1-2028 CO Certification Letter Instructions.docx
DOCX document 37 KB Posted
- Solicitation number
- US.261440
- Issued by
- New Mexico
About this file
This file is instruction guidance for a certification letter required by the New Mexico Aging and Long Term Services Department (ALTSD) for the 2028 Capital Outlay Application for New Construction. The document provides step-by-step instructions for senior centers applying for capital outlay funding to support new construction projects, including new facilities, structures, or major site or infrastructure improvements. The certification letter must be prepared on official letterhead of the municipality, county, nation, tribe, or pueblo providing authorization and must document that a certifying official authorizes a named applicant to submit an application for specified facilities. Applicants must ensure that all placeholder text is replaced with accurate entity, applicant, and facility names; verify the application cycle and program addressee; obtain the certifying official's signature; and submit a legible signed copy in a format accepted by the application portal. The instruction set includes a pre-submission checklist confirming official letterhead inclusion, placeholder replacement, name consistency with the application, application cycle verification, and proper signature and formatting.
The certification letter serves as authorization documentation only and does not constitute certification of project readiness, completed planning and design, or secured funding. Applicants must separately provide planning and design documentation, permits, funding commitments, and other required attachments as specified in the final application instructions. The guidance emphasizes that this authorization letter does not establish additional program eligibility or signature requirements beyond what the final program instructions specify, and applicants should confirm all requirements with the final application materials before submission.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 5-2028 Capital Outlay Application Manual with Examples.pdf | ||
| 3-Combined Project Budget, Scope of Work and Funding Worksheet Instruction Sheet.docx | DOCX document | |
| 2-2028 CO Certification Letter Template.docx | DOCX document | |
| 4-Combined Project Budget, Scope of Work and Funding Worksheet.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Certification Letter — Instructions 2028 ALTSD Capital Outlay | Draft applicant guidance Purpose: Use the accompanying letter to document that the certifying official authorizes the named applicant to apply for funding for the listed facility or facilities. This template follows the authorization format of the example provided; it is not a certification of project readiness, completed planning and design, or secured funding.
1. Use official letterhead.
Place the letter on the letterhead of the municipality, county, nation, tribe, or pueblo providing authorization.
2. Identify the entity and official.
Replace the entity name, mailing address, certifying official name and title, and date. Use the official authorized by your entity to provide this authorization.
3. Identify the applicant.
Enter the full name and title of the person authorized to submit the application. Keep the name consistent with the application.
4. List the facilities.
Replace the facility placeholder with each facility name and location covered by the authorization. Use the same facility names as the application. If necessary, add a clearly identified facility list and refer to it in the letter.
5. Confirm the application cycle.
This draft uses 2028 to match the application materials discussed. Verify the cycle and program addressee against the final application instructions before signing.
6. Review and sign.
Remove all brackets and placeholder text. Have the certifying official review and sign the completed letter. Include the printed name, title, entity name, telephone number, and email address.
7. Prepare the submission copy.
Retain the editable Word version. Prepare a legible signed copy in the format accepted by the application portal, and attach or upload it as directed by the final application instructions.
Before submission ☐ Official letterhead is included.
☐ All placeholders have been replaced.
☐ Entity, applicant, and facility names match the application.
☐ Application cycle and addressee have been verified.
☐ The certifying official has signed the letter.
☐ The signed copy is legible and prepared in an accepted file format.
Scope note: This authorization letter does not replace separate planning/design documentation, permits, funding commitments, or other application attachments. This draft does not establish additional program eligibility or signature requirements; confirm final program instructions.
File details come from the government source that posted it. Updated .