1-26-048-B Bid Pricing Form 2025-10-30.xlsx
XLSX spreadsheet 136 KB Posted
- Solicitation number
- 26-048-B
- Issued by
- Texas
About this file
This document is a Bid Pricing Form for the North Texas Municipal Water District (NTMWD) for Fencing and Gate Systems Maintenance and Repair Services, covering four distinct geographical zones. The solicitation seeks qualified contractors to provide comprehensive fencing and gate system services, including equipment inspection, preventative and corrective maintenance, removal and installation of various fence types such as chain link, wood privacy, and barbed wire fences. The bid form includes detailed pricing structures for different labor rates (regular, overtime, emergency, and holiday) and specific installation services for fence components across Zones 1-4, with estimated quantities for each line item.
The pricing form allows bidders to quote hourly rates for different maintenance scenarios and fence installation types, with additional pricing options for clearing vegetation, installation of fencing materials, and percentage discounts on parts and new equipment. While the specific unit prices are not filled in, the form provides a comprehensive framework for pricing various fencing services, including equipment inspection, corrective maintenance at different rates, and installation of multiple fence types such as 6-ft and 8-ft industrial chain link, wood privacy fences, and barbed wire fences. The document indicates that additional pricing will not be used in determining the lowest, responsive bidder, suggesting a focus on core service pricing and capabilities.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 3-26-048-B Attachment C Zone Map.pdf | ||
| 4-26-048-B Attachment B Standard.pdf | ||
| 2-26-048-B Solicitation Packet 2025-10-30.docx.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Zone 1
| 25-197-B Fencing & Gate Systems Maintenance and Repair, Parts, and Service |
| Bid Pricing Form |
| Zone 1 | |||||
| Line Item | Description | Unit of Measure | Unit Price | Estimated Quantity | Extended Price |
| FENCE COMPONENTS & EQUIPMENT - MAINTENANCE & REPAIR :Provide hourly rate for: mobilization,equipment,fuel and labor to perform repairs to fence systems. | |||||
| 1.1 | Equipment Inspection and Preventative Maintenance Hourly Labor Rate | HR | 1 | $ - 0 | |
| 1.2 | Corrective Maintenance Hourly Labor Rate - Regular Time | HR | 1 | $ - 0 | |
| 1.3 | Corrective Maintenance Hourly Labor Rate - Overtime Rate | HR | 1 | $ - 0 | |
| 1.4 | Corrective Maintenance Hourly Labor Rate - Emergency Rate | HR | 1 | $ - 0 | |
| 1.5 | Corrective Maintenance Hourly Labor Rate - Holiday Rate | HR | 1 | $ - 0 | |
| Subtotal | $ - 0 | ||||
| Zone 1 | |||||
| Line Item | Description | Unit of Measure | Unit Price | Estimated Quantity | Extended Price |
| ACCESS GATE COMPONENTS & EQUIPMENT MAINTENANCE & REPAIR:Provide hourly rate for: mobilization,equipment,fuel and labor to perform repairs to access gate systems. | |||||
| 2.1 | Equipment Inspection and Preventative Maintenance Hourly Labor Rate | HR | 1 | $ - 0 | |
| 2.2 | Corrective Maintenance Hourly Labor Rate - Regular Time | HR | 1 | $ - 0 | |
| 2.3 | Corrective Maintenance Hourly Labor Rate - Overtime Rate | HR | 1 | $ - 0 | |
| 2.4 | Corrective Maintenance Hourly Labor Rate - Emergency Rate | HR | 1 | $ - 0 | |
| 2.5 | Corrective Maintenance Hourly Labor Rate - Holiday Rate | HR | 1 | $ - 0 | |
| 2.6 | Installation of 16' pipe gate with H-Braces per specification | EA | 1 | $ - 0 | |
| Subtotal | $ - 0 |
| Zone 1 | |||||
| Line Item | Description | Unit of Measure | Unit Price | Estimated Quantity | Extended Price |
| FENCE COMPONENTS REMOVAL & INSTALLATION:Provide a unit price for: mobilization,equipment, fuel, labor material, supplies and all |
associated fees for removal and installation of fences per specifications.
3.1 Removal and Disposal of Exisitng Fence Material HR 1 $ - 0
3.2 Installation of 6-ft Industrial grade chain link security fence with 18" mow curb LF 100 $ - 0
3.3 Installation of 8-ft Industrial grade chain link security fence with 18" mow curb LF 100 $ - 0
3.4 Installation of Western Red Cedar 6-ft wood privacy fence with 2.5 inch steel post LF 100 $ - 0
3.5 Installation of Western Red Cedar 8-ft wood privacy fence with 2.5 inch steel post LF 100 $ - 0
3.6 Installation of four-strand barbed wire fence 4-ft tall with 6-ft tee-post and steel ties LF 100 $ - 0
3.7 Installation of six-strand barbed wire fence 5-ft tall with 7-ft tee-post and steel ties LF 100 $ - 0
| 3.8 | Installation of silt fence for erosion control | LF | 100 | $ - 0 |
| Subtotal | $ - 0 | |||
| ZONE 1 TOTAL | $ - 0 |
| Line Item | Description | Unit | Unit Price |
| ADDITIONAL PRICING - Additional pricing will not be used in determining lowest, responsive bidder | |||
| 4.1 | Clearing and Grubbing of vegetation for installation of fence components | HR | |
| 4.2 | Installation of fencing type materials for projects other than fencing | HR | |
| 4.3 | Parts - Percentage discount on cost of new and replacement parts | Percentage | |
| 4.4 | New Equipment - Percentage discount on cost of new equipment | Percentage |
Zone 2
| 25-197-B Fencing & Gate Systems Maintenance and Repair, Parts, and Service |
| Bid Pricing Form |
| Zone 2 | |||||
| Line Item | Description | Unit of Measure | Unit Price | Estimated Quantity | Extended Price |
| FENCE COMPONENTS & EQUIPMENT - MAINTENANCE & REPAIR :Provide hourly rate for: mobilization,equipment,fuel and labor to perform repairs to fence systems. | |||||
| 1.1 | Equipment Inspection and Preventative Maintenance Hourly Labor Rate | HR | 100 | $ - 0 | |
| 1.2 | Corrective Maintenance Hourly Labor Rate - Regular Time | HR | 100 | $ - 0 | |
| 1.3 | Corrective Maintenance Hourly Labor Rate - Overtime Rate | HR | 50 | $ - 0 | |
| 1.4 | Corrective Maintenance Hourly Labor Rate - Emergency Rate | HR | 20 | $ - 0 | |
| 1.5 | Corrective Maintenance Hourly Labor Rate - Holiday Rate | HR | 10 | $ - 0 | |
| Subtotal | $ - 0 | ||||
| Zone 2 | |||||
| Line Item | Description | Unit of Measure | Unit Price | Estimated Quantity | Extended Price |
| ACCESS GATE COMPONENTS & EQUIPMENT MAINTENANCE & REPAIR:Provide hourly rate for: mobilization,equipment,fuel and labor to perform repairs to access gate systems. | |||||
| 2.1 | Equipment Inspection and Preventative Maintenance Hourly Labor Rate | HR | 100 | $ - 0 | |
| 2.2 | Corrective Maintenance Hourly Labor Rate - Regular Time | HR | 100 | $ - 0 | |
| 2.3 | Corrective Maintenance Hourly Labor Rate - Overtime Rate | HR | 50 | $ - 0 | |
| 2.4 | Corrective Maintenance Hourly Labor Rate - Emergency Rate | HR | 20 | $ - 0 | |
| 2.5 | Corrective Maintenance Hourly Labor Rate - Holiday Rate | HR | 10 | $ - 0 | |
| Subtotal | $ - 0 |
| Zone 2 | |||||
| Line Item | Description | Unit of Measure | Unit Price | Estimated Quantity | Extended Price |
| FENCE COMPONENTS REMOVAL & INSTALLATION:Provide a unit price for: mobilization,equipment, fuel, labor material, supplies and all |
associated fees for removal and installation of fences per specifications.
3.1 Removal and Disposal of Exisitng Fence Material HR 1 $ - 0
3.2 Installation of 6-ft Industrial grade chain link security fence with 18" mow curb LF 100 $ - 0
3.3 Installation of 8-ft Industrial grade chain link security fence with 18" mow curb LF 100 $ - 0
3.4 Installation of Western Red Cedar 6-ft wood privacy fence with 2.5 inch steel post LF 100 $ - 0
3.5 Installation of Western Red Cedar 8-ft wood privacy fence with 2.5 inch steel post LF 100 $ - 0
3.6 Installation of four-strand barbed wire fence 4-ft tall with 6-ft tee-post and steel ties up to 500 lf LF 100 $ - 0
3.7 Installation of six-strand barbed wire fence 5-ft tall with 7-ft tee-post and steel ties LF 100 $ - 0
| 3.8 | Installation of silt fence for erosion control | LF | 100 | $ - 0 |
| Subtotal | $ - 0 | |||
| ZONE 2 TOTAL | $ - 0 |
| Line Item | Description | Unit | Unit Price |
| ADDITIONAL PRICING - Additional pricing will not be used in determining lowest, responsive bidder | |||
| 4.1 | Clearing and Grubbing of vegetation for installation of fence components | HR | |
| 4.2 | Installation of fencing type materials for projects other than fencing | HR | |
| 4.3 | Parts - Percentage discount on cost of new and replacement parts | Percentage | |
| 4.4 | New Equipment - Percentage discount on cost of new equipment | Percentage |
Zone 3
| 25-197-B Fencing & Gate Systems Maintenance and Repair, Parts, and Service |
| Bid Pricing Form |
| Zone 3 | |||||
| Line Item | Description | Unit of Measure | Unit Price | Estimated Quantity | Extended Price |
| FENCE COMPONENTS & EQUIPMENT - MAINTENANCE & REPAIR :Provide hourly rate for: mobilization,equipment,fuel and labor to perform repairs to fence systems. | |||||
| 1.1 | Equipment Inspection and Preventative Maintenance Hourly Labor Rate | HR | 100 | $ - 0 | |
| 1.2 | Corrective Maintenance Hourly Labor Rate - Regular Time | HR | 100 | $ - 0 | |
| 1.3 | Corrective Maintenance Hourly Labor Rate - Overtime Rate | HR | 50 | $ - 0 | |
| 1.4 | Corrective Maintenance Hourly Labor Rate - Emergency Rate | HR | 20 | $ - 0 | |
| 1.5 | Corrective Maintenance Hourly Labor Rate - Holiday Rate | HR | 10 | $ - 0 | |
| Subtotal | $ - 0 | ||||
| Zone 3 | |||||
| Line Item | Description | Unit of Measure | Unit Price | Estimated Quantity | Extended Price |
| ACCESS GATE COMPONENTS & EQUIPMENT MAINTENANCE & REPAIR:Provide hourly rate for: mobilization,equipment,fuel and labor to perform repairs to access gate systems. | |||||
| 2.1 | Equipment Inspection and Preventative Maintenance Hourly Labor Rate | HR | 100 | $ - 0 | |
| 2.2 | Corrective Maintenance Hourly Labor Rate - Regular Time | HR | 100 | $ - 0 | |
| 2.3 | Corrective Maintenance Hourly Labor Rate - Overtime Rate | HR | 50 | $ - 0 | |
| 2.4 | Corrective Maintenance Hourly Labor Rate - Emergency Rate | HR | 20 | $ - 0 | |
| 2.5 | Corrective Maintenance Hourly Labor Rate - Holiday Rate | HR | 10 | $ - 0 | |
| Subtotal | $ - 0 |
| Zone 3 | |||||
| Line Item | Description | Unit of Measure | Unit Price | Estimated Quantity | Extended Price |
| FENCE COMPONENTS REMOVAL & INSTALLATION:Provide a unit price for: mobilization,equipment, fuel, labor material, supplies and all |
associated fees for removal and installation of fences per specifications.
3.1 Removal and Disposal of Exisitng Fence Material HR 1 $ - 0
3.2 Installation of 6-ft Industrial grade chain link security fence with 18" mow curb LF 100 $ - 0
3.3 Installation of 8-ft Industrial grade chain link security fence with 18" mow curb LF 100 $ - 0
3.4 Installation of Western Red Cedar 6-ft wood privacy fence with 2.5 inch steel post LF 100 $ - 0
3.5 Installation of Western Red Cedar 8-ft wood privacy fence with 2.5 inch steel post LF 100 $ - 0
3.6 Installation of four-strand barbed wire fence 4-ft tall with 6-ft tee-post and steel ties up to 500 lf LF 100 $ - 0
3.7 Installation of six-strand barbed wire fence 5-ft tall with 7-ft tee-post and steel ties LF 100 $ - 0
| 3.8 | Installation of silt fence for erosion control | LF | 100 | $ - 0 |
| Subtotal | $ - 0 | |||
| ZONE 3 TOTAL | $ - 0 |
| Line Item | Description | Unit | Unit Price |
| ADDITIONAL PRICING - Additional pricing will not be used in determining lowest, responsive bidder | |||
| 4.1 | Clearing and Grubbing of vegetation for installation of fence components | HR | |
| 4.2 | Installation of fencing type materials for projects other than fencing | HR | |
| 4.3 | Parts - Percentage discount on cost of new and replacement parts | Percentage | |
| 4.4 | New Equipment - Percentage discount on cost of new equipment | Percentage |
Zone 4
| 25-197-B Fencing & Gate Systems Maintenance and Repair, Parts, and Service |
| Bid Pricing Form |
| Zone 4 | |||||
| Line Item | Description | Unit of Measure | Unit Price | Estimated Quantity | Extended Price |
| FENCE COMPONENTS & EQUIPMENT - MAINTENANCE & REPAIR :Provide hourly rate for: mobilization,equipment,fuel and labor to perform repairs to fence systems. | |||||
| 1.1 | Equipment Inspection and Preventative Maintenance Hourly Labor Rate | HR | 100 | $ - 0 | |
| 1.2 | Corrective Maintenance Hourly Labor Rate - Regular Time | HR | 100 | $ - 0 | |
| 1.3 | Corrective Maintenance Hourly Labor Rate - Overtime Rate | HR | 50 | $ - 0 | |
| 1.4 | Corrective Maintenance Hourly Labor Rate - Emergency Rate | HR | 20 | $ - 0 | |
| 1.5 | Corrective Maintenance Hourly Labor Rate - Holiday Rate | HR | 10 | $ - 0 | |
| Subtotal | $ - 0 | ||||
| Zone 4 | |||||
| Line Item | Description | Unit of Measure | Unit Price | Estimated Quantity | Extended Price |
| ACCESS GATE COMPONENTS & EQUIPMENT MAINTENANCE & REPAIR:Provide hourly rate for: mobilization,equipment,fuel and labor to perform repairs to access gate systems. | |||||
| 2.1 | Equipment Inspection and Preventative Maintenance Hourly Labor Rate | HR | 100 | $ - 0 | |
| 2.2 | Corrective Maintenance Hourly Labor Rate - Regular Time | HR | 100 | $ - 0 | |
| 2.3 | Corrective Maintenance Hourly Labor Rate - Overtime Rate | HR | 50 | $ - 0 | |
| 2.4 | Corrective Maintenance Hourly Labor Rate - Emergency Rate | HR | 20 | $ - 0 | |
| 2.5 | Corrective Maintenance Hourly Labor Rate - Holiday Rate | HR | 10 | $ - 0 | |
| Subtotal | $ - 0 |
| Zone 4 | |||||
| Line Item | Description | Unit of Measure | Unit Price | Estimated Quantity | Extended Price |
| FENCE COMPONENTS REMOVAL & INSTALLATION:Provide a unit price for: mobilization,equipment, fuel, labor material, supplies and all |
associated fees for removal and installation of fences per specifications.
3.1 Removal and Disposal of Exisitng Fence Material HR 1 $ - 0
3.2 Installation of 6-ft Industrial grade chain link security fence with 18" mow curb LF 100 $ - 0
3.3 Installation of 8-ft Industrial grade chain link security fence with 18" mow curb LF 100 $ - 0
3.4 Installation of Western Red Cedar 6-ft wood privacy fence with 2.5 inch steel post LF 100 $ - 0
3.5 Installation of Western Red Cedar 8-ft wood privacy fence with 2.5 inch steel post LF 100 $ - 0
3.6 Installation of four-strand barbed wire fence 4-ft tall with 6-ft tee-post and steel ties up to 500 lf LF 100 $ - 0
3.7 Installation of six-strand barbed wire fence 5-ft tall with 7-ft tee-post and steel ties LF 100 $ - 0
| 3.8 | Installation of silt fence for erosion control | LF | 100 | $ - 0 |
| Subtotal | $ - 0 | |||
| ZONE 4 TOTAL | $ - 0 |
| Line Item | Description | Unit | Unit Price |
| ADDITIONAL PRICING - Additional pricing will not be used in determining lowest, responsive bidder | |||
| 4.1 | Clearing and Grubbing of vegetation for installation of fence components | HR | |
| 4.2 | Installation of fencing type materials for projects other than fencing | HR | |
| 4.3 | Parts - Percentage discount on cost of new and replacement parts | Percentage | |
| 4.4 | New Equipment - Percentage discount on cost of new equipment | Percentage |
Totals
| Zone 1 | Zone 2 | Zone 3 | Zone 4 |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| VALUES WILL AUTO-POPULATE DO NOT ADD VALUE HERE |