2026 Bonneville Basketball Court Project - Construction Drawings

This is a set of construction drawings prepared by the City of Orem, Utah, Community Development Engineering Division for the 2026 Bonneville Basketball Court Project. The project involves constructing an 80-foot by 50-foot post-tensioned basketball court with related site improvements at the Bonneville location in Orem. The scope of work includes demolition of existing concrete flatwork, grading and site preparation, installation of the post-tensioned concrete court with surfacing and striping, two basketball hoops with 72-inch backboards and appurtenances, concrete flatwork for bench pads, landscape and irrigation restoration, and stormwater management features including small swales around the court perimeter. The project was designed by Tom Nisson in April 2026 and is scheduled for construction completion by October 1, 2026. The drawings include a demolition plan, grading plan with elevations, site plan with tendon spacing details, dimension plan, and detail sheets for the post-tensioned concrete court construction and concrete flatwork specifications.

The contractor is responsible for all survey staking and layout activities within the City's "Orem97" survey datum, locating and protecting existing underground utilities through potholing, and coordinating with the City Parks Department for landscape and irrigation restoration. The construction drawings specify a 5-inch thick post-tensioned concrete court with 4-inch concrete flatwork over 4-inch compacted Utah Test Base Course material, a 6-inch minimum compacted subbase of A-1 graded material, and a 6-millimeter polyethylene vapor barrier. Maximum allowable slope is 20 percent, with grade corners incorporating small swales to convey stormwater around the court and bench pads. Key contacts include Design Engineer Tom Nisson, Project Manager John Wirthlin, and various City staff members responsible for sewer, water, storm drain, streets, street lights, signs, traffic control, and Stormwater Pollution Prevention Plan coordination.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEVELOPMENT SERVICES

ENGINEERING DIVISION

56 NORTH STATE ST

OREM, UT 84057

CITY OF OREM

APRIL 2026

CITY OF OREM, COMMUNITY DEVELOPMENT, ENGINEERING DIVISION

DRAWINGS FOR THE CONSTRUCTION OF:

2026 BONNEVILLE BASKETBALL

COURT PROJECT

- POST-TENSIONED BASKETBALL COURTS -

4/16/2026

PROJECT VICINITY MAP SYMBOLS DRAWING INDEX

LOCATION MAP

ABBREVIATIONS

CITY OF OREM

ENGINEERING DIVISION

COMMUNITY DEVELOPMENT

OREM, UT 84057

56 NORTH STATE ST

(801) 229-7107

APPROVAL CITY ENGINEER

APPROVAL COMMUNITY DEVELOPMENT DIRECTOR

DESIGN: TOM NISSON

DATE: APRIL 2026

2000 NORTH

1600 NORTH

1200 NORTH

800 NORTH

400 NORTH

CENTER ST

400 SOUTH

800 SOUTH

1200 SOUTH

1600 SOUTH

2000 SOUTH

W

ES

T

W

ES

T

W

ES

T

W

ES

T

M

AI

N S

T

EA

ST

EA

ST

E

AS

T

GENERAL INFORMATION

PROJECT NUMBER: 26-007

SHEET

TITLENUMBER

TITLE SHEET1

GENERAL INFO AND LOCATION MAP2

SP1

IRR IRRIGATION

OC ON CENTER

OUTSIDE DIAMETEROD

LIP OF GUTTER

NOT IN CONTRACT

NOT TO SCALE

NIC

NTS

LG

MH MANHOLE

SIDEWALK

TOP OF WALK

TOP OF CONCRETE

TELEPHONE

EOA EDGE OF ASPHALT

END VERTICAL CURVE

FIRE HYDRANT

INSIDE DIAMETER

G

ID

GAS

EVC

FL

FH

FLOW LINE

CONTROL POINT

DUCTILE IRON

END CURB RETURN

EL

ECR

EC END CURVE

ELEVATION

CP

CTV

DI

CABLE TV

TW

W

TYP

WATER

TYPICAL

SW

TC

T

ENGINEERING STATION

POINT OF TANGENCY

POINT ON CURVE

POINT OF INTERSECTION

POLYVINYL CHLORIDE

RIGHT OF WAY

STORM DRAIN

SANITARY SEWER

POINT OF CURVATURE

POLE, POWER

CURB & GUTTER

BEGIN VERTICAL CURVE

CORRUGATED METAL PIPE

CG

CONC

CI

CO

CMP

CAST IRON

CLEANOUT

CONCRETE

BVC

CB

BM BENCH MARK

CATCH BASIN

R/W

SS

SD

STA

PT

PVC

PRV

ASPHALT CONCRETE

BEGIN CURVE

BEGIN CURB RETURN

AC

.BCR

BC

P

POC

PI

PC

S S

EXISTING CATCH BASIN

EXISTING CLEANOUT

EXISTING MANHOLE

EXISTING PRESSURE REDUCER

EXISTING SUMP

EXISTING WATER METER

EXISTING FIRE HYDRANT

EXISTING WATER VALVE

NEW CATCH BASIN

NEW CLEANOUT

NEW MANHOLE

NEW PRESSURE REDUCER

NEW SUMP

NEW WATER METER

NEW FIRE HYDRANT

NEW WATER VALVE

NEW WATER CROSS

NEW WATER TEE

NEW WATER ELBOW

NEW WATER SLEEVE

NEW WATER REDUCER

NEW WATER PLUG

NEW STREETLIGHTEXISTING STREETLIGHT

EXISTING POLE

EXISTING POLE WITH ANCHOR

SECTION CORNER

CONTROL POINT

SIGN

CONIFEROUS TREE DECIDUOUS TREE

CURB, GUTTER & SIDEWALKCG&SW

ROAD CENTERLINERCL

PRESSURE REDUCING VALVE

EXISTING UTILITIES NEW UTILITIES

INVERT ELEVATIONINV

HDPE

REINFORCED CONCRETE PIPERCP

CL CENTERLINE

FO FIBER OPTIC

HIGH-DENSITY POLYETHYLENE

DM1

DP1

PROJECT

AREA

1450 N.

DIMENSION PLAN

DESIGN ENGINEER TOM NISSON 229-7331

PROJECT MANAGER JOHN WIRTHLIN 229-7336

SEWER RYAN JOHNSON 229-7481

WATER QUINN FENTON 229-7546

STORM DRAIN RICK SABEY 229-7545

STREETS BILL PETERSON 229-7537

STREET LIGHTS SHAUN BRIDGES 229-7584

SIGNS TRENT MALLINSON 229-7519

TRAFFIC CONTROL JOHN DORNY 229-7320

SWPPP RYAN CASPER 229-7573

CONTACTS

GENERAL NOTES

TOP OF ASPHALTTA

GP1

DEMOLITION SHEET

SITE PLAN

GRADING PLAN

W

W

ANGLE POINTAP

2026 BONNEVILLE BASKETBALL

COURT PROJECT

- POST-TENSIONED BASKETBALL COURTS -

1. THE CONTRACTOR IS TO READ AND UNDERSTAND THE M&P SPECIAL

CONDITIONS LOCATED IN THE SPECIFICATIONS. EACH LINE ITEM IS

COVERED IN DETAIL WITH EXTRA INFORMATION THAT MAY NOT BE FOUND

ON THE PLANS. THE CONSTRUCTION COMPLETION DATE IS OCTOBER 1,

2026.

2. UNDERGROUND UTILITIES ARE APPROXIMATE. THE CONTRACTOR IS

RESPONSIBLE TO POTHOLE, LOCATE AND PROTECT ALL EXISTING UTILITIES.

THE CONTRACTOR IS RESPONSIBLE TO POTHOLE EXISTING UTILITIES TO

VERIFY ELEVATION AND LOCATION.

3. THE CONSTRUCTION SURVEY STAKING IS TO BE PROVIDED BY THE

CONTRACTOR. ALL SURVEY ACTIVITIES SHALL BE PERFORMED WITHIN THE

CITY'S “OREM97” SURVEY DATUM, UNLESS OTHERWISE NOTED.

4. THE CONTRACTOR IS RESPONSIBLE TO SURVEY AND LAYOUT ALL

IMPROVEMENTS. IF THE CONTRACTOR SHALL NOTIFY THE PROJECT

MANAGER OF ANY DISCREPANCIES.

5. THE CONTRACTOR SHALL RESTORE ALL DAMAGED LANDSCAPING AND

IRRIGATION THAT IS DAMAGED OR REQUIRES ADJUSTMENTS. THE

CONTRACTOR SHALL COORDINATE WITH CITY STAFF IN THE PARKS

DEPARTMENT BEFORE RESTORING ANY LANDSCAPING OR IRRIGATION.

D1 DETAIL SHEET

EXISTING STRUCTURE

OR FACILITY

1440 N.

1500 N.

DA

TE

CO

M

M U

N

IT

Y

DE

VE

LO

PM

EN

T

DI

RE

CT

O R

CI

TY

E N

GI

N

EE

R

DA

TE

AP

PR

O

VE

D

AP

PR

O

VA

L

RE

CO

M

M

EN

DE

D

CLEARING, GRUBBING AND DEMOLITION

WITHIN THE PROJECT EXTENTS AND AS

REQUIRED TO INSTALL NEW IMPROVEMENTS

PRESERVE & PROTECT EXISTING POWER TRANSFORMER

REMOVE & DISPOSE OF EXISTING

CONCRETE FLATWORK

PRESERVE & PROTECT EXISTING LIGHT

PRESERVE & PROTECT EXISTING TREE

PRESERVE & PROTECT EXISTING TREE

PRESERVE & PROTECT EXISTING TREEPRESERVE & PROTECT EXISTING TREE

CLEARING, GRUBBING AND DEMOLITION

WITHIN THE PROJECT EXTENTS AND AS

REQUIRED TO INSTALL NEW IMPROVEMENTS

CLEARING, GRUBBING AND DEMOLITION

WITHIN THE PROJECT EXTENTS AND AS

REQUIRED TO INSTALL NEW IMPROVEMENTS

C

IT

Y O

F O

R

EM

O R

EM

, U

T

N

O R

TH

S

TA

TE

S T

EN

G

IN

EE

R

IN

G D

IV

IS

IO

N

C O

M M

U N

IT

Y

D

EV

EL

O

PM

EN

T

DE

SC

RI

PT

IO

N

BY

RE

V

DA

TE

CH

EC

KE

D

DR

AW

N

DE

SI

GN

TL

N

TL

N

TL

N

DE

M

O

LI

TI

O

N P

LA

N

B O

N N

EV

IL

LE

B

AS

KE

TB

AL

L

CO

U

RT

P

RO

JE

CT

AP

RI

L

AP

RI

L

AP

RI

L

DM1

SCALE: 1" = 10' (11"x 17" SHEET SIZE)

Z:

\D

S_

EN

G\

EN

G_

PR

O

JE

CT

S\

\2 6-

7-

PR

K

B O

N N

EV

IL

LE

B

AS

KE

TB

AL

L

CO

U

RT

\D

ES

IG

N

\D W

G\

-0

D

ES

IG

N

B

AS

EM

AP

.D W

G

PR

O

JE

CT

N U

M

BE

R:

6-

CO

M

M U

N

IT

Y

DE

VE

LO

PM

EN

T

DI

RE

CT

O R

CI

TY

E N

GI

N

EE

R

DA

TE

AP

PR

O

VE

D

AP

PR

O

VA

L

RE

CO

M

M

EN

DE

D

-2.8%

-2.0%

-2.0%

-2.0%

-1.0%

-1.0%

-1.0%

.0

4737.00

.0

.0

.0

-2.9%

FG:4737.05

EG:4737.03

FG:4737.31

EG:4737.37

FG:4736.63

EG:4736.17

FG:4736.37

EG:4735.94

FG:4736.52

EG:4736.08

FG:4736.49

EG:4736.09

FG:4735.77

EG:4735.77

FG:4735.69

EG:4735.68

FG:4737.00

EG:4736.70

FG:4736.92

EG:4736.61

FG:4736.63

EG:4736.63

FG:4736.66

EG:4736.66

FG:4736.77

EG:4736.48

FG:4736.84

EG:4736.56

FG:4736.94

EG:4736.66

FG:4737.01

EG:4736.72

FG:4737.11

EG:4736.90

FG:4737.18

EG:4737.05

FG:4736.67

EG:4736.16

FG:4736.74

EG:4736.25

GRADE CORNER WITH SMALL SWALE

TO CONVEY STORMWATER AROUND

BASKETBALL COURT

GRADE CORNER WITH SMALL SWALE TO

CONVEY STORMWATER AROUND BENCH PAD

FG:4736.81

EG:4736.65 FG:4736.98

EG:4736.81

FG:4737.15

EG:4737.09

FG:4736.63

EG:4736.21

FG:4736.70

EG:4736.29

FG:4736.88

EG:4736.73

FG:4737.05

EG:4736.89 FG:4737.22

EG:4737.27

-1 .0

-1 .0

-1 .0

-1 .1

GRADE A MAX DISTANCE OF 5' FROM

THE NEW IMPROVEMENTS. MAXIMUM

ALLOWABLE SLOPE IS 20% (TYP.)

C

IT

Y O

F O

R

EM

O R

EM

, U

T

N

O R

TH

S

TA

TE

S T

EN

G

IN

EE

R

IN

G D

IV

IS

IO

N

C O

M M

U N

IT

Y

D

EV

EL

O

PM

EN

T

DE

SC

RI

PT

IO

N

BY

RE

V

DA

TE

CH

EC

KE

D

DR

AW

N

DE

SI

GN

TL

N

TL

N

TL

N

GR

AD

IN

G

PL

AN

B O

N N

EV

IL

LE

B

AS

KE

TB

AL

L

CO

U

RT

P

RO

JE

CT

AP

RI

L

AP

RI

L

AP

RI

L

GP1

SCALE: 1" = 10' (11"x 17" SHEET SIZE)

Z:

\D

S_

EN

G\

EN

G_

PR

O

JE

CT

S\

\2 6-

7-

PR

K

B O

N N

EV

IL

LE

B

AS

KE

TB

AL

L

CO

U

RT

\D

ES

IG

N

\D W

G\

-0

D

ES

IG

N

B

AS

EM

AP

.D W

G

PR

O

JE

CT

N U

M

BE

R:

6-

CO

M

M U

N

IT

Y

DE

VE

LO

PM

EN

T

DI

RE

CT

O R

CI

TY

E N

GI

N

EE

R

DA

TE

AP

PR

O

VE

D

AP

PR

O

VA

L

RE

CO

M

M

EN

DE

D4" CONCRETE FLATWORK

OVER 4" UTBC

4" CONCRETE FLATWORK

OVER 4" UTBC

4" CONCRETE FLATWORK OVER 4"

UTBC - BENCH PAD- (TYP.)

80'X50' POST-TENSIONED 5" THICK

CONCRETE COURT, COURT WITH

SURFACING, STRIPING, ETC.

"SERIOUS SPORTS" HEAVY DUTY PARK SYSTEM

BASKETBALL HOOP, 72 INCH BACKBOARD, POLE &

APPURTENANCES OR APPROVED EQUAL (TYP.)

INSTALL PER MANUFACTURERS RECOMMENDATIONS

BUILDING A BETTER OREM SLOGAN (TYP.)

OREM LOGO

LANDSCAPE & IRRIGATION

RESTORATION AS REQUIRED (TYP.)

LANDSCAPE & IRRIGATION

RESTORATION AS REQUIRED (TYP.)

LANDSCAPE & IRRIGATION

RESTORATION AS REQUIRED (TYP.)

WIDTH TENDON SPACING: 2 FT 5 IN

LENGTH TENDON SPACING: 2 FT 1 IN

C

IT

Y O

F O

R

EM

O R

EM

, U

T

N

O R

TH

S

TA

TE

S T

EN

G

IN

EE

R

IN

G D

IV

IS

IO

N

C O

M M

U N

IT

Y

D

EV

EL

O

PM

EN

T

DE

SC

RI

PT

IO

N

BY

RE

V

DA

TE

CH

EC

KE

D

DR

AW

N

DE

SI

GN

TL

N

TL

N

TL

N

SI

TE

P

LA

N

B O

N N

EV

IL

LE

B

AS

KE

TB

AL

L

CO

U

RT

P

RO

JE

CT

AP

RI

L

AP

RI

L

AP

RI

L

SP1

SCALE: 1" = 10' (11"x 17" SHEET SIZE)

Z:

\D

S_

EN

G\

EN

G_

PR

O

JE

CT

S\

\2 6-

7-

PR

K

B O

N N

EV

IL

LE

B

AS

KE

TB

AL

L

CO

U

RT

\D

ES

IG

N

\D W

G\

-0

D

ES

IG

N

B

AS

EM

AP

.D W

G

PR

O

JE

CT

N U

M

BE

R:

6-

CO

M

M U

N

IT

Y

DE

VE

LO

PM

EN

T

DI

RE

CT

O R

CI

TY

E N

GI

N

EE

R

DA

TE

AP

PR

O

VE

D

AP

PR

O

VA

L

RE

CO

M

M

EN

DE

D

80.00'

50.00'

3.00'

3.00'

74.00'

44.00'

3.00'

4.00' 8.00'

4.00' 5.00'

37.65'

10.50'

10.19'

12.06'

12.00'

25.00'

13.00'

12.00'

6.00'

C

IT

Y O

F O

R

EM

O R

EM

, U

T

N

O R

TH

S

TA

TE

S T

EN

G

IN

EE

R

IN

G D

IV

IS

IO

N

C O

M M

U N

IT

Y

D

EV

EL

O

PM

EN

T

DE

SC

RI

PT

IO

N

BY

RE

V

DA

TE

CH

EC

KE

D

DR

AW

N

DE

SI

GN

TL

N

TL

N

TL

N

DI

M

EN

SI

O N

P

LA

N

B O

N N

EV

IL

LE

B

AS

KE

TB

AL

L

CO

U

RT

P

RO

JE

CT

AP

RI

L

AP

RI

L

AP

RI

L

DP1

SCALE: 1" = 10' (11"x 17" SHEET SIZE)

Z:

\D

S_

EN

G\

EN

G_

PR

O

JE

CT

S\

\2 6-

7-

PR

K

B O

N N

EV

IL

LE

B

AS

KE

TB

AL

L

CO

U

RT

\D

ES

IG

N

\D W

G\

-0

D

ES

IG

N

B

AS

EM

AP

.D W

G

PR

O

JE

CT

N U

M

BE

R:

6-

VARIES

SEE PLANS FOR DETAILS

5"

8"

SUBBASE TO BE A MINIMUM OF 6" OF A-1

GRADED MATERIAL. REMOVAL OF EXISTING

MATERIAL AS DETERMINED BY CITY

ENGINEER.

6" MIN. COMPACTED

UTBC REQ'D

POST TENSIONED TENDONS

WITH SLEEVES

12"

R = 1/2"

6 MIL POLYETHYLENE VAPOR BARRIER

12"

18.4'

7.6'

6.7

CI

TY

O F

O

RE

M

O

RE

M , U

T

N

O

RT

H

ST

AT

E

ST

EN

GI

N

EE

RI

N G

DI

VI

SI

O

N

CO

M M

U N

IT

Y

DE

VE

LO

PM

EN

T

DE

SC

RI

PT

IO

N

BY

RE

V

DA

TE

CH

EC

KE

D

DR

AW

N

DE

SI

GN

A

POST-TENSIONED CONCRETE COURT

N.T.S.

C

STENCIL DETAILS

N.T.S.

D

N.T.S.

TL

N

TL

N

TL

N

AP

RI

L

AP

RI

L

AP

RI

L

D1

DE

TA

IL

S

B O

N N

EV

IL

LE

B

AS

KE

TB

AL

L

CO

U

RT

P

RO

JE

CT

PR

O

JE

CT

N U

M

BE

R:

6-

Z:

\D

S_

EN

G\

EN

G_

PR

O

JE

CT

S\

\2 6-

7-

PR

K

B O

N N

EV

IL

LE

B

AS

KE

TB

AL

L

CO

U

RT

\D

ES

IG

N

\D W

G\

-0

D

ES

IG

N

B

AS

EM

AP

.D W

G

4"

1.

5%

4" MIN. COMPACTED

UTBC REQ'D

SUBBASE TO BE A MINIMUM OF 6" OF A-1

GRADED MATERIAL. REMOVAL OF EXISTING

MATERIAL AS DETERMINED BY CITY ENGINEER.

B

CONCRETE FLATWORK

N.T.S.

Sheets and Views
Title
26-007 Title & Index - Index
26-007 Design Basemap - DM1
26-007 Design Basemap - GP1
26-007 Design Basemap - SP1
26-007 Design Basemap - DP1
26-007 Design Basemap - Details