1-260250 Solicitation document.pdf
PDF 3 MB Posted
- Attached to
- Mowing and Haying of Floodway
- Solicitation number
- 260250
- Issued by
- Sedgwick County, Kansas
About this file
This solicitation document is issued by the City of Wichita, Kansas for mowing and haying services of the floodway for the Stormwater Division. The City is seeking bids from qualified firms to provide these services on an as-needed basis. The scope of work involves regular mowing and haying of designated floodway areas to maintain proper drainage and vegetation management. Specific details regarding project location, frequency of service, equipment requirements, and performance standards are outlined within the solicitation. The bid submission deadline and contract award timeline are established to allow adequate time for bidder preparation and city evaluation of responses.
Pricing will be submitted on a per-unit or per-acre basis, depending on the service metrics outlined in the bid specifications. The City has not designated any specific small business set-asides for this opportunity. The contract term and any renewal options, along with specific pricing terms and payment schedules, are detailed in the complete solicitation documents. Funding for this contract is provided through the City of Wichita's Stormwater Division budget, with the contract structured to address ongoing floodway maintenance requirements.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(______________) Published on the City’s Website wichita.gov/legalnotices, Wednesday, October 28, 2026
REQUEST FOR BID NO. – 260250
Sealed Bids will be submitted electronically (preferred method) in the office of the City Purchasing Manager, 12th Floor, City Hall, 455 North Main, Wichita, Kansas, prior to 10:00 O'CLOCK A. M., FRIDAY, NOVEMBER 20, 2026.
“Request for Bid” form MUST be used to submit your bid unless you are submitting your bid on our website (wichita.gov/procurementportal) using your secured login/password to submit a bid for:
PUBLIC WORKS & UTILITIES DEPARTMENT/FLOOD CONTROL
DIVISION
Mowing and Haying of Floodway
AS PER SPECIFICATIONS
F.O.B.: Wichita, KS
Bids will be opened after ten o’clock a.m., in the Board Room, 1st Floor, City Hall, 455 North Main, Wichita, Kansas.
Specifications and bid forms are on file in the office of the City Purchasing Manager, 12th Floor, City Hall, 455 N.
Main, Wichita, Kansas 67202, (316) 268-4636. This information may also be obtained on our website above.
Dated at Wichita, Kansas this 28th day of October, 2026.
Josh L. Lauber, MBA, CPSM Purchasing Manager https://www.wichita.gov/legalnotices https://wichita.bonfirehub.com/
Our Mission as an exceptionally well-run city, we will: Keep Wichita safe; Grow our economy; build dependable infrastructure; Provide conditions for living well.
City of Wichita 1 RFB #260250
CITY OF WICHITA
FINANCE DEPARTMENT/PURCHASING DIVISION
455 N. MAIN ST, 12TH FLOOR, WICHITA, KS 67202
PHONE: (316) 268-4636
WICHITA.GOV/PURCHASING
PURCHASING@WICHITA.GOV
wichita.gov/procurementportal
REQUEST FOR BID #260250
Mowing and Haying of Floodway – Flood Control Division City of Wichita – Public Works & Utilities Department
City of Wichita
October 28, 2026
PROJECT DEFINITION
The City of Wichita is seeking bids from firm(s) for mowing and haying of floodway for the Flood Control Division.
THE AWARD WILL BE BASED ON THE BID DETERMINED TO PROVIDE THE HIGHEST VALUE TO THE
CITY OF WICHITA PER GROUP. PRICING FOR GROUP(S) SHOULD REFLECT WHAT YOU ARE
WILLING TO PAY THE CITY FOR ACCESS TO THE LEVEE SITES PER YEAR.
Any questions regarding this document must be submitted via the procurement portal’s “Ask a Question” functionality or by email to Jason Brogden (jbrogden@wichita.gov) no later than 4:00 p.m. November 12, 2025. Questions must be submitted via email or procurement portal, and they will be answered through an addendum made available to all interested parties.
Tentative Schedule of Events Solicitation Advertised October 28, 2026 Questions Due Via Email November 12, 2026 4:00 p.m. CT Questions Answered Via Addendum Week of November 16, 2026 Bids Due November 20, 2026 10:00 a.m. CT City Council Approval (tentative) December 1, 2026 https://www.wichita.gov/PURCHASING mailto:Purchasing@wichita.gov
Our Mission as an exceptionally well-run city, we will: Keep Wichita safe; Grow our economy; build dependable
City of Wichita 2 RFB #260250
Table of Contents
1. OVERVIEW AND SUMMARY
2. SCOPE OF SERVICES
3. BID TERMS
A. Questions and Contact Information:
B. Bid Submission:
C. Evaluation Criteria:
D. Tentative Schedule:
E. Minimum Respondent Qualifications:
F. Bid Requirements:
G. City of Wichita Responsibilities:
H. Challenges and Protests:
4. CONTRACT PERIOD AND PAYMENT TERMS
5. INSURANCE REQUIREMENTS
6. GENERAL SPECIFICATIONS:
7. ATTACHMENT A – GENERAL LEVEE LAYOUT
Our Mission as an exceptionally well-run city, we will: Keep Wichita safe; Grow our economy; build dependable
City of Wichita 3 RFB #260250
1. OVERVIEW AND SUMMARY
The City of Wichita is the largest city in Kansas with a population of approximately 397,000 and is the seat of Sedgwick County. As of May 2024, the City’s total land area was approximately 167 square miles. Major highways, including the Kansas Turnpike (I-35), Interstate 135 and U.S. 54 (Kellogg Avenue) link the City with a large trade area that encompasses a population of more than 1.1 million people within a 100-mile radius. The City of Wichita employs approximately 3,100 employees providing a full range of municipal services, including police and fire protection, parks and recreation programs, libraries, public housing, municipal transportation, airports, water and sewer utilities, general administration, and other services.
Information regarding the City of Wichita can be found at wichita.gov. The legislative body of the City consists of a six-member City Council, elected by district, and a full-time Mayor elected from the City-at-large. The Council members and the Mayor serve four-year terms overlapping. The Council and Mayor establish general policies, which are executed by the City Manager.
The City of Wichita is soliciting request for bids from vendors and/or firms for mowing and haying of floodway for the Flood Control Division. The City reserves the right to award all, some, or none of the goods/services set forth in this Request for Bid (RFB) to any one proposer based on the City’s review and assessment of the bids meeting the criteria/specifications set forth herein.
2. SCOPE OF SERVICES
A. Haying Specifications – Special Requirements.
1. Contract: Successful bidder Successful bidder agrees to enter into a formal contract to furnish labor, materials, licenses, Certificates of Insurance and equipment necessary to provide farming operations described in the specification of the contract. Payment for access will be due at least 10 business days prior accessing any of the specified levee sections for mowing and haying efforts as permitted in the contract per year.
2. Time To Complete Work: Upon acceptance and signing a contract agreement it is expected the
Contractor will mow, bale and remove bales of hay during the period of July to September. If events beyond the control of the Contractor will prevent completion of work within the period stated above the Contractor may request a time extension. Such a request will be made to the assigned City Employee and a written determination will be made at his/her discretion to allow or disallow the extension, given the circumstances. All equipment and material must be removed from the levee no later than October 14th.
3. Documentation: The City of Wichita shall supply the Contractor a receipt of payment upon payment from the Contractor to The City of Wichita. The Contractor shall contact the designated City Employee in writing to make access arrangements at least five business days ahead of accessing the levee sections permitted under this agreement. When work is completed, the Contractor must notify the appropriate assigned City Employee of completion thru e-mail. After site inspection is made by the assigned City Employee, he/she will notify the Contractor that the area is clear of hay and clean of any debris left on the ground from the haying operation. The City shall provide access for mowing and haying of the assigned flats no more than twice per year during the allowed period of July 1 to September 30. The contractor shall consider the value of the hay when developing their bid cost per each time mowing and haying particular acreage and bid accordingly. The City shall develop and maintain a calculated number of acres for each levee to determine the maximum amount of acreage in the flats of each named levee available for haying to establish the maximum base number of acres per named levee that are available.
https://www.wichita.gov/
Our Mission as an exceptionally well-run city, we will: Keep Wichita safe; Grow our economy; build dependable
City of Wichita 4 RFB #260250
4. Access Plan and Related Insurance: The successful bidder must provide a comprehensive Access Plan for each of the six (6) named levees they are authorized to mow and hay. The Access Plan shall specify no more than two (2) designated access points for each named levee, resulting in a maximum total of twelve (12) authorized access points across the entire project. The designated City Employee must review and provide explicit written approval of the Access Plan via email prior to granting the Contractor physical access to any levee or floodway area. To account for the heightened risk associated with critical infrastructure, the Contractor shall secure and maintain specialized liability coverage of no less than $35,000 per designated access point. For the twelve
(12) authorized access points, the Contractor must maintain a minimum of $420,000 in dedicated property damage liability insurance. This coverage must explicitly insure against:
a. Physical damage caused to the levees, embankments, or adjacent structures while accessing, operating on, or departing the flats for mowing and haying purposes.
b. Any and all potential damage caused to the floodway, drainage systems, or surrounding terrain during mowing, haying, and related operational activities.
The $420,000 requirement may be satisfied either through a dedicated Inland Marine/Equipment policy, a specialized Environmental/Property Damage endorsement attached to the Commercial General Liability (CGL) policy, or by ensuring the baseline CGL policy has no exclusions for "care, custody, or control" regarding City-owned infrastructure, levees, or floodways. Proof of this specific liability coverage, explicitly naming the City of Wichita as an Additional Insured, must be provided to the City prior to the commencement of any work. The Contractor is solely responsible for making any and all repairs to damages caused by their operations to the satisfaction of the City.
Failure to maintain the required insurance levels, or failure to promptly repair damages caused by the Contractor, shall be considered a material breach of contract and cause for immediate termination of the agreement.
5. Liquidated Damages Specified:
a. The City shall notify the Contractor of all claims for damages incurred to City property as a result of the Contractor’s actions. This includes structures, hardscapes and any and all amenities located on City property. Extent and cost of damage will be assessed by the assigned City representative. At the discretion of the City, the Contractor may be given the opportunity to repair/replace damaged items or the cost for repair will be invoiced to the Contractor. The City of Wichita may also require that an insurance clause be executed to pay for these repairs/replacement needs.
b. All hay bales and equipment must be removed in a timely manner one (1) week after baling is completed for any given area. If bales are not removed, the CONTRACTOR hereby agrees, not as a penalty, the CITY holds the right to liquidated damages in the amount of$100 per day for each area. An area will be defined by the City’s numbering system used to track acreage mowed.
EX: LEVEE C – NAME C-200 SENECA TO MERIDIAN 74.82 ACRES. This includes all grass on the south side of the waterway from Meridian east to Seneca, excluding the levee.
Our Mission as an exceptionally well-run city, we will: Keep Wichita safe; Grow our economy; build dependable
City of Wichita 5 RFB #260250
B. Contractor Responsibilities:
1. All equipment must be maintained in good working condition and must be properly registered and equipped in accordance with all federal, state, and local laws and regulations. Costs for all equipment and apparatus required in the performance of the work shall be borne by the Contractor. All equipment must be operated in a manner consistent with manufacturer’s recommendations.
Minimum Equipment for performing the work under these specifications is the Contractor's responsibility for listed project areas at time of award of bid.
2. Extreme care shall be taken to safeguard all existing facilities, site amenities, windows, and all vehicles on or around the job sites. Damage to public and/or private property shall be the responsibility of the Contractor and shall be replaced or repaired by the Contractor at no cost to the City, and in a manner acceptable to the City. In the event any damage is done to City and/or private property, caused by Contractor’s personnel, the Contractor shall notify the assigned City employee, no later than the next working day. If the Contractor has not repaired/replaced damaged property within 48 hours, the City reserves the right to correct the situation and invoice the Contractor for costs incurred.
3. The Contractor must exercise caution and good judgment when operating equipment or vehicles near slopes and drop off areas and waterways. The City holds no responsibility for damages incurred due to ground conditions or operator actions while working on City property in fulfilling this contract.
Any horseplay or negligent vehicle operation while on City property will not be tolerated and will be grounds to immediately terminate this contract.
4. Work under this Contract will be performed on public property in full view of the general public. Citizen’s impressions of the Contractor’s employees, equipment, work procedures, and finished product will reflect on both the Contractor and the City of Wichita. The Contractor’s employees shall conduct themselves in a respectable manner while performing the duties of this bid and while on City property.
5 . The City may request that the Contractor remove any employee if it is determined that services are not being performed in accordance with the terms and conditions of the contract, or if an employee is conducting himself/herself in an inappropriate manner on City property.
6. The Contractor shall suspend mowing operations when:
• In the City’s opinion, continuing operations will result in damage to the grounds.
• Extensions to end dates will be given for days lost due to the City suspending operations for any reason.
7 . The Contractor will work with the designated City Employee or Employees to open and close locks in locations with access control gates and fences. If it is found the contractor or those employees doing work for the contractor are not following this procedure, and ensuring the sites are properly secured, then the Contractor shall be considered in violation of this agreement.
8. The bid form list of areas and acreages is the City’s best estimate of the acreage for a specific location site. It is the contractor’s responsibility to verify the actual acreage of each listed location site in the group if this information is needed by the contractor prior to submission of bid. Contractors are urged to use “Google maps” @ maps.goggle.com to see detailed location maps.
Our Mission as an exceptionally well-run city, we will: Keep Wichita safe; Grow our economy; build dependable
City of Wichita 6 RFB #260250
C. Scope of Work:
1. Mowing: All mowing equipment will be set to mow at 5 inches.
*Note: The Contractor should expect a greater amount of debris to be left after a flood event. It will be the contractors’ responsibility to move or remove debris if it impedes haying operations. The city will be removing debris but as a normal maintenance duty and will not jump around to various locations to assist the haying operations.
2. All mowing will be mapped out before the City goes through an area so the contractor can have the most acreage possible to produce hay from. What this means is the City may go through an area before the contractor but the City will only mow those areas that it is anticipated the contractor will not be able to mow, slopes, drainage ditches, levee tops unless there is ample room to hay and still leave room to transport vehicles around the hay bales, narrow uneven or otherwise hard areas to get haying equipment into. This will be toured and discussed in depth and mapped out before mowing and haying work shall be permitted.
3. No hay bales or equipment will ever be left on a levee top so as to limit emergency equipment to travel those levees as they are the only way to get in and out of many areas. Equipment shall not be left in the floodway system overnight.
4. Mandatory Site Inspection: It shall be mandatory that a review of the contracted area be conducted prior to beginning the first maintenance cycle. Such a review shall be attended by the successful bidder and the designated City Employee. The review shall include an explanation of the area and any site specific requirements.
3. BID TERMS
A. Questions and Contact Information:
Any questions regarding this document must be submitted via the procurement portal’s “Ask a Question” functionality or by email to Jason Brogden, jbrogden@wichita.gov in accordance with the dates and times stipulated for questions. Any questions of a substantive nature will be addressed in written form as a posted addendum on the City’s Procurement Portal (wichita.gov/procurementportal). Respondents are responsible for checking the City’s Procurement Portal and acknowledging any addenda electronically as a part of the Procurement Portal submission’s electronic acknowledgment for all stipulated response forms and addendum acknowledgments.
To ensure interested parties receive notification of any published addendum by the City, respondents need to verify the selection of “semi-hourly” on their Procurement Portal - Notification Center settings:
• Accept Invites from Agencies (to receive invitations for new solicitation opportunities)
• Accept Messages (to receive notifications for any published addendum)
Failure to select “semi-hourly” notification settings will impact your Procurement Portal profile’s ability to receive notifications and messages by the City of Wichita Purchasing Division.
To view your Procurement Portal’s Notification Center settings, log into your account and select Settings, Global Vendor Record, Manage my Organization, and Notifications to view this settings screen. If further assistance is needed, please contact the Purchasing Office directly at purchasing@wichita.gov or by phone at 316-268-4636.
mailto:purchasing@wichita.gov
Our Mission as an exceptionally well-run city, we will: Keep Wichita safe; Grow our economy; build dependable
City of Wichita 7 RFB #260250
B. Bid Submission:
Bids will be received (electronically as stated) in the office of the City Purchasing Manager, 12th Floor, City Hall, 455 North Main, Wichita, Kansas, prior to 10:00 O'CLOCK A.M., Friday, November 20, 2026 Bids are to be submitted through the City’s Procurement Portal (wichita.gov/procurementportal) using a secure login/password.
If a Bonfire registration for system access has not been completed, please visit wichita.gov/purchasing for assistance. On the Purchasing website page, a video tutorial (Bonfire Registration Video) walkthrough and registration resources are available to help in the completion of the registration process. If further assistance is needed, please contact the Purchasing Office directly at purchasing@wichita.gov or by phone at 316-268-4636.
All bids, including supporting documentation/manuals, shall become the property of the City.
C. Evaluation Criteria:
Bid Award will be based on the Bid Determined to Provide the Highest Value to the City of Wichita per Group from a Responsible and Responsive vendor.
The City, through its Board of Bids and Contracts, reserves the right to accept or reject any or all bids and any part of parts of any bid and to waive formalities therein to determine which is lowest and best bid. Any bid which is incomplete, conditional, obscure, or which contains additions not called for or irregularities of any kind, may be rejected. All bids are awarded subject to a check of the computations shown on the "Request For Formal Bid" form. In the event of a discrepancy in the extension(s) or total for the item(s), the unit cost shall prevail.
The City, through its Purchasing Manager, reserves the right to accept or reject any or all submittals and any part or parts of any submittal, and to waive formalities therein to determine which is the most beneficial bid.
D. Tentative Schedule:
The tentative schedule will apply to this Request for Bid (RFB) and may change according to with the City’s needs or unforeseen circumstances. All dates and times will be in Central Standard Time (CST;
CDT) and can be confirmed through the Purchasing Office located at 455 N. Main 12th Floor Wichita, KS 67202, calling (316) 268-4636, or by contacting the buyer listed on the solicitation document.
Questions of a substantive nature will be reviewed and answered in written form as an addendum and posted to the City’s Procurement portal at wichita.gov/procurementportal.
Vendors are encouraged to complete bidder registration by visiting the City of Wichita’s eProcurement Portal at wichita.gov/procurementportal, then follow the link to the Bonfire vendor registration page to register your company. Please check our website, wichita.gov/purchasing for upcoming registration opportunities, training dates & locations, and information as it is updated in the near future.
https://www.wichita.gov/purchasing mailto:purchasing@wichita.gov https://wichita.bonfirehub.com/ https://wichita.gov/procurementportal
Our Mission as an exceptionally well-run city, we will: Keep Wichita safe; Grow our economy; build dependable
City of Wichita 8 RFB #260250
Event Date Solicitation Advertised October 28, 2026 Last Day for Written Question November 12, 2026 @ 4:00 p.m. CT Addendum Posting Week of November 16, 2026 Bid Due November 20, 2026 @ 10:00 a.m. CT City Council Approval December 1, 2026
E. Minimum Respondent Qualifications:
This section lists the criteria to be considered in evaluating the responsiveness of firms interested in providing the goods and/or service(s) specified in this Request for Bid. Firms should meet or exceed these qualifications to be considered for award. Any exceptions to the requirements listed should be clearly detailed in the proposer’s response. Bidders shall:
1. Have a minimum of 2 years’ experience in providing similar services specified in this RFB.
2. Understanding of industry standards and best practices.
3. Have experience in providing goods and/or services of comparable size and complexity to that being requested.
4. Have knowledge of and comply with all currently applicable, and as they become enacted during the contract term, federal, state and local laws, statutes, ordinances, rules and regulations. All laws of the State of Kansas, whether substantive or procedural, shall apply to the contract, and all statutory, charter, and ordinance provisions that are applicable to public contracts in the city shall be followed with respect to the contract.
5. Registration with the Kanas Secretary of State’s Office before contract execution.
6. Having Municipal government experience is preferable; however, the City will make the final determination based on responses received and the evaluation process.
7. Have the capacity to acquire all bonds, escrows or insurances as outlined in the terms of this
RFB.
8. Provide project supervision (as required) and quality control procedures.
9. Have appropriate material, equipment and labor to perform specified services.
10. Ensure parking occurs only in designated areas and parking permits are displayed (if provided).
11. Wear company uniform or ID badge for identification purposes.
12. Meet local, state, and federal guidelines as applicable.
F. Bid Requirements:
1. Completed Bonfire Portal (wichita.gov/procurementportal) submission (or Request for Bid Form signed and dated if submitted via paper).
2. Bids submitted may not be withdrawn for a period of 60 days following the opening of this Request for Bid. Prices MUST also be free of duties and federal, state, and local taxes unless otherwise imposed by a governmental body, and applicable to the material on the proposal.
3. Pricing for all stipulated Item(s) and/or Group(s) requirements. Bidders who do not submit pricing for all items when stipulated may be deemed nonresponsive when not adhering to:
a. Highest Value to the City per Group when requested will be calculated by aggregate total.
No other pricing or miscellaneous charges will be submitted outside of the six (6) Groups.
4. Exceptions to any part of this document clearly delineated and detailed.
5. Responses that do not include all required forms/items may be deemed non-responsive.
Our Mission as an exceptionally well-run city, we will: Keep Wichita safe; Grow our economy; build dependable
City of Wichita 9 RFB #260250
G. City of Wichita Responsibilities:
1. Provide Contractor with appropriate facility access(es) for completion of awarded goods and/or services.
2. Provide Contractor with Contact Information for key City staff who will manage the contract.
H. Challenges and Protests:
Challenges A challenge is defined as a written objection by any party interested in responding to either a bid or proposal (collectively referred to as solicitations), when that party wishes to have the City consider an addition, substitution or modification to the specifications stated in the outstanding solicitation.
The written challenge of the solicitation specifications must be filed with the Purchasing Manager located on the 12th Floor, Finance Department at City Hall, 455 N Main, Wichita, KS 67202, telephone number
(316) 268-4636, at least five (5) business days before the solicitation opening due date and time as listed on the solicitation documents. Any challenge to solicitation specifications received after the five (5) business days deadline will not be considered by the City. The Purchasing Manager will acknowledge receipt of the challenge. The written challenge is to include the name, address, email address and telephone number of the interested party, identification of the solicitation number and project title, a detailed statement of the reasons for the challenge, supporting evidence or documentation to substantiate any arguments, and the form of relief requested, e.g., the proposed addition, substitution or modification to the specifications. The Purchasing Manager will investigate the written challenge and any evidence or documentation submitted with the challenge.
In the event of a timely challenge of the solicitation specifications to the Purchasing Manager, the affected pending solicitation shall not proceed further until the challenge is resolved by Purchasing Manager decision. The Purchasing Manager will issue a written decision, which will be posted on the City’s Procurement Portal, wichita.gov/procurementportal, for viewing by all interested parties. The decision rendered by the Purchasing Manager will be final.
Protests A protest is defined as a written objection to a proposed award, or the award of a contract, with the intention of receiving a remedial result. In order to be considered valid, a protest must 1) come from an actual bidder or proposer for the contract, 2) who claims to be the rightful award recipient, 3) whose economic interest may be affected substantially and directly by the award of a contract or by the failure to award a contract. Suppliers or subcontractors to a bidder or proposer cannot file a valid protest. A valid protest can only be filed by a bidder or proposer which can show that it would be awarded the contract if the protest were successful. Therefore, all conditions numbered 1 through 3 listed above in this paragraph must be met.
The written protest for bids must be filed with the Contract Compliance Officer located on the 12th Floor, Finance Department, City Hall, 455 N Main, Wichita, KS prior to 9:00 a.m. of the Tuesday immediately following the posting of the notice of intent to award on the City’s Purchasing Bid Results site wichita.gov/purchasing. Failure of a protestor to file a written protest related to the award of a contract prior to the 9:00 a.m., Tuesday deadline will invalidate that protest and cause it not to be considered.
The written protest for proposals must be filed with the Contract Compliance Officer located on the 12th Floor, Finance Department, City Hall, 455 N Main, Wichita, KS prior to 5:00 p.m. on the third business day following the day of issuing an email or written notification of award. Failure of a protestor to file a
Our Mission as an exceptionally well-run city, we will: Keep Wichita safe; Grow our economy; build dependable
City of Wichita 10 RFB #260250 written protest related to the award of a contract prior to 5:00 p.m. on the third business day deadline will invalidate that protest and cause it not to be considered.
The Contract Compliance Officer will acknowledge receipt of the written protest. The written protest is to include the name, address, email address and telephone number of the protestor, identification of the solicitation number or contract number and project title, a detailed statement of the reasons for the protest which justify the relief sought, supporting evidence or documentation to substantiate any arguments, and a concise statement of the form of relief requested (e.g., reconsideration of the offer). All the above required information must be included in the protest at its submission. Untimely protests will be returned unopened. Incomplete protests will be rejected without consideration.
In the event of a valid, timely protest, the City shall not proceed with the execution of the contract until all City administrative remedies have been exhausted or waived, or until a determination is made that a contract award is required to protect the interests of the City.
The decision of the Contract Compliance Officer, based on review of the written protest and information available from City sources, will be rendered within ten (10) business days after receipt of protest, will recite the reasons for the decision, and be provided to the protestor by email or written notification.
The protestor may seek reconsideration of the decision of the Contract Compliance Officer’s decision in writing to the Internal Auditor on the 13th Floor, City Manager Office, City Hall, 455 N Main, Wichita, KS prior to 5:00 p.m. on the third business day following the day of issuing an email or written notification of decision. Failure of a protestor to file a written reconsideration request related to the Contract Compliance decision prior to 5:00 p.m. on the third business day deadline will invalidate that protest and cause it not to be considered. The Internal Auditor decision will be issued by email or written notification, within ten (10) business days after receiving the written reconsideration, unless this time for a response is extended in writing and agreeable by both parties.
The Internal Auditor’s decision will be final, unless the protestor seeks a hearing before the City Council, by written request filed with the City Clerk, located on the 13th Floor, City Hall, 455 N Main, Wichita, KS, prior to 5:00 p.m. on the third business days after issuance of the Internal Auditor written decision.
Failure of a protestor to file a written reconsideration request related to the internal Auditor’s decision prior to 5:00 p.m. on the third business day deadline will invalidate that protest and cause it not to be considered.
If there is a timely written reconsideration request, the protestor may seek reconsideration of the decision of the Internal Auditor by means of a hearing before the City Council. This hearing must be in aid of the City Council’s legislative authority to approve contracts for goods, services, and public improvements on behalf of the City, and does not imply any due process right of the protestor in an unawarded, unexecuted contract. The hearing must be scheduled as soon as practicable according to the City Council’s calendar. The hearing must be granted only upon such facts and issues as are presented in writing to the City Clerk for submission to City Council at or before noon on the Thursday preceding the scheduled hearing. No documents or other evidence must be accepted at the hearing. The protesting party must have available no more than 20 minutes for presentation of argument, followed by no more than 20 minutes of argument presented by City staff. The City Council may deliberate in executive session to seek the assistance of the City Attorney, but must deliver its decision from the bench during the City Council meeting.
Our Mission as an exceptionally well-run city, we will: Keep Wichita safe; Grow our economy; build dependable
City of Wichita 11 RFB #260250
If a written protest is made against any proposed award or the award of a contract that relies in part on federal funding, then the Contract Compliance Officer must notify the Granting Authority in writing with all information regarding the protest. A protestor must exhaust all administrative remedies with the City of Wichita before pursuing a protest with the Granting Authority. Protestors are put on notice that according to federal regulations, certain determinations made at the local level are not subject to appeal to the Granting Authority. If a review is granted by the Granting Authority, it will be limited to:
1. the City of Wichita’s failure to have or follow its protest procedures, or its failure to review a complaint or protest; or
2. violations of Federal law or regulations.
The Contract Compliance Officer will provide notice to the Granting Authority Regional Office or Headquarters Office of any request for reconsideration before the City Council, and also provide notice of the decision rendered by the City Council, or any alternative resolution reached.
4. CONTRACT PERIOD AND PAYMENT TERMS
The term of this contract shall be for a one (1) year period with two (2) one (1) year options to renew under the same terms and conditions by mutual agreement of both parties. Specific project details (Statement of Work, Milestones, etc.) will be negotiated prior to execution of contract. Once goals as outlined are met and parties mutually agree that terms have been satisfied, the contract shall be complete.
Either party may cancel its obligations herein upon thirty-day (30) prior written notice to the other party. It is understood that funding may cease or be reduced at any time, and in the event that adequate funds are not available to meet the obligations hereunder, the city reserves the right to terminate this agreement upon thirty (30) days prior written notice to the contracted party. Payment will be remitted following receipt of a detailed invoice that, depending upon the scope of services solicited, may require outlining of City-assigned work order number, labor hours, hourly labor cost, materials costs, miscellaneous costs (i.e. – shop supplies, travel time, vehicle charges, etc.). Any payments remitted for installation, maintenance, and/or repair will itemize costs of labor and materials, including hourly rate, number of hours worked, and materials costs. Invoices received that are missing this information will be returned to the vendor for correction.
SOLICITATION
260250 PW_Flood Control Division
Mowing and Haying of Floodway
Responses are due before:
CONTACT INFORMATION
Contact: Jason Brogden Email: jbrogden@wichita.gov Phone: (316) 268-4429 Fax: (316) 268-4656 Address: 455 N Main, 12th Floor, Wichita, KS 67202
PLEASE QUOTE DELIVERED PRICES ON THE EQUIPMENT, MATERIAL, OR SERVICES LISTED BELOW
NOTE: THIS IS NOT A BID FORM - FOR INFORMATION PURPOSES ONLY
Line # Bid Item Description Quantity UOM
1-1 Group 1: Levee C South 72,689 Feet 364 AC
2-1 Group 2: Levee C North 87,244 Feet 532 AC
3-1 Group 3: Levee D South 77,856 Feet 382 AC
4-1 Group 4: Levee D North 39,792 Feet 275 AC
5-1 Group 5: Levee F North 49,913 Feet 396 AC
6-1 Group 6: Levee J North 31,503 Feet 160 AC
VENDOR NAME
VENDOR ADDRESS
VENDOR CITY/STATE/ZIP
TITLE
SIGNATURE
PRINT NAME
EMAIL ADDRESS
11/20/2026 10:00:00 AM
RETURN TO:
Submit Electronically (preferred method to https://wichita.gov/procurem entportal
Our Mission as an exceptionally well-run city, we will: Keep Wichita safe; Grow our economy; build dependable
City of Wichita 12 RFB #260250
5. INSURANCE REQUIREMENTS
LIABILITY INSURANCE SPECIFICATIONS
The Successful Bidder will be required to furnish a Certificate of Insurance (prior to the Purchase Order, Agreement, or Contract being issued) with the following minimum coverage:
1. Commercial General Liability
Covering premises---operations, xcu hazards, Product/Completed Operations, errors and omissions, Broad Form Property Damage and Contractual Liability with minimum limits as follows:
Bodily Injury Liability $1,000,000 Each Occurrence $2,000,000 Annual Aggregate
Property Damage Liability $1,000,000 Each Occurrence $2,000,000 Annual Aggregate Or Bodily Injury and Property Damage $1,000,000 Each Occurrence Liability (Combined Single Limit) $2,000,000 Annual Aggregate
2. Comprehensive Automobile Liability All Owned, Non-Owned, and Hired vehicles with minimum limits as follows:
Bodily Injury Liability $1,000,000 Each Occurrence
Property Damage Liability $1,000,000 Each Occurrence Or Bodily Injury and Property Damage Liability (Combined Single Limit) $1,000,000 Each Occurrence
3. Workers' Compensation to meet Statutory requirements.
4. Employers Liability $1,000,000 Each Accident $1,000,000 Occupational Disease $1,000,000 Annual Aggregate
The following additional coverages will apply when selected:
Required: YES___ NO _X__
5. Professional Liability (Claims made basis) $1,000,000 Each Claim $1,000,000 Annual Aggregate Required: YES___ NO _X__
6. Pollution Liability $1,000,000 Each Claim $1,000,000 Annual Aggregate Required: YES___ NO _X__
7. Umbrella Liability $1,000,000 Each Claim $1,000,000 Annual Aggregate The Insurance Certificate must contain the following:
The City of Wichita shall be added as primary and non-contributory additional insured. The policy shall also provide coverage for contractor’s/vendor’s contractual obligations created in the Agreement. Coverage shall be the greater of the requirements stated here or the contractor’s existing policy.
The Certificate of Insurance must be submitted within ten (10) days after notification of award to the City of Wichita Purchasing Manager, City Hall, 12th Floor, 455 North Main, Wichita, Kansas, 67202-1694.
END OF SPECIFICATIONS
(2/2026)
Our Mission as an exceptionally well-run city, we will: Keep Wichita safe; Grow our economy; build dependable infrastructure;
Provide conditions for living well.
City of Wichita 13 RFB #260250
6. GENERAL SPECIFICATIONS:
GENERAL SPECIFICATIONS
BID FORMS
All bids MUST be electronically submitted and acknowledged (Yes/No) by an officer or employee authorized to submit and bind the bidder to the terms of the solicitation and bidder. Any exceptions, to the specifications, terms and/or other conditions concerning the bid, must be noted in the “bid" submitted to be considered. The "bid" is to be submitted electronically through the City’s Procurement Portal (wichita.gov/procurementportal) using a secure login/password. Vendors are requested to submit current literature or brochures relating to their bid.
LICENSE
Vendors bidding on commodities or services for the City of Wichita must be currently licensed by the City of Wichita or the State of Kansas, where applicable, before a purchase order or contract will be issued.
BILLING TERMS
Discounts for prompt payment will be considered in the evaluation of your bid. The discount time will not begin until the City receives all of the commodities or services. If testing is required, the discount time will begin upon completion of the testing. Billing terms must be noted on the bid form to consider the deduction in the award.
CONTRACT
The successful bidder agrees to enter into a contract with the City, and when required, as per specifications, to furnish bond by a surety company authorized to do business in the State of Kansas.
SUBCONTRACTING/JOINT VENTURES
Respondents are encouraged to consider subcontracting portions of the contract to small and emerging businesses. A joint venture between two or more vendors is wholly acceptable if it serves the best interests of the City of Wichita. If this is done, the names of the proposed subcontracting vendors must be clearly identified in the qualification. Following an award of the contract, no additional subcontracting will be permitted without the express prior written consent of the City of Wichita. The firm receiving the contract award will be responsible for any work of such subcontractors and sign the contract with the City of Wichita.
SMALL & EMERGING BUSINESS ENTERPRISE PARTICIPATION ENCOURAGEMENT
The City of Wichita encourages all bidders to include small and emerging business enterprise participation in their bid.
ARBITRATION PROVISIONS
"Notwithstanding anything to the contrary contained in these bid documents or the contract to be awarded herein, the City shall not be subject to arbitration and any clause relating to arbitration contained in these bid documents or in the contract to be awarded herein shall be null and void."
ANTITRUST LITIGATION CLAUSE
"For good cause, and as consideration for executing a purchase order/contract, the contractor, acting therein by and through its authorized agent, hereby conveys, sells, assigns, and transfers to the City of Wichita, all rights title and interest in and to all causes of action it may now or hereafter acquire under the antitrust laws of the United States and the State of Kansas, relating to the particular product, products, or services purchased or acquired by the City of Wichita, Kansas, pursuant to a purchase order/contract.
CONSTRUCTION - PAVING PROJECTS
On construction or paving projects, contractors MUST contact the City Controller's Office, City Hall, 12th Floor, 455 North Main Street for a Kansas Sales Tax Exemption Certificate prior to starting work. Contractors will be responsible for paying Kansas Sales Tax on any purchase for these projects made before the certificate is issued.
MUTUAL WAIVER OF CONSEQUENTIAL DAMAGES
The contractor and owner waive claims against each other for consequential damages arising out of or relating to this contract. This mutual waiver includes, but is not limited to:
1) Damages incurred by the owner for rental expenses, for loss of use, income, profit, financing, business and reputation and for loss of management or employee productivity or for the services of such persons; and
2) Damages incurred by the contractor for principal office expenses, including, but not limited to, the compensation of personnel stationed in such principal office, for losses of financing, business and reputation and for the loss of profit, except anticipated profit arising directly from the construction.
RESTORATION
"Contractor shall, as a condition of final payment, restore all right-of-way and adjacent private property which has been disturbed, damaged or otherwise affected by construction to a condition equal to or better than existed prior to the commencement of construction. Such restoration shall include but not be limited to regrading and seeding of areas where grass was planted and growing prior to construction; provided, however, such regrading and seeding of lawn areas, when completed, shall be considered to be restoration of an area to a condition equal to or better than previously existing grass growth and Contractor shall have no responsibility to ensure growth of such seeded area(s). This restoration shall be considered part of the contract work and Contractor shall be responsible for the performance of such restoration work in the same manner as it is responsible for the performance of the contract work."
FEDERAL EXCISE TAX
The articles specified in this bid are for the exclusive use of the City of Wichita, Kansas. Therefore, Federal Excise Tax shall not be imposed. The City of Wichita, Kansas Federal Excise Tax Exemption Certificate Number is 48 77 0021K.
ESTIMATED QUANTITIES
If estimated quantities are shown, on the "Request For Formal Bid" form, they are used to evaluate the bid only. The figure(s) listed is the estimated usage only and is not intended to limit or guarantee in any way, the amount the City may purchase under the purchase order/contract.
Our Mission as an exceptionally well-run city, we will: Keep Wichita safe; Grow our economy; build dependable infrastructure;
Provide conditions for living well.
City of Wichita 14 RFB #260250
CITY OF WICHITA CREDIT CARD
Presently, many City Agencies use a City of Wichita Procurement Card (Visa) in lieu of a City warrant to pay for some of its purchases. No additional charges will be allowed for using the card.
DELIVERY
Delays in delivery caused by bona fide strikes, government priority or requisitions, riots, fires, sabotage, acts of God or any other delays deemed by the Board of Bids and Contracts to be clearly and unequivocally beyond the contractor's control, will be recognized by the City, and the contractor will be relieved of the responsibility of meeting the delivery time, as stipulated in the contract, upon contractor's filing with the Board of Bids and Contracts a notarized just and true statement signed by a responsible official of the contractor's company, giving in detail all the essential circumstances which, upon verification by the City, justifies such action by the Board of Bids and Contracts.
AWARD
The City, through its Board of Bids and Contracts reserves the right to accept or reject any or all bids and any part of parts of any bid and to waive formalities therein to determine which is lowest and best bid. Any bid which is incomplete, conditional, obscure, or which contains additions not called for or irregularities of any kind, may be cause for rejection of the bid. All bids are awarded subject to a check of the computations shown on the "Request For Formal Bid" form. In the event of a discrepancy in the extension(s) or total for the item(s), the unit cost shall prevail.
If there are tie bids, the Board of Bids and Contracts will recommend the successful bidder, and final determination will be made by the City Council.
THE AWARD WILL BE BASED ON THE BID DETERMINED TO PROVIDE THE HIGHEST VALUE TO THE CITY OF WICHITA PER GROUP.
Our Mission as an exceptionally well-run city, we will: Keep Wichita safe; Grow our economy; build dependable infrastructure; Provide conditions for living well.
City of Wichita 15 RFB #260250
EXHIBIT A
CITY OF WICHITA MANDATORY CONTRACTUAL PROVISIONS ATTACHMENT
1. Terms Herein Controlling Provisions. The terms of this attachment shall prevail and control over the terms of any other conflicting provision in any other document relating to and a part of the Agreement.
2. Choice of Law. This Agreement shall be interpreted under and governed by the laws of the State of Kansas. Any dispute or cause of action that arises in connection with this Agreement will be brought before a court of competent jurisdiction in Sedgwick County, Kansas.
3. Termination Due to Lack of Funding Appropriation. If, in the judgment of the City’s Director of Finance, sufficient funds are not appropriated to continue the function performed in this Agreement and for the payment of the charges hereunder, City may terminate this Agreement at the end of its current fiscal year. City agrees to give written notice of termination to Contractor at least thirty (30) days prior to the end of its current fiscal year and shall give such notice for a greater period prior to the end of such fiscal year as may be provided for in the Agreement, except that such notice shall not be required prior to ninety (90) days before the end of such fiscal year.
Contractor shall have the right, at the end of such fiscal year, to take possession of any equipment provided to City under the Agreement. City will pay to Contractor all regular contractual payments incurred through the end of such fiscal year; plus, contractual charges incidental to the return of any related equipment. Upon the effective termination of the Agreement by City, title to any such equipment shall revert to Contractor. The termination of the Agreement pursuant to this paragraph shall not cause any penalty to be charged to the City or the Contractor.
4. Disclaimer of Liability. As a Kansas municipality, City shall not be obligated to protect, defend, hold harmless, or indemnify any Contractor beyond that liability incurred under the Kansas Tort Claims Act (K.S.A. 75-6101 et seq.). City specifically reserves and does not intend to waive any defenses, limitations of liability or damages, and/or immunities available to it under the Kansas Tort Claims Act or other state or federal law. It is understood that the duty to indemnify or hold harmless includes the duty to defend. This indemnification and hold harmless clause shall apply whether or not insurance policies shall have been determined to be applicable to any of such damages or claims for damages. In no event shall either party be obligated to indemnify the other on account of the negligence or willful misconduct of the party seeking indemnity or any agent or employee thereof.
5. Acceptance of Agreement. This Agreement shall not be considered accepted, approved or otherwise effective until the statutorily required approvals and certifications have been given.
6. Arbitration, Damages, Jury Trial and Warranties. The City does not ever accept binding arbitration or the payment of damages or penalties upon the occurrence of a contingency and expressly denies such acceptance for this Agreement. The City never consents to a jury trial to resolve any disputes that may arise hereunder and expressly denies such consent for this Agreement. Contractor waives its right to a jury trial to resolve any disputes that may arise hereunder. No provision of any document within the Agreement between the Parties will be given effect which attempts to exclude, modify, disclaim or otherwise attempt to limit implied warranties of merchantability and fitness for a particular purpose.
7. Representative's Authority to Contract. By signing this Agreement, the representative of the Contractor thereby represents that such person is duly authorized by the
Contractor to execute this Agreement on behalf of the Contractor and that the Contractor agrees to be bound by the provisions thereof.
8. Federal, State and Local Taxes. Unless otherwise specified, the proposal price shall include all applicable federal, state, and local taxes.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .