1-260616 PPFFA Memorial Construction Plans.pdf

PDF 37 MB Posted

Attached to
Pennsylvania Professional Fire Fighters Association (PPFFA) Memorial Project
Solicitation number
US.242088
Issued by
Pennsylvania

About this file

This file contains construction plans and specifications for the Pennsylvania Professional Fire Fighters Association (PPFFA) Fallen Firefighters Memorial project located in Harrisburg, Dauphin County, Pennsylvania. The project encompasses site work including demolition, grading, concrete walks and plaza, memorial assembly installation, electrical work, and erosion control measures. Two separate contracts will be awarded: one for General Construction and one for Electrical Construction. Sealed proposals must be submitted online through the PennBid Program (www.PennBid.net) by 3:00 PM prevailing time on July 17, 2026, with public opening and reading of bids to follow. The construction plans include detailed specifications for site clearing, earth moving, concrete walks, foundation details, utility coordination, and temporary erosion and sediment control measures. The memorial assembly consists of granite pedestals, carved sculptures, pavers, benches, tablets, and a 30-foot aluminum flagpole with internal halyard system and lockable door.

Each bidder must submit a bid accompanied by cash, certified check, or bidder's bond equal to not less than ten percent (10%) of the proposal amount. The successful bidders will be required to execute a Non-Collusion Affidavit, enter into a contract with PPFFA, and furnish Performance and Labor and Material Bonds in the full amount of their respective bids. No bidder may withdraw their bid within 90 days after the actual date of opening. All applicable federal, state, and local laws and regulations governing prevailing wage determination and fair employment practices shall apply to the contracts. The contractor is responsible for all costs associated with construction layout performed by a qualified Pennsylvania-registered professional land surveyor, field quality control testing, utility coordination and notification, and compliance with Pennsylvania Underground Utility Protection Law and the ADA Standards for Accessible Design.

View the file

Other files

File Type Posted
2-260616 PPFFA Memorial Full Specification.pdf PDF
4-2026PrevailingWage.aspx.pdf PDF
3-2026PrevailingWage.aspx.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .