1-25-219-B Bid Table.xlsx
XLSX spreadsheet 37 KB Posted
- Attached to
- MATERIAL SUPPLY AND INSTALLATION OF CFRP LINERS FOR INTERNAL REPAIR OF LARGE WATER AND WASTEWATER PIPES
- Solicitation number
- 25-219-B
- Issued by
- Texas
About this file
The document is a comprehensive Bid Table (Excel spreadsheet) for the North Texas Municipal Water District (NTMWD), detailing a service contract for material supply and installation of Carbon Fiber Reinforced Polymer (CFRP) liners for internal repair of large water and wastewater pipes. The bid covers a wide range of pipe sizes from 36" to 144", with specific line items for mobilization, surface preparation, joint repairs, CFRP liner installation, additional layer pricing, slope adjustments, access point distances, terminations, and support services. The bid includes quantities for various pipe sizes, with options for different mobilization timelines, surface preparation, and additional technical requirements.
The bid pricing structure includes several significant allowance items, notably $100,000 for site security (12-month period) and $500,000 for diversion and bypass pumping for wastewater pipelines. The total bid grand total is $600,000, with unit pricing left blank for bidders to complete. Additional cost considerations include traffic control, personnel rescue services, welding, dewatering for raw and potable water pipelines, and various technical specifications for pipe repairs. The bid form provides extensive granular pricing options for different pipe sizes, repair techniques, and supplementary services, allowing for precise and flexible project costing.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 2-25-219-B Bid Specifications.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| BID PRICING FORM - MATERIAL SUPPLY AND INSTALLATION OF CFRP LINERS FOR INTERNAL REPAIR OF LARGE WATER AND WASTEWATER PIPES | |||||
| Bid Form Instructions - Please use this bid spread sheet within the Excel program so that the Extended Cost can automatically be calculated. It is the bidder's responsibility to verify all calculations. | |||||
| Line | Description | Unit | Quantity | Unit Price | Extended Cost |
| Mobilization | |||||
| 1 | Mobilization normal 14 days (all materials F.O.B to job site, and included in unit cost) | Each | 12 | $0.00 | |
| 2 | Mobilization in 72 hours (all materials F.O.B to job site, and included in unit cost) | Each | 3 | $0.00 | |
| Substrate Surface Preparation | |||||
| 3 | Pipe Surface Preparation - Pipe Sizes 36" to 48" | LF | 800 | $0.00 | |
| 4 | Surface Preparation - Pipe Sizes 54" to 72" | LF | 4700 | $0.00 | |
| 5 | Surface Preparation - Pipe Sizes 84" to 144" | LF | 140 | $0.00 | |
| Conventional Joint Repairs (Remove and Replace Deteriorated Mortar) | |||||
| 6 | 36” Pipe | Each | 2 | $0.00 | |
| 7 | 42” Pipe | Each | 37 | $0.00 | |
| 8 | 48” Pipe | Each | 2 | $0.00 | |
| 9 | 54” Pipe | Each | 2 | $0.00 | |
| 10 | 60” Pipe | Each | 99 | $0.00 | |
| 11 | 66" Pipe | Each | 2 | $0.00 | |
| 12 | 72” Pipe | Each | 117 | $0.00 | |
| 13 | 84” Pipe | Each | 4 | $0.00 | |
| 14 | 90” Pipe | Each | 2 | $0.00 | |
| 15 | 96” Pipe | Each | 2 | $0.00 | |
| 16 | 108” Pipe | Each | 2 | $0.00 | |
| 17 | 144” Pipe | Each | 2 | $0.00 | |
| Material Supply and Installation of CFRP - Minimum Layers | |||||
| 18 | 36” pipe with three layers of CFRP, 1 GFRP and topcoat | LF | 24 | $0.00 | |
| 19 | 42” pipe with three layers of CFRP, 1 GFRP and topcoat | LF | 888 | $0.00 | |
| 20 | 48” pipe with three layers of CFRP, 1 GFRP and topcoat | LF | 24 | $0.00 | |
| 21 | 54” pipe with three layers of CFRP, 1 GFRP and topcoat | LF | 24 | $0.00 | |
| 22 | 60” pipe with three layers of CFRP, 1 GFRP and topcoat | LF | 2376 | $0.00 | |
| 23 | 66” pipe with three layers of CFRP, 1 GFRP and topcoat | LF | 24 | $0.00 | |
| 24 | 72” pipe with three layers of CFRP, 1 GFRP and topcoat | LF | 2808 | $0.00 | |
| 25 | 84” pipe with three layers of CFRP, 1 GFRP and topcoat | LF | 48 | $0.00 | |
| 26 | 90” pipe with three layers of CFRP, 1 GFRP and topcoat | LF | 24 | $0.00 | |
| 27 | 96” pipe with three layers of CFRP, 1 GFRP and topcoat | LF | 24 | $0.00 | |
| 28 | 108” pipe with three layers of CFRP, 1 GFRP and topcoat | LF | 24 | $0.00 | |
| 29 | 144” pipe with three layers of CFRP, 1 GFRP and topcoat | LF | 24 | $0.00 | |
| Price of Additional CFRP Layers | |||||
| 30 | Each additional single layer of CFRP for 36” pipe | LF | 24 | $0.00 | |
| 31 | Each additional single layer of CFRP for 42” pipe | LF | 222 | $0.00 | |
| 32 | Each additional single layer of CFRP for 48” pipe | LF | 24 | $0.00 | |
| 33 | Each additional single layer of CFRP for 54” pipe | LF | 24 | $0.00 | |
| 34 | Each additional single layer of CFRP for 60” pipe | LF | 594 | $0.00 | |
| 35 | Each additional single layer of CFRP for 66” pipe | LF | 24 | $0.00 | |
| 36 | Each additional single layer of CFRP for 72” pipe | LF | 702 | $0.00 | |
| 37 | Each additional single layer of CFRP for 84” pipe | LF | 48 | $0.00 | |
| 38 | Each additional single layer of CFRP for 90” pipe | LF | 24 | $0.00 | |
| 39 | Each additional single layer of CFRP for 96” pipe | LF | 24 | $0.00 | |
| 40 | Each additional single layer of CFRP for 108” pipe | LF | 24 | $0.00 | |
| 41 | Each additional single layer of CFRP for 144” pipe | LF | 24 | $0.00 | |
| Price of Additional GFRP Layer | |||||
| 42 | Each additional single layer of GFRP for 36” pipe | LF | 24 | $0.00 | |
| 43 | Each additional single layer of GFRP for 42” pipe | LF | 222 | $0.00 | |
| 44 | Each additional single layer of GFRP for 48” pipe | LF | 24 | $0.00 | |
| 45 | Each additional single layer of GFRP for 54” pipe | LF | 24 | $0.00 | |
| 46 | Each additional single layer of GFRP for 60” pipe | LF | 594 | $0.00 | |
| 47 | Each additional single layer of GFRP for 66” pipe | LF | 24 | $0.00 | |
| 48 | Each additional single layer of GFRP for 72” pipe | LF | 702 | $0.00 | |
| 49 | Each additional single layer of GFRP for 84” pipe | LF | 48 | $0.00 | |
| 50 | Each additional single layer of GFRP for 90” pipe | LF | 24 | $0.00 | |
| 51 | Each additional single layer of GFRP for 96” pipe | LF | 24 | $0.00 | |
| 52 | Each additional single layer of GFRP for 108” pipe | LF | 24 | $0.00 | |
| 53 | Each additional single layer of GFRP for 144” pipe | LF | 24 | $0.00 | |
| Additional Price for Pipes on Slopes | |||||
| Pipe sizes 36" to 66" | |||||
| 54 | Greater than 11º but less than or equal to 21º Slope of pipe to repair | Per Section | 1 | $0.00 | |
| 55 | Greater than 21º but less than or equal to 31º Slope of pipe to repair | Per Section | 1 | $0.00 | |
| 56 | Greater than 31º but less than or equal to 36º Slope of pipe to repair | Per Section | 1 | $0.00 | |
| 57 | Greater than 36º but less than or equal to 41º Slope of pipe to repair | Per Section | 1 | $0.00 | |
| Pipe sizes 72" to 144" | |||||
| 58 | Greater than 11º but less than or equal to 21º Slope of pipe to repair | Per Section | 1 | $0.00 | |
| 59 | Greater than 21º but less than or equal to 31º Slope of pipe to repair | Per Section | 1 | $0.00 | |
| 60 | Greater than 31º but less than or equal to 36º Slope of pipe to repair | Per Section | 1 | $0.00 | |
| 61 | Greater than 36º but less than or equal to 41º Slope of pipe to repair | Per Section | 1 | $0.00 | |
| Additional Price for Increased Distances from Access Point | |||||
| Pipe Size 36" to 48" | |||||
| 62 | Work Access from center of access manhole - Between 251' and 500’ | Per Section | 1 | $0.00 | |
| 63 | Work Access from center of access manhole - Between 501' and 750’ | Per Section | 1 | $0.00 | |
| 64 | Work Access from center of access manhole - Between 751' and 500’ | Per Section | 1 | $0.00 | |
| 65 | Work Access from center of access manhole - Between 1001' and 500’ | Per Section | 1 | $0.00 | |
| 66 | Work Access from center of access manhole - Between 1251' and 500’ | Per Section | 1 | $0.00 | |
| 67 | Work Access from center of access manhole - Between 251' and 500’ | Per Section | 1 | $0.00 | |
| 68 | Work Access from center of access manhole - Between 251' and 500’ | Per Section | 1 | $0.00 | |
| 69 | Work Access from center of access manhole - Between 251' and 3,000’ | Per Section | 1 | $0.00 | |
| Pipe Size 54" to 72" | |||||
| 70 | Work Access from center of access manhole - Greater than 201' to 501’ | Per Section | 1 | $0.00 | |
| 71 | Work Access from center of access manhole - Greater than 501 to 801’ | Per Section | 1 | $0.00 | |
| 72 | Work Access from center of access manhole - Greater than 801 to 1001’ | Per Section | 1 | $0.00 | |
| 73 | Work Access from center of access manhole - Greater than 1001 to 1401’ | Per Section | 1 | $0.00 | |
| 74 | Work Access from center of access manhole - Greater than 1401 to 1701’ | Per Section | 1 | $0.00 | |
| 75 | Work Access from center of access manhole - Greater than 1701 to 2001’ | Per Section | 1 | $0.00 | |
| 76 | Work Access from center of access manhole - Greater than 2001 to 2501’ | Per Section | 1 | $0.00 | |
| 77 | Work Access from center of access manhole - Greater than 2501 to 3001’ | Per Section | 1 | $0.00 | |
| Pipe Size 84" to 144" | |||||
| 78 | Work Access from center of access manhole - Greater than 201' to 501’ | Per Section | 1 | $0.00 | |
| 79 | Work Access from center of access manhole - Greater than 501 to 801’ | Per Section | 1 | $0.00 | |
| 80 | Work Access from center of access manhole - Greater than 801 to 1001’ | Per Section | 1 | $0.00 | |
| 81 | Work Access from center of access manhole - Greater than 1001 to 1401’ | Per Section | 1 | $0.00 | |
| 82 | Work Access from center of access manhole - Greater than 1401 to 1701’ | Per Section | 1 | $0.00 | |
| 83 | Work Access from center of access manhole - Greater than 1701 to 2001’ | Per Section | 1 | $0.00 | |
| 84 | Work Access from center of access manhole - Greater than 2001 to 2501’ | Per Section | 1 | $0.00 | |
| 85 | Work Access from center of access manhole - Greater than 2501 to 3001’ | Per Section | 1 | $0.00 | |
| CFRP Terminations (Excluding Expansion Rings) | |||||
| 86 | 36”Chip and tuck joint Pipe Termination | Each | 1 | $0.00 | |
| 87 | 42”Chip and tuck joint Pipe Termination | Each | 1 | $0.00 | |
| 88 | 48”Chip and tuck joint Pipe Termination | Each | 1 | $0.00 | |
| 89 | 54”Chip and tuck joint Pipe Termination | Each | 1 | $0.00 | |
| 90 | 60”Chip and tuck joint Pipe Termination | Each | 1 | $0.00 | |
| 91 | 66”Chip and tuck joint Pipe Termination | Each | 1 | $0.00 | |
| 92 | 72”Chip and tuck joint Pipe Termination | Each | 1 | $0.00 | |
| 93 | 84”Chip and tuck joint Pipe Termination | Each | 1 | $0.00 | |
| 94 | 90”Chip and tuck joint Pipe Termination | Each | 1 | $0.00 | |
| 95 | 96”Chip and tuck joint Pipe Termination | Each | 1 | $0.00 | |
| 96 | 108”Chip and tuck joint Pipe Termination | Each | 1 | $0.00 | |
| 97 | 144”Chip and tuck joint Pipe Termination | Each | 1 | $0.00 | |
| Stainless Steel Expansion Rings | |||||
| 98 | 36” Weko Seal Only | Each | 2 | $0.00 | |
| 99 | 42” Weko Seal Only | Each | 37 | $0.00 | |
| 100 | 48” Weko Seal Only | Each | 2 | $0.00 | |
| 101 | 54” Weko Seal Only | Each | 2 | $0.00 | |
| 102 | 60” Weko Seal Only | Each | 99 | $0.00 | |
| 103 | 66" Weko Seal Only | Each | 2 | $0.00 | |
| 104 | 72” Weko Seal Only | Each | 117 | $0.00 | |
| 105 | 84” Weko Seal Only | Each | 4 | $0.00 | |
| 106 | 90” Weko Seal Only | Each | 2 | $0.00 | |
| 107 | 96” Weko Seal Only | Each | 2 | $0.00 | |
| 108 | 108” Weko Seal Only | Each | 2 | $0.00 | |
| 109 | 144” Weko Seal Only | Each | 2 | $0.00 | |
| Additional Support | |||||
| 110 | Traffic Control Service | Daily | 1 | $0.00 | |
| 111 | Personnel Rescue Services | Daily | 1 | $0.00 | |
| 112 | Site Security (for 12 month period) | Allowance | 1 | $100,000.00 | $100,000.00 |
| 113 | Welding | Daily | 1 | $0.00 | |
| 114 | Dewatering, raw water pipelines | Daily | 1 | $0.00 | |
| 115 | Dewatering, Potable water pipelines | Daily | 1 | $0.00 | |
| 116 | Diversion and Bypass Pumping for Wastewater pipelines (for 12 month period) | Allowance | 1 | $500,000.00 | $500,000.00 |
Grand Total: $600,000.00
Company Name and Signature
| LF - Linear Feet |
| Refer to Project Scope of Work, Specification Part 5, for Pay Item descriptions |
image1.png
File details come from the government source that posted it. Updated .