This is a project specification and scope of work document from the City of Lebanon, Pennsylvania, detailing the 2026 Paving Project (Contract C-1-26-LF), a PennDOT-funded street reconstruction initiative. The project encompasses five distinct options covering multiple street segments: Park Drive from Oak Street to the City Line (3,600 square yards estimated), Park Drive from City Line to Northfield Drive (850 square yards estimated), Agnes Street from Ruth Street to 16th Street (2,800 square yards estimated), 22nd Street from Oak Street to the City Line (1,970 square yards estimated), and Foster/Plum Street from Chestnut Street to Walnut Street (548 square yards estimated). All segments require milling and preparation of 2 inches with a 0.5-inch base and 1.5-inch wearing course (9.5mm Superpave asphalt base/scratch course, PG 64-22), with sealing of all seams at curbs, cross streets, valve boxes, and manholes. Sealed electronic proposals must be submitted via PennBid by June 22, 2026, at 2:00 p.m., with results displayed publicly on the platform no later than June 26, 2026, at 2:00 p.m. The project requires mobilization to site as part of the bid scope, and all work must be performed at prevailing wage rates as determined by PennDOT.
The procurement requires bidders to submit comprehensive proposals covering all labor, equipment, materials, and incidental costs for the specified work. Proposals must be structured to address the five optional paving segments, allowing flexibility in bid submission. The contract involves prevailing wage requirements under PennDOT standards, indicating federal wage compliance obligations. No specific budget allocation is identified in the documentation, though street paving projects of this scale typically represent significant municipal investments. The City of Lebanon procurement process is facilitated through the PennBid electronic bidding platform, which provides public transparency and accessibility to qualified contractors. No incumbent vendors are identified, and no specific set-aside provisions are detailed in this scope document, though such provisions may exist in the full contract specifications.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 3-LF- 2026 Paving (Park, Agnes, 22nd, Foster-Plum).docx | DOCX document | |
| 2-Foster-Plum St. Pave Parameters- Attachment D (Option 5).pptx | PPTX presentation | |
| 2-Madison St. Pave Parameters.pptx | PPTX presentation | |
| 4-MBE-WBE State Required Forms.pdf | ||
| 1-Davis Bacon Wage Rates.docx | DOCX document | |
| 3-Contract and Specifications for the City of Lebanon (PennBid)(Madison).doc | DOC document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Park Drive (Gold highlighted section) 30’ Paved width 1,100’ linear length to City line Estimated 3,600 SQYD of material needed Cut in to E. radii at Robin Rd. & Elm St.
2” mill with .5” base & 1.5” wearing course (9.5mm) Seal all seams at curbs, cross streets and any valve or manholes
Please break out Green section as separate price using Same parameters Approx. 250’ linear at 30’ wide to seam at N. radii @ Northfield Dr.
Estimated 850 SQYD of material needed
Park Drive Oak St Northfield Dr.
Attachment A
Agnes Street (Highlighted Route)
Agnes Street- 12’ Paved width Approx. 2,000’ linear length to Eastern seam @ 16th Street Estimated 2,800 SQYD of material needed Cut in to radii at all cross streets- Larch, Steitz, Aspen, S. 15th, S. 14th, S. 13th, & Ruth Sts.
2” mill with .5” base & 1.5” wearing course (9.5mm) Seal all seams at curbs, cross streets and any valve or manholes
Attachment B
22nd St. (Gold highlighted section) 30’ Paved width 590’ linear length to City line Estimated 1970 SQYD of material needed Cut in to radii at Kline St, Walnut & Locust Alleys. Terminate at N. seam of Oak St.
2” mill with .5” base & 1.5” wearing course (9.5mm) Seal all seams at curbs, cross streets and any valve or manholes
22nd Street Attachment C
2” mill with .5” base & 1.5” wearing course (9.5mm) Seal all seams at curbs, cross streets and any valve or manholes image1.png image2.png image3.png
Microsoft_PowerPoint_Presentation.pptx
Foster St.
448’ linear distance
548 SYDS (approx.)
Attachment D image1.png image4.emf