
BLAST & COAT
BLAST & COAT
BLAST & COAT
BLAST & COAT
REMOVE & REPLACE
REMOVE & REPLACE
REMOVE & REPLACE
REMOVE & REPLACE
AutoCAD SHX Text Items Identified with Mixed Case Text are Existing.
AutoCAD SHX Text S:\Active Clients\564 Pleasant Hills Authority\564-22 2nd Stage Final Clarifiers Survey\Dwg\M564-22-003.dwg 10/19/2026 10:19 AM Plotted By: Jason Antitomas 10/19/2026 10:19 AM Plotted By: Jason Antitomas10/19/2026 10:19 AM Plotted By: Jason Antitomas Plotted By: Jason AntitomasJason Antitomas
AutoCAD SHX Text Sludge Withdrawal Pipes (Typ.)
AutoCAD SHX Text Truss Arm Assembly, Flight & Squeegee
AutoCAD SHX Text Walkway
AutoCAD SHX Text Aluminum Handrail
AutoCAD SHX Text Truss Arm Assembly, Flight & Squeegee
AutoCAD SHX Text Influent Well Assembly
AutoCAD SHX Text Primary Drive Assembly & 12" Worm Gear
AutoCAD SHX Text Center Pier & Drive Cage
AutoCAD SHX Text Sludge Withdrawal Pipes (Typ.)
AutoCAD SHX Text Center Pier Assembly
AutoCAD SHX Text Truss Arm Assembly, Flight & Squeegee
AutoCAD SHX Text Influent Well Assembly
AutoCAD SHX Text Primary Drive Assembly & 12" Worm Gear
AutoCAD SHX Text Influent Well Assembly
AutoCAD SHX Text Aluminum Handrail
AutoCAD SHX Text Sludge Withdrawal Pipes (Typ.)
AutoCAD SHX Text Truss Arm Assembly, Flight & Squeegee
AutoCAD SHX Text Influent Well Assembly
AutoCAD SHX Text Sludge Withdrawal Pipes (Typ.)
AutoCAD SHX Text Truss Arm Assembly, Flight & Squeegee
AutoCAD SHX Text Scum Deflector
AutoCAD SHX Text Primary Drive Assembly & 12" Worm Gear
AutoCAD SHX Text Influent Well Assembly
AutoCAD SHX Text Walkway
AutoCAD SHX Text Aluminum Handrail
AutoCAD SHX Text Primary Drive Assembly & 12" Worm Gear
AutoCAD SHX Text Sludge Withdrawal Pipes (Typ.)
AutoCAD SHX Text Truss Arm Assembly, Flight & Squeegee (Typ.)
AutoCAD SHX Text Scum Deflector
AutoCAD SHX Text Influent Well Assembly
AutoCAD SHX Text Sludge Withdrawal Pipes (Typ.)
AutoCAD SHX Text Walkway
AutoCAD SHX Text Structural Steel
AutoCAD SHX Text Scum Box
AutoCAD SHX Text Electrical & Control Conduits & Wires
AutoCAD SHX Text Structural Steel
AutoCAD SHX Text Structural Steel
AutoCAD SHX Text Drive Cage
AutoCAD SHX Text Flap Gate Valve (Typ.)
AutoCAD SHX Text Joint Sealant
AutoCAD SHX Text Sight Box
AutoCAD SHX Text Structural Steel
AutoCAD SHX Text Sludge Withdrawal Pipes (Typ.)
AutoCAD SHX Text Center Pier
AutoCAD SHX Text Drive Cage
AutoCAD SHX Text Flap Gate Valve (Typ.)
AutoCAD SHX Text Flap Gate Valve (Typ.)
AutoCAD SHX Text Flap Gate Valve (Typ.)
Flap Gate Valve (Typ.)
| Sheets and Views |
| 1 G564-22-001 - G1 |
| 2 C564-22-001 - C1 |
| 3 M564-22-001 - M1 |
| 4 M564-22-002 - M2 |
| 5 M564-22-003 - M3 |
File details come from the government source that posted it. Updated .