About this file

This is a Request for Bids (RFB) issued by the City of Princeton, Kentucky, for the construction and installation of reinforced concrete box culverts at two locations: N Franklin Street and N Hawthorne Street. The project involves the removal of existing damaged culverts and installation of new structures with associated site improvements including asphalt paving, concrete sidewalks, geotextile fabric, and channel lining. Sealed bids must be submitted online to the DFS Procurement Portal at dfs.bonfirehub.com no later than August 12, 2026 at 2:00 P.M. CST. Questions may be submitted through the Portal by August 10, 2026 at 5:00 P.M. Bids will be publicly opened on August 12, 2026 at 3:00 P.M. at the Princeton City Chamber, with contract award occurring at the City Council meeting on August 17, 2026 at 5:00 P.M. Work must be completed within 60 days of contract award, and all bid prices shall remain valid for 90 calendar days following submission.

Bidders must submit unit price bids for removal of existing culverts, installation of box culverts on both streets, concrete sidewalk installation (7 square yards), dense grade aggregate (32 tons), Class II asphalt base (83 tons), Class II asphalt surface (17 tons), geotextile fabric (579 square yards), Class II channel lining (750.5 tons), and mobilization/demobilization services. A bid guarantee of 10 percent of the total bid price is required in the form of a bid bond or other acceptable instrument. Contractors must provide proof of commercial general liability insurance ($2,000,000 aggregate/$1,000,000 per occurrence), comprehensive automobile liability ($1,000,000 per occurrence), and worker's compensation insurance with employer's liability coverage of $1,000,000 per occurrence. The contractor bears all project expenses including materials, labor, equipment, permits, and inspections. Work must comply with Kentucky Department of Highways 2019 Standard Specifications for Road and Bridge Construction. Payment is contingent upon work completion, submission of all required documentation including before/after photographs with GPS coordinates, quarry tickets or load counts, and debris disposal receipts, followed by approval by the Mayor and City Council. The City reserves the right to accept or reject any or all bids.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CITY OF PRINCETON, KENTUCKY

4860 – N FRANKLIN ST AND N HAWTHORNE ST – BOX CULVERT

INSTALLATION

REQUEST FOR BIDS

The City of Princeton (“City”) is seeking sealed bids for the construction of improvements made to the culvert on N Franklin St located at coordinates (37.11073, -87.87941) and the culvert on N Hawthorne St located at coordinates (37.11073, -87.87941). Construction will adhere to engineering designs included in this RFB.

BID SUBMISSION

Bids and all required documents must be submitted online to the DFS Procurement Portal (hereinafter “DFS Portal” or “Portal”) at dfs.bonfirehub.com no later than Wednesday, August 12, 2026 at 2:00 P.M., local time (CST).

Bids received after the due date and time will be considered non-responsive and will not be considered.

Questions regarding this RFB are to be submitted within the Portal at dfs.bonfirehub.com by August 10, 2026 at 5:00 PM. For questions regarding portal registration or navigation, please email: procurement@erassist.com.

Bids will be opened publicly August 12, 2026 at 3:00 PM at the Princeton City Chamber at 206 E. Market St., Princeton, KY 42445. The award will occur at the City of Princeton City Council meeting at 5:00 PM on August 17, 2026 at the Princeton City Chamber.

Submission of any bid signifies the Contractor’s agreement that their bid and the content thereof, are valid for ninety (90) calendar days following the submission deadline and will become part of the contract that is negotiated between the City of Princeton and the successful bidder. All prices submitted with the bid shall remain in effect for the ninety (90) day period.

Bidders must provide insurance policies in the DFS Procurement Portal showing proof of general and professional liability coverage upon submission.

Bidders shall submit a bid guarantee in the amount of 10% percent of the total bid price, which shall be in the form of a firm commitment such as a bid bond, postal money order, certified check, cashier’s check, or irrevocable letter of credit. Bid guaranteed other than bid bonds will be returned (a) to unsuccessful bidders after the opening of bids; and (b) to the successful bidder upon execution of such further contractual documents (i.e., insurance coverage) and bonds as may be required by the bid. Hard copies shall be delivered to the City of Princeton at 206 E. Market St., Princeton, KY 42445. Soft copies shall be uploaded to the DFS Procurement Portal.

4860 City of Princeton, KY 952869 N Franklin St. and N Hawthorne St .Page 1 https://www.google.com/maps/@37.1106842,-87.8793948,17z?entry=ttu&g_ep=EgoyMDI2MDcxNS4wIKXMDSoASAFQAw%3D%3D https://www.google.com/maps/place/37%C2%B006'31.6%22N+87%C2%B052'45.9%22W/@37.1036327,-87.8794604,15z/data=!4m4!3m3!8m2!3d37.10878!4d-87.87942?entry=ttu&g_ep=EgoyMDI2MDcxNS4wIKXMDSoASAFQAw%3D%3D http://dfs.bonfirehub.com http://dfs.bonfirehub.com mailto:procurement@erassist.com

GENERAL TERMS & INFORMATION

● All requested information fields in the Portal must be filled out to be considered a valid bid.

● Work is expected to be completed within 60 days of contract award.

● Work will not be considered complete until all invoice documents are provided and invoice validation is complete. Final invoice with all required documents must be provided in a single transmission (email or link to a dropbox, google drive, or other file sharing service). Multi-part transmission of invoice documentation will cause a delay in validation which will affect payment processing timelines and designation of completion.

● Project locations and site photos are provided in Appendix A of this RFB.

● Contractor shall be responsible for all expenses incurred while performing services under this Agreement. This includes automobile, truck, and other travel expenses; vehicle maintenance and repair costs; vehicle and other license fees and permits; insurance premiums; road, fuel, and other taxes; fines; radio, pager, or cell phone expenses; meals; and all salary, expenses, and other compensation paid to employees or contract personnel the Contractor hires to complete the work under this Agreement.

● The contractor will restore any landscaping, asphalt, concrete, etc. disturbed during construction to its original state or approved alternative. Any damage to the City’s property caused during construction will be repaired at the contractor’s expense.

● Contractors will be responsible for determining all requirements and permits needed to complete the reconstruction work and any associated components needed to ensure the proper, efficient, and safe completion of this project. The awarded contractor will also be responsible for obtaining any and all engineering approvals mandated and required by federal, state, or local codes or regulations. All permits, inspections, engineering approvals and associated requirements are the responsibility of the selected Contractor. Copies of required permits and approvals must be provided to the City upon receipt.

● This work is for a specific site/repair with quantities listed on a FEMA grant; as such documentation supporting the quantities must be provided (e.g. quarry tickets, or load counts/truck capacities). Invoices must list the haul off location of any debris, spoils, or waste (example: permitted landfill, recycling location, or road dept for reuse).

● Payment will follow only after work is completed, all documentation is received from the Contractor and reconciled by the Grants Management Team, and after approval by the Mayor and City Council. (Documentation to include items such as before/after photos (always required), quarry documentation, quantity documentation, and documentation of disposal).

● Successful bidders, assigns, and subcontractors must be compliant with all applicable Federal, State and Local laws.

● The City of Princeton reserves the right to accept or reject any or all bids. The right is also reserved to waive any minor irregularities in this bid, and to award the bid to the bidder whose offer is most advantageous to the City and in the best interests of the City.

● The City is an Equal Opportunity Employer. All companies, including women, minority, and veteran owned businesses are encouraged to submit a bid.

4860 City of Princeton, KY 952869 N Franklin St. and N Hawthorne St .Page 2

● Work can not start until the contract agreement is fully executed and the contractor has made contact with the City of Princeton to schedule work and work supervision/inspection.

● Work will follow all best construction practices. All work shall conform to Division 400 of the KY Department of Highways 2019 Standard Specifications for Road and Bridge Construction, which can be found at http://transportation.ky.gov/Construction/Pages/Kentucky-Standard-Specifications.aspx

● For Ditching Projects or culvert clean out projects. Earthen Material from Ditching or Culvert Clean Out may be worked into surrounding embankment at appropriate angles, especially in locations under which Channel Lining will be installed. Remaining Sediment or Earthen Material must be hauled to a government borrow pit (location/tickets/photos must be included on invoice) or hauled to a landfill. Debris must be hauled to a landfill. Landfill tickets are required to be submitted with an invoice.

● Invoices must include at least 4 Photos of “Before” and 4 Photos “After” work completion.

Photos must be taken with an app (such as Solocator or GPS Camera) that displays the GPS (and preferably road name) and date.

● If rock/aggregate or fill material is supplied as part of this work, the Invoice must list the quarry location of aggregate or the source location of the fill. If rock/aggregate is supplied from a third party, must provide documentation from the third party of the original location of the aggregate or fill. Third party documentation must be signed and submitted on third party letterhead.

● All specifications must meet engineering design requirements.

The following forms are provided in this RFB for reference. Bidders must review each form and enter their response as directed in the Portal’s Required Information section. The confirmation or declaration statement for each form for which a response is required is provided in a gray box at the bottom of each form in this document. All responses must be true and accurate and shall be considered the equivalent of a legally-binding electronic signature.

1. ATTACHMENT 1: Bid Certification and Cost Proposal Form

2. ATTACHMENT 2: Non-Collusion Declaration

3. ATTACHMENT 3: Certification Regarding Lobbying

4. ATTACHMENT 4: Form 200.321 Affirmative Steps

5. ATTACHMENT 5: Certification Regarding Debarment, Suspension, Ineligibility, and

Voluntary Exclusion

6. ATTACHMENT 6: Conflict/Non-Conflict of Interest Statement

7. ATTACHMENT 7: Drug-Free Workplace Affidavit

8. ATTACHMENT 8: Insurance Coverage Declaration

4860 City of Princeton, KY 952869 N Franklin St. and N Hawthorne St .Page 3 http://transportation.ky.gov/Construction/Pages/Kentucky-Standard-Specifications.aspx

Appendix A - SCOPE OF WORK - CULVERT REPLACEMENT

All specifications must meet engineering design requirements.

Scope of Work Current Site Standard Location

N Franklin Street - Box Culvert

1. Remove existing damaged non-bridge structure.

2. Install Reinforced Concrete Box Culvert (35’L x

14’W x 4.75’H), including excavation, erosion control, foundation preparation, concrete sealing.

3. Install 20 Tons of Dense Grade Aggregate (DGA) road base

4. Install 50 Tons of Class II Asphalt Base 1.00D

PG64-22

5. Install 10 Tons of Class II Asphalt Surface 0.38D

PG64-22

6. Install 7 Square Yards of Concrete Sidewalk - 4in.

7. Install 300 SY of Geotextile Fabric to embankment.

8. Install 390.39 Tons of Class II Channel Lining to armor embankment. (260’L x 10’W x 3’D)

N Franklin Street Engineer Design Requirements

GPS : 37.11073, -87.87941

4860 City of Princeton, KY 952869 N Franklin St. and N Hawthorne St .Page 4 https://erassist-files.s3.amazonaws.com/media/uploads/Princeton_FranklinCulvert_Final_RFC.pdf https://www.google.com/maps/place/37%C2%B006'38.6%22N+87%C2%B052'45.9%22W/@37.1102621,-87.8794245,17.51z/data=!4m4!3m3!8m2!3d37.11073!4d-87.87941?entry=ttu&g_ep=EgoyMDI2MDcxNS4wIKXMDSoASAFQAw%3D%3D

N Hawthorne Street - Box Culvert

1. Remove existing damaged non-bridge structure.

2. Install Reinforced Concrete Box Culvert (25’L x

11’W x 5’H), including excavation, erosion control, foundation preparation, concrete sealing.

3. Install 12 Tons of Dense Grade Aggregate (DGA) road base

4. Install 33 Tons of Class II Asphalt Base 1.00D

PG64-22

5. Install 7 Tons of Class II Asphalt Surface 0.38D

PG64-22

6. Install 279 SY of Geotextile Fabric to embankment

7. Install 360.36 Tons of Class II Channel Lining to armor embankment. (240’L x 10’W x 3’D)

N Hawthorne Street Engineer Design Requirements

GPS : 37.11073, -87.87941

4860 City of Princeton, KY 952869 N Franklin St. and N Hawthorne St .Page 5 https://erassist-files.s3.amazonaws.com/media/uploads/Princeton_HawthorneCulvert_Final_RFC.pdf https://www.google.com/maps/place/37%C2%B006'31.6%22N+87%C2%B052'45.9%22W/@37.1036327,-87.8794604,15z/data=!4m4!3m3!8m2!3d37.10878!4d-87.87942?entry=ttu&g_ep=EgoyMDI2MDcxNS4wIKXMDSoASAFQAw%3D%3D

ATTACHMENT 1: Bid Certification and Cost Proposal Form

Example: Box Culvert Installation Unit Cost Bid Form Unit pricing shall be all-inclusive and include all labor, equipment, material, and supply costs and shall not be increased or changed for any reason other than changes requested or approved by the City.

Description Unit of Measure Qty

Removal and Disposal of existing culverts EA 2

Provision and installation of all materials surrounding the installation of (35’L x 14’W x 4.75’H) concrete box culvert on N Franklin St including, including excavation, erosion control, foundation preparation, and concrete sealing.

Lump Sum 1

Provision and installation of all materials surrounding the installation of (25’L x 11’W x 5’H) concrete box culvert on N Franklin St including, including excavation, erosion control, foundation preparation, and concrete sealing.

Lump Sum 1

Provision and Installation of Concrete Sitewalk - 4 in. SY 7

Provision and Installation of Dense Grade Aggregate (DGA) road base TON 32

Provision and Installation of Class II Asphalt Base 1.00D PG64-22 TON 83

Provision and Installation of Class II Asphalt Surface 0.38D

PG64-22 TON 17

Provision and Installation of Geotextile Fabric to embankment

SY 579

Provision and Installation of Class II Channel Lining to armor embankment. TON 750.5

Mobilization/Demobilization and Traffic Control Lump Sum 1

4860 City of Princeton, KY 952869 N Franklin St. and N Hawthorne St .Page 6

ATTACHMENT 2: NON-COLLUSION DECLARATION

The bid is not made in the interest of, or on behalf of, any undisclosed person, partnership, company, association, organization, or corporation. The bid is genuine and not collusive or sham. The bidder has not directly or indirectly induced or solicited any other bidder to put in a false or sham bid. The bidder has not directly or indirectly colluded, conspired, connived, or agreed with any bidder or anyone else to put in a sham bid, or that anyone shall refrain from bidding. The bidder has not in any manner, directly or indirectly, sought by agreement, communication, or conference with anyone to fix the bid price of the bidder or any other bidder, or to fix any overhead, profit, or cost element of the bid price, or of that of any other bidder.

All statements contained in the bid are true. The bidder has not, directly or indirectly, submitted his or her bid price of any breakdown thereof, or the contents thereof, or divulged information or data relative thereto, to any corporation, partnership, company, association, organization, bid depository, or to any member or agent thereof to effectuate a collusive or sham bid, and has not paid, and will not pay, any person or entity for such purpose.

Any person executing this declaration on behalf of a bidder that is a corporation, partnership, joint venture, limited liability company, limited liability partnership, or any other entity, hereby represents that he or she has full power to execute, and does execute, this declaration on behalf of the bidder.

I declare under penalty of perjury under the applicable laws that the foregoing is true and correct.

DFS Portal Confirmation / Declaration:

Do you confirm that you have read the Non-Collusion declaration and therefore declare under penalty of perjury under the applicable laws that the Non-Collusion Declaration is true and correct? (Y/N)

4860 City of Princeton, KY 952869 N Franklin St. and N Hawthorne St .Page 7

ATTACHMENT 3: CERTIFICATION REGARDING LOBBYING

The undersigned certifies that, to the best of his or her knowledge and belief, that:

1. No Federally appropriated funds have been paid or will be paid, by or on behalf of the undersigned, to any person for influencing or attempting to influence an officer or employee of an agency, a Member of Congress, an officer or employee of Congress, or an employee of a Member of Congress in connection with the awarding of any Federal contract, the making of any Federal grant, the making of any Federal loan, the entering into of any cooperative agreement, and the extension, continuation, renewal, amendment, or modification of any Federal contract, grant, loan, or cooperative agreement.

2. If any funds other than Federally appropriated funds have been paid or will be paid to any person for influencing or attempting to influence an officer or employee of any agency, a Member of Congress, an officer or employee of Congress, or an employee of a Member of Congress in connection with this Federal contract, grant, loan, or cooperative agreement, the undersigned shall complete and submit Standard Form-LLL, “Disclosure Form to Report Lobbying,” in accordance with its instruction.

3. The undersigned shall require that the language of this certification be included in the award document for all subawards at all tiers (including subcontracts, subgrants, and contracts under grants, loans, and cooperative agreements) and that all subrecipients shall certify and disclose accordingly. This certification is a material representation of fact upon which reliance was placed when this transaction was made or entered into. Submission of this certification is a prerequisite for making or entering into this transaction imposed by section 1352, title 31 U.S.

Code. Any person who fails to file the required certification shall be subject to a civil penalty of not less than $10,000 and not more than $100,000 for each such failure.

The Contractor certifies or affirms the truthfulness and accuracy of each statement of its certification and disclosure, if any. In addition, the Contractor understands and agrees the provisions of 31 U.S.C. Chap 38, Administrative Remedies for False Claims and Statements, apply to this certification and disclosure, if any.

Do you, the Contractor, confirm that you have read the Certification Regarding Lobbying form and certify or affirm the truthfulness and accuracy of each statement of its certification and disclosure, if any. In addition, the Contractor understands and agrees that the provisions of 31 U.S.C. Chap. 38, Administrative Remedies for False Claims and Statements, apply to this certification and disclosure, if any. (True/False)

4860 City of Princeton, KY 952869 N Franklin St. and N Hawthorne St .Page 8

ATTACHMENT 4: FORM 200.321 AFFIRMATIVE STEPS

CONTRACTING WITH SMALL AND MINORITY BUSINESSES, WOMEN’S BUSINESS

ENTERPRISES, AND LABOR SURPLUS AREA FIRMS 2 CFR §200.321

The City of Princeton is required to take all necessary affirmative steps to assure that minority businesses, women's business enterprises, and labor surplus area firms are used when possible. If contractors (including engineers) use subcontractors, they are required to take the following affirmative steps:

● Place qualified enterprises on solicitation lists

● Assure that enterprises are solicited whenever they are potential sources

● Divide total requirements when economically feasible into smaller tasks or quantities to permit maximum participation by enterprises

● Establish delivery schedules, where the requirement permits, which encourage participation by enterprises

● Use the services and assistance, as appropriate, of such organizations as the Small Business Administration and the Minority Business Development Agency of the Department of Commerce

Do you confirm that you have read the 200.321 Affirmative Steps Confirmation and agree to take the listed affirmative steps when using subcontractors. (Y/N)

4860 City of Princeton, KY 952869 N Franklin St. and N Hawthorne St .Page 9

ATTACHMENT 5: CERTIFICATION REGARDING DEBARMENT, SUSPENSION,

INELIGIBILITY and VOLUNTARY EXCLUSION

Neither the entity or its principals are presently debarred, suspended, proposed for debarment, declared ineligible, or voluntarily excluded from participation by any federal department or agency.

Do you confirm that neither the entity nor its principals are presently debarred, suspended, proposed for debarment, declared ineligible, or voluntarily excluded from participation by any federal department or agency? (Y/N

4860 City of Princeton, KY 952869 N Franklin St. and N Hawthorne St .Page 10

ATTACHMENT 6: CONFLICT/NON-CONFLICT OF INTEREST STATEMENT

To the best of our knowledge the bidder has no potential conflict of interest due to any other clients, contracts, or property interest for this project. [ SELECT YES IF TRUE ]

OR

The bidder, by attachment, submits information which may be a potential conflict of interest due to other clients, contracts, or property interest for this project. [ SELECT NO IF TRUE &

UPLOAD DOCUMENTATION ]

Failure to answer appropriately may result in disqualification of your bid.

Do you confirm that to the best of your knowledge the undersigned proposer has no potential conflict of interest due to any other clients, contracts, or property interest for this project? (Y/N)

If answered no, documentation must be uploaded containing information regarding what may be a potential conflict of interest due to other clients, contracts, or property interest for this project.

4860 City of Princeton, KY 952869 N Franklin St. and N Hawthorne St .Page 11

ATTACHMENT 7: Drug-Free Workplace Affidavit

The undersigned certifies that the responding firm has taken steps to :

1. Publish a statement notifying employees that the unlawful manufacture, distribution, dispensing, possession, or use of a controlled substance is prohibited in the workplace and specifying the actions that will be taken against employees for violations of such prohibition.

2. Inform employees about the dangers of drug abuse in the workplace, the business's policy of maintaining a drug-free workplace, any available drug counseling, rehabilitation, and employee assistance programs, and the penalties that may be imposed upon employees for drug abuse violations.

3. Give each employee engaged in providing the commodities or contractual services that are proposed, a copy of the drug- free workplace statement.

4. In the statement specified in drug-free workplace statement, notify the employees that as a condition of working on the commodities or contractual services that are under bid the employee will abide by the terms of the statement and will notify the employer of any conviction of or plea of guilty or nolo contendere to any violation of any controlled substance law of the United States or any state for a violation occurring in the workplace no later than five (5) days after such conviction.

5. Impose a sanction on or require the satisfactory participation in a drug abuse assistance or rehabilitation program if such is available in the employee's community by any employee who is so convicted.

6. Make a good faith effort to continue to maintain a drug-free workplace through implementation of this section.

Do you confirm that you have read the Drug-Free Workplace Affidavit and certify that the responding company complies fully with the listed requirements? (Y/N)

If answered Yes, please upload Drug-free workplace policy

4860 City of Princeton, KY 952869 N Franklin St. and N Hawthorne St .Page 12

ATTACHMENT 8: INSURANCE COVERAGE DECLARATION

Contractor shall complete the form below and attach the following insurance policies (including all endorsements) to this proposal. Failure to do so, may result in a rejected Proposal.

1. Commercial General Liability – in the amount of two million dollars ($2,000,000.00) aggregate/one million dollars ($1,000,000.00) per occurrence. The General Aggregate limit shall either apply separately to the resulting Contractor or shall be at least twice the required occurrence limit.

2. Comprehensive Automobile and Water Vehicle Liability – covering any automotive equipment to be used in performance of the service, with a minimum limit in the amount of One Million Dollars ($1,000,000.00) per occurrence combined single limit / any auto.

Physical Damage Insurance covering owned or rented machinery, tools, equipment, office trailers, and vehicles.

3. Worker’s Compensation – Proposer shall provide a policy with employer’s liability coverage with limits of not less than One Million Dollars ($1,000,000.00) per occurrence for each accident or illness. The Worker’s Compensation policy shall state that it cannot be canceled or materially changed without first giving thirty (30) days prior notice thereof in writing to the City. Firms that have owner/operators that have filed a “Notice of Election to be Exempt” shall supply a signed copy of said notice. Any such exemption shall meet the requirements that qualify for an exemption under the applicable Worker’s Compensation law.

Do you confirm that you have read the Insurance Coverage Declaration and have provided copies of the insurance policies. (Y/N)

4860 City of Princeton, KY 952869 N Franklin St. and N Hawthorne St .Page 13

Appendix A - SCOPE OF WORK - CULVERT REPLACEMENT
ATTACHMENT 1: Bid Certification and Cost Proposal Form
ATTACHMENT 2: NON-COLLUSION DECLARATION
ATTACHMENT 3: CERTIFICATION REGARDING LOBBYING
ATTACHMENT 7: Drug-Free Workplace Affidavit
ATTACHMENT 8: INSURANCE COVERAGE DECLARATION

File details come from the government source that posted it. Updated .