This Request for Proposals is issued by the Utah Transit Authority (UTA) for contracted transportation services providing ADA Complementary Paratransit and/or Route Deviation (Fixed Flex) services in areas outside Salt Lake County, specifically in Utah County (Southern), and Davis, Weber, and Box Elder Counties (Northern). The solicitation seeks proposals to operate, maintain, and conduct safe and reliable paratransit services for certified passengers and/or fixed-route deviation transportation for the general public, delivered as shared-ride, origin-to-destination curb-to-curb services. UTA issued the RFP on November 23, 2026, with a deadline for submitting questions by December 14, 2026, at 2:00 p.m. MST, and a final addenda deadline of December 21, 2026. Proposals are due on January 11, 2027, at 2:00 p.m. MST via the Euna portal. The initial contract term runs from May 1, 2027, through June 30, 2028 (14 months), with subsequent annual extensions possible through June 30, 2032, based on mutual agreement and meeting performance indicators. The proposal limit is 30 pages, excluding cover pages, table of contents, resumes, cost proposals, and required forms. This is a best-value procurement with technical factors weighted at 80 percent and price at 20 percent of the evaluation.

Compensation is structured as a service-based Agency-Furnished Equipment arrangement where UTA provides vehicle fleets, fuel cards, dispatch software licenses, and reservation services, while the contractor is responsible for operations facilities, staffing, training, vehicle maintenance, insurance, and fare collection. Projected annual revenue service hours include Southern Paratransit (25,530–29,580 hours over five years), Northern Paratransit (46,630–54,500 hours), and Northern Flex (17,650–20,650 hours), with corresponding trip and mileage projections. Contractors must demonstrate at least five years of relevant ADA-compliant transportation experience, adequate facilities and equipment, compliance with Americans with Disabilities Act, EPA, OSHA, DOT/FTA standards, and appropriate insurance coverage. The funding source is identified as local, state, and federal (Federal Transit Administration), making all proposals subject to Utah state law and FTA regulations. Compensation is based on negotiated hourly rates plus fixed monthly fees, with invoicing and payment occurring monthly in arrears. Contractors must submit required exhibits including cost proposals, response questions, policy crosswalks, federal certifications, contractor structure and references, and key personnel resumes. No specific DBE goal is established for this procurement.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

UTAH TRANSIT AUTHORITY

REQUEST FOR PROPOSALS

Cover Sheet

General Information Project Name Transportation Services: ADA Complementary

Paratransit and/or Route Deviation (Fixed Flex) Project Description

Contracted services for areas outside Salt Lake County that are committed to representing UTA by providing community transportation services that meet local need, ADA guidelines and Key Performance Indicators.

Project Start Date May 1, 2027

Contract Type RFP Funding Source Local � State Federal DBE Goal N/A Procurement Information:

RFP No. 26-04071 Contract Administrator *All correspondence during RFP must be directed through the Contract Administrator.

Danielle Laird 669 West 200 South Salt Lake City, Utah 84101

(801) 287-3324 Danielle.laird@rideuta.com

Evaluation Criteria:

• Technical o Experience o Quality of Service o References

• Price

This is a best-value procurement. UTA will select the team whose proposal is most advantageous to UTA, considering both price and quality/technical factors. The technical factors will account for eighty percent (80%) of the total evaluation. The price will be considered twenty percent (20%) of the total evaluation. See Part 2 for more information on proposal content and the rating method.

Projected RFP Schedule:

Please refer to Euna for updates to all dates, times and any additional deadlines not listed below.

A) UTA to Issue Request for Proposals November 23, 2026

B) Deadline to Submit Questions and Request for Approved Equals or Changes to UTA

December 14, 2026, 2:00 pm MST

C) Last Day for UTA to Issue Addenda and Clarifications December 21, 2026

D) Deadline to Submit Proposals January 11, 2027, 2:00 pm MST

E) Optional Presentations/Interviews, if necessary

TBD if needed

Included as part of this RFP:

Part 1 – Project Specific Information Part 2 – Procurement Process Information Part 3 – Standard Solicitation Terms Part 4 – Standard Contract Terms / Sample Contract Part 5 – Forms Part 6 – Federal Clauses Proposal Contents:

Page Limit = 30 Pages

Cover pages, table of contents, divider tabs, and resumes, the Cost Proposal, and required forms do not count toward the page limit.

Submittal Instructions:

• One (1) electronic copy of the technical proposal and one (1) electronic copy of the

Cost Proposal shall be uploaded to Euna on or before the deadline referenced above.

See Part 3 of this RFP for further instructions.

Required Forms To be considered responsive, proposals must include the additional forms, declarations, and certifications listed below:

• Exhibit A 26-04071DNL Cost Proposal

• Exhibit B 26-04071DNL Response Questions

• Exhibit C 26-04071DNL Policy Crosswalk

• Exhibit D 26-04071DNL Federal Certifications

• Contractor Structure and References

• Key Personnel Resumes (1 Page each)

• Signed Proposal Forms and Declarations

Part 1 – Project Specific Information

A. GENERAL OVERVIEW

UTA Special Services Business Unit (SSBU) is responsible for meeting Paratransit and Route Deviation (Flex-Routes) statutory regulations of the Federal Transportation Administration (FTA) under 49 CFR 37.121(a): “…each public entity operating a fixed-route system shall provide paratransit or other special service to eligible individuals with disabilities that is comparable to the level of service provided to individuals without disabilities who use the fixed-route system.”

UTA Special Services Business Unit provides unique and customized services to every rider, every trip, every time. UTA and its contractors are committed to NO service denials due to capacity constraints. UTA is committed to meet the demands of the community’s scheduled transportation requests. UTA contractors will provide reasonable staffing levels of qualified Operators who are trained to operate UTA vehicles and accommodate UTA riders with safety, curtesy and respect. UTA is seeking proposals from professional and qualified transit service providers to operate, maintain, and conduct:

1. safe and reliable paratransit to certified passengers and/or

2. fixed-route deviation transportation for the general public

The respondent will be responsible for all associated, negotiated administrative oversight and operations support for these services, as indicated through the Cost Proposal submitted with the RFP response. Not all offered options need to be included in the Proposal. Respondents will complete only the portions they are willing to contract for.

All requested services shall be delivered as shared-ride, Origin-to-Destination (curb-to-curb) transportation service. Services are inclusive of, but not limited to, providing transportation services for passengers with disabilities who are ambulatory, mobility dependent and/or transportation disadvantaged.

For RFP respondents to obtain a clear understanding of current expectations regarding day-to-day work instruction for services required, include these accompanying Work/Service Instruction Guides in your consideration of performance requirements for purposes of responding to this

RFP:

• Appendix A 26-04071DNL UTA Special Services Contractor Guide

• Appendix B 26-04071DNL UTA Paratransit Rider’s Guide

These guides may be updated periodically throughout the contract’s period of performance to include emerging best practices and updates to policy and/or performance requirements, along with other performance expectations that could fluctuate or be enhanced, through discussion and collaboration with UTA’s partner/contract agencies.

B. CONTRACTOR REQUIREMENTS

The Contractor Requirements listed in this section are minimum requirements. Failure to meet these requirements will render a proposal non-responsive. Contractors must demonstrate experience providing transportation services to a variety of customers. The experience expressed in the response shall provide a clear picture of:

1. At least five (5) years of relevant experience providing ADA Compliant services to the public.

2. Operation and maintenance facilities with equipment sufficient to deliver transportation services. All facilities and equipment must comply with all local, state, and federal requirements, ordinances, and laws.

3. The service that shall be provided must be of high quality and meet the requirements of UTA including complying with the Americans with Disabilities Act of 1990 (ADA), U.S.

Environmental Protection Agency (EPA), the Occupational Safety and Health Administration (OSHA), the U. S. Department of Transportation (DOT)/Federal Transit Administration (FTA) standards, and Public Health and Welfare, 42 U.S.C. 126; and support Emergency Bus Evacuations in response to national or natural disasters, coordinated in conjunction with FEMA and UTA Emergency Response Division.

4. Capacity to provide and maintain vehicle insurance at the levels reflected in Special Services Contractor Guide, Appendix A as required through the term of the Contract.

5. Ability to meet Equal Employment Opportunity (EEO) requirements, and other applicable federal, state, and local laws, including FTA 49 U.S.C. Parts 27, 37-40, Services for People with Disabilities and FTA 49 U.S.C. Parts 382, 391 and 655 - Drug & Alcohol; Program and Testing for safety-sensitive personnel.

C. GENERAL PROJECT DESCRIPTION

UTA is required to provide Demand Response Public Transportation Service (Paratransit) wherever regular UTA bus service is available for defined groups of disabled persons who cannot, by virtue of their disability, safely access or use the fixed-route transit system. Each rider is registered as an eligible consumer of services through a mobility assessment performed by UTA;

and trips are only provided when the rider requests them.

Special Services Contractors may also provide Fixed-Route Deviation (Flex) services, utilizing a fixed-route model but unlike regular buses, passengers can request a deviation or a special stop up to ¾ mile from the regular route for pick up or drop off before returning to its regularly scheduled route for the general public for an additional fare fee. This service may be used to transfer to standard fixed-route, Trax or Frontrunner services.

This contract agreement will be Service-based Agency-Furnished Equipment (AFE) structure where UTA provides:

• Vehicle Fleet that Accommodate ADA needs

• Fuel Cards for UTA owned Vehicles

• Dispatch/Manifest Software Licenses

• Bus Radios if Dispatch is provided by UTA

• Manifest Tablets and Audio/Video recordings

• Computer Hardware, if needed

• Reservation Services for Paratransit and Deviation (Flex)

• Route Planning and Scheduling, subject to change throughout the contract period.

• Finalization of Daily Manifest

• Coordination for Safety and Coaching Requirements

• Customer Concerns Centralized Management

• Operational Planning and Improvements

• NTD and FTA Reporting

• Policy and Procedure Input and Direction

• Project and Progress Meetings

The contracted provider is responsible for:

• Coordination and Compliance with applicable Laws, Regulations and Guidelines; including

Report Shift, Fuel and Coaching procedures included in Contractor’s Guide

• Participation in Monthly Project Check-in and Progress Meetings

• Operations Facility(ies) and Management

• Revenue Operations Staffing, Training, Labor and Coaching

• Transportation Safety Program Development/Oversight

• Meeting or Exceeding Key Performance Indicators (KPI) and meet the stated goals and performance standards included in the Contractor’s Guide

• Daily Vehicle Route Assignment, Trip Checks and Detailing

• Vehicle Maintenance and Insurance

• Fare Collection, Recording and Reporting

• Customer Concerns Research and Response

• Invoicing and Record Keeping

• *Daily Dispatch Services and Radio system (optional)

• *Fare Outlet/Distribution Sales (optional)

The UTA brand will be the default brand for the contracted services, related vehicles, equipment, and other materials.

1. Standard Operations Paratransit and Flex services are to be provided within three-quarter (¾) mile of a standard scheduled bus route path of travel, by time of day and day of week. However, any small area (i.e.

enclave) outside the three-quarter (¾) corridor dimension, but surrounded by regular bus service corridors, will be also serviced. Included with in the ¾ mile service area is UTA’s Light rail platforms (Trax) by time of day and day of week. Excluded are rapid-transit/commuter routes and Frontrunner routes.

Contractor compensation shall be based upon an amount per revenue vehicle service hour plus a fixed monthly rate during the term of the Agreement. Revenue service hours are billable from first pickup to last drop off, including any layover time. A revenue vehicle service hour shall exclude travel time to and from storage facilities, fueling, all sizable driver rest and lunch breaks of one (1) hour or more, training, road tests, vehicle breakdowns, and deadhead.

Service Hourly Contingency allowance is only compensated when the Contractor follows the Report Hours/Shift procedures in the Appendix A – 26-04071DNL Contractor Guide; and an agreed upon hourly rate of service for Report Hours is provided as part of the RFP response.

The Contractor shall use the automated systems provided by UTA for the dispatch/manifest, reservations, customer service and data functions. UTA’s automated system for Dispatch, Reservations and Customer Care is NOT part of this RFP. DO NOT submit questions whether UTA is interested in SaaS quotes, inclusion or consideration. This RFP will only award negotiated activities reflected on the Cost Proposal.

Performance under this Contract shall require the Contractor to meet a daily On-Time Performance (OTP) goal for all trips deemed within their control, and other thresholds of service included in Key Performance Indicators (KPI) that reflect standards of service and opportunities for improvement. Performance Indicators and Liquidated Damages for not meeting thresholds, found in Appendix A 26-04071DNL Contractor Guide.

Participation in UTA Activities like Emergency Drills: Throughout the contract period, there may be opportunities for Contractors to schedule Operators outside revenue service. Events will be coordinated based on community needs and Contractors will have an opportunity to participate after negotiations and agreements of the hourly rate projected in the RFP Cost Proposal.

Operation During an Emergency: In the event of an emergency, the Contractor shall deploy vehicles as directed by UTA. In the absence of directions from UTA, the Contractor shall follow the directions of appropriate law enforcement or emergency management agencies. Emergency service does not constitute an expansion of service. The Contractor shall be reimbursed for documented and reasonable costs at a rate that is an hourly rate plus coverage of the extra administrative responsibilities. Overtime may be considered if requested and approved by UTA Contract Administrator or Special Service Operations Director prior to incurring overtime.

Operation during Special Events: In the event that extra work is requested temporarily, either through expanded or new routes, for a defined period of time and purpose, UTA and the Contractor will negotiate service coverage expectations and an Amendment to the awarded contract may be executed that defines the temporary parameters and expectations. Overtime may be considered if requested and approved by UTA Contract Administrator or Special Service Operations Director prior to incurring overtime.

2. Invoicing and Payment All payments for services provided shall be made in arrears, after the service has been provided.

All invoices shall be submitted monthly for approval and shall be paid for within UTA’s routine accounts payable (AP) process. All payments are expressly conditioned upon Contractor providing services hereunder that are satisfactory. Any disputed charges shall be separated from the invoice, and the undisputed portion shall be paid.

3. Key Personnel For this contract, Key Personnel shall be identified as: operations manager, safety officer, maintenance manager and technicians, operations supervisors and trainers, radio dispatchers (if applicable), and dispatch coordinators (if applicable). Contractor may assign multiple functions to a single position. See general descriptions of job responsibilities in Appendix A 26-04071 Contractor Guide.

The Contractor shall provide, as part of the RFP response, one-page personnel resumes for the key staff identified above, demonstrating their qualifications for each position. Any operations or maintenance manager hiring or changes in key personnel are subject to prior approval of UTA.

4. Staff Hiring, Retention, and Training The Contractor shall be solely responsible for the satisfactory work performance of all employees described in the RFP and any reasonable performance standard established by UTA. Contractor shall have a personnel program, which includes recruitment, hiring, training, retention and performance reviews. It is of paramount interest to UTA and in the best interest of passengers that Contractor employees and subcontractors are properly trained and gain hands-on experience in their craft, especially positions deemed Safety Sensitive that require an annual background check both through licensure and criminal activity search, primarily to ensure that each Safety Sensitive position is responsible enough to work with vulnerable people, including those with disabilities, the elderly and minors.

The Contractor will be solely responsible for payment of wages and benefits as well as for wrongful acts of its employees or subcontractors. Wages and work hours shall be in accordance with Local, County, State, and Federal regulations affecting such personnel. Notwithstanding the foregoing, UTA will have the right to notify the Contractor of any problems or concerns involving the performance or conduct of an employee or subcontractor who is participating in the provision of the UTA services. Contractor shall respond immediately to any such notice and shall take appropriate actions to remedy any problems or concerns including, where appropriate, termination or removal of employees from provision of service for UTA. Contractors shall require in their policy and procedures that all employees and subcontractors self-report any arrests and convictions before and during their employment.

The Contractor including all its agents, employees, independent contractors, and subcontractors, shall carry out its obligations under this RFP in compliance with the regulations of the Health Insurance Portability and Accountability Act of 1996 (HIPAA) as amended from time to time, and the regulations promulgated thereunder, in order to protect the privacy of all individually identifiable protected health information that is created, received, collected, processed or learned as a result of services provided under this RFP.

The Contractors shall maintain a workplace free of drug and alcohol abuse during the term of the contract. To this end, UTA provides guidance and policy regarding expectations that reflect the stringent FTA requirements of 49 CFR Parts 40 and 655 which address drug and alcohol prevention concerning safety-sensitive functions and employees. Purchasing, having in possession, or consuming illegal drugs or alcoholic beverages while in uniform shall not be permitted. The Contractor(s) shall terminate any employee that purchases, has in possession, or consumes drugs or alcoholic beverages while on duty and/or performing services for the UTA.

Each employee must be sufficiently versed in the English language to be able to communicate effectively, both orally and in writing, with UTA staff and UTA customers when performing their assigned responsibilities. All employees providing services under this contract shall be able to comprehensively understand questions asked by customers and UTA staff and respond in English in a clear, coherent, and understandable manner. Any employees found to have insufficient command of the English language, as deemed by the UTA, shall be reported to the Contractor(s) for replacement. The UTA encourages the employment of multilingual employees.

It is UTA’s belief that high turnover reduces service quality. To indicate the level of commitment to encouraging retention and longevity of employees and subcontractors, Contractor is required as part of the proposal to submit a retention plan, including, but not limited to, starting wages and wage progress for operators, mechanics and if applicable dispatchers and dispatch coordinators.

5. Rider Eligibility

For Flex services, Route deviations are available to all riders but need to be scheduled no less than two hours before a trip and no more than seven days in advance. Flex routes are designed to allow for route deviations without creating excessive delays for other riders on the bus. For this reason, flex routes are typically short, flex bus stops are farther apart than regular fixed route stops, and the number of route deviations are monitored to ensure the overall operating schedule can be reasonably maintained. Flex routes are limited to two deviations per trip, and deviations are scheduled on a first come, first serve basis.

UTA’s Paratransit Eligibility Center will determine the eligibility of all Paratransit Route riders.

Applicants deemed conditionally, temporarily and/or unconditionally eligible will be marked appropriately in Trapeze Pass software or other software that may be utilized in the future that is projected to perform similarly. Approval of mobility aids will be conducted by UTA and information will be denoted in Trapeze or other reservation systems including the make, model, color and UTA-issued sticker number. All this information will be displayed electronically on an in-vehicle electronic device (tablet) or a paper manifest for the operator.

Under a service agreement between UTA and State of Utah Department of Health and Human Services, Paratransit riders should not be left unattended. Paratransit riders should have an attendant available to meet them at all drop-offs, unless the stop is a bus-to-bus transfer.

Applicable notes will be on the client’s record in Trapeze or on the manifest. If in doubt, contact UTA dispatch to confirm the expectation of maintaining visuals (no one left unattended) on clients until they are in custody of the caretaker, case manager, day center worker or family member.

6. Fares The ADA paratransit and Flex fares will be established by UTA and are subject to change. The second leg of any intercounty trip is free. Fares must be paid for in cash (exact change only), paratransit paper punch pass, an indication of DSPD fare code on the tablet or manifest for a specific rider, or Medicaid stickers for qualified trips. Contractor Operators will be required to collect Fares at time of service, unless otherwise indicated on tablet/manifest. The Contractor shall collect and retain fare revenue for ADA paratransit and route deviation trips separately. UTA shall deduct fare revenue from the Contractor’s invoice for each service provided (paratransit and route deviation) where the amount deducted is calculated based on the reported trips completed. Any shortfall of fare revenue is the responsibility of the Contractor. For more information on fare collection, see Appendix A 26-04071DNL Contractor Guide or Appendix B 26- 04071DNL Paratransit Rider’s Guide.

At time of this RFP release, the fares displayed on UTA’s Fares web site https://rideuta.com/Fares-And-Passes/Individual-Fares/Current-Fares

• $4.00 each way for Paratransit trips

• $2.50 each way (full day $5.00) for Fixed Route plus $1.25 (each way, limited to two per trip) for Deviation (Flex) https://rideuta.com/Fares-And-Passes/Individual-Fares/Current-Fares

Additionally, Contractors will be required to transport, free of charge, passengers seeking paratransit eligibility to and from UTA’s Mobility Center in Salt Lake County without requiring fare payment, as scheduled by UTA. This may include waiting for the rider during the assessment.

UTA Mobility Center is at 4384 South 50 West, Murray, UT 84107.

UTA intends to deploy electronic fare payment options during the contract period of performance. Until then, UTA invites potential respondents to consider becoming a Paratransit Paper Punch Pass (P4) outlet/distributor. To do so, a consignment contract between the Contractor and UTA Fares department will be negotiated & executed, with the Contractor determining how:

• To provide the P4s to UTA passengers; as a storefront and/or if Operators will actually have those on hand.

• If the operators will carry P4; how to reconcile to ensure none are lost and fees potentially be miscalculated

• How to reconcile based on the opportunity to distribute

• The processing of payment from the passenger to the contractor accounts

• How they will reconcile that with UTA

7. Trip Reservations/Scheduling

UTA’s scheduling department will be responsible for all trip reservations, for placing trips on runs, and for updating passenger account records. UTA reserves the right to leave trips in an unscheduled status to be managed by day-of-service dispatch.

UTA will provide/confirm with the Contractor the total number of runs and start/end times by 1500 (3 p.m.) local time the day before the scheduled service. Approximately 60% of the weekday, all weekend, and holiday service runs will be adjusted to meet daily service demands to ensure all eligible trips are performed without service denials or performance standard violations. By 1700 (5 p.m.), the next service day schedule should be solidified; with Friday’s scheduling to include Saturday and Sunday manifests.

The Contractor is expected to provide adequate staffing and vehicle availability to avoid any service delay or service performance failures.

UTA reserves the right to schedule trips in a manner that best serves system performance and passenger experience. This could include use of discretionary work assignments, including, but not limited to directly operating trips within contracted service areas.

8. Vehicle Use and Maintenance

The Contractor will utilize vehicles provided by UTA. The Contractor will be provided a sufficient number of vehicles to cover expected daily requests for rides, and standard contingency count allowed by FTA. The Contractor shall be solely responsible for the proper use, care and maintenance of all vehicles and equipment required to adequately fulfill the responsibilities associated with the provision of fixed route and/or paratransit services as described herein.

Contractor is responsible for completing emissions testing and providing insurance on each of the vehicles assigned to them for revenue or non-revenue services or maintenance, as applicable.

Below are the vehicle counts currently projected to support service performance expectations.

Potential respondents should consider the time, effort and cost to perform needed services including emissions and safety inspections annually, along with the preventative maintenance schedules included in Appendix A 26-04071 Contractor Guide. The vehicles are expected to be no older than 8 years old, rotated out as opportunity presents. Due to stock demand constraints at any given time, contractors may be operating 9-year-old vehicles. Planned rotation for new vehicles are reflected in grey below, with the stock being replaced with the 2026 and 2027 vehicles as they arrive and are ready to place into service. UTA prefers to have vehicle responsibility assigned to a contractor as cradle to grave to demonstrate maintenance accountability. Outside this plan, rotation of current stock will only be made as a contingency.

Vehicle Count

2016 2018 2019 2020 2023 2024 2026 2027

Southern

PARA

19 3 7 9 3

Northern

PARA

36 4 4 15 4 5 4 4

Northern

FLEX

8 2 6

The Contractor shall implement and follow UTA’s preventive maintenance program according to the schedules listed in Appendix A 26-04071 Contractor Guide; along with any other maintenance provisions required by the FTA to maintain vehicles in a State of Good Repair, including checking and replacing tires and fluids.

A complete record of all maintenance and/or repairs performed on each vehicle must be maintained and provided to UTA’s Fleet Management Supervisor monthly. This information must include the history of service for each vehicle. It is the Contractor's responsibility to establish arrangements for all service repairs necessary. Contractor shall maintain cleanliness and sanitation of all vehicles.

Fueling for vehicles is currently utilizing US Bank/Voyager credit cards, provided by UTA at 1 card assigned to each vehicle; and one for Supervisor use. Use of credit cards must follow the procedures outlined in the Appendix A 26-04071DNL Contractor Guide.

D. SERVICE LEVELS AND AREAS

UTA offers route deviations in some areas. Buses running these routes may deviate up to ¾ mile upon request for pick up or drop off before returning to its regularly scheduled route, without creating excessive delays for other riders on the bus. For this reason, flex routes are typically short, flex bus stops are farther apart than regular fixed route stops, and the number of route deviations are monitored to ensure the overall operating schedule can be reasonably maintained.

UTA’s ADA Complementary Paratransit service acts as a safety net for eligible riders with disabilities who are functionally unable to independently use UTA fixed route (bus and TRAX) system temporarily, all the time, or only under certain circumstances, following ADA regulations codified under Title 49 of the Code of Federal Regulations (CFR), Parts 27, 37, 38 and 39. UTA’s commuter rail service (FrontRunner) does not have a paratransit obligation.

Services under this contract operate the same days and hours as UTA’s fixed route service. The service areas are limited to ¾ mile of the UTA fixed routes.

The geographic areas served are:

• SOUTHERN: Utah County- currently paratransit routes only.

• NORTHERN: Davis, Weber, Box Elder County - both paratransit and flex services

Below are the most recent levels of service used to project future levels so potential respondents can project the size of workforce needed to provide expected service levels. Contractors should staff sufficiently to support the demands of Paratransit and Flex needs in the respective areas, and Report Shift/Hours are only used as a contingency, not to replace what standard staffing needs are. See detailed expectations in Appendix A 26-04071DNL Contractor Guide.

Some Considerations for projecting Operations/Maintenance staffing needs:

1. The historic counts include 2022-2025 service levels and include the caveat of UTA service levels ‘returning to normal’ after COVID-19. Projections are slightly more conservative than what the data has shown because it includes increase from 2022 to 2023 when services were returning to more normal levels. Flex routes are not projected to change, and any change – addition, or expansion will be negotiated with the Contractor in the area before implementation.

2. Flex Miles and Hours shouldn't increase drastically because fuel cards were introduced April 2026 that reduced deadhead time and miles significantly; as much as 5,000 miles a quarter.

3. UTA flex and paratransit miles and trips may increase due to On-Demand being launched and expanded. UTA On-Demand is a curb-to-curb microtransit service in 6 zones across

UTA’s service area. It connects riders with other transit services like TRAX, FrontRunner, or bus, and other destinations inside the service zones. It is intended to help with first-and last-mile connections, local connectivity, and access to key neighborhood destinations. During peak hours, eligible riders may receive a Lyft ride instead of an On- Demand (Via) vehicle, without having to use the Lyft reservation system. The zone is designed for short, local trips, so the maximum travel distance is 6 miles. Exceptions may be made to connect directly to FrontRunner stations.

https://www.rideuta.com/Services/UTA-On-Demand

Historic

Averages

Sq.

Miles

Avg. Annual hours

Avg. Annual miles

Avg. Annual trips

Weekday routes

Weekend routes

Southern PARA 132.86 24,552 322,980 72,790 24 2 sat /2 sun Northern PARA 156.73 44,843 498,042 112,931 36 7 sat /2 sun Northern FLEX 23.70 16,978 254,763 80,666 12 2 sat /2 sun

Year 1

(12 months*) Proj. Annual hours Proj. Annual miles Proj. Annual trips Southern PARA 25,530 332,669 76,430 Northern PARA 46,630 512,984 118,576 Northern FLEX 17,650 257,311 81,473

Year 2 Southern PARA 26,555 342,650 80,251 Northern PARA 48,500 528,373 124,507 Northern FLEX 18,300 259,884 82,287

Year 3 Southern PARA 27,600 352,929 84,264 Northern PARA 50,442 544,224 128,242 Northern FLEX 19,000 262,483 83,110

Year 4 Southern PARA 28,722 363,517 88,477 Northern PARA 52,400 560,551 132,089 Northern FLEX 19,800 265,107 83,941

Year 5 Southern PARA 29,580 374,422 92,901 Northern PARA 54,500 577,367 136,052 Northern FLEX 20,650 267,758 84,781

Levels of Service may be adjusted at any time by Utah Transit Authority. Modifications of services may include but are not limited to extending, deleting or adding service hours by day of week, expanding or reducing geographical service areas, or adding or deleting number of daily runs, including Route deviations services.

https://www.rideuta.com/Services/UTA-On-Demand

E. PERIOD OF PERFORMANCE

To align with UTA’s new fiscal year, revenue services should commence on May 1, 2027 with the first-year period of performance active through June 30, 2028 which will result in a *14-month initial contract term. Subsequent annual period of performance extensions will be based upon mutual agreement and meeting performance indicators. Each will cover 12 months.

*Year 1 – May 1, 2027 to June 30, 2028

Year 2 – July 1, 2028 to June 30, 2029 Year 3 – July 1, 2029 to June 30, 2030 Year 4 – July 1, 2030 to June 30, 2031 Year 5 – July 1, 2031 to June 30, 2032

Proposers are advised that the procurement resulting from this solicitation may be supported with funds received from the Federal Transit Administration and the State of Utah. As such, the agreement with the successful proposer will always be subject to the rules and regulations of Utah State law and the Federal Transit Administration. Proposers are to carefully review Contract Terms and Conditions in Part 4, as all terms and conditions expressed will apply to this procurement and resulting contracts. The successful Contractor will be responsible for complying with all applicable laws and regulations governing the services described in this RFP and its associated documents.

F. COST PROPOSAL SUBMISSION

The cost proposal should be reasonable and realistic. The Cost Proposal excel workbook has an INSTRUCTIONS page that provides a general description and some examples for each line item.

These examples are not an all-inclusive list. The tabs are color coded by fiscal year. Each fiscal year has a sheet for each proposal (Northern Flex; Northern PARA; Southern PARA). ALL BUDGET SHEETS for the proposal’s areas to be considered need to be completed. UTA needs to budget a baseline expenditure expectation. In the event of any change in federal, state or local law, rule or ordinance which has the effect of increasing or decreasing Contractor’s operating costs, Contractor and UTA shall meet to discuss the impact of these costs and may, subject to the approval of UTA and Contractor, negotiate adjustments to Contractor’s rates as specified herein.

After award, the actual annual price adjustment could be calculated based on the percentage change in the CPI for the applicable twelve (12)-month period. If the percentage change in the CPI is positive, contract prices may be increased by the corresponding percentage but will be capped at 5%.

The Contractor is responsible for any and all costs associated with preparation and/or delivery of the proposals and any and all incidental costs associated with the clarification, presentation, or amendment of the proposal. Proposals shall be valid for one-hundred twenty (120) calendar days from proposal due date.

Part 2 – Procurement Process Information

A. PROPOSAL FORMAT

Proposals must adhere to the following format:

• Formatted primarily to 8 ½ by 11 inches.

• An 11-by 17-inch format may be used for charts, tables, and schedules. No text should be included on the 11-by 17-inch size format except for text that is required for the interpretation of the chart, table, or schedule.

• Use a minimum 12-point font.

• If a proposal is submitted in double-sided format, both sides of the page will be counted toward the page limit.

• The proposal must not exceed the page limit shown on the RFP Cover Sheet. The Proposer shall not submit brochures or additional materials.

• Hyperlink content will be counted toward the page limit unless specified as exempt. At its discretion, UTA will not consider such additional materials in the selection of the successful Proposer.

• The maximum file upload size in Euna is 50mb.

Failure to follow the format described above may result in the proposal being deemed non-responsive.

B. PROPOSAL CONTENT

The proposal should consist of the following sections in the order listed below:

1. Cover Letter

Explain the interest of the Proposer in the work defined by this RFP and identify the Proposer’s point of contact, including name, address, telephone, and e-mail address. Limit the cover letter to one page.

2. Technical Proposal (80%) Technical Proposal will illustrate Recent and Relevant Experience, including how the work will be performed, and related procedures already in place.

o Experience (35%) Contractor will be evaluated based on the depth of the firm’s specialized experience and technical competence in the performance of comparable assignments, sourced only from information contained in the proposal.

o Quality of Service (35%) UTA will consider all the relevant material submitted by each Contractor, and other relevant material it may otherwise obtain, to determine Capabilities. Evaluations based on Contractor’s proposal describing the understanding of the Scope of Work to be performed; able to provide the personnel, equipment and facilities to perform the Scope of Work and demonstrate an understanding of the undertaking and its contribution to UTA.

Evidence of meeting KPI as determined by FTA and this RFP. Evidence of commitment to sufficiently trained and employed staff to support administration, operations and maintenance expectations. Direct Administration, no subcontracting expected o References (10%)

UTA will email reference requests to the provided companies of which the Contractor states in their proposal. Companies shall be able to attest to the Contractor’s experience as it relates to providing the services listed in this RFP. Include the structure planned to administer required services.

Forms: Proposer shall provide all Federal Forms/Certifications as in Exhibit D Federal Certifications. Proposal forms are supplied for the purpose of listing the Proposer’s team or individual data. The Proposer shall provide the data in the appropriate form. A Proposer's failure to follow the specified format may be considered non-responsive.

• Exhibit B – 26-04071DNL Paratransit Services Response Questions

• Exhibit C – 26-04071DNL Policy Crosswalk

• Exhibit D - Federal Forms/Certifications

• Contractor Structure and References

• Key Personnel Resumes

• Signed Proposal Forms and Declarations

3. Cost Proposal (20%)

The cost proposal shall be evaluated based on both price and cost realism. Price will be taken at face value, while cost realism will be evaluated based on whether the evaluator believes the Contractor’s price reflects a realistic understanding of the scope of effort and resources required to complete the project. Price proposals shall receive a rating from 0 to 20 based on the combined evaluation of price and cost realism.

4. Cost Realism Determination (0 to 10 points) Cost Realism is determined by evaluating and assigning a score to each of the following three elements:

Are the cost elements (labor and materials) realistic for the work to be performed? (0 to 5 points)

Do costs reflect a clear understanding of RFP requirements? (0 to 3 points) Are costs consistent with the Offeror’s unique method of performance as described in its

Proposal (0 to 2 points)

Forms:

• Exhibit A – 26-04071DNL Cost Proposal

COST PROPOSAL SHALL BE SUBMITTED USING THE COST FORM PROVIDED AND COST FORM

MUST BE UPLOADED IN EUNA AS A SEPARATE FILE FROM THE TECHNICAL PROPOSAL.

C. WEIGHTING OF EVALUATION CRITERIA

Proposals will be evaluated based on responses to the information requested herein. The Utah Transit Authority may interview one or more firms as part of the evaluation process; however, a decision to award a contract may be based solely upon the submitted proposals.

This is a best-value procurement wherein the award will be made to the responsive and responsible respondent whose proposal is determined to be the most advantageous to UTA, with the evaluation taking into consideration both the technical and pricing factors. In the evaluation, the technical and pricing factors shall be weighted as detailed above.

• The Cost Proposal must be submitted in a separate file from the technical proposal.

• The Technical Proposal must not contain any cost information.

UTA may use the following cost formula: Each proposal will be given a score from 0 to 20 based on both price and cost realism. A proposal with a low price and a high degree of cost realism shall receive a score on the upper end of the scale. A proposal with a high price and a low degree of cost realism shall receive fewer points on the lower end of the scale. To arrive at an overall total score, the price proposal rating will be weighted according to the overall evaluation criteria and combined with the technical evaluation scores.

In addition to the above, proposals whose total evaluated price is fifty percent (50%) or more above or below the median price of all responsive proposals may be deemed unreasonably priced and non-responsive and may be removed from further consideration at the Authority’s sole discretion.

The Authority reserves the right to disqualify such proposals without further evaluation if it determines that the pricing reflects a material risk to successful performance or does not represent a fair and reasonable price.

Part 3 – Standard Terms of Solicitation

A. INSTRUCTIONS TO PROPOSERS

1. Submission of Proposals

Proposals must be uploaded to Euna by the “Bid Ends” date and time listed on Euna. Proposals uploaded after the deadline will be considered non-responsive. It is the responsibility of the Proposer to ensure that its proposal is properly uploaded by the deadline. Log on to Euna at https://solutions.Euna.com/apps/Router/SupplierLogin?CustOrg=StateOfUtah If you have already registered, log in and search by Utah Transit Authority or the RFP number.

If you need to create an account, please select “Create Account,” and then you can search UTA or the RFP number identified on the Cover Page. If you need assistance, please email the Utah Supplier Portal Support at Eunaadmin@utah.gov.

2. Federal Requirements

If federal funds are being used to finance this project, the Contractor shall also comply with the additional applicable federal terms and conditions listed in Part 6 and submit all applicable certifications, forms and reports listed in Part 6.

a. UTA eComply Solutions. In addition, where federal funds are being used, the awarded Bidder/Proposer shall submit required labor and subcontractor information to UTA through following portal: https://uta.ecomply.us. The information provided shall include the following:

Set up and maintain contractor login for all persons inputting information in the system.

Description of payments received from UTA and payments made to subcontractors of all tiers, including amounts and confirmation of payment.

All certified payroll must be input into eComply Solutions which may be accomplished either through direct input or importation from the contractor’s accounting system.

All subcontract award amounts, dates signed, and change orders.

Certified payroll information shall be uploaded on a weekly basis; all other information shall be uploaded or input no less than monthly.

The Contractor shall include this clause in all subcontracts and manage and monitor compliance of all subcontractors within the UTA eComply system.

https://solutions.sciquest.com/apps/Router/SupplierLogin?CustOrg=StateOfUtah mailto:sciquestadmin@utah.gov https://uta.ecomply.us/

3. Minimum Standards

This section sets forth the minimum requirements that all Proposals must meet. Failure to submit Proposals in accordance with this RFP may render the Proposal unacceptable or non-responsive.

UTA may, in its sole discretion, waive minor irregularities in a Proposal that do not alter the quality or quantity of the information provided.

4. Confidential, Protected, and Public Information

In accordance with Utah Code Section 63G-2-305(6) of the Government Records Access and Management Act (GRAMA) and UTA's Procurement Standard Operating Procedures (SOPs), procurement information related to this procurement will not be made public until after the execution of the Contract with the successful Proposer. Procurement information includes the Proposals submitted by Proposers in response to this RFP, any accompanying documentation, and records maintained by UTA during the procurement process.

UTA will maintain a process to ensure confidentiality for the duration of this procurement. If the Proposer submits information in its Proposal that it believes is "trade secret," the Proposer must follow the procedure set forth in Section 63G-2-309 of GRAMA.

Additionally, UTA requests that each Proposer also follow the steps identified below:

a. Clearly mark all trade secret information as such in its Proposal at the time the Proposal is submitted and include a cover sheet stating, “DOCUMENT CONTAINS TRADE SECRET INFORMATION,” and identifying each section and page which has been so marked

b. Include a statement with its Proposal justifying the Proposer’s determination that certain records are trade secret information for each record so defined

c. In addition to the Proposal uploaded to Euna, upload a second copy of the Proposal as an attachment that has all the trade secret information deleted, and label this copy of the Proposal “Public Copy.” If a Proposer uploads a Proposal containing no trade secret information, no "Public Copy" needs to be submitted. However, any Proposer that submits a Proposal containing no trade secret information must so certify in a cover letter to its Proposal; and

d. Defend any action seeking release of the records it believes to be trade secret information and indemnify, defend, and hold harmless UTA and the State of Utah and its agents and employees from any judgments awarded against UTA and its agents and employees in favor of the party requesting the records, including any and all costs connected with that defense. This indemnification survives UTA’s cancellation or termination of this procurement or award and subsequent execution of the Contract.

In submitting a Proposal, the Proposer agrees that this indemnification survives as long as the trade secret information is in possession of UTA.

All records pertaining to this procurement will become public information after the execution of the Contract, unless such records are identified as trade secret information as specified above.

No liability will be attached to UTA for the errant release of trade secret information by UTA under any circumstances.

5. Submitting Questions to UTA Questions and Requests for changes to the RFP must be submitted via the Euna Q&A page before the end of the Question and Answer period. UTA’s answers to timely questions will be posted on the Euna Q&A page. All communications regarding this RFP should be addressed solely to the Contract Administrator whose name and contact information are listed on the Cover Page of the

RFP.

6. Requests for Approved Equals or Changes Whenever a brand, manufacturer, or product name is indicated in this RFP, it is included only for the purpose of establishing identification and a general description of the item. Wherever such names appear, the term "or approved equal" is considered to follow.

Requests for Approved Equals must be submitted via Euna Q&A page. UTA retains the discretion to withhold approval for one or more requested equals if the magnitude of requested approvals exceeds UTA’s available resources to allow for adequate evaluation in support of a timely procurement.

Any request for an approved equal must be fully supported with technical data, test results, or other pertinent information as evidence that the substitute offered is equal or better than the RFP requirement.

UTA will only assess requests for approved equals if the price of the substitute product is competitive with the price of the product specified in the RFP, as determined by UTA in its sole discretion.

Specifying a brand name, components, and/or equipment in this RFP will not relieve the Proposer from its responsibility to provide the product in accordance with the performance warranty and contractual requirements. The Proposer shall notify UTA of any inappropriate brand name, component, and/or equipment that may be called for in this RFP and shall propose a suitable substitute for consideration.

7. Addenda to the Request for Proposals

UTA reserves the right to make changes to the RFP by issuing a written addendum to the RFP which will be posted to Euna.

8. Multiple or Alternative Proposals

The submission of multiple or alternative Proposals, except as specifically called for in the RFP, may render all such Proposals non-responsive and may cause the rejection of some or all of such Proposals.

9. Withdrawal of Proposals A Proposer may withdraw its Proposal from Euna before the Proposal due date without prejudice to itself.

10. Cost of Proposals

UTA is not liable for any costs incurred by Proposers in the preparation, presentation, or negotiation of Proposals submitted in response to this RFP.

11. Examination of Request for Proposals

The submission of a Proposal constitutes an acknowledgment upon which UTA may rely that the Proposer: (i) has thoroughly examined and is familiar with the RFP, including the contractual terms in Part 4, (ii) is familiar with any work site identified in the RFP, and (iii) has reviewed and inspected all applicable statutes, regulations, ordinances, and resolutions addressing or relating to the goods and services to be provided hereunder. The failure or neglect of a Proposer to receive or examine such documents, work sites, statutes, regulations, ordinances, or resolutions will in no way relieve the Proposer from any obligations with respect to the Proposer’s Proposal or to any contract awarded pursuant to this RFP. No reduction or modification in the Proposer’s obligations will be allowed based upon a lack of knowledge or misunderstanding of this RFP, work sites, statutes, regulations, ordinances, or resolutions.

12. Firm Offer

Unless otherwise stated in this RFP, submission of a Proposal constitutes an offer to provide the goods or services described in the RFP, for the price set forth in the Proposal. Such offer must be good and firm for a period of ninety (90) days after the Deadline to Submit Proposals.

B. SELECTION PROCESS

1. No Public Opening

This is an RFP and, as such, the Proposals submitted in response to this RFP will not be subject to a public opening.

2. Procurement Options

Based on submitted information, UTA may do or take any of the following actions, without limitation:

• Select a Proposer based solely on the written proposals, with or without subsequent negotiations.

• Ask for more information or clarifications before making a selection.

• Use presentations, interviews, or problem-solving exercises before making a selection.

• Under specific circumstances described in the Utah Procurement Code, determine a

Competitive Range, conduct Discussions, and/or request Best and Final Offers (BAFO) before making a selection if a material error in…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .