1-2027 Yeadon Borogh Trash Collection.pdf

PDF 1 MB Posted

Attached to
2027 Removal and Disposal of Residential and Municipal Trash and Single Stream Recyclables
Solicitation number
US.255465
Issued by
Delaware County, Pennsylvania

About this file

Summary

This is a sealed bid solicitation document issued by Yeadon Borough, Delaware County, Pennsylvania, for the 2027 removal and disposal of residential and municipal trash and single-stream recyclables. The scope of work encompasses refuse and recycling collection services for approximately 3,400 residential units, plus municipal facilities including Yeadon Borough Hall, the Yeadon Public Library, and the Public Works Garage. The bidding structure includes a base bid for Year 1 (January 1, 2027 through December 31, 2027) with two optional alternate bids providing different collection frequencies. Sealed bids must be submitted electronically through PennBid by 10:00 AM on October 13, 2026. The contract period is for one calendar year with the option for the Borough to extend the contract to Years 2 and 3 at its discretion, with notification of extension decisions to occur by October 1. Contractors will be notified of extension awards for subsequent optional years by October 1 of the current contract year.

Bid security of 10 percent of the bid amount, submitted as either a certified check or bid bond, must accompany each proposal. The successful bidder must provide Performance and Payment Bonds each in the amount of 50 percent of the contract sum prior to execution of the contract. Monthly compensation will be paid to the contractor following submission of a Monthly Solid Waste Report and weight receipts by the fifth day of each month, with the Borough having 30 days to remit payment. The contractor shall collect refuse twice weekly during July and August and once weekly during the remainder of the year under the base bid, with alternate bid options providing for once-weekly collection year-round. The contractor retains all revenue from the sale of recyclable materials. Performance penalties range from $40 to $100 per incident based on the number of violations, with specific penalties of $500 for commingling residential and commercial waste or for improper handling of recyclables. Subcontractor use is limited to 25 percent of the contract work.

View the file

Other files

File Type Posted
2-Addendum No 1 2026.10.08.pdf PDF
3-Pricing Section BT-79RT 1791900729.8061378.xlsx XLSX spreadsheet

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ADVERTISEMENT

INSTRUCTION TO BIDDERS

FORM OF BID

GENERAL AND SPECIAL CONDITIONS

CONSTRUCTION SPECIFICATIONS

ARTICLES OF AGREEMENT

CONTRACT BOND

YEADON BOROUGH

DELAWARE COUNTY, PENNSYLVANIA

2027 REMOVAL AND DISPOSAL OF

RESIDENTIAL & MUNCIPAL TRASH &

SINGLE STREAM RECYCLABLES

September 2026

PENNONI ASSOCIATES INC.

CONSULTING ENGINEERS

WEST CHESTER, PA 19380

www.pennoni.com

PROJECT NO. YEADB 00008 SET NO.

U:\Accounts\YEADB\YEADB00008 - Trash Collection\RESOURCES\DRAFT SPECS\2022 Bulk Trash General Conditions.doc

All documents prepared by Pennoni Associates are instruments of service in respect of the project. They are not intended or represented to be suitable for reuse by Owner or others on extensions of the Project or on any other project. Any reuse without written verification or adaptation by Pennoni Associates will be at Owner's sole risk and without liability or legal exposure to Pennoni Associates; and Owner shall indemnify, and hold harmless Pennoni Associates from all claims, damages, losses and expenses arising out of or resulting therefrom.

TABLE OF CONTENTS NO.

ADVERTISEMENT A

INSTRUCTION TO BIDDERS B

FORM OF BID C

STATEMENT OF BIDDER QUALIFICATIONS

GENERAL CONDITIONS D

CONTRACTORS WORK E

DEFINITIONS F

SCOPE OF WORK G

ARTICLES OF AGREEMENT H

CONTRACT BOND

MAP OF SERVICE AREA

A. ADVERTISEMENT

YEADON BOROUGH

DELAWARE COUNTY, PENNSYLVANIA

Sealed bids will be received electronically through PennBid™ by Yeadon Borough until 10:00 AM, prevailing time, on the 13th day of October 2026, for 2027 REMOVAL AND

DISPOSAL OF RESIDENTIAL & MUNCIPAL TRASH & SINGLE STREAM

RECYCLABLES at which time and place they will be opened, and the bid results posted on PennBid™. All documents and solicitations details are available online anytime at no cost at PennBid™ (www.pennbid.bonfirehub.com). Note, PennBIDTM assesses a fee to the bidder who is issued the award. Click on the “Solicitations” and “View” tabs.

Each bid must be accompanied by a certified check or bid bond payable to the Owner in an amount of not less than ten percent (10%) of the bid or bids. Only bonds from companies licensed to do business in the State where the Owner is located will be accepted and the bond shall so state same.

Contract period for Yeadon Borough shall be for the period starting January 1, 2027, and ending December 31, 2027. This contract may be extended for optional years 2 and 3 at the discretion of the Borough.

Bids must be submitted unconditionally. No bidder may withdraw their bid within SIXTY

(60) days after the scheduled closing time for receipt of bids.

The Owner reserves the right to waive any informalities, or to reject any or all bids.

B. INSTRUCTION TO BIDDERS

1. THE WORK

2027 Removal and Disposal of Residential and Municipal Trash & Single Stream Recyclables – Yeadon Borough.

The Borough reserves the right to award optional years 2 and 3 to this contract.

2. METHOD FOR SUBMITTING BIDS

Sealed Bids shall be accepted online via the PennBid Program (www.penbid.bonfirehub.com) No bid will be considered unless submitted upon the electronic bid form for the project.

If a bidder has been incorporated in some state other than Pennsylvania, that bidder shall state whether the corporation is registered to do business in Pennsylvania. If a bidder operates under an assumed or fictitious name, that bidder shall state whether such name has been registered in Pennsylvania.

No contract will be awarded to a bidder who is a foreign corporation or operating under a fictitious or assumed name unless the bidder has complied or agreed to comply with the proper registration under the laws of this Commonwealth.

3. BONDS

A. Bid security in the amount stated in the invitation to bid must accompany each bid. The successful bidder’s security will be retained until the bidder has signed the Contract and has furnished the required Certificate of Insurance.

B. The Owner reserves the right to retain the security of all bidders until the successful bidder enters into the Contract or until 60 days after bid opening, whichever is sooner.

Other bid security will be returned as soon as practicable. If any bidder refuses to enter into a Contract, the Owner may retain that bidder’s bid security as liquidated damages which shall not be construed as a penalty.

C. Prior to signing the Contract, the Owner will require the successful bidder to secure and post Performance and Payment Bonds in the amount of 50% of the Contract Sum, and on the form provided therefore in the Project Manual. Such bonds shall be issued by Surety acceptable to the Owner. Costs of such bonds will be included in the Bid.

4. EXAMINATION OF DOCUMENTS AND LOCATIONS OF WORK

Before submitting a bid, the bidder shall read the Specifications and all other proposed Contract Documents, and shall become familiarized with the pick-up and delivery sites.

Each bidder shall become fully informed prior to bidding as to existing conditions and limitations under which the work is to be performed, and shall include in the bid a sum to cover the cost of items necessary to perform the work as set forth in the proposed Contract Documents. No allowance will be made to a bidder because of the lack of such examination or knowledge. The submission of a bid will be considered as conclusive evidence that the bidder has made such an examination.

5. QUALIFICATIONS

Each prospective bidder may be required to submit a detailed list of work outlining the projects they have performed within the last five (5) years. This list, at a minimum, shall include the following:

1. Location of Project.

2. Owner’s Name and Address.

3. Total Contract Amount (including change orders).

4. Dates work was performed.

5. Detailed narrative of work performed.

6. Name, address and telephone number of contact person for the awarding agency.

6. WITHDRAWAL OF BIDS

A. A bidder may withdraw their bid at any time prior to the scheduled time for opening bids.

B. No bidder may withdraw their bid for a period of 60 calendar days after the date set for opening thereof, and bids shall be subject to acceptance by the Owner during this period.

7. AWARD OR REJECTION OF BIDS

The Contract, if awarded, will be awarded to the responsive, responsible bidder who has proposed the lowest Contract Sum, subject to the Owner’s right to reject any or all bids and to waive informality and irregularity in the bids and in the bidding.

8. EXECUTION OF AGREEMENT

A. The form of Agreement which the successful bidder will be required to execute is included in the Project Manual.

B. The bidder to whom the Contract is awarded shall, within 15 calendar days after notice of award and receipt of Agreement forms from the Owner, sign and deliver required copies to the Owner.

C. At or prior to delivery of the signed Agreement, the bidder to whom the Contract is awarded shall deliver to the Owner those Certificates of Insurance required by the

Contract Documents and such Labor and Materials Payment Bonds and Performance Bond as are required by the Owner.

D. Bonds and Certificates of Insurance shall be approved by the Owner before the successful bidder may proceed with the Work. Failure or refusal to provide Bonds or Certificates of Insurance in a form satisfactory to the Owner shall subject the successful bidder to loss of time from the allowable construction period equal to the time of delay in furnishing the required documents.

9. INTERPRETATION OF CONTRACT DOCUMENTS PRIOR TO BIDDING

A. If any person contemplating submission of a bid for the Work is in doubt as to the true meaning of any part of the proposed Contract and related Documents, or finds discrepancies in or omissions from any part of the proposed Contract Documents, he may submit a request for interpretation thereof not later than seven days before bids will be opened through PennBid.

B. Interpretation or correction of proposed Contract Documents will be made only by Addendum. The Owner will be responsible for any other explanations or interpretations of the proposed Contract Documents.

10. USE OF SUBCONTRACTORS

A. Use of subcontractors not to exceed 25%.

11. CONSTRUCTION AND LIQUIDATED DAMAGES

A. The Agreement will include a stipulation, schedule, and penalties under which the Work be completed.

Liquidated damages are not applicable following receipt of the Owner’s Notice to Proceed.

Penalties for failure to perform will be assessed per the schedule outlined in the contract below; Section G. (r).

THIS SET OF FORMS IS TO BE COMPLETED ELECTRONICALLY VIA PENNBID

C. FORM OF BID

Proposals for 2027 Removal and Disposal of Residential and Municipal Trash & Single Stream Recyclables, for use in Yeadon Borough for the period of January 1, 2027 to December 31, 2027.

The contract may be extended to Years 2 and 3 (calendar year 2028 and 2029) at the discretion of the

Borough in accordance with the General Conditions and Specifications.

The undersigned, as bidder, declares that the only person, persons, company, or parties interested in this proposal, as principals, are named herein, that the bidder has carefully examined the specifications and that the bidder proposes and agrees that if their proposal is accepted, the bidder will contract with Yeadon Borough to perform the Work.

Bidder declares that they will perform the Work for the various prices as set forth in the following form of proposal.

Greetings:

This bid is submitted in accordance with your advertisement inviting bids to be received until 10:00 AM on the 13th day of October 2026 for:

FORM OF BID

2027 REMOVAL AND DISPOSAL OF RESIDENTIAL AND MUNICIPAL TRASH & SINGLE

STREAM RECYCLABLES

BASE BID YEAR 1– January 1, 2027 to December 31, 2027

ITEM

NO. QUANTITY DESCRIPTION

UNIT

PRICE TOTAL

1 1 L.S. Twice per week residential and municipal trash collection in July and August. Once per week residential and municipal trash collection balance of the year.

Approximately 3,400 units

DOLLARS $ $

2 1 L.S. Weekly residential and municipal single stream recycling once per week collection; Hauler keeps all revenue from sale of recyclables.

Approximately 3,400 units.

BASE BID

TOTAL

(ITEMS 1 THROUGH 2 BASED ON

ESTIMATED QUANTITIES)

ALTERNATE BID YEAR 1 – January 1, 2027 to December 31, 2027

A1.1 1 L.S. Once per week residential and municipal trash collection balance for the entire year.

ALT BID*

NO. 1

TOTAL

(ITEM A1.1 BASED ON ESTIMATED

QUANTITIES)

*Should this alternate be awarded, Base Bid Line Item No. 1 is superseded.

ALTERNATE BID YEAR 2 – January 1, 2028 to December 31, 2028

A2.1 1 L.S. Twice per week residential and municipal trash residential and municipal trash collection

A2.2 1 L.S. Weekly residential and municipal single stream recycling once per week collection; Hauler

ALT BID

NO. 2

TOTAL

(ITEMS A2.1 THROUGH A2.2 BASED ON

ALTERNATE BID YEAR 2 – January 1, 2028 to December 31, 2028

A3.1 1 L.S. Once per week residential and municipal trash

NO. 3

TOTAL

(ITEM A3.1 BASED ON ESTIMATED

QUANTITIES)

*Should this alternate be awarded, Alternate No. 2 Line Item No. A2.1 is superseded.

ALTERNATE BID YEAR 3– January 1, 2029 to December 31, 2029

A4.1 1 L.S. Twice per week residential and municipal trash residential and municipal trash collection

A4.2 1 L.S. Weekly residential and municipal single stream recycling once per week collection; Hauler

ALT BID

NO. 4

TOTAL

(ITEMS A4.1 THROUGH A4.2 BASED ON

ALTERNATE BID YEAR 3– January 1, 2029 to December 31, 2029

A5.1 1 L.S. Once per week residential and municipal trash

NO. 5

TOTAL

(ITEM A5.1 BASED ON ESTIMATED

QUANTITIES)

*Should this alternate be awarded, Alternate No. 4 Line Item No. A4.1 is superseded.

List of Electronic Copies of Documents to be Uploaded with Bid

____ Form of Bid (C-3 through C-5)

____ Bid Bond with Bonding Company Form

____ Form of Guaranty (D-1) PennBID only

____ Statement of Bidder’s Qualifications (D-2 through D-4)

(TO BE UPLOADED WITH BID)

STATEMENT OF BIDDER'S QUALIFICATIONS

All questions must be answered and the date given must be clear and comprehensive. This statement must be notarized. If necessary, questions may be answered on separate sheets. The Bidder may submit any additional information he desires.

1. Name of Bidder

2 . Permanent main office address

3 . When organized

4. If a corporation, where incorporated

5. How many years have you been engaged in improvements work of this type under your present firm or trade name?

6. Contract on hand: (Schedule these showing gross amount of each contract and the appropriate anticipated dates of completion).

7. General character of work performed by you

8 . Have you ever failed to complete any work awarded to you? If so, where and why?

9. Have you ever defaulted on a contract? If so, where and why?

10. List the more important contracts recently by you, stating approximate gross cost for each, and the month and year completed.

11. List your major equipment (including make, model, and VIN Number) available for this contract.

12. Experience in work similar in importance to this project.

13 Background and experience of the principal members of your organization, including the officers.

14. Give bank references and address.

15. Enclosed or attached is a detailed financial statement.

16. Will you, upon request, furnish any other information that may be required by the Owner.

17. The undersigned hereby authorizes and requests any person, firm or corporation to furnish any information requested by the Owner.

In verification of the recitals comprising this Statement of Bidder's Qualifications.

Dated at this day of 20 __

Name of Bidder

D-3

By

Title

STATE OF )

) SS

COUNTY OF )

, being duly sworn, deposes and says that he is of

Name of Bidder’s Organization and that the answers to the foregoing questions and all statements therein contained are true and correct. Subscribed and sworn to before me this ___________________ day of ___________________, 20___.

Notary Public

My Commission Expires :

D-4

D. GENERAL CONDITIONS

1. Requirements of Bid

All bids must be submitted through PennBid on the attached Form of Proposal completed in full and completely executed by the bidder.

2. Rejection of Bid

The Borough reserves the right to reject any and all bids for any cause, or no cause whatsoever.

3. Term of Contract

Contract period for Yeadon Borough shall be for the period starting January 1, 2027, and ending December 31, 2027. This contract may be extended for optional years 2 and 3 at the discretion of the Borough. Contractor will be notified by October 1 if you are going to be awarded the next option year.

4. Acceptance of Terms and Specifications

It is understood that parties bidding accept all the terms and conditions contained and expressed in the specifications attached to the proposal submitted.

5. Hold Harmless

The Contractor agrees to indemnify and save harmless the Borough and their respective representatives from all suits or actions of every nature and description brought against them or either of them.

The Borough reserves the right to determine whether performance of the Work is of an acceptable condition prior to payment for invoiced services. The Borough further reserves the right to withhold payment for any service determined to be defective, incomplete, or otherwise unsatisfactory.

6. Tax Waiver

Each bidder, when submitting a bid, shall not include any allowance for Pennsylvania State Sales Tax, which the Borough is exempt from paying.

7. Independent Contractors

It is to be understood that the successful bidder is an independent contractor of the Borough and is solely responsible for completion of the Work. Any failure to satisfactorily complete the Work shall be corrected at no expense to the Borough.

8. Entire Agreement

The Notice to Bidders, Proposal, Specifications, General Conditions, Form of Contract, and Bonds comprise the entire agreement between the Parties. Any modifications or alterations can be made only in writing, signed by both Parties hereto. The Borough will not enter into any other agreement related to the provision of services specified in this agreement of any kind whatsoever after the execution of this agreement.

9. Payments

It is understood that the contractor shall be paid for services provided on a monthly basis after Owner receives an invoice accurately reflecting the services performed by the Contractor for a given month. Owner shall have thirty (30) days to remit payment unless the Owner determines that work identified in a given invoice is defective, incomplete, or otherwise unacceptable to Owner.

10. Financial Standing

All bidders must be prepared to present suitable evidence of their financial standing and their ability to supply equipment as set forth in the Proposal and Specifications.

11. Change in Specifications

No verbal instructions or information to bidders shall be binding. The specifications will be clear and complete unless attention is called to any apparent discrepancies, or incompleteness thereof, before the opening of the bids. Should any change in specifications be required, they will be issued to all bidders in the form of an addendum to the original bid.

12. Examination of Proposals

Submitted bids will be considered as conclusive evidence of complete examination of the Proposal and Specifications by bidder.

13. Bonds

At the time of submitting a bid proposal, the contractor must enclose a bid bond or certified check in the amount of 10% of the bid amount.

When the bid is awarded, bonds and/or certified checks of rejected bidders will be returned to those bidders. The person, firm, or corporation who is awarded the contract will have their bid bond or certified check returned after the contract is signed.

Before the contract is awarded, the Contractor shall furnish, at the time of execution of the contract, or under certain conditions, before the contract, Performance and Payment bonds, with surety, acceptable to the Borough to be approved by the Borough Solicitor.

The Performance and Payment bonds shall each be for the amount of Fifty Percent (50%) of the contract price, conditioned for the faithful performance of said contract, including the indemnification of the owner in all respects set forth in the General Conditions and Specifications.

Attached to the bonds, shall be a recent financial statement of the surety, along with a Power of Attorney showing that the person signing the bonds on behalf of the surety has power to do so.

Failure to post the required bonds will be sufficient reason for Borough Council to rescind their action of accepting the bid and to accept the bid of the next lowest responsive, responsible bidder. If the successful bidder fails to execute a contract on bonds, the bid bond or certified check, whichever has been deposited, will be forfeited as liquidated damages.

E. CONTRACTORS WORK

1. The collection point for refuse, bulk refuse, and recycling will be curbside, common shared driveways, and in rear alleys, as further delineated in the General Conditions.

2. Missed collection days due to holidays and/or severe weather (snow and floods) will be made up on the next collection day. Refuse collections will be made on all days that the Delaware County Solid Waste Authority is open for business.

3. The successful bidder will be responsible for leaving all collection sites clean and orderly. Spilled trash and recycling and "tossed" empty containers will not be permitted. The Borough's Public Works personnel, and/or Borough Staff will confirm reports of any incident of careless collection.

4. Five bags and/or containers of trash per collection per residential unit may be set at the curb line for collection. No construction debris is permitted. Yard waste is to be to be bundled and tied and shall be cut so as not to exceed 3' in length. Yard waste is limited to 4 bundles per collection. One bulk item shall be collected per residential unit/week.

5. Recycling is to be placed in a container and all materials are to be comingled.

Plastic bags are not permitted in any recycling container.

6. The successful bidder will be responsible for ensuring its collection crews do not engage in "entrepreneurial" activities. Soliciting payments from residents to pick-up large volumes of trash will not be tolerated. The successful bidder will be required to transfer, or discharge, crews who engage in such activities, and/or the successful bidder will risk cancellation of their contract.

7. Trash at Borough-owned properties (Borough Hall, the Yeadon Public Library and the Public Works Garage) shall be collected by the successful bidder on the same frequency as it collects residential trash and is incidental to the respective contract line items. At Borough Hall and the Yeadon Public Library, the Borough shall place trash containers at a convenient location on said properties for collection by the successful bidder. At the Public Works Garage, the successful bidder shall collect refuse contained in cans and shall haul the dumpster when notified by the Borough. For pricing purposes of dumpster use, the anticipated collection schedule is every two months. Dumpster contents shall include: trash; clean-outs from Borough facilities including desks, chairs, etc.; dropped tree limbs and like vegetation as picked up from the grounds of Borough parks; and trash collected by the Public Works department.

8. Recyclables from Borough-owned properties (Borough Hall, Yeadon Public Library and the Public Works Garage) shall be collected by the successful bidder on the same frequency as the collection of residential recyclables and is incidental to the respective contract line items. At Borough Hall, the Yeadon Public Library and the Public Works Garage, the Borough shall place recyclables at a convenient location on said properties for collection by the successful bidder.

9. Within no more than ninety (90) days following the commencement of the Contract, the successful bidder shall prepare and distribute (by either U.S. mail or hand delivery) to all Borough residents a refrigerator magnet listing the schedule for recycling pickup and the recyclable materials which may be deposited curbside for collection. In January of each subsequent year of the Contract, the successful bidder shall either mail a brochure or place a "robocall" to all Borough residents encouraging recycling. The form of all refrigerator magnets, and all brochures and/or robocalls shall be subject to the approval of the Borough prior to their distribution. This requirement is incidental to the respective year's scope of work, i.e., the magnets are incidental to the first year's contract; the brochure and/or robocall is incidental to each subsequent year's contract.

10. Failure to successfully complete collection as described in the conditions above will result in penalties assessed per Section G. Scope of Work, subsection r. Failure to Perform/Penalties”.

11. In addition to the conditions set forth in this Section E. Contractor’s Work, the Borough reserves the right to add and make a part of this contract, any additional Special Conditions which it deems necessary for the adequate performance of the contract. All such additional Special Conditions will be attached to, and become a part of, the Agreement executed by the parties.

12. Tax Waiver - Each bidder, when submitting his bids, shall not include any allowance for Pennsylvania State Sales tax, which the Borough is exempt from paying.

F. DEFINITIONS

For the purposes of this contract, the following terms shall have the meaning set forth below:

a. "Municipality" means the Borough of Yeadon, Delaware County.

b. "Contractor" means a private firm awarded a contract to perform a service.

c. "General Refuse" means any garbage, refuse, industrial lunchroom or office waste and other material, including solid or semisolid material generated in residential establishments as set forth in the Pennsylvania Solid Waste Management Act of 1980 (P.S. Section 6018.101 et seq.) as amended.

d. "Municipal trash" means all trash collected at the Borough Hall, Yeadon Library, and Public Works garage.

e. "Bulk Trash" means furniture, cabinets, mattresses, box springs, television, and other like materials. All metal items and white goods are excluded.

f. "Single-Stream Collection of Recyclables" means a collection system by which all recyclables specified are mixed together at the time of collection and separation takes place at a recycling facility.

g. "Public Awareness Program" developed and provided by Municipality to inform and encourage residents to use the recycling collection services.

h. "Recycling Collection Service" those services to be performed by contractor as follows:

(1) the collection of recyclable materials from locations specifically designated herein;

(2) processing of recyclable materials as applicable; and

(3) marketing of the recyclable materials.

i. "Recycling Containers" approximately a 25 to 35 gallon container with lid made of rigid plastic construction. The contractor is not responsible for providing collection containers at any time during the contract period of performance.

j. "Recyclable materials" means all paper, glass, metal cans (aluminum, steel, bimetallic) and # 1 thru #5, and #7 plastic as defined herein and/or other such material as the parties may agree in writing.

k. "Aluminum" means the light in weight and malleable metallic substance or element commonly known as aluminum and shall include all aluminum food and beverage cans. This description does not include aluminum foil, trays, plates, and miscellaneous aluminum products.

1. "Bimetallic" means containing two (2) or more metallic materials.

m. "Glass" shall for the purposes of this contract mean the hard, brittle, transparent or partially transparent substance produced by fusion of silica and silicates or sand containing soda and lime and/or other chemicals and substances usually or conveniently included in the manufacture of glass, and shall for the purpose of this contract, include all materials commonly known as glass bottles or containers. This includes all food and beverage containers made of glass of one (1) gallon or less capacity. Excluded are: blue glass, ceramics, pottery; and flat glass commonly known as "window" or "plate" glass.

n. "Paper" means types of paper made from wood pulp and/or other fibrous materials mixed together, either with or without chemicals to produce thin sheets of product customarily and primarily used for the production of newsprint.

o. "Plastic" means synthetic or semi-synthetic polymers molded into a variety of products, including containers for soda, milk, and other beverages and other packaging, and generally identified as #1 thru #7 plastic.

p. "Processing Center" location which may be maintained by the Contractor for the purpose of sorting, preparing and/or consolidating recyclable materials (as defined herein) for sale.

q. "Steel" means the ferrous metal food or beverage containers commonly known as "tin cans.

r. “Residential Complex” shall mean a multi-unit residential dwelling containing four

(4) or less dwelling units.

G. SCOPE OF WORK

The contractor shall perform refuse and single stream recycling collection services in the Borough of Yeadon as described herein. General refuse and recyclables are to be collected from approximately 3400 residential units as well as the Yeadon

Borough Library. Contractor shall collect recyclables only from Yeadon Borough Hall and Yeadon Public Works Garage.

a. Collection of General Refuse: Contractor shall collect and remove general refuse curbside on public streets, rear alleys, and in common driveways from all single-family homes and residential complexes in the Borough which has been placed in trash bins, plastic bags, or otherwise clearly marked containers at the curbside on public streets, rear alleys, and in common driveways in the Borough. Any and all clearly identifiable containers holding refuse placed curbside shall be emptied by the Contractor.

The Contractor shall be responsible for emptying all reusable containers and replacing them along the curb outside of the cartway. The Contractor's employees shall exercise care in the handling of containers to prevent unnecessary damage to containers or surrounding property. General Refuse shall be delivered to the appropriate transfer or disposal facility as designated by Delaware County. No recyclable materials are to be collected with the general refuse collection. These items are to be left at the property uncollected.

b. Collection of Recyclable Materials: Contractor shall collect and remove all single-stream recyclable materials which are commingled, or separated, and placed in or adjacent to recycling containers at the curbside on public streets, rear alleys, and common driveways from all single-family homes and residential apartment complexes in the municipality. In addition, collection of recyclables from the Yeadon Borough Hall, Yeadon Public Library, and the Yeadon Public Works yard is incidental to this scope. The recycling container(s) will be used for the single stream collection of glass, aluminum, bimetallic and steel cans, paper, and # 1 thru 5 and #7 plastic. The recycling collection services performed shall be expanded to include all newly constructed units as they become inhabited. Compensation for such expanded recycling collection services shall be adjusted to include the new units on a prorated basis and shall be considered annually.

Manner of Collection: The general refuse and recyclable collections shall be in a neat and workman-like manner, and if by accident or otherwise, the general refuse or recyclable materials shall be spilled, the contractor shall be required to gather up and remove same in a neat and clean manner, and remove any spilled material from the street, including but not limited to, liquids, organic waste, and other unseemly, noxious, or offensive material which may negatively impact the health and welfare of Borough residents. The contractor shall also be obligated to load his vehicle in such a manner as to prevent spillage.

c. Schedule and Time of Collection

General Refuse: Contractor shall collect the general refuse four days per week, which shall be placed at the curb, rear alleys or in common driveways by residents for collection as per the current Yeadon ordinance, or as provided for in the bid proposal.

The current ordinance limits containers to 5 bags and/or containers per collection.

Collection will not be made on the following holidays: New Year's Day, Martin Luther King's Birthday, Memorial Day, Independence Day, Labor Day, Thanksgiving Day; and Christmas Day or any other day that the County transfer station or recycling center is closed. Collection will resume the next working day. Said collection of trash shall be commenced and completed between the hours of 7 a.m. and 7 p.m. except in the case of mechanical breakdown or extreme or unusual circumstances.

Refer to approved Borough map of Yeadon for location to be collected on currently approved days.

Recyclable Materials: Contractor shall collect the recyclable materials placed at the curbside for collection as per the current Yeadon ordinance. Recyclables are to be collected each week on Wednesday. Collection will not be made on the following holidays: New Year's Day, Independence Day, and Christmas Day or any other day that the recycling center is closed. Collection will resume the next scheduled recycling day. Said collection of recycling shall be commenced and completed between the hours of 7 a.m. and 7 p.m. except in the case of mechanical breakdown or extreme or unusual circumstances.

Leaf Pick-up: The contractor shall not be responsible for collection of the seasonal leaf collection. The Borough's Public Works Department personnel will be responsible the seasonal leaf collection.

Bulk Trash: The contractor will be responsible for picking up one large bulk trash item per household each week on the regularly scheduled pick up day, if placed at the curbside, rear alley or common driveway with the other trash for pick-up.

d. Obligation of Contractor Regarding Equipment: The Contractor shall at its own cost and expense provide all labor and supply all necessary vehicles, tools, equipment, materials, and other facilities for the collection and handling of the general refuse, recyclable materials, and bulk trash in strict conformity with these specifications. Equipment shall be maintained in good mechanical and electrical operating condition and in compliance with the weight, safe and sanitary laws and regulations of the Commonwealth of Pennsylvania or any governmental agency with jurisdiction.

The Contractor should be aware that their trucks will access some of the trash collection from alleyways and their trucks should be of a size that will allow this.

Contractor shall have available a minimum number of trash vehicles necessary for the performance of work under this contract. The bodies of such vehicles shall be constructed to prevent the leakage of liquids. Contractor vehicles and equipment shall not be parked or stored on streets or roads of the Borough except during hours of collection or except in an emergency. In the latter case, the Borough Manager shall be promptly notified, and the vehicle or equipment moved to a proper location as soon as possible after the emergency is ended.

Contractor shall collect recyclable materials in vehicles which are suitable for such collection, are dedicated for use in the performance of recycling collections, and which bear prominent markings, signs or decals identifying them as being recycling collection vehicles. Contractor shall have available a minimum number of recycling collection vehicles necessary for the performance of work under this contract. The bodies of such vehicles shall be constructed to prevent the leakage of liquids. Contractor vehicles and equipment shall not be parked or stored on streets or roads of the municipality except during hours of collection or except in an emergency. In the latter case, the Borough Manager shall be promptly notified, and the vehicle or equipment moved to a proper location as soon as possible after the emergency is ended.

e. Conduct of Employees: The Borough Manager, or authorized representatives, may request a suspension or discharge of any employee for any one (1) or more of the following offenses during working hours, and the contractor shall comply with the request as soon as possible:

1. Intoxication

2. Use of controlled substance (i.e., illicit drugs)

3. Use of loud, profane, vulgar or obscene language

4. Soliciting gratuities or tips

5. Refusal to collect or handle refuse as herein required and defined if properly stored and placed for collection.

6. Wanton or malicious damage or destruction of property, including waste containers or receptacles.

7. Any act which may constitute a public nuisance in the performance of this contract.

f. Replacement of Recycling Containers: The resident or the Borough will be responsible for replacing recycling containers when the respectively-owned collection container is damaged or missing, unless it is determined that the container has been damaged by the wanton, negligent, or malicious acts of the Contractor’s employees, in which case, Contractor shall be liable for the replacement of the damaged or missing container.

g. Transportation Sale and Disposal of Recyclable Material: Contactor shall transport the collected recyclable materials to a suitable processing center or at its election, directly to a purchaser. Contractor shall have title to the recyclable materials upon pick-up, may sell or otherwise transfer the recyclables as contractor deems appropriate provided the recipient thereof is in the business of recycling such materials for-reuse, and shall retain all proceeds from such sales.

h. Missed Pick-Up: In the case of a missed pick-up reported by the Borough or a resident, Contractor shall collect the general refuse or recyclable materials from such resident within six (6) hours of notification.

i. Refusal to Pick-up: Contractor may refuse to make a pick-up under the following circumstances:

1. If the resident has placed an unusual amount of general refuse or bulk trash in such condition that the contractor's personnel cannot complete the pick-up. All such incidents must be reported to the Borough immediately, and the Borough will assess the situation to determine how much the Contractor can pick-up before they leave the Borough that day, how much the Borough will pick-up as a part of its bulk pick-up obligation, and what instructions will be given to the resident about the limits upon general refuse permitted to be placed for collection.

2. If a resident does not properly segregate recyclable materials from general refuse at or before the time of collection, Contractor may refuse to collect the improperly co-mingled general refuse and recyclable materials. Contractor will issue a notice to the resident which contains instructions for the proper segregation of recyclable materials. If a resident receives two such notices within a period of thirty (30) days, contractor may refuse all further pickups from that resident until Borough can assure contractor of the resident's future compliance.

k. Reports: Contractor shall on or before the fifth (5th) day of each month provide a summary monthly report (the "Monthly Solid Waste Report") to the Borough consisting of dumping activity. The form of the report will be agreed upon by the Contractor and Borough. Contractor is required to provide all weight and or material slips from the processing center or recycling center and shall certify that all refuse and recyclables were collected from Yeadon Borough residential units and the municipal facilities.

1. Public Awareness Program: Contractor shall develop and implement a Public Awareness Program for the recycling program. Within no more than ninety (90) following the commencement of the Contract, Contractor shall prepare and distribute (by either U.S.

mail or hand delivery) to all Borough residents a refrigerator magnet listing the schedule for recycling pickup and the recyclable materials which may be deposited curbside for collection. In each January of each subsequent year of the Contract, Contractor shall mail a brochure or place a "robocall" to all Borough residents encouraging recycling. The form of the refrigerator magnet, all brochures and/or all robocalls shall be subject to the approval of the Borough at least one month prior to their distribution. The cost of designing, producing, and distributing the magnets are incidental to the Year 1 contract pricing. Compliance with the subsequent year public notification requirements are incidental to each year's scope of work.

m. Designation of Contact Person: Contractor shall designate an employee who shall be available by cell phone during all working hours for the purpose of responding to any inquiries or complaints which the Borough may have. Such contact person shall be an employee in the field, and thus capable of directing trash trucks or other equipment to respond to complaints rather than a person in Contractor's business office. Whenever such contact person is not working due to vacations, sickness or the like Contractor shall notify the Borough of the contact information for the person who shall act as the contact person in the absence of the primary contact person. In the event the primary contact person separates from the Contractor’s business for any reason whatsoever, Contractor shall promptly provide the Borough with contact information for a substitute primary contact person.

n. Compensation for Services: The Borough will pay the Contractor in equal monthly installments. The contractor must prior thereto present the Monthly Solid Waste Report together with weight receipts for general refuse collected in the Borough to the Borough's designated representative by the fifth (5th) day of the following month. Said weight receipts shall reflect the total weight of general refuse collected each collection day and handled by the contractor pursuant to these specifications. The contractor shall certify on each invoice that only residential and municipal refuse from Yeadon Borough have been transported to the DCSWA or the recycling center. If it is determined that refuse or recycling from commercial entities, including residential buildings having greater than 4 dwelling units, or any property outside the municipal boundary of Yeadon has been collected and transported to the DCSWA facility or recycling center, the contractor shall be deemed in violation of the contract and the Borough may immediately terminate the contract and may seek any other remedies available in law and under the provisions of this agreement.

o. Borough's Obligations:

The Borough shall:

a. Use reasonable efforts to inform residents of (1) the benefits which may be obtained from recycling; (2) the types of waste that is recyclable; (3) the schedule for collection of recyclables; and (4) the schedule for collection of general refuse.

b. Use reasonable efforts to enforce the rules and regulations for refuse and recycling collections.

c. Use reasonable efforts to protect contractor's ownership of all recyclable materials placed at the curbside for collection under the terms of the contract entered into pursuant to these specifications including enforcement of its anti-scavenging ordinance.

d. Use reasonable efforts to obtain the cooperation of the Borough general refuse contractor (if not same contractor) where applicable with respect to mailing or delivering notices to residents; educating general refuse haulers (if no recyclable hauler) as to the need to leave recyclable materials for pickup by recycling contractor; place recycling stickers or signs on collection vehicles and in other ways deemed appropriate by the Borough and Contractor.

p. Weather, etc.: Contractor shall make arrangements to carry forth the transactions contemplated by this contract notwithstanding unexpected occurrence such as unusual weather conditions, temporarily closed streets, etc., and, upon the occurrence of any such event, the Contractor shall make appropriate arrangements with the Borough to carry forth the transactions contemplated by this contract. Without limiting the foregoing, in the event that Contractor cannot gain access to alleys due to snow or ice, Contractor shall immediately notify the Borough Manager and/or Public Works Supervisor of such fact, arrange for pick-up of general refuse, recyclable materials, and bulk trash from such alleys at the earliest practicable opportunity, and inform the Borough when such follow-up pick up has occurred. The provisions of this paragraph shall not require the Contractor to take any action which would endanger the health or safety of any person.

q. Collection Locations: Within 10 days of contract, Borough and Contractor shall agree on all collection routes and locations. In case of disagreements, the Borough shall have final say as to collection locations and routes.

r. Failure to Perform/Penalties:

Failure on the part of the Contractor to provide collection and disposal service within the terms of these specifications shall incur penalties assessed to the Contractor at the following rates:

0-50 incidents: $40/incident 51-100 incidents: $50/incident 101-200 incidents: $75/incident >200 incidents: $100/incident

Beginning with each new year of the contract, the count will start again at 0.

Upon failure of the Contractor to cure a default of any term of the Contract, the Borough may exercise any remedies set forth under this paragraph.

The Borough Manager or designee shall notify the Contractor of any violation(s) listed below. A penalty shall be issued for each of the following items listed:

1. Negligent or willful failure of a truck and crew to operate over and finish a regular route;

2. Failure to collect general refuse and/or recyclables properly, per the approved schedule, in specific locations — this shall be corrected within 6 hours — penalty may be assessed even if a follow-up pick-up is made, at the Borough’s discretion.

Note that each missed residential unit on a street will result in an individual incident being assessed;

3. Using or maintaining trucks in a leaking or unsanitary condition;

4. Damaging (other than reasonable and normal wear and tear) or carrying away permanent receptacles;

5. Failure to clean up any materials spilled from trash containers or equipment;

6. Failure to submit accurate weight slips/monthly reports within specified time;

7. Commingling residential general refuse and bulk trash with commercial trash - $500 per occurrence; failure to perform penalties listed above do not apply;

8. Collecting of recycling materials and commingling with residential trash - $500 per occurrence; failure to perform penalties listed above do not apply;

9. Sending recyclables to a transfer station, incinerator or landfill;

10. Failure to deliver recyclable materials to an approved Recycling Processing Facility;

11. Changing routes without proper notification;

12. Failure to comply with the hours of operations as stated in the Contract;

13. Tossing any empty trash containers;

14. Failure to comply with the Public Awareness Program requirements set forth in these contract documents;

b. It is hereby stipulated and agreed that in the event of a labor stoppage; labor strike lockout; destruction of, or damage to, or interruption, suspension, or interference with the operation of the Contractor's equipment caused by force majeure, fires, explosions, or other matters beyond the reasonable control of the Contractor; restraints of government, lawful orders of court, administrative agencies or governmental officers;

suspension, termination, or interruption of governmental licenses or permits; changes in laws, regulations or ordinance; or other like emergency, the Contractor shall not be considered in default or breach of contract by reason thereof, provided however, that the Borough's cost of performing the work specified in the service contract to be done during such period shall be charged to the Contractor as in the case of a default by the Contractor and/or the Borough may avail itself of the Performance Bond and Labor and Materials Bond.

c. In the event the Contractor defaults in the performance of any of the conditions or terms of this Contract, the Borough shall notify the Contractor of the nature of the default. The Contractor shall correct this default within seventy-two (72) hours (unless another time period is expressly stated herein elsewhere following receipt of such notice). If the Contractor fails to correct the default, the Borough, without further notice, shall have the option to exercise any or all of the following remedies and receive compensation and damages from the Performance Bond and Labor and Materials Bond, in addition to any other rights or remedies available to the Borough in law or equity:

1. The right to declare the Contract and all rights granted to the Contractor under it as terminated effective upon such date as the Borough shall designate;

2. The right to contract with others to perform the services to be performed by the Contractor;

3. To perform such services itself and to withhold any and all payments then due and owing to Contractor until the work is completed. In the event such costs to perform the work exceed such unpaid balance, the Contractor shall pay the difference to the Borough.

ARTICLES OF AGREEMENT – Yeadon Borough

ARTICLES OF AGREEMENT made and concluded this ______ day of _____________, A.D. ____, between ______________________________________, party of the first part, hereinafter called the Contractor, and Yeadon Borough, party of the second part, hereinafter called Owner.

1. The Contractor, for and in consideration of the payments mentioned to be made in Article 2 by the Owner, agrees to and with the Owner to complete all the work or such part as may be directed by the Owner in accordance with the plans mentioned and the preceding specifications, under the supervision and to the satisfaction of the Borough Engineer and to the approval of the Owner.

2. The Owner agrees to pay the Contractor for the work embodied in this Contract and described in the specifications, the prices given in the bidding sheet, which is made part of this contract.

3. Should the Contractor at any time refuse or neglect to supply a sufficiency of properly skilled workmen, or of materials of the proper quality, or fail in any respect to prosecute the work with promptness and diligence, or fail in the performance of any of the agreements herein contained, such refusal, neglect, or failure being certified by the Borough Engineer, the Owner shall be at liberty after seventy-two (72) hours written notice to the Contractor to provide any such labor or materials and to deduct the cost thereof from any moneys then due or thereafter to become due to the Contractor under this Contract, and if the Engineer shall certify that such refusal, neglect, or failure is sufficient ground for such action, the Owner shall also be at liberty to terminate the employment of the Contractor for said work and either call upon the Surety to complete said Contract, or to enter upon the premises and take possession for the purpose of completing the work included under this Contract, of all materials, tools, and appliances thereon and to employ any other person or persons to finish the work and to provide the materials, therefor, and in case of such discontinuance of the employment of the Contractor, Contractor shall not be entitled to receive any further payments under this Contract until said work shall be wholly finished, at which time, if the unpaid balance of the amount to be paid under this Contract shall exceed the expenses incurred by the Owner in finishing the work, such excess shall be paid to the Contractor by the Owner, but if such expense shall exceed unpaid balance, the Contractor shall pay the difference to the Owner. The expenses incurred through such default shall be audited by the Borough Engineer, whose certificate thereof shall be conclusive and binding upon the parties.

4. The Contractor agrees not to sublet any portion of the Contract without consent of the Owner, and the Contractor further agrees to hold…