ESU 30-2207 Minsi Hall Roof Replacement
Solicitation number
Not on record
Issued by
Monroe County, Pennsylvania

About this file

Summary

This is a complete bidding package from the State System of Higher Education Commonwealth of Pennsylvania for the Minsi Residence Hall Roof Replacement Project (ESU 30-2207) at East Stroudsburg University located in Monroe County, Pennsylvania. The project involves the comprehensive replacement of the existing SBS Modified roofing system with a new PVC membrane roofing system across the Minsi Residence Hall. The scope of work includes providing all manpower, materials, and equipment necessary for safe removal and replacement of the roofing system, including new metal roof edging, scuppers, walk pads, and associated flashing and terminations. Three distinct roof areas with different existing conditions require specialized treatment: Area A features a lightweight insulating concrete deck with ballasted EPDM membrane; Area B contains tapered polyisocyanurate insulation over metal decking; and Area C has existing wood planking with fiberboard insulation. A mandatory pre-bid conference is scheduled for March 19, 2026, at 10:00 AM at the Mattioli Recreation Center with mandatory site visit immediately following. Pre-bid questions must be submitted by March 30, 2026, at 2:00 PM. Sealed electronic bids are due through PennBid on April 17, 2026, at 2:00 PM. On-site work shall commence no earlier than May 11, 2026, with substantial completion required by July 31, 2026. The contract includes liquidated damages of $1,000 per calendar day for delays beyond the completion date.

The project is estimated at a contract cost range of $350,000 to $400,000 for General Construction (Contract 2207.1). A 5% bid bond is required, with 100% performance, payment, and maintenance bonds mandated upon contract award. The project is subject to Pennsylvania Prevailing Wage requirements under Serial Number 26-01524, effective February 17, 2026. Bidders must demonstrate compliance with Small Diverse Business (SDB) requirements with a Reasonable Effort Award Amount (REAA) of 5% of the base bid, requiring proactive solicitation of SDB subcontractors. The apparent low bidder may be required to submit original hard copies of bid forms and security within 48 hours of bid opening. The System contemplates awarding a firm fixed-price contract and will endeavor to issue the Notice to Proceed within 120 days of bid opening. All work must comply with the Uniform Construction Code, prevailing wage standards, and Pennsylvania E-Verify requirements. The project manual includes comprehensive technical specifications for PVC thermoplastic single-ply roofing, manufactured roof specialties, joint sealants, painting, rough carpentry, and selective demolition procedures.

View the file

Other files

File Type Posted
1-2192 Complete bid package.pdf PDF
1-ESU 30-2198 - Project manual and drawings.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation for Construction 2016K110 Solicitation No. ESU 30-2207

Cover Sheet

STATE SYSTEM OF HIGHER EDUCATION

COMMONWEALTH OF PENNSYLVANIA

PROJECT MANUAL

AND

INVITATION FOR BIDS

Roof Replacement Project

Minsi Residence Hall

Project No. ESU 30-2207

Contract No.:

General Construction 2207.1 at

EAST STROUDSBURG UNIVERSITY OF PENNSYLVANIA

Monroe County

East Stroudsburg, PA 18301-2999 of the State System of Higher Education Commonwealth of Pennsylvania

Harrisburg, Pennsylvania

Office of the Chancellor

March 16, 2026

Cover Sheet

TABLE OF CONTENTS

Solicitation for Construction Page Numbers

Special Instructions to Bidders 1 - 2 General Instructions to Bidders 1 - 8 Bid Form 1 - 4 Bid Bond Form 1 - 2 MBE/WBE & VB/SDVB Requirements Instructions 1 - 4 MBE/WBE & VB/SDVB Solicitation Form 1 - 3 Contractor's Qualification Form 1 - 6

Contract Form

Standard Form of Contract 1 - 4 Contract Bond Form 1 - 6 General Conditions 1 - 35 Insurance Rider 1 - 3 Prevailing Wage Report 1 - 7

Technical Specifications

Division 01 - General Requirements Section 011000, Summary of Work 1 - 8 Section 012200, Unit Prices 1 - 3 Section 012300, Alternates 1 - 1 Section 012600, Contract Modification Procedures 1 - 6 Section 012900, Payment Procedures 1 - 8 Section 013100, Project Management and Coordination 1 - 5 Section 013119, Project Meetings 1 - 4 Section 013200C, Construction Progress Documentation 1 - 3 Section 013300, Submittal Procedures 1 - 6 Section 013500C, Safety and Health Requirements 1 - 5 Section 014500, Quality Control 1 - 4 Section 015000B, Temporary Facilities and Controls 1 - 5 Section 016000, Product Requirements 1 - 4 Section 016200, Product Options 1 - 3 Section 017123, Field Engineering 1 - 3 Section 017329, Cutting and Patching 1 - 5 Section 017700, Closeout Procedures 1 - 4 Section 017823 Operation and Maintenance Data 1 - 5 Section 017836 Warranties 1 - 3 Section 017839 Project Record Documents 1 - 2

GENERAL CONSTRUCTION (CONTRACT NO. 2198.1)

Division 02 – Sitework

Section 02 4119 Selective Demolition 1 – 7

Division 06 – Wood and Plastic

Section 06 1000 Rough Carpentry 1 – 5

Cover Sheet

Division 07 – Thermal & Moisture Protection

Section 07 5400 PVC Single Ply roofing 1 – 8

Section 07 7100 Manufactured Roof Specialties 1 - 9

Section 07 9200 Joint Sealants 1 - 6

Section 09 9100 Painting 1 - 7

Drawings

A0.00 Cover Sheet A0.60 Demolition Plans and General Notes A1.30 Roof Plans and Details

Solicitation for Construction 71-FA-8.2

General Instructions to Bidders

STATE SYSTEM OF HIGHER EDUCATION

COMMONWEALTH OF PENNSYLVANIA

SPECIAL INSTRUCTIONS TO BIDDERS

PROJECT INFORMATION

Project Title: Minsi Residence Hall Roof Replacement Project

Project No: ESU 30-2207

Location: East Stroudsburg University of PA 200 Prospect Street East Stroudsburg, PA 18301

Project Scope: The Project involves the replacement of the existing SBS Modified roofing system with a new PVC membrane roofing system. Scope includes but is not limited to providing all manpower, materials and equipment, man-lifts, scaffolding and necessary protections for the safe removal and replacement of the roofing system, including new metal roof edging, scuppers, and walk pads.

Contract Time: See Standard Form of Contract

Prevailing Wages: Yes; The Prevailing Minimum Wage Determination for this Project is Serial Number 26-01524, dated 02/17/2026.

Liquidated Damages: Yes; see Standard Form of Contract.

Contract Cost Ranges: 2207.1 General Construction $350,000 to $400,000

Directions: https://www.esu.edu/about/index.cfm

BIDDING INFORMATION

Issuing Office East Stroudsburg University Facilities Management Office 118 Normal Street East Stroudsburg, PA 18301-2999

Contracting Officer: Omar Mayyasi Chief Financial Officer

(570) 422-3117, Email: omayyasi@esu.edu

Design Professional: Spillman Farmers Architects 1720 Spillman Drive, Suite 200 Bethlehem, PA 18015

(610) 865-2621

Plans and Specs: Available on PennBid at https://pennbid.bonfirehub.com/ All aspects of bidding will be utilized through this system. All solicitation documents must be obtained from this website. Bidders must download and utilize the system provided documents

General Instructions to Bidders

Bids Due Date/Time: 2:00 PM (local time) on Friday, April 17th, 2026

Method of submission of bids for this IFB (see Sections 1 and 7 of the General Instructions to Bidders):

By upload of electronic documents to PennBid at https://pennbid.bonfirehub.com/

Pre-bid Conference Date/Time: 10:00 AM (local time) on Thursday, March 19th, 2026

Mandatory or not: Attendance at Pre-Bid Conference is Mandatory

Location of pre-bid meeting: East Stroudsburg University Mattioli Recreation Center 1282 Center Street East Stroudsburg, PA 18301

Site Visits: Attendance at the Site Visit is mandatory. To be held at end of Pre-Bid Conference. Additional Site Visits may be pre-arranged by contacting the University Project Manager, John Bondarchuk, (570) 422-3871, Email: jbondarchuk@esu.edu.

Point of Contact: University Project Manager John Bondarchuk, (570) 422-3871, Email: jbondarchuk@esu.edu.

Submit Pre-Bid Questions regarding this project via the “Ask a Question” feature in PennBid

Cut-off Date for Pre-Bid Questions: 2:00 PM (local time) on Monday, March 30th, 2026

REAAs for Small Diverse Business (SDB) proactive solicitation:

2198.1 General Construction 5% of Base Bid 1

Bid Security Required: 5% of bid price

Bid Security Allowed: Bid Bond only

Bid Period: Bids shall be valid for not less than 60 days

Items Required to be Submitted with the Bid: Bid Form

Bid Bond and/or other bid security Small Diverse Business (SDB) Solicitation Form and supporting documents Licenses, certifications, etc. to be submitted with bid Contractor’s Qualification Statement (FRC-2016)

Performance, Payment, and Maintenance Bonds Required with the Contract: 100% of awarded Contract Price

General Instructions to Bidders

STATE SYSTEM OF HIGHER EDUCATION

COMMONWEALTH OF PENNSYLVANIA

GENERAL INSTRUCTIONS TO BIDDERS

1. PennBid Bonfire Event

The System uses the PennBid Bonfire web-based platform for public notice for Invitations for Bids (IFBs).

Specific instructions related to the PennBid Bonfire Bid Event are posted online. The bid documents take precedence over any online instruction.

Detailed information about submission and acceptance of bids is addressed in Section 7 below.

2. Responsibility of the Bidder

It is the responsibility of the bidders by careful examination of the Contract Documents to satisfy themselves as to the nature and location of the Work, as well as all environmental conditions that may affect performance of the Work. All bidders should visit the site to thoroughly familiarize themselves with the existing conditions. If any discrepancies should be found between existing conditions and the Contract Documents, prospective bidders shall report these discrepancies to the System for clarification prior to submitting a bid. Requests for interpretation of the Work to be performed shall be submitted in writing to the System or the System's designated representative. Failure of the bidder to visit the site, recognize and take into account in their bid site conditions that affect the Work, shall not be considered sufficient cause for any increase in the agreed-upon contracted amount. If subsurface drilling or other exploration has been performed at the Project site, information resulting from such drilling and/or exploration and provided to the System in forms and/or subsurface drilling reports is included in the Technical Plans and Specifications.

3. Incurring Costs

The System is not liable for any cost or expenses incurred by bidders or prospective bidders in the preparation of their bids or for attendance at any conferences, meetings, or site visits related to tI IFB.

4. Restriction of Contact

From the issue date of this IFB until a final contract award has been made, all contacts with Commonwealth personnel concerning this IFB must be made only through the Issuing Office or other specific representatives identified for the IFB on PennBid Bonfire Bid Event.

5. Addenda to the IFB

If it becomes necessary to revise any part of this IFB, Addenda will be issued. If Addenda are issued, all terms and conditions that are not changed remain. Bidders shall acknowledge on the Bid Form all Addenda, identified by the numbers and dates of those Addenda. Bidders are responsible for ensuring they are aware of all Addenda prior to submitting their bid.

6. Questions and Answers to the IFB

The PennBid Bonfire Bid Event provides a message board for on-line questions and answers. The System will post answers to questions, as applicable. If there are a significant number of questions and/or complex questions/answers, the answers may be consolidated and provided in an Addendum. Posted answers shall be considered official, as if included in an Addendum. Answers will be posted in a timely-enough manner for bidders to be able to adequately consider them. Bidders are responsible for ensuring they are aware of all posted answers prior to submitting their bid.

7. Submission and Acceptance of Bids

Bids shall be entered on the Bid Form provided elsewhere in this IFB. The completed Bid Form shall be PDF format and uploaded to the PennBid Bonfire Bid Event not later than the bid due date and time to be considered as responsive to the bid requirements. Bidders submitting bids for more than one separate prime contract shall prepare and upload separate Bid Forms.

All other items required to be submitted with the bid shall be PDF format and uploaded in the same manner and at the same time as the Bid Form. Items may be separate PDF files or combined into one PDF file; or may be combined into one PDF file with the Bid Form. If separate PDF files are used, however, they must be gathered into a Zip file for uploading. Bidders submitting bids for more than one separate prime contract shall prepare, scan, and upload separate items for each separate prime contract.

The apparent low bidder may be asked to submit one (1) original hard copy of their Bid Form, and one (1) original hard copy of their bid security, if required for the IFB, with all entries in ink or typewritten and with original signatures, within 48 hours of bid opening date and time. Other items required to be submitted with the bid may also be required to be submitted as original hard copies.

The System will not be responsible if the bidder is not able to upload their scanned PDF Bid Form if the problem is not associated with a failure of PennBid Bonfire, Sourcepoint, or Discovery itself. Uploaded Bid Forms and other documents which are not readable when accessed by the System will be rejected as non-responsive.

To be considered, bids must be a complete response to the IFB, and must contain all elements required to be submitted with the bid. An omission of prices requested on the Bid Form may be sufficient cause for rejection of the entire bid as non-responsive.

Bidders may submit modifications to their bids at any time before the bid due date and time. Modifications to bids shall be accomplished by withdrawing their bid form and uploading a new bid form. Otherwise, all bids shall be unconditionally accepted without alteration or modification except as authorized in this IFB.

Bids may be withdrawn up to the time of bid opening.

Requests for withdrawal of bids after bid opening based on an erroneous bid and/or a mistake in the bid, in accordance with the Commonwealth Procurement Code 62 P.S. 512(f), must be made within two (2) working days after the date of bid opening.

8. Bid Security

If a bid security is required, each bid must be accompanied by a certified check, bank cashier's check, or Bid Bond. Specific bid security required, and the type, for the solicitation is identified on the Pennbid Bonfire bid event. Failure to submit bid security, if required, will result in the rejection of the bid as non-responsive.

If a check is allowed, it shall be drawn to the order of the System. If a Bid Bond is used as the security, it must be submitted on the System-furnished Bid Bond form, complete with all signatures, seals, and certificate of power of attorney. Failure to use the System Bid Bond form for a bid bond will result in the rejection of the bid as non-responsive. The Bid Bond form is located elsewhere in this IFB.

The bid security will be forfeited if a bid or any part thereof is accepted by the System and the bidder fails to furnish approved performance and payment bonds, if required, and execute the contract within the time frame stated in the Notice of Award.

All bid security not forfeited, except for the two lowest responsive, responsible bidders, shall be released on or before the thirtieth (30th) day after the bid opening. The bid security of the two lowest responsive, responsible bidders, except where forfeiture is involved, will be returned, or released, as appropriate, upon execution of the performance and payment bonds and the contract by the lowest responsive, responsible bidder. In the event no contract is awarded by the System, the bid security of the two lowest responsive, responsible bidders will be returned, or released, as appropriately, on or about sixty (60) days after the bid opening, unless an extension is agreed upon.

9. Business Certification

The Bid Form contains a Bidder Business Certification section that bidders must complete.

If the bidder is incorporated or organized in a state other than Pennsylvania, the bidder must be registered to do business in Pennsylvania. If the bidder is operating under an assumed or fictitious name, the bidder must have registered that name in Pennsylvania. No contract will be awarded to a foreign (non-Pennsylvania) corporation, LLC, LLP, or LP, or to an assumed or fictitious name, unless the bidder has complied with the registration requirements of Pennsylvania statutes.

Information on business registration in the Commonwealth of Pennsylvania is available from the Pennsylvania Department of State, Bureau of Corporations and Charitable Organizations, 206 North Office Building, Commonwealth Avenue & North Street, Harrisburg, PA 17120.

10. Submission of Small Diverse Business (SDB) Participation Information

If applicable, bidders must submit with their bid the required SDB participation information. The SDB Requirements Instructions, and the required SDB Solicitation Form, are located elsewhere in this IFB.

11. Selection for Award

The System intends to award a contract or contracts resulting from this IFB to the responsible bidder(s) who submitted a responsive bid(s) which represents the lowest price to the System based on the bid evaluation plan.

If unit-priced bid items are included on the Bid Form, the System reserves the right to make an award on any item for a quantity less than the estimated quantity offered.

If the Bid Form includes multiple Bid Items, the System reserves the right to make multiple awards if, after considering the additional administrative costs, it is in the System's best interest to do so.

12. Tie Bids

When two or more low bids are equal in all respects, a recognized simple "game of chance" will be used to determine which equally eligible bidder is to be awarded the contract. For two equally eligible bidders, a coin flip or a drawing of straws or lots may be used. For three or more equally eligible bidders, a drawing of straws or lots will be used. Equally eligible bidders will have the opportunity to witness the process, if applicable.

13. Unbalanced Bids

The System may reject a bid as non-responsive if it is materially unbalanced as to prices for the basic requirement, any unit prices, and/or any options. Unbalanced pricing exists when, despite an acceptable total evaluated price, the price of one or more Bid Form line items is significantly overstated or understated.

A bid may be rejected if the System determines that the lack of balance poses an unacceptable risk to the System.

14. Apparent Clerical and Other Mistakes on the Bid Form

For the purpose of initial evaluation of bids, the following will be utilized in resolving arithmetic discrepancies found on the face of the Bid Form as submitted by the bidder:

a. Obviously misplaced decimal points will be corrected.

b. For a discrepancy between a unit price and its extended price, the unit price will govern.

c. Apparent errors in extension of unit prices will be corrected.

d. Apparent errors in addition of lump-sum and extended prices will be corrected.

In the case of a discrepancy between written words and numbers, the written words will govern.

15. System's Right to Reject Bids

The System reserves the right to reject any bid if it shows any omission, alteration, addition, or deduction not called for; if it contains substitutions or exceptions; if it is conditional or represents an uninvited alternate bid; or if it contains irregularities of any kind. The System reserves the right, however, to waive technical defects or minor irregularities. Additionally, in the event a bidder fails, refuses, or neglects to provide any requested information or documents within the time stated in this IFB or upon the System's request, the System will have the right to reject their bid as non-responsive.

The System reserves the right to reject at any time all bids received.

16. Anti-Bid-Rigging

The bids of any bidder or bidders who engage in collusive bidding shall be rejected. Any bidder who submits more than one bid in such manner as to make it appear that the bids submitted are on a competitive basis from different parties shall be considered a collusive bidder. The System may reject the bids of any collusive bidder upon bid openings of future projects. By submitting a bid, a bidder is certifying that they are not engaged in collusive bidding or bid rigging relative to this bid. Nothing in this section shall prevent a bidder from superseding a bid by a subsequent bid delivered prior to bid opening which expressly revokes the previous bid.

17. Reciprocal Limitations Act Requirements

The Reciprocal Limitations Act (62 P.S. 107) is applicable to contracts of $10,000 and greater.

The Reciprocal Limitations Act requires the System to give bidders a preference against a non-resident bidder from any state that gives or requires a preference to bidders from that state. The amount of the preference shall be equal to the amount of the preference applied by the state of the nonresident bidder.

The following is a list of the states which have been found by the Commonwealth of Pennsylvania to have applied a preference for in-state bidders and the amount of the preference:

Arizona 5% (construction materials from Arizona resident dealers only)

Montana 3%

West Virginia 2.5% (for the construction, repair, or improvement of any buildings)

Wyoming 5%

The Reciprocal Limitations Act also requires the System to give preference to those bidders offering supplies produced, manufactured, mined, or grown in Pennsylvania against those bidders’ offering supplies produced, manufactured, mined, or grown in any state that gives or requires a preference to supplies produced, manufactured, mined, or grown in that state. The amount of the preference shall be equal to the amount of the preference applied by the other state for that particular supply. The following is a list of states which have been found by the Commonwealth of Pennsylvania to have applied a preference for in-state supplies and the amount of the preference:

Alaska 7% (applies only to timber, lumber, and manufactured lumber products originating in the state)

Arizona 5% (construction materials produced or manufactured in the state only)

Hawaii 10%

Louisiana 10% (steel rolled in Louisiana)

7% (all other products)

Montana 5% (for residents offering in-state goods, supplies, equipment, and materials)

3% (for non-residents offering in-state goods, supplies, equipment, and materials)

New Mexico 5%

Oklahoma 5%

Washington 5% (fuels mined or produced in the state only)

Wyoming 5%

The Reciprocal Limitations Act also requires the System to not specify, use, or purchase supplies which are produced, manufactured, mined, grown, or performed in any state that prohibits the specification for, use of, or procurement of such supplies in or on its public buildings or other works when such supplies are not produced, manufactured, mined, or grown, or performed in that state. The following is a list of the states which have been found by the Commonwealth of Pennsylvania to have prohibited the use of certain out-of-state supplies:

Georgia forest products only

Indiana coal

New Jersey various products, to include but not limited to: chain link fence, portable sanitation units, glass, glazier supplies, carpet and cushion, shades, upholstery materials and supplies, room air conditioning, electrical supplies, plumbing supplies, hardware supplies, fasteners, lumber, building supplies, audio/visual equipment, fire extinguishers, fire hose, motor oils, fuel oil, Venetian blinds, and drapes

New Mexico construction

The above lists and amounts of preferences are those related to construction contracts only. The complete list of preferences for all contracts, supplies, and services is available from the Commonwealth of Pennsylvania Department of General Services.

18. Nondiscrimination

The System is an equal opportunity employment agency with nondiscrimination/sexual harassment requirements, as contained in the General Conditions for the Construction Contract. It is the policy of the System to award and administer contracts for goods and services in a nondiscriminatory manner, to promote the affirmative participation of minority-owned and women-owned businesses in procurement activities and awards, and to integrate into procurement processes the necessary practices and procedures for the procurement of all goods and services for the System to effectively implement the policy.

19. Debarred Contractors

Contractors currently under suspension or debarment by the Commonwealth, any other state, or the Federal government, are not eligible for award of any contract for this Project. By submitting a bid, a bidder is certifying that they are not currently under suspension or debarment by the Commonwealth, any other state, or the

Federal government. Additionally, contractors shall not contract with or employ any subcontractors, suppliers, or individuals that are currently under suspension or debarment. A current list of suspended or debarred contractors is available by contacting the Department of General Services, Office of General Counsel, North Office Building Room 603, Harrisburg, Pennsylvania 17125.

20. Delinquent Payments

By submitting a bid, a bidder is certifying that, to the best of their knowledge, they are not delinquent in the payment of taxes or other levies to the Pennsylvania Department of Revenue, the Pennsylvania Department of Labor & Industry, or any other Commonwealth Agency or entity.

21. Submission of Contractor Qualification and/or Financial Information

Upon request, or if specifically required by the terms of this IFB, the apparent low bidder may be requested to submit a contractor's qualification and/or financial statement within ten (10) calendar days of the bid date, with financial information current within twelve (12) months prior to the bid date, of which statements shall be certified to be true and correct by an affidavit sworn to or affirmed before a notary public or other officer empowered to administer oaths or affirmations.

22. Financial Requirements

To be deemed a responsible bidder, the bidder may be required to demonstrate, in relation to the bid price, adequate financial and other resources in order to be able to successfully prosecute the work. Additional information may be requested by the System whenever, in its judgment, such information is necessary to determine the responsibility of the bidder.

23. Contractor Performance Evaluation Systems

The System may utilize a contractor performance evaluation system or tool established by the Department of General Services or by another Commonwealth agency, entity, or instrumentality to obtain past performance information on the bidder. Such information may be used in a determination of the bidder’s responsibility.

24. Commonwealth of Pennsylvania Contractor Responsibility Program (CRP)

The System may utilize the Commonwealth of Pennsylvania CRP System, as provided for under the Governor's Office's Management Directive 215.9 Amended, Contractor Responsibility Program, dated October 25, 2010, to ensure that the System contracts only with responsible contractors.

25. References and Past Performance

The System reserves the right to contact any and all references provided by the bidder, as well as any of the bidder’s past or current clients and/or customers, to glean information on the bidder’s past performance and experience. Such information may be used in a determination of the bidder’s responsibility.

26. Award of Contract

The System may, solely at its own discretion, award a contract within sixty (60) days from the date of bid opening. A time extension may be made by written consent of the lowest responsive responsible bidder.

Award will be consummated by a Notice of Award letter mailed to the Contractor.

The System contemplates award of a firm fixed price contract resulting from this IFB. The contract into which the parties are anticipated entering is the System's Standard Form of Contract for Construction, located elsewhere in this IFB.

The System will provide to the contractor the completed Contract for signature with the Notice of Award letter. The Contract will not become effective until executed by all necessary Commonwealth officials as provided by law.

27. Notice to Proceed (NTP)

The System will endeavor to issue the NTP within 120 days of the bid opening. Any delays caused by the contractor's failure to provide any required documents within the specified time will cause an equivalent number of days to be added to this 120-day time frame.

28. Performance, Payment, and Maintenance Bonds

Should Performance, Payment, and/or Maintenance Bonds be required, the System will provide to the Contractor with the Notice of Award letter the blank System Contract Bond form. The Contractor's surety company must be authorized to do business in the Commonwealth of Pennsylvania and must successfully demonstrate in writing prior to award that the amount of bond or reinsurance or other security has been obtained in conformance with the Pennsylvania Insurance Company law of 1921, 40 P.S. 832. If specifically required by the terms of this IFB, as indicated in the Special Instructions to Bidders, the Contractor’s surety company may be required to be rated at a specific level or better by A.M. Best and Company. Failure of the Bidder to execute the required Performance, Payment, and/or Maintenance Bonds within the time specified may result in payment to the System their bid security, in the amount of the difference between their bid and the next lowest responsive responsible bid, or the bid security amount, whichever is less. The System shall have the right to award the contract to the next lowest responsive responsible bidder.

29. PA E-Verify

The Commonwealth of Pennsylvania enacted Act 127 of 2012, known as the Public Works Employment Verification Act (‘the Act’), which requires all public work contractors and subcontractors to utilize the Federal Government’s E-Verify system (EVP) to ensure that all employees performing work on public work projects are authorized to work in the United States. The Department of General Services’ (DGS) Public Works Employment Verification Compliance Program is responsible for the administration, education, and enforcement of the Act. Information on the Act and DGS' program are available on DGS' web site.

Contracts resulting from this solicitation will fall under the Act and the associated DGS compliance program.

Contractors will be required to sign and submit to the university, as a pre-condition of being awarded a contract, the Commonwealth of Pennsylvania Public Works Employment Verification Form (the Form). The Form is available on DGS' web site and/or through the university.

30. Investment Activities in Iran

The Commonwealth of Pennsylvania enacted Act 149 of 2014, which prohibits entities which engage in certain investment activities in Iran from entering into a contract with the Commonwealth. Contractors may be required to sign and submit to the university, as a pre-condition of being awarded a contract, a certification stating that they are not on the Department of General Services' list of entities whom the Department determined are engaged in investment activities in Iran, as described in Act 149.

31. News Releases

News releases and media contacts regarding this Contract and Project will be made by the System only, unless the System directs otherwise in specific instances. In such instances, the System shall receive prior review and approval of such releases. In any case, Contractors shall not use the name of the System or any University for promotional or marketing purposes without the System’s prior written approval.

32. Pennsylvania Right-to-Know Law

Effective January 1, 2009, all responses to this procurement opportunity are subject to the Pennsylvania Right-to-Know Law, 65 P.S. §67.101 et seq., (Act 3 of 2008). The Right-to-Know Law permits any requestor to inspect and/or copy any record prepared and maintained or received in the course of the operation of a public office or agency that is not subject to the enumerated exceptions under the law. If a bidder’s/proposer’s response to the procurement opportunity contains a trade secret or confidential proprietary information, the bidder/proposer should include with their response a separate signed written statement to that effect. Should the response become the subject of a Pennsylvania Right-to-Know Law request, the bidder/proposer will be notified by the procurement office to identify all trade secrets or confidential and proprietary information that is included in your response. The agency will then determine whether the claimed trade secret or confidential and proprietary information is subject to disclosure.

33. Right to Protest

A bidder or prospective bidder or prospective contractor who is aggrieved concerning the solicitation or award of a contract may protest, as provided for in the Commonwealth Procurement Code, 62 Pa C.S.

1711.1. Protests shall be made in writing by submitting the protest to the Office of the Chancellor, State System of Higher Education, 2986 North Second Street, Harrisburg PA 17110. A copy of the protest shall be mailed simultaneously to the Contracting Officer identified for the solicitation on the PennBid Bonfire bid event. All protests must be received within seven (7) calendar days after the protestant knew or should have known of the facts giving rise to the protest. If a protest is submitted by a prospective bidder, the protest must be received prior to the bid opening date/time. If a protestant fails to file a protest or files an untimely protest, the protestant shall be deemed to have waived its right to protest the solicitation or award of the contract in any forum. Untimely filed protests will be disregarded. A protest must state all grounds upon which the protestant asserts the solicitation or award of the contract was improper. The protestant may submit with the protest any documents or information it deems relevant to the protest. Upon receipt and evaluation of the protest, the Office of the Chancellor will render a written decision, in accordance with the procedures outlined within the Commonwealth Procurement Code.

Solicitation for Construction 71-FA-8.2 Bid Form Solicitation No ESU 30-2207 Page 1 of 4

BID FORM

BID FOR:

Contract No. ESU 30-2207

Title of Project Minsi Roof Replacement Project

Location Minsi Residence Hall, East Stroudsburg University of Pennsylvania

BID FROM:

Firm Name

Federal ID No.

Address

Telephone

Fax

E-mail

Name of Contact for this Bid

The Bidder agrees to perform the work specified in the Contract Documents, under the terms and conditions specified in the Contract Documents, without exceptions or substitutions, and under any required additional certifications and conditions attached hereto, for the prices proposed on this Bid Form.

The Bidder additionally certifies that requirements in the Instructions to Bidders are met.

The Bidder acknowledges the Addenda hereinafter enumerated, which have been issued during the period of bidding, and agrees that contents of said Addenda shall become incorporated into the Contract.

Addenda No. Date Issued

Solicitation No ESU 30-2207 Page 2 of 4

BASE BIDS

BASE BID NO. 1 (General Construction 2207.1)

All work complete as shown on the drawings and described in the specifications, for the sum of:

Dollars $

(WRITTEN) (FIGURES)

Unit price for Repair / Replacement of Lightweight Insulating Concrete Decking (per cu. Yd.): Unit price for removing damaged existing lightweight insulating concrete decking and replacing it with new lightweight insulating concrete to match the existing.

Unit price for Repair / Replacement of Existing Tapered Roof Insulation (per Board Foot (BF)): Unit price for removing damaged existing tapered roof insulation and replacing it with new tapered insulation to match the existing. Reference Division 07 Roofing Specifications for the Tapered Insulation.

Solicitation No ESU 30-2207 Page 3 of 4

BIDDER'S BUSINESS CERTIFICATION

TYPE OF BUSINESS (check one of the three options below, and circle the correct entries within)

The Bidder is a Pennsylvania Corporation, LP, LLP, or LLC (circle one), organized and existing under the laws of Pennsylvania, and so is authorized to do business in Pennsylvania by the

Pennsylvania Business Corporation Law of 1988, as amended.

The Bidder is a Foreign Corporation, LP, LLP, or LLC (circle one), organized and existing under the laws of the state of (enter the name of the state), and has or has not (circle one) been granted a certificate of authority, or is or is not (circle one) registered, to do business in

Pennsylvania as required by the Pennsylvania Business Corporation Law of 1988, as amended.

The Bidder is an Individual, Proprietorship, Partnership, or other (circle one), trading under a fictitious or assumed name, and has or has not (circle one) registered under the Pennsylvania Fictitious

Names Act of 1982, as amended.

RESIDENCY (complete one of the two options below)

Does your firm have a street address in Pennsylvania at which it was transacting business when the

Notice to Contractors for this contract was issued?

If "Yes", insert the address, or insert "same as address on page 1."

If "No," insert the address of the office responsible for this bid, or insert "same as address on page 1."

(In either case, provide a street address in lieu of a post office box.)

Solicitation No ESU 30-2207 Page 4 of 4

BID SIGNATURE PAGE

CERTIFICATIONS

The person(s) signing below certifies that:

he/she(they) is(are) authorized to represent the Bidder and bind the Bidder to this bid, and, the information contained in or with this bid is true and correct, and that this information is material and important and will be relied upon by the System in awarding the contract for which this bid is submitted.

If the Bidder is an Individual, Proprietorship, or Partnership:

(one signature and one witness signature required)

(Signature) (Witness)

(Date)

If the Bidder is a Corporation, LP, LLP, or LLC:

(two signatures required)

(President/Vice President) (Secretary/Treasurer)

(CORPORATE SEAL)

Solicitation for Construction 71-FA-8.2 Bid Bond Solicitation No. ESU 30-2207 Page 1 of 2

BID BOND

(Bid Bond must be submitted on this form; all blanks must be completed)

Bond No.

Amount of $

KNOW ALL MEN BY THESE PRESENTS, that we, (hereinafter called the "Principal") as Principal and a corporation organized and existing under the laws of the State/Commonwealth of , and authorized to transact business in Pennsylvania, as Surety, (hereinafter called the "Surety"), are held and firmly bound unto the State System of Higher Education, Pennsylvania (hereinafter called the "Obligee"), in the sum of Dollars ($ ) for the payment of which sum, well and truly to be made, we, the said Principal, and the said Surety, bind ourselves, our heirs, our administrators, successors, and assigns, jointly and severally firmly by these presents.

Sealed with our seals and dated this day of , WHEREAS the Principal has submitted a bid upon Contract No.

for

NOW, THEREFORE, the conditions of these obligations are such that if the Principal shall not withdraw its bid prior to the expiration of the award period after the opening of the bids; and shall comply with all requirements set forth in the "Invitation For Bids", in the "Instructions to Bidders", and on the "Bid Form";

and if the said contract be awarded to the Principal and the Principal shall, within such time as may be specified, enter into the contract in writing, and give bond, with Surety acceptable to the Obligee, covering the faithful performance of the said contract, payment of claims for labor, material, and equipment rental, comply with the warranty provisions, and the remedy of defective workmanship or material for one year after the date of completion, all of which shall be supplied on the forms as specified by said Obligee; or if the Principal shall fail to do so, pay to the Obligee the lesser of the following amounts: 1) the amount of this bond as hereinabove set forth, or 2) the difference between the amount specified in the Principal's bid and such larger amount for which the Obligee may in good faith contract with another party to perform the work covered by said bid including the administrative cost to effect such contract, then this obligation shall be void; otherwise to remain in full force and effect.

Solicitation for Construction 71-FA-8.2 Bid Bond Solicitation No. ESU 30-2207 Page 2 of 2

(Signature) (Witness)

(President/Vice President) (Secretary/Treasurer)

(CORPORATE SEAL)

SURETY (include title of Signatory)

(SURETY SEAL)

INSTRUCTIONS FOR BID BOND:

The names of the Principal and the Surety on the front page must include a street address.

The Surety must attach to the Bid Bond a Power-of-Attorney, which must be dated to match the date of the Bid Bond and show that the person signing the Bid Bond for the Surety has current authority to do so.

Solicitation for Construction 71-FA-8.2 SDB Requirements Instructions Solicitation No. ESU 30-2207 Page 1 of 4

SMALL DIVERSE BUSINESS (SDB) REQUIREMENTS INSTRUCTIONS

1. Scope

These SDB Requirements Instructions are applicable for construction contracts procured and administered by the System. These SDB Requirements Instructions are unique to the System.

The SDB Requirements Instructions and the processes contained herein have been implemented as an interim program by the System and may be changed in the future.

2. Definitions

The following words or terms are defined as stated when used herein, unless clearly indicated otherwise.

Diverse Business: a business which meets the requirements of one or more certifications from third party entities, as recognized by the Pennsylvania Department of General Services (DGS), to qualify it as a Minority Business Enterprise, a Woman Business Enterprise, a Veteran Business Enterprise, a Service- Disabled Veteran Business Enterprise, a Disability-Owned Business Enterprise, or an LGBT Business Enterprise.

Small Business: a business which meets the requirements of the DGS Small Business Procurement Initiative for self-certification as being Small.

SDB: Small Diverse Business; a Diverse Business which also is a Small Business.

Verified SDB: an SDB verified as such by DGS, and in the DGS SDB database. Hereinafter, Verified SDB are simply referred to as SDB, in both the singular and the plural.

Non-SDB Firm: A business that cannot be classified, or has not been verified or certified, as an SDB.

REAA: Reasonable Effort Award Amount; that amount of the work under a construction contract for which competitive quotes can reasonably be expected to be obtained from SDB subcontractors, suppliers, and/or vendors. The REAA is expressed as a percent, applied as a percentage of the prime bidder’s bid (usually applied against Base Bid No. 1), or as a dollar amount.

Proactive Solicitation: Aggressive effort taken by a prime bidder to obtain written quotes from SDB subcontractors, suppliers, and/or vendors, which the prime bidder can then submit with his/her bid so as to reach or exceed the REAA for the Contract.

Commitment: A conditional written promise that a subcontractor's, supplier's, and/or vendor's written quote given at the time of bid will be honored, in at least the amount quoted, or in a lesser amount if acceptable by mutual negotiations, for the scope of work and/or materials specified.

Subcontract: The term subcontract shall include subcontracts for construction services, purchase orders for construction materials and/or equipment rental, or some combination of the two, or similar arrangements. Hereafter, no distinction is made between subcontract, purchase order, rental agreement, or other similar arrangement. The same applies for subcontractor, supplier, and vendor.

3. Proactive Solicitation Policy

Prime bidders submitting bids for System construction contracts shall proactively solicit SDB and encourage them to submit written quotes for portions of the work as subcontractors. If a quote from an SDB is the lowest received for that portion of the work, if that quote is responsive, and if the prime bidder determines that SDB to be responsible, then the prime bidder shall make a commitment to award a subcontract to that

SDB.

Solicitation No. ESU 30-2207 Page 2 of 4

4. Acceptable Proactive Solicitation

An REAA for each Separate Prime contract is established by the System and is provided in the Special Instructions to Bidders. The REAA is based on the scope of work of the project and contract, and the current demographics concerning ready, willing, and able SDB subcontractors in an appropriate geographic area.

An acceptable proactive solicitation effort by a bidder is considered to be, at a minimum, solicitation effort such that competitive quotes totaling the REAA could reasonably be expected to be received from SDB.

a. Normally, it takes multiple solicitations in order to reasonably expect to receive a quote. The number of solicitations that may be needed varies, depending on the size of the project, the scope of work being solicited, the dollar value of the work being solicited, the location of the project, the location of the SDB being solicited, etc.

b. In some cases, it may take solicitations of various scopes of work of lesser value to total the value of the REAA. In such a case, multiple solicitations for each scope of work would most likely be required.

Evidence of proactive solicitation is considered in determining the responsiveness of a bid. A bidder shall be considered to have fulfilled the requirement to conduct acceptable proactive solicitation in one of the following three ways. All actions shall be as of the time of bids.

a. If the bidder makes commitments to SDB at or above the REAA at the time of bids, the bidder will be considered to have met the proactive solicitation requirements.

b. If the bidder does not make commitments to SDB at or above the REAA at the time of bids, the bidder must have conducted acceptable proactive solicitation for the value of the REAA, with one, or a combination of, the following occurring.

(1) An acceptable proactive solicitation effort was made to obtain quotes from SDB, but written quotes were not received from any of them, and/or

(2) A written quote was received from an SDB, but a lower written quote was received from a Non- SDB Firm for the identical scope of work, and a commitment was made to that Non-SDB Firm.

c. A combination of items a., b.(1), and b.(2) above is acceptable. A portion of the REAA may be fulfilled by commitment to an SDB, with the rest of the REAA being fulfilled through acceptable proactive solicitation.

5. Submission Requirements for Evidence of Proactive Solicitation

Bidders must show proof of their proactive solicitation by submitting with their bid a completed SDB Solicitation Form and copies of the following, as appropriate:

a. All written solicitations to SDB.

b. All solicited and unsolicited written quotes received from SDB.

c. Any written quote from a Non-SDB Firm that is lower than the lowest quote received from an SDB, and which is the basis of a commitment to that Non-SDB Firm.

d. Any letters of commitment to SDB or Non-SDB Firms submitting the lowest written quotes.

e. Explanatory information, if not obvious from other information submitted, which provides reasons, if known, why written commitments were not made for the lowest written quotes received from SDB, and/or other reasons why the REAA could not be met.

If the prime bidder is an SDB, he/she must indicate on the SDB Solicitation Form that they are a DGS-verified SDB and are in the DGS SDB database. No proactive solicitation or other documentation is required.

Solicitation No. ESU 30-2207 Page 3 of 4

6. Determination of Responsiveness

The procurement office issuing the Contract will review the documentation submitted and determine, based on the documentation submitted, whether acceptable proactive solicitation was conducted. If the Contracting Officer determines that the bidder did not perform acceptable proactive solicitation, the Contracting Officer may determine the bid to be non-responsive and reject the bid.

The review and determination will consider, among other things, the following requirements:

If the SDB Solicitation Form was fully completed, and if all supporting documents were included.

If the bidder listed all those SDB to which solicitations were made.

If the bidder identified the scope of work and/or materials solicited from each SDB.

If the bidder contacted SDB directly and requested written quotes for specific work or materials.

Mailings to large numbers of SDB which are intended to provide notice of a bidder's interest in bidding a construction project may be deemed to not be acceptable proactive solicitation.

If the bidder provided sufficient time for SDB to properly prepare quotes.

If the bidder submitted all solicited and/or unsolicited quotes from SDB.

The review and determination may also include, among other things, the following considerations.

Did the bidder solicit a varied selection of SDB which appear to be categorized as performing the required subcontracting effort?

Did the bidder solicit appropriate scopes of work to the various SDB? Scopes of work that are too small, oddly organized, or cut out of a larger scope may not be of interest to some SDB; scopes of work that are too large or include other trades or specialties may not be within the capacity of some

SDB.

Did the bidder solicit SDB in a geographic locale such that they would reasonably be expected to quote on the project, or outside that locale? Did the bidder make an effort to solicit all the appropriate SDB within a reasonable geographic locale, or simply solicit a set number?

Was the bidder supportive of solicited SDB in order to obtain their quotes? Was the scope of work being solicited clear? Did the solicitation indicate where and how the plans and specifications could be reviewed? Was the time for submitting a quote clear and adequate?

How many quotes did the bidder get from SDB, even if some or all of them were not competitive?

How many quotes were received, and what percent of the REAA did they represent? If quotes were received, depending on the number and percent, the proactive solicitation effort may not be required to be as demanding as if no bids or quotes were received.

Was the bidder able to make some commitments to SDB, even if at below the REAA? For what percent of the REAA were commitments made? If commitments were made, depending on that percentage, the proactive solicitation effort for the remaining dollar value to reach the REAA may not be required to be as demanding as if no commitments were made.

Did the bidder receive a low quote from an SDB, but that SDB then refused a commitment?

How clear and convincing is the bidder's explanatory information as to why he/she was otherwise not able to meet the REAA?

7. Contractual Obligations

The bid of the successful bidder, including the completed SDB Solicitation Form and accompanying documents regarding solicitation and commitments to SDB, shall be considered as incorporated in, and become contractual obligations under, the terms and conditions of the Contract awarded to that bidder.

Solicitation No. ESU 30-2207 Page 4 of 4

If an SDB submits a quote that is the lowest quote for a specific scope of work and/or materials, the successful bidder is obligated to offer a commitment, at the time of bids, in the amount quoted to that SDB, but only to the extent that there is an agreement as to the scope of work and/or materials specified at the time of bids. The successful bidder may, however, offer a commitment to an SDB whose quote was not the lowest quote.

If accepted by an SDB, a commitment to that SDB made at the time of bids must be culminated with a subcontract or purchase order of at least the dollar value of the commitment, unless otherwise agreed upon by the SDB. If a commitment is not accepted by the SDB, a commitment may be made to any other qualified subcontractor without penalty of invalidating the bidder’s SDB proactive solicitation.

The System will send copies of the successful bidder's Notice of Award letter, or other notification, to those SDB who presented the lowest quotes and/or received commitments from the successful bidder at the time of bids. These copies will serve as notice to those SDB to anticipate award of subcontracts for the project.

Failure to follow the above procedures constitutes a potential breach of the requirements of the Contract, and may be grounds for termination of the Contract. In any event, the Contract Sum will not be adjusted to accommodate rejected commitments made to subcontractors to satisfy SDB requirements.

Other contractual requirements relative to the SDB program are in…