1-26-007-V Bid Pricing Form 2025-10-09.xlsx

XLSX spreadsheet 117 KB Posted

Attached to
Pump Evaluation, Maintenance and Repairs
Solicitation number
26-007-V
Issued by
Texas

About this file

This is a Bid Pricing Form for the North Texas Municipal Water District (NTMWD) soliciting bids for pump evaluation, maintenance, and repairs. The document provides a comprehensive pricing structure for various labor categories, including shop labor, machinist labor, field service labor, and engineering labor at straight time, overtime, and emergency rates. The pricing form also includes preventative maintenance hourly rates for field service labor, data collection, and data analysis during standard business hours (Monday-Friday, 7:00 AM - 5:00 PM). An additional line item covers spare equipment storage pricing, with the intent to award multiple contracts and rotate contractors for individual jobs.

The pricing form includes optional pricing components such as percentage discounts on parts, materials, supplies, and new equipment. The document allows bidders to specify hourly rates across multiple labor categories and provides flexibility for different service scenarios. While the total price section is currently showing $0.00, the form is designed to capture detailed pricing information for various service types and labor classifications. The bid appears to be structured to enable NTMWD to compare and select contractors based on comprehensive pricing metrics across different service dimensions and labor types.

View the file

Other files

File Type Posted
3-26-007-V Attachment A 2025-10-09.xlsx XLSX spreadsheet
2-26-007-V Solicitation Packet 2025-10-09.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

Item No.DescriptionUnit of MeasurePrice
PROVIDE HOURLY RATES AT STRAIGHT TIME (line items 1-4)
1Shop LaborHR
2Machinist LaborHR
3Field Service LaborHR
4Engineering LaborHR
PROVIDE OVERTIME HOURLY RATES (line items 5-8)
5Shop LaborHR
6Machinist LaborHR
7Field Service LaborHR
8Engineering LaborHR
PROVIDE EMERGENCY HOURLY RATES (line items 9-11)
9Shop LaborHR
10Machinist LaborHR
11Field Service LaborHR
PREVENTATIVE MAINTENANCE HOURLY RATES M-F 7:00 AM - 5:00 PM (line items 12-14)
12PM Field Service LaborHR
13PM Data CollectionHR
14PM Data AnalysisHR
SPARE EQUIPMENT STORAGE
15Storage of spare pump and equipmentSq/Ft
Total Price (Line Items 1-15)$0.00
Optional Pricing
Optional Pricing will not be used in determining lowest price
Item No.DescriptionUnit of MeasurePrice
16Percentage Discount off List Price of Parts, Materials and SuppliesPercent
17Percentage Discount off List Price of New EquipmentPercent

&"Arial,Bold"&12 BID PRICING FORM 20-118-V&"Arial,Regular"&11 image1.emf

File details come from the government source that posted it. Updated .