This is a Request for Bids (RFB) issued by Letcher County Fiscal Court in Kentucky for culvert repair work across multiple sites. The project (736024) encompasses culvert repairs and replacements at 12 locations, including work such as unclogging and cleaning existing corrugated metal pipe (CMP) culverts, removing and replacing damaged culverts with high-density polyethylene (HDPE) pipe, installing geotextile fabric, crushed limestone backfill, dense graded aggregate (DGA) base, channel lining, and constructing pipe headwalls with wingwalls and aprons. The bid items total 15 line items covering quantities including 30 to 40 linear feet of culvert cleaning, 50 to 76 linear feet of culvert replacement in various diameters (18 inches to 52 inches), 189.61 tons of crushed limestone backfill, 476.64 square yards of geotextile fabric, 44.06 tons of DGA road base, 63.58 tons of channel lining, 170 linear feet of ditch cleaning and reshaping, and a lump sum for mobilization/demobilization and traffic control. Bids must be submitted through the DFS Procurement Portal by July 9, 2026, at 9:00 AM ET, with bids opened at 10:00 AM ET the same day at the Letcher County Judge Executive's Office in Whitesburg, Kentucky. Award will occur at a special Fiscal Court meeting on July 10, 2026, at 10:00 AM EST. Work must be completed by July 29, 2026.
All unit pricing must be all-inclusive of labor, equipment, materials, and supplies with no increases permitted except for county-approved changes. Contractors must provide copies of insurance and drug-free workplace policies and must comply with Division 400 of the Kentucky Department of Highways 2019 Standard Specifications for Road and Bridge Construction. Invoices require a minimum of four before and four after photographs taken with GPS-enabled applications, documentation of material sources and disposal locations, and all supporting documentation (quarry tickets, load counts, landfill tickets) submitted in a single transmission to avoid payment delays. Any contractor with overdue work for the county is ineligible for additional work until projects are completed. The county reserves the right to accept or reject any bids and reserves the right to seek clarification from bidders. Letcher County Fiscal Court is an Equal Opportunity Employer and encourages participation from minority, women, and veteran-owned businesses as well as hub-zone businesses.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Scope of Work
LETCHER COUNTY FISCAL COURT
PROJECT NAME: 736024 Culvert Damage Group 7 – Culvert Repair
Questions: email judgeadams@letchercounty.ky.gov and procurement@erassist.com
Responses are due no later than July 9, 2026; 9:00 AM ET.
Any contractor with overdue work for the county is ineligible for additional work from the county until overdue projects are completed.
Required Documents for Submission in DFS Procurement Portal:
Copy of Insurance Copy of Drug Free Workplace Policy
RESPONSE DELIVERY:
Bid and all required forms shall be submitted through the DFS Procurement Portal:
dfs.bonfirehub.com
Procurement Notes:
● All requested information must be filled out to be considered a valid bid.
● Bids and all required forms shall be submitted through the DFS Procurement Portal at dfs.bonfirehub.com/portal no later than July 9, 2026, 9:00 AM ET. Submissions received after the due date and time will be considered non-responsive and will not be considered.
● Bids will be opened on July 9, 2026, 10:00 AM ET at the Letcher County Judge Executive's
Office at 156 Main St. Suite 107, Whitesburg, KY 41858.
● Award will occur at a special call of the Letcher County Fiscal Court meeting on July 10, 2026 at 10:00 AM EST at 156 Main St. Suite 107, Whitesburg, KY 41858.
● WORK MUST BE COMPLETE BY JULY 29th 2026.
● Work will not be considered complete until all invoice documents are provided and invoice validation is complete. Final invoice with all required documents must be provided in a single transmission (email or link to a dropbox , google drive, or other file sharing service).
Multi-part transmission of invoice documentation will cause a delay in validation which will affect payment processing timelines and designation of completion.
● Work will follow all best construction practices. All work shall conform to Division 400 of the KY Department of Highways 2019 Standard Specifications for Road and Bridge Construction, which can be found at http://transportation.ky.gov/Construction/Pages/Kentucky-Standard-Specifications.aspx
4663 Letcher County Fiscal Court 736024 Culvert Damage Group 7 Page 1 mailto:judgeadams@letchercounty.ky.gov mailto:procurement@erassist.com http://dfs.bonfirehub.com http://transportation.ky.gov/Construction/Pages/Kentucky-Standard-Specifications.aspx
● For Ditching Projects or culvert clean out projects. Earthen Material from Ditching or Culvert Clean Out may be worked into surrounding embankment at appropriate angles, especially in locations under which Channel Lining will be installed. Remaining Sediment or Earthen Material must be hauled to a government borrow pit (location/tickets/photos must be included on invoice) or hauled to a landfill. Debris must be hauled to a landfill. Landfill tickets are required to be submitted with an invoice.
● Invoices must include at least 4 Photos of “Before” and 4 Photos “After” work completion.
Photos must be taken with an app (such as Solocator or GPS Camera) that displays the GPS (and preferably road name) and date.
● If rock/aggregate or fill material is supplied as part of this work, the Invoice must list the quarry location of aggregate or the source location of the fill. If rock/aggregate is supplied from a third party, must provide documentation from the third party of the original location of the aggregate or fill. Third party documentation must be signed and submitted on third party letterhead.
● This work is for a specific site/repair with quantities listed on a FEMA grant; as such documentation supporting the quantities must be provided (e.g. quarry tickets, or load counts/truck capacities). Invoices must list the haul off location of any debris, spoils, or waste (example: permitted landfill, recycling location, or road dept for reuse).
● Payment will follow only after work is completed, all documentation is received from the Contractor and reconciled by the Grants Management Team, and after approval by the Fiscal Court. (Documentation to include items such as before/after photos (always required), quarry documentation, quantity documentation, and documentation of disposal).
● Successful bidders, assigns, subcontractors must be compliant with all applicable Federal, State and Local laws.
● Letcher County reserves the right to accept or reject any and all bids. Letcher County reserves the right to seek clarification from bidders.
● Letcher County Fiscal Court is an Equal Opportunity Employer and encourages all qualified businesses to respond to this request, including minority, women, veteran owned businesses, as well as hub-zone businesses.
● Work can not start until the contract agreement is fully executed and the contractor has made contact with Letcher County Matt Amburgey at (606) 595-8710 to schedule work and work supervision/inspection.
4663 Letcher County Fiscal Court 736024 Culvert Damage Group 7 Page 2
Using Care to not destroy pavement or place equipment in water:
Site # Scope GPS /Map Picture
Dove Rd Site 1
1. Unclog and Clean 30 LF of 15 in Diameter
Corrugated Metal Pipe (CMP)
2. Clean and reshape 10 LF of roadside ditch on each side of culvert ( 20 LF Total)
3. Install 9.33 SY (12’ L x 7’W) of Geotextile Fabric on each side of culvert (18.67 SY Total)
4. Install 2.59 Tons (10’L x 5’W x 1’D) of Class II
Channel Lining to each side of culvert (5.19
Tons Total)
37.16891, -82.82494
4663 Letcher County Fiscal Court 736024 Culvert Damage Group 7 Page 3 https://www.google.com/maps/place/37%C2%B010'08.1%22N+82%C2%B049'29.8%22W/@37.1708381,-82.8269399,17z/data=!4m4!3m3!8m2!3d37.16891!4d-82.82494?entry=ttu
Great Oak Rd Site 5
1. Remove existing CMP Culvert and replace with
36 LF of 36 in Diameter HDPE culvert
2. Install 72 SY of Geotextile Fabric around culvert according to specifications
3. Install 45.86 Tons of Crushed Limestone
Backfill around culvert
4. Install 5.88 Tons of DGA Base on top of Culvert as road base.
5. Clean and Reshape 10 LF of roadside ditch at the culvert inlet
6. Install 9.33 SY (12’L x 7’W) of Geotextile Fabric to each end of Culvert (18.67 SY Total)
7. Install 2.59 Tons (10’L x 5’W x 1’D) of Class II
Channel Lining at culvert inlet
8. Install 3.89 Tons (10’L x 5’W x 1.5’D) of Class III
Channel Lining at culvert outlet
37.10788, -82.77447
4663 Letcher County Fiscal Court 736024 Culvert Damage Group 7 Page 4 https://www.google.com/maps/place/37%C2%B006'28.4%22N+82%C2%B046'28.1%22W/@37.1079655,-82.7744244,2847m/data=!3m1!1e3!4m4!3m3!8m2!3d37.10788!4d-82.77447?entry=ttu&g_ep=EgoyMDI2MDYyMy4wIKXMDSoASAFQAw%3D%3D
Emerson Drive Site 1
1. Remove existing Corrugated Metal Pipe (CMP)
Culvert and replace with 20 LF of 52 in
Diameter High Density Polyethylene (HDPE) culvert
2. Install 57.77 SY of Geotextile Fabric around culvert and rock bedding according to specifications
3. Install 35.22 Tons of Crushed Limestone
Backfill around the culvert.
4. Install 11.67 Tons of Dense Graded Aggregate
(DGA) Base on top of culvert as road base.
5. Install 54 in Diameter pipe culvert headwalls with wingwalls and apron to each end of culvert (2 Headwalls Total)
6. Install 2.75 SY of Geotextile Fabric to each end of the culvert (5.5 SY Total)
7. Install 1.75 Tons of Class II Channel Lining to each end of the culvert (3.5 Tons Total)
37.11140, -82.77763
4663 Letcher County Fiscal Court 736024 Culvert Damage Group 7 Page 5 https://www.google.com/maps/place/37%C2%B006'41.0%22N+82%C2%B046'39.5%22W/@37.1155295,-82.7764284,15.08z/data=!4m4!3m3!8m2!3d37.1114!4d-82.77763?entry=ttu
Driftwood Loop Site 2
1. Remove existing Culvert and replace with 20
LF of 24 in Diameter High Density Polyethylene
(HDPE) culvert
2. Install 26.67 SY of Geotextile Fabric around culvert and rock bedding according to specifications
3. Install 18.73 Tons of Crushed Limestone
Backfill around culvert.
4. Install 6.30 Tons of Dense Graded Aggregate
(DGA) Base under and around culvert
5. Clean and reshape 10 LF of roadside ditch on each side of culvert ( 20 LF Total)
6. Install 9.33 SY (12’ L x 7’W) of Geotextile Fabric on each side of culvert (18.67 SY Total)
7. Install 3.89 Tons (10’L x 5’W x 1.5’D) of Class III
Channel Lining to each side of culvert (7.78
37.12055, -82.84888
4663 Letcher County Fiscal Court 736024 Culvert Damage Group 7 Page 6 https://www.google.com/maps/place/37%C2%B007'14.0%22N+82%C2%B050'56.0%22W/@37.1209193,-82.8546957,15.5z/data=!4m4!3m3!8m2!3d37.12055!4d-82.84888?entry=ttu
Haymond Hill Rd Site 1
LF of 36in Diameter High Density Polyethylene
(HDPE) culvert
2. Install 40 SY of Geotextile Fabric around culvert and rock bedding according to specifications
3. Install 25.48 Tons of Crushed Limestone
Backfill around culvert
4. Install 8.4 Tons of Dense Graded Aggregate
(DGA) Base under and around culvert
5. Clean and reshape 10 LF of roadside ditch on each side of culvert ( 20 LF Total)
6. Install 9.33 SY (12’ L x 7’W) of Geotextile Fabric on each side of culvert (18.67 SY Total)
7. Install 3.89 Tons (10’L x 5’W x 1.5’D) of Class III
37.18663, -82.69820
4663 Letcher County Fiscal Court 736024 Culvert Damage Group 7 Page 7 https://www.google.com/maps/place/37%C2%B011'11.9%22N+82%C2%B041'53.5%22W/@37.1905944,-82.7057179,15.09z/data=!4m4!3m3!8m2!3d37.18663!4d-82.6982?entry=ttu
El paso Dr Site 1
1. Remove existing Culvert and replace with 16
LF of 18in Diameter High Density Polyethylene
(HDPE) culvert
2. Install 16 SY of Geotextile Fabric around culvert and rock bedding according to specifications
3. Install 12.43 Tons of Crushed Limestone
Backfill around culvert.
4. Install 1.11 Tons of Dense Graded Aggregate
(DGA) Base on top of culvert as road base.
5. Clean and reshape 10 LF of roadside ditch on each side of culvert ( 20 LF Total)
6. Install 9.33 SY (12’ L x 7’W) of Geotextile Fabric on each side of culvert (18.67 SY Total)
7. Install 3.89 Tons (10’L x 5’W x 1.5’D) of Class III
37.12878, -82.86425
4663 Letcher County Fiscal Court 736024 Culvert Damage Group 7 Page 8 https://www.google.com/maps/place/37%C2%B007'43.6%22N+82%C2%B051'51.3%22W/@37.1283577,-82.8705444,15.71z/data=!4m4!3m3!8m2!3d37.12878!4d-82.86425?entry=ttu
Flower Rd Site 4
1. Remove existing Culvert and replace with 18
LF of 18 in Diameter High Density Polyethylene
(HDPE) culvert
2. Install 16 SY of Geotextile Fabric around culvert and rock bedding according to specifications
3. Install 13.98 Tons of Crushed Limestone
Backfill around culvert.
4. Install 5.67 Tons of Dense Graded Aggregate
(DGA) Base on top of culvert as road base.
5. Clean and reshape 10 LF of roadside ditch on each side of culvert ( 20 LF Total)
6. Install 9.33 SY (12’ L x 7’W) of Geotextile Fabric on each side of culvert (18.67 SY Total)
7. Install 3.89 Tons (10’L x 5’W x 1.5’D) of Class III
37.13314, -82.87123
4663 Letcher County Fiscal Court 736024 Culvert Damage Group 7 Page 9 https://www.google.com/maps/place/37%C2%B007'59.3%22N+82%C2%B052'16.4%22W/@37.1301131,-82.8775686,15.25z/data=!4m4!3m3!8m2!3d37.13314!4d-82.87123?entry=ttu
Four Wheel Drive Site 3
1. Unclog and Clean 30 LF of 18 in Diameter
Corrugated Metal Pipe (CMP)
2. Clean and reshape 10 LF of roadside ditch on each side of culvert ( 20 LF Total)
3. Install 9.33 SY (12’ L x 7’W) of Geotextile Fabric on each side of culvert (18.67 SY Total)
4. Install 3.89 Tons (10’L x 5’W x 1.5’D) of Class III
37.19466, -82.87769
4663 Letcher County Fiscal Court 736024 Culvert Damage Group 7 Page 10 https://www.google.com/maps/place/37%C2%B011'40.8%22N+82%C2%B052'39.7%22W/@37.1944855,-82.8818781,16.25z/data=!4m4!3m3!8m2!3d37.19466!4d-82.87769?entry=ttu
Eagle Road Site 3
1. Remove existing Culvert and replace with 16
LF of 18in Diameter High Density Polyethylene
(HDPE) culvert
2. Install 16 SY of Geotextile Fabric around culvert and rock bedding according to specifications
3. Install 12.43 Tons of Crushed Limestone
Backfill around culvert.
4. Install 1.11 Tons of Dense Graded Aggregate
(DGA) Base on top of culvert as road base.
5. Clean and reshape 10 LF of roadside ditch on each side of culvert ( 20 LF Total)
6. Install 9.33 SY (12’ L x 7’W) of Geotextile Fabric on each side of culvert (18.67 SY Total)
7. Install 3.89 Tons (10’L x 5’W x 1.5’D) of Class III
37.17740, -82.82655
4663 Letcher County Fiscal Court 736024 Culvert Damage Group 7 Page 11 https://www.google.com/maps/place/37%C2%B010'38.6%22N+82%C2%B049'35.6%22W/@37.1773544,-82.8287405,16.5z/data=!4m4!3m3!8m2!3d37.1774!4d-82.82655?entry=ttu
Grays Branch Site 22
1. Unclog and Clean 40 LF of 24 in Diameter
Corrugated Metal Pipe (CMP)
2. Clean and reshape 10 LF of roadside ditch on each side of culvert ( 20 LF Total)
3. Install 9.33 SY (12’L x 7’W) of Geotextile Fabric to each end of Culvert (18.67 SY Total)
4. Install 2.59 Tons (10’L x 5’W x 1’D) of Class II
Channel Lining at culvert inlet
5. Install 3.89 Tons (10’L x 5’W x 1.5’D) of Class III
Channel Lining at culvert outlet
37.18629 -82.67249
4663 Letcher County Fiscal Court 736024 Culvert Damage Group 7 Page 12 https://www.google.com/maps/place/37%C2%B011'10.6%22N+82%C2%B040'21.0%22W/@37.18526,-82.6740564,17z/data=!4m4!3m3!8m2!3d37.18629!4d-82.67249?entry=ttu
Grays Branch Site 26
LF of 36in Diameter HDPE culvert
2. Install 40 SY of Geotextile Fabric around culvert and rock bedding according to specifications
3. Install 25.48 Tons of Crushed Limestone
Backfill around culvert.
4. Install 9.8 Tons of DGA Base on top of culvert as road base
5. Install 9.33 SY (12’ L x 7’W) of Geotextile Fabric on each side of culvert (18.67 SY Total)
6. Install 3.89 Tons (10’L x 5’W x 1.5’D) of Class III
Channel Lining to each side of culvert (7.78
37.18452 -82.67192
4663 Letcher County Fiscal Court 736024 Culvert Damage Group 7 Page 13 https://www.google.com/maps/place/37%C2%B011'04.3%22N+82%C2%B040'18.9%22W/@37.1869218,-82.676233,16z/data=!4m4!3m3!8m2!3d37.18452!4d-82.67192?entry=ttu
The following forms are provided in this RFB for reference. Bidders must review each form and enter their response as directed in the Portal’s Required Information section. The confirmation or declaration statement for each form for which a response is required is provided in a gray box at the bottom of each form in this document. All responses must be true and accurate and shall be considered the equivalent of a legally-binding electronic signature.
1. Attachment 1: Bid Certification and Cost Proposal Form
2. Attachment 2: NON-COLLUSION DECLARATION
3. Attachment 3: CERTIFICATION REGARDING LOBBYING
4. Attachment 4: FORM 200.321 AFFIRMATIVE STEPS
5. Attachment5: CERTIFICATION REGARDING DEBARMENT, SUSPENSION, INELIGIBILITY and VOLUNTARY EXCLUSION
6. Attachment 6: CONFLICT/NON-CONFLICT OF INTEREST STATEMENT
7. Attachment 7: DRUG-FREE WORKPLACE AFFIDAVIT
8. Attachment 8: INSURANCE COVERAGE DECLARATION
4663 Letcher County Fiscal Court 736024 Culvert Damage Group 7 Page 14
Attachment 1: Certification and Cost Proposal Form
Bidding Certification: I have carefully examined the Request for Bids and any other documents accompanying or made a part of this Request for Bids.
I hereby propose to furnish the goods or services specified in the Request for Bids at the rates quoted in my Bid. I agree that my Bid will remain in effect for a period of up to one hundred eighty (180) days.
I agree to abide by all conditions of this Bid l and understand that a background investigation may be conducted prior to award.
I certify that all information contained in this Bid is truthful to the best of my knowledge and belief. I further certify that I am duly authorized to submit this Bid on behalf of the Bidder as its act and deed and that the Bidder is ready, willing and able to perform if awarded the Contract.
I certify this Bid is made without prior understanding, agreement, connection, discussion, or collusion with any other person, firm or corporation submitting a Bid for the same product or service. I further certify that no officer, employee or agent of
County or of any other Bidder has a financial interest in this Bid. I further certify that the undersigned executed this Bidder's Certification with full knowledge and understanding of the matters therein contained and was duly authorized to do so.
DFS Portal Confirmation / Declaration:
By completing and submitting the Cost Proposal Form, you are certifying all of the above as well as the prices and data entered in the Cost Proposal Form in the DFS Portal. The following
Cost Proposal Form is provided for reference only.
4663 Letcher County Fiscal Court 736024 Culvert Damage Group 7 Page 15
Attachment 1: Certification and Cost Proposal Form
Total Quantity List
Unit pricing shall be all-inclusive and include all labor (including equipment programming), equipment, material, and supply costs and shall not be increased or changed for any reason other than changes requested or approved by the County.
Bid item
Description Unit of
Measure Appx Qty
1 Clean and Unclog 15 IN Diameter HDPE Culvert LF 30
2 Clean and Unclog 18 IN Diameter HDPE Culvert LF 30
3 Clean and Unclog 24 IN Diameter HDPE Culvert LF 40
Remove existing culvert and replace with 18 IN Diameter HDPE Culvert
LF 50
Remove existing culvert and replace with 24 IN Diameter HDPE Culvert
LF 20
Remove existing culvert and replace with 36 IN Diameter HDPE Culvert
LF 76
Remove existing culvert and replace with 52 IN Diameter HDPE Culvert
LF 20
Provision and Installation of Crushed Limestone Backfill
TON 189.61
9 Provision and Installation of Geotextile Fabric SY 476.64
10 Provision and Installation of DGA Road base TON 44.06
Provision and Installation of Class II Channel Lining
TON 6.09
Provision and Installation of Class III Channel Lining
TON 57.49
13 Clean and Reshape Ditch at Culvert Inlet/Outlet LF 170
Provision and Installation of 54 in Diameter pipe culvert headwalls with wingwalls and apron
EA 2
15 Mobilization/Demobilization and Traffic Control Lump Sum
4663 Letcher County Fiscal Court 736024 Culvert Damage Group 7 Page 16
Attachment 2: NON-COLLUSION DECLARATION
The bid is not made in the interest of, or on behalf of, any undisclosed person, partnership, company, association, organization, or corporation. The bid is genuine and not collusive or sham. The bidder has not directly or indirectly induced or solicited any other bidder to put in a false or sham bid. The bidder has not directly or indirectly colluded, conspired, connived, or agreed with any bidder or anyone else to put in a sham bid, or that anyone shall refrain from bidding. The bidder has not in any manner, directly or indirectly, sought by agreement, communication, or conference with anyone to fix the bid price of the bidder or any other bidder, or to fix any overhead, profit, or cost element of the bid price, or of that of any other bidder.
All statements contained in the bid are true. The bidder has not, directly or indirectly, submitted his or her bid price of any breakdown thereof, or the contents thereof, or divulged information or data relative thereto, to any corporation, partnership, company, association, organization, bid depository, or to any member or agent thereof to effectuate a collusive or sham bid, and has not paid, and will not pay, any person or entity for such purpose.
Any person executing this declaration on behalf of a bidder that is a corporation, partnership, joint venture, limited liability company, limited liability partnership, or any other entity, hereby represents that he or she has full power to execute, and does execute, this declaration on behalf of the bidder.
I declare under penalty of perjury under the applicable laws that the foregoing is true and correct.
Do you confirm that you have read the Non-Collusion declaration and therefore declare under penalty of perjury under the applicable laws that the Non-Collusion Declaration is true and correct? (Y/N)
4663 Letcher County Fiscal Court 736024 Culvert Damage Group 7 Page 17
Attachment 3: CERTIFICATION REGARDING LOBBYING
The undersigned certifies that, to the best of their knowledge and belief, that:
1. No Federal appropriated funds have been paid or will be paid, by or on behalf of the undersigned, to any person for influencing or attempting to influence an officer or employee of an agency, a Member of Congress, an officer or employee of Congress, or an employee of a Member of Congress in connection with the awarding of any Federal contract, the making of any Federal grant, the making of any Federal loan, the entering into of any cooperative agreement, and the extension, continuation, renewal, amendment, or modification of any Federal contract, grant, loan, or cooperative agreement.
2. If any funds other than Federal appropriated funds have been paid or will be paid to any person for influencing or attempting to influence an officer or employee of any agency, a Member of Congress, an officer or employee of Congress, or an employee of a
Member of Congress in connection with this Federal contract, grant, loan, or cooperative agreement, the undersigned shall complete and submit Standard Form-LLL, “Disclosure
Form to Report Lobbying,” in accordance with its instruction.
3. The undersigned shall require that the language of this certification be included in the award document for all subawards at all tiers (including subcontracts, subgrants, and contracts under grants, loans, and cooperative agreements) and that all subrecipients shall certify and disclose accordingly.
This certification is a material representation of fact upon which reliance was placed when this transaction was made or entered into. Submission of this certification is a prerequisite for making or entering into this transaction imposed by section 1352, title 31
U.S. Code. Any person who fails to file the required certification shall be subject to a civil penalty of not less than $10,000 and not more than $100,000 for each such failure.
Do you, the Contractor, confirm that you have read the Certification Regarding Lobbying form and certify or affirm the truthfulness and accuracy of each statement of its certification and disclosure, if any. In addition, the Contractor understands and agrees that the provisions of 31
U.S.C. Chap. 38, Administrative Remedies for False Claims and Statements, apply to this certification and disclosure, if any. (True/False)
4663 Letcher County Fiscal Court 736024 Culvert Damage Group 7 Page 18
Attachment 4: FORM 200.321 AFFIRMATIVE STEPS
CONTRACTING WITH SMALL AND MINORITY BUSINESSES, WOMEN’S BUSINESS
ENTERPRISES, AND LABOR SURPLUS AREA FIRMS §200.321
The County is required to take all necessary affirmative steps to assure that minority business, women's business enterprises, and labor surplus area firms are used when possible. If contractor uses subcontractors, they are also required to take the following affirmative steps:
1. Placing qualified enterprises on solicitation lists.
2. Assuring that enterprises are solicited whenever they are potential sources.
3. Dividing total requirements when economically feasible into smaller tasks or quantities to permit maximum participation by enterprises.
4. Establishing delivery schedules, where the requirement permits, which encourage participation by enterprises.
5. Using the services and assistance, as appropriate, of such organizations as the Small
Business Administration and the Minority Business Development Agency of the
Department of Commerce.
Do you confirm that you have read the 200.321 Affirmative Steps Confirmation and agree to take the listed affirmative steps when using subcontractors. (Y/N)
4663 Letcher County Fiscal Court 736024 Culvert Damage Group 7 Page 19
Attachment 5: CERTIFICATION REGARDING DEBARMENT, SUSPENSION, INELIGIBILITY and
VOLUNTARY EXCLUSION
Neither the entity or its principals are presently debarred, suspended, proposed for debarment, declared ineligible, or voluntarily excluded from participation by any federal department or agency.
Do you confirm that neither the entity nor its principals are presently debarred, suspended, proposed for debarment, declared ineligible, or voluntarily excluded from participation by any federal department or agency? (Y/N)
4663 Letcher County Fiscal Court 736024 Culvert Damage Group 7 Page 20
Attachment 6: CONFLICT/NON-CONFLICT OF INTEREST STATEMENT
To the best of our knowledge the bidder has no potential conflict of interest due to any other clients, contracts, or property interest for this project. [ SELECT YES IF TRUE ]
OR
The bidder, by attachment, submits information which may be a potential conflict of interest due to other clients, contracts, or property interest for this project. [ SELECT NO
IF TRUE & UPLOAD DOCUMENTATION ]
Failure to answer appropriately may result in disqualification of your bid.
Do you confirm that to the best of your knowledge the undersigned bidder has no potential conflict of interest due to any other clients, contracts, or property interest for this project?
(Y/N)
If answered no, documentation must be uploaded containing information regarding what may be a potential conflict of interest due to other clients, contracts, or property interest for this project.
4663 Letcher County Fiscal Court 736024 Culvert Damage Group 7 Page 21
Attachment 7: DRUG-FREE WORKPLACE AFFIDAVIT
The undersigned certifies that the responding firm has taken steps to :
1. Publish a statement notifying employees that the unlawful manufacture, distribution, dispensing, possession, or use of a controlled substance is prohibited in the workplace and specifying the actions that will be taken against employees for violations of such prohibition.
2. Inform employees about the dangers of drug abuse in the workplace, the business's policy of maintaining a drug-free workplace, any available drug counseling, rehabilitation, and employee assistance programs, and the penalties that may be imposed upon employees for drug abuse violations.
3. Give each employee engaged in providing the commodities or contractual services that are proposed, a copy of the drug- free workplace statement.
4. In the statement specified in drug-free workplace statement, notify the employees that as a condition of working on the commodities or contractual services that are under bid the employee will abide by the terms of the statement and will notify the employer of any conviction of or plea of guilty or nolo contendere to any violation of any controlled substance law of the United States or any state for a violation occurring in the workplace no later than five (5) days after such conviction.
5. Impose a sanction on or require the satisfactory participation in a drug abuse assistance or rehabilitation program if such is available in the employee's community by any employee who is so convicted.
6. Make a good faith effort to continue to maintain a drug-free workplace through implementation of this section.
I certify that this firm complies fully with the above requirements.
Do you confirm that you have read the Drug-Free Workplace Affidavit and certify that the responding company complies fully with the listed requirements? (Y/N)
- Upload the contractor's Drug Free Workplace Policy
4663 Letcher County Fiscal Court 736024 Culvert Damage Group 7 Page 22
| Attachment 1: Certification and Cost Proposal Form |
| Attachment 1: Certification and Cost Proposal Form |
| Attachment 2: NON-COLLUSION DECLARATION |
| Attachment 3: CERTIFICATION REGARDING LOBBYING |
| Attachment 4: FORM 200.321 AFFIRMATIVE STEPS |
| Attachment 5: CERTIFICATION REGARDING DEBARMENT, SUSPENSION, INELIGIBILITY and VOLUNTARY EXCLUSION |
| Attachment 6: CONFLICT/NON-CONFLICT OF INTEREST STATEMENT |
| Attachment 7: DRUG-FREE WORKPLACE AFFIDAVIT |
File details come from the government source that posted it. Updated .