Walnut Manor Elevator Modernization - Bid Documents Summary
This is a sealed bid solicitation issued by the Allentown Housing Authority, a federally assisted housing program under the Department of Housing and Urban Development (HUD), for elevator modernization services at Walnut Manor, located at 1519 West Walnut Street, Allentown, Pennsylvania 18102. The project involves the modernization of elevators at the facility and includes work scopes covering selective demolition, metal fabrications, resilient tile flooring, high-performance coatings, and electric traction elevator systems. Contract documents became available online through the Penn Bid Program beginning May 14, 2026, at 9:00 A.M. A mandatory pre-bid meeting is scheduled for May 21, 2026, at 10:00 A.M. at the Walnut Manor site, where prospective bidders may inspect existing conditions. Sealed bids must be submitted electronically through the Penn Bid Program no later than June 16, 2026, at 10:00 A.M. prevailing time. Bidders may submit written questions through the Penn Bid Program until June 5, 2026, at 4:00 P.M., with responses provided to registered plan holders by June 9, 2026, at 9:30 A.M. The Allentown Housing Authority reserves the right to accept or reject any bids and may withhold award for up to sixty days.
Bids must be accompanied by a negotiable bid bond equal to ten percent of the total bid amount. The successful bidder shall furnish both a performance bond and a payment bond, each in the amount of one hundred percent of the total contract value. The solicitation includes two separately priced alternates: Alternate #1 addresses increasing elevator speed from 150 FPM to 250 FPM, and Alternate #2 provides for a two-year monthly preventative maintenance contract. All bids must remain firm for sixty days from the due date. Strict compliance with federal Equal Employment Opportunity requirements is mandatory, including Executive Order 11246 (establishing goals of 6.9% female employment and 1.3% minority participation by craft), Executive Orders 11625 and 12138 (promoting minority and women business enterprises), Section 3 of the Housing and Urban Development Act of 1968, and the Civil Rights Act of 1964. Prospective contractors must submit comprehensive documentation with their bids, including HUD Form 5369-A representations and certifications, non-collusive affidavits, statements of bidder qualifications, previous participation certifications, debarment certifications, and corporate resolutions. The project manager is Mr. John Carson, AIA, with The Pelorus Group.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Contract Documents and Specifications
FOR
Walnut Manor Elevator Modernization 1519 West Walnut Street
Allentown, PA 18102
Owner:
Allentown Housing Authority 1339 West Allen Street
Date: May 14, 2026 Project #: 2026-05
Walnut Manor TABLE OF CONTENTS - 1 05.14.2026
Elevator Modernization BID DOCUMENTS
TABLE OF CONTENTS
DIVISION 0 – PROCUREMENT AND CONTRACTING REQUIREMENTS
00 11 00 INVITATION TO BID
00 21 00 INSTRUCTION TO BIDDERS (HUD 5369 - 10/2002)
00 22 00 BID SUBMITTAL CHECKLIST
00 41 05 FORM OF BID (GENERAL CONSTRUCTION)
00 45 00 REPRESENTATIONS, CERTIFICATIONS, & OTHER STATEMENTS OF BIDDERS (HUD
5369-A – 11/92)
00 45 13 STATEMENT OF BIDDER QUALIFICATIONS
00 45 14 PREVIOUS PARTICIPATION CERTIFICATION (HUD 2530 – 10/2016)
00 45 19 FORM OF NON-COLLUSIVE AFFIDAVIT STATEMENT OF BIDDERS’ QUALIFICATION
00 45 36 AFFIRMATIVE ACTION PROGRAM
00 45 37 SECTION 3 CLAUSE
00 45 46 BUSINESS LICENSE
00 45 47 E-VERIFY
00 45 48 CERTIFIED STATEMENT (DEBARMENT)
00 52 00 FORM OF AGREEMENT
00 60 00 STIPULATION AGAINST LIENS
00 60 05 SUBSTITUTION REQUEST FORM
00 60 10 REQUEST FOR ACCEPTANCE OF SUBCONTRACTOR
00 61 00 BID BOND
00 61 13 PERFORMANCE BOND
00 61 14 RIDER TO PERFORMANCE BOND
00 61 15 PAYMENT BOND
00 72 00 GENERAL CONDITIONS FOR CONSTRUCTION CONTRACTS (HUD 5370 – 1/2014)
DIVISION 01 - GENERAL REQUIREMENTS
01 10 00 SUMMARY
01 23 00 ALTERNATES
01 25 00 SUBSTITUTION PROCEDURES
01 26 00 CONTRACT MODIFICATIONS PROCEDURES
01 29 00 PAYMENT PROCEDURES
01 31 00 PROJECT MANAGEMENT AND COORDINATION
01 32 00 CONSTRUCTION PROGRESS DOCUMENTATION
01 33 00 SUBMITTAL PROCEDURES
01 40 00 QUALITY AND CODE REQUIREMENTS
01 50 00 TEMPORARY FACILITIES AND CONTROLS
01 73 00 EXECUTION
01 77 00 CLOSE OUT PROCEDURES
01 78 23 OPERATIONS AND MAINTENANCE DATA
01 78 39 PROJECT RECORD DOCUMENTS
01 79 00 DEMONSTRATION AND TRAINING
DIVISION 02 – EXISTING CONDITIONS
Walnut Manor TABLE OF CONTENTS - 2 05.14.2026
Elevator Modernization BID DOCUMENTS
02 41 19 SELECTIVE DEMOLITION
DIVISION 05 – METALS
05 50 00 METAL FABRICATIONS
DIVISION 09 – FINISHES
09 65 19 RESILIENT TILE FLOORING
09 96 00 HIGH-PERFORMANCE COATINGS
DIVISION 14 – CONVEYING SYSTEMS
14 22 00 ELECTRIC TRACTION ELEVATORS
DRAWINGS
SK-01 WALNUT MANOR – PROPOSED FINISHES
Walnut Manor 00 11 00 - 1 05.14.2026
Elevator Modernization INVITATION TO BID BID DOCUMENTS
INVITATION TO BID
The Housing Authority of the City of Allentown, PA, by virtue of its contract with the United States of
America, acting through the Department of Housing and Urban Development, pursuant to the United
States Housing Act of 1937, as amended, is hereby requesting sealed bids for the Allentown Housing
Authority, Walnut Manor Elevator Modernization, located at 1519 West Walnut Street, Allentown, PA 18102.
Attention is called to all respondents that all applicable Equal Employment Opportunity requirements for federally assisted contracts must be complied with. This includes strict compliance with Executive Order
11246, as amended (establishing a goal of 6.9% for female employment and 1.3% minority percentage by craft); Nondiscrimination; Executive Order 11625, Minority Business Enterprises; Executive Order
12138, Women Business Enterprise; Section 3 of the Housing and Urban Development Act of 1968; Civil
Rights Act of 1964; and Minority Business Participation.
All Contract Documents will be available online at no cost beginning Thursday, May 14, 2026 at
9:00 A.M. Interested respondents may obtain Contract Documents containing detailed submission requirements by accessing the Penn Bid Program at www.pennbid.bonfirehub.com.
Bids must be accompanied by a Bid Bond in the amount of ten percent (10%) of the total bid amount meeting the requirements in the Contract Documents. A Performance Bond and Payment Bond both in the amount of one hundred percent (100%) of the total contract value shall be furnished by the successful bidder as detailed in the Contract Documents.
A pre-bid meeting will be held on Thursday, May 21, 2026 at 10:00 A.M. prevailing time, at the
Walnut Manor at 1519 West Walnut Street, Allentown, PA 18102. Following the meeting, bidders will have the opportunity to view the existing conditions at the project site. All prospective bidders are encouraged to attend.
Interested Firms are requested to respond by bid submission satisfying the requirements of the Contract
Documents on or before Tuesday, June 16, 2026 at 10:00 A.M. prevailing time. Bids shall only be submitted electronically via the Penn Bid Program at www.pennbid.bonfirehub.com.
Questions may be submitted through the Penn Bid Program on or before Friday, June 5, 2026 at 4:00
P.M. Responses will be provided to all registered plan holders no later than Tuesday, June 9, 2026 at
9:30 A.M.
The Allentown Housing Authority reserves the right, in its sole and absolute discretion, to accept or reject any or all proposals or to waive any informalities in bidding, and to withhold award for a period of sixty (60) days.
Allentown Housing Authority
Fred Bañuelos, Chairperson
Julio A. Guridy, Executive Director
Contact Person: Mr. John Carson, Assoc. AIA – Project Manager
The Pelorus Group
105 North 5th Street Unit #235
Emmaus, PA 18049 jcarson@thepelorusgroup.com http://www.pennbid.bonfirehub.com/ http://www.pennbid.bonfirehub.com/ mailto:jcarson@thepelorusgroup.com
THIS PAGE INTENTIONALLY LEFT BLANK.
Previous edition is obsolete form HUD-5369 (10/2002)
Instructions to Bidders for Contracts Public and Indian Housing Programs
U.S. Department of Housing and Urban Development Office of Public and Indian Housing
Walnut Manor Elevator Modernization
00 21 00 - 1
INSTRUCTIONS TO BIDDERS - HUD 5369
05.14.2026
BID DOCUMENTS
Instructions to Bidders for Contracts Public and Indian Housing Programs
Table of Contents Clause Page
1. Bid Preparation and Submission 1
2. Explanations and Interpretations to Prospective Bidders 1
3. Amendments to Invitations for Bids 1
4. Responsibility of Prospective Contractor 1
5. Late Submissions, Modifications, and Withdrawal of Bids 1
6. Bid Opening 2
7. Service of Protest 2
8. Contract Award 2
9. Bid Guarantee 3
10. Assurance of Completion 3
11. Preconstruction Conference 3
12. Indian Preference Requirements 3
1. Bid Preparation and Submission
(a) Bidders are expected to examine the specifications, drawings, all instructions, and, if applicable, the construction site (see also the contract clause entitled Site Investigation and Conditions Affect-ing the Work of the General Conditions of the Contract for Construc-tion). Failure to do so will be at the bidders’ risk.
(b) All bids must be submitted on the forms provided by the Public Housing Agency/Indian Housing Authority (PHA/IHA). Bidders shall furnish all the information required by the solicitation. Bids must be signed and the bidder’s name typed or printed on the bid sheet and each continuation sheet which requires the entry of information by the bidder. Erasures or other changes must be initialed by the person signing the bid. Bids signed by an agent shall be accompanied by evidence of that agent’s authority. (Bidders should retain a copy of their bid for their records.)
(c) Bidders must submit as part of their bid a completed form HUD- 5369-A, “Representations, Certifications, and Other Statements of Bidders.”
(d) All bid documents shall be sealed in an envelope which shall be clearly marked with the words “Bid Documents,” the Invitation for Bids (IFB) number, any project or other identifying number, the bidder’s name, and the date and time for receipt of bids.
(e) If this solicitation requires bidding on all items, failure to do so will disqualify the bid. If bidding on all items is not required, bidders should insert the words “No Bid” in the space provided for any item on which no price is submitted.
(f) Unless expressly authorized elsewhere in this solicitation, alter-nate bids will not be considered.
(g) Unless expressly authorized elsewhere in this solicitation, bids submitted by telegraph or facsimile (fax) machines will not be considered.
(h) If the proposed contract is for a Mutual Help project (as de-scribed in 24 CFR Part 905, Subpart E) that involves Mutual Help contributions of work, material, or equipment, supplemental informa-tion regarding the bid advertisement is provided as an attachment to this solicitation.
2. Explanations and Interpretations to Prospective Bidders
(a) Any prospective bidder desiring an explanation or interpretation of the solicitation, specifications, drawings, etc., must request it at least 7 days before the scheduled time for bid opening. Requests may be oral or written. Oral requests must be confirmed in writing.
The only oral clarifications that will be provided will be those clearly related to solicitation procedures, i.e., not substantive technical information. No other oral explanation or interpretation will be provided. Any information given a prospective bidder concerning this solicitation will be furnished promptly to all other prospective bidders as a written amendment to the solicitation, if that information is necessary in submitting bids, or if the lack of it would be prejudicial to other prospective bidders.
(b) Any information obtained by, or provided to, a bidder other than by formal amendment to the solicitation shall not constitute a change to the solicitation.
3. Amendments to Invitations for Bids
(a) If this solicitation is amended, then all terms and conditions which are not modified remain unchanged.
(b) Bidders shall acknowledge receipt of any amendment to this solicitation (1) by signing and returning the amendment, (2) by identifying the amendment number and date on the bid form, or (3) by letter, telegram, or facsimile, if those methods are authorized in the solicitation. The PHA/IHA must receive acknowledgement by the time and at the place specified for receipt of bids. Bids which fail to acknowledge the bidder’s receipt of any amendment will result in the rejection of the bid if the amendment(s) contained information which substantively changed the PHA’s/IHA’s requirements.
(c) Amendments will be on file in the offices of the PHA/IHA and the Architect at least 7 days before bid opening.
4. Responsibility of Prospective Contractor
(a) The PHA/IHA will award contracts only to responsible prospec-tive contractors who have the ability to perform successfully under the terms and conditions of the proposed contract. In determining the responsibility of a bidder, the PHA/IHA will consider such matters as the bidder’s:
(1) Integrity;
(2) Compliance with public policy;
(3) Record of past performance; and
(4) Financial and technical resources (including construction and technical equipment).
(b) Before a bid is considered for award, the bidder may be re-quested by the PHA/IHA to submit a statement or other documenta-tion regarding any of the items in paragraph (a) above. Failure by the bidder to provide such additional information shall render the bidder nonresponsible and ineligible for award.
Walnut Manor Elevator Modernization
00 21 00 - 2
INSTRUCTIONS TO BIDDERS - HUD 5369
5. Late Submissions, Modifications, and Withdrawal of Bids
(a) Any bid received at the place designated in the solicitation after the exact time specified for receipt will not be considered unless it is received before award is made and it:
(1) Was sent by registered or certified mail not later than the fifth calendar day before the date specified for receipt of offers (e.g., an offer submitted in response to a solicitation requiring receipt of offers by the 20th of the month must have been mailed by the 15th);
(2) Was sent by mail, or if authorized by the solicitation, was sent by telegram or via facsimile, and it is determined by the PHA/IHA that the late receipt was due solely to mishandling by the PHA/IHA after receipt at the PHA/IHA; or
(3) Was sent by U.S. Postal Service Express Mail Next Day Service - Post Office to Addressee, not later than 5:00 p.m. at the place of mailing two working days prior to the date specified for receipt of proposals. The term “working days” excludes weekends and observed holidays.
(b) Any modification or withdrawal of a bid is subject to the same conditions as in paragraph (a) of this provision.
(c) The only acceptable evidence to establish the date of mailing of a late bid, modification, or withdrawal sent either by registered or certified mail is the U.S. or Canadian Postal Service postmark both on the envelope or wrapper and on the original receipt from the U.S.
or Canadian Postal Service. Both postmarks must show a legible date or the bid, modification, or withdrawal shall be processed as if mailed late. “Postmark” means a printed, stamped, or otherwise placed impression (exclusive of a postage meter machine impres-sion) that is readily identifiable without further action as having been supplied and affixed by employees of the U.S. or Canadian Postal Service on the date of mailing. Therefore, bidders should request the postal clerk to place a hand cancellation bull’s-eye postmark on both the receipt and the envelope or wrapper.
(d) The only acceptable evidence to establish the time of receipt at the PHA/IHA is the time/date stamp of PHA/IHA on the proposal wrapper or other documentary evidence of receipt maintained by the PHA/IHA.
(e) The only acceptable evidence to establish the date of mailing of a late bid, modification, or withdrawal sent by Express Mail Next Day Service-Post Office to Addressee is the date entered by the post office receiving clerk on the “Express Mail Next Day Service-Post Office to Addressee” label and the postmark on both the envelope or wrapper and on the original receipt from the U.S. Postal Service.
“Postmark” has the same meaning as defined in paragraph (c) of this provision, excluding postmarks of the Canadian Postal Service.
Therefore, bidders should request the postal clerk to place a legible hand cancellation bull’s eye postmark on both the receipt and Failure by a bidder to acknowledge receipt of the envelope or wrapper.
(f) Notwithstanding paragraph (a) of this provision, a late modifica-tion of an otherwise successful bid that makes its terms more favorable to the PHA/IHA will be considered at any time it is received and may be accepted.
(g) Bids may be withdrawn by written notice, or if authorized by this solicitation, by telegram (including mailgram) or facsimile machine transmission received at any time before the exact time set for opening of bids; provided that written confirmation of telegraphic or facsimile withdrawals over the signature of the bidder is mailed and postmarked prior to the specified bid opening time. A bid may be withdrawn in person by a bidder or its authorized representative if, before the exact time set for opening of bids, the identity of the person requesting withdrawal is established and the person signs a receipt for the bid.
6. Bid Opening All bids received by the date and time of receipt specified in the solicitation will be publicly opened and read. The time and place of opening will be as specified in the solicitation. Bidders and other interested persons may be present.
7. Service of Protest
(a) Definitions. As used in this provision:
“Interested party” means an actual or prospective bidder whose direct economic interest would be affected by the award of the contract.
“Protest” means a written objection by an interested party to this solicitation or to a proposed or actual award of a contract pursuant to this solicitation.
(b) Protests shall be served on the Contracting Officer by obtaining written and dated acknowledgement from —
[Contracting Officer designate the official or location where a protest may be served on the Contracting Officer]
(c) All protests shall be resolved in accordance with the PHA’s/ IHA’s protest policy and procedures, copies of which are maintained at the PHA/IHA.
8. Contract Award
(a) The PHA/IHA will evaluate bids in response to this solicitation without discussions and will award a contract to the responsible bidder whose bid, conforming to the solicitation, will be most advan-tageous to the PHA/IHA considering only price and any price-related factors specified in the solicitation.
(b) If the apparent low bid received in response to this solicitation exceeds the PHA’s/IHA’s available funding for the proposed contract work, the PHA/IHA may either accept separately priced items (see 8(e) below) or use the following procedure to determine contract award. The PHA/IHA shall apply in turn to each bid (proceeding in order from the apparent low bid to the high bid) each of the separately priced bid deductible items, if any, in their priority order set forth in this solicitation. If upon the application of the first deductible item to all initial bids, a new low bid is within the PHA’s/IHA’s available funding, then award shall be made to that bidder. If no bid is within the available funding amount, then the PHA/IHA shall apply the second deductible item. The PHA/IHA shall continue this process until an evaluated low bid, if any, is within the PHA’s/IHA’s available funding. If upon the application of all deductibles, no bid is within the PHA’s/IHA’s available funding, or if the solicitation does not request separately priced deductibles, the PHA/IHA shall follow its written policy and procedures in making any award under this solicitation.
(c) In the case of tie low bids, award shall be made in accordance with the PHA’s/IHA’s written policy and procedures.
(d) The PHA/IHA may reject any and all bids, accept other than the lowest bid (e.g., the apparent low bid is unreasonably low), and waive informalities or minor irregularities in bids received, in accordance with the PHA’s/IHA’s written policy and procedures.
Walnut Manor Elevator Modernization
00 21 00 - 3
INSTRUCTIONS TO BIDDERS - HUD 5369
05.14.2026
BID DOCUMENTS
Julio Guridy Executive Director Allentown Housing Authority 1339 Allen Street
(e) Unless precluded elsewhere in the solicitation, the PHA/IHA may accept any item or combination of items bid.
(f) The PHA/IHA may reject any bid as nonresponsive if it is materially unbalanced as to the prices for the various items of work to be performed. A bid is materially unbalanced when it is based on prices significantly less than cost for some work and prices which are significantly overstated for other work.
(g) A written award shall be furnished to the successful bidder within the period for acceptance specified in the bid and shall result in a binding contract without further action by either party.
9. Bid Guarantee (applicable to construction and equip-ment contracts exceeding $25,000)
All bids must be accompanied by a negotiable bid guarantee which shall not be less than five percent (5%) of the amount of the bid. The bid guarantee may be a certified check, bank draft, U.S. Government Bonds at par value, or a bid bond secured by a surety company acceptable to the U.S. Government and authorized to do business in the state where the work is to be performed. In the case where the work under the contract will be performed on an Indian reservation area, the bid guarantee may also be an irrevocable Letter of Credit (see provision 10, Assurance of Completion, below). Certified checks and bank drafts must be made payable to the order of the PHA/IHA. The bid guarantee shall insure the execution of the contract and the furnishing of a method of assurance of completion by the successful bidder as required by the solicitation. Failure to submit a bid guarantee with the bid shall result in the rejection of the bid. Bid guarantees submitted by unsuccessful bidders will be returned as soon as practicable after bid opening.
10. Assurance of Completion
(a) Unless otherwise provided in State law, the successful bidder shall furnish an assurance of completion prior to the execution of any contract under this solicitation. This assurance may be [Contracting Officer check applicable items] —
[ ] (1) a performance and payment bond in a penal sum of 100 percent of the contract price; or, as may be required or permitted by State law;
[ ] (2) separate performance and payment bonds, each for 50 percent or more of the contract price;
[ ] (3) a 20 percent cash escrow;
[ ] (4) a 25 percent irrevocable letter of credit; or, [ ] (5) an irrevocable letter of credit for 10 percent of the total contract price with a monitoring and disbursements agreement with the IHA (applicable only to contracts awarded by an IHA under the Indian Housing Program).
(b) Bonds must be obtained from guarantee or surety companies acceptable to the U.S. Government and authorized to do business in the state where the work is to be performed. Individual sureties will not be considered. U.S. Treasury Circular Number 570, published annually in the Federal Register, lists companies approved to act as sureties on bonds securing Government contracts, the maximum underwriting limits on each contract bonded, and the States in which the company is licensed to do business. Use of companies listed in this circular is mandatory. Copies of the circular may be downloaded on the U.S. Department of Treasury website http:// www.fms.treas.gov/c570/index.html, or ordered for a minimum fee by contacting the Government Printing Office at (202) 512-2168.
(c) Each bond shall clearly state the rate of premium and the total amount of premium charged. The current power of attorney for the person who signs for the surety company must be attached to the bond. The effective date of the power of attorney shall not precede the date of the bond. The effective date of the bond shall be on or after the execution date of the contract.
(d) Failure by the successful bidder to obtain the required assur-ance of completion within the time specified, or within such extended period as the PHA/IHA may grant based upon reasons determined adequate by the PHA/IHA, shall render the bidder ineligible for award. The PHA/IHA may then either award the contract to the next lowest responsible bidder or solicit new bids. The PHA/IHA may retain the ineligible bidder’s bid guarantee.
11. Preconstruction Conference (applicable to construction contracts)
After award of a contract under this solicitation and prior to the start of work, the successful bidder will be required to attend a preconstruction conference with representatives of the PHA/IHA and its architect/engineer, and other interested parties convened by the PHA/IHA. The conference will serve to acquaint the participants with the general plan of the construction operation and all other require-ments of the contract (e.g., Equal Employment Opportunity, Labor Standards). The PHA/IHA will provide the successful bidder with the date, time, and place of the conference.
12. Indian Preference Requirements (applicable only if this solicitation is for a contract to be performed on a project for an Indian Housing Authority)
(a) HUD has determined that the contract awarded under this solicitation is subject to the requirements of section 7(b) of the Indian Self-Determination and Education Assistance Act (25 U.S.C. 450e(b)).
Section 7(b) requires that any contract or subcontract entered into for the benefit of Indians shall require that, to the greatest extent feasible
(1) Preferences and opportunities for training and employment (other than core crew positions; see paragraph (h) below) in connec-tion with the administration of such contracts or subcontracts be given to qualified “Indians.” The Act defines “Indians” to mean persons who are members of an Indian tribe and defines “Indian tribe” to mean any Indian tribe, band, nation, or other organized group or community, including any Alaska Native village or regional or village corporation as defined in or established pursuant to the Alaska Native Claims Settlement Act, which is recognized as eligible for the special programs and services provided by the United States to Indians because of their status as Indians; and,
(2) Preference in the award of contracts or subcontracts in connection with the administration of contracts be given to Indian organizations and to Indian-owned economic enterprises, as de-fined in section 3 of the Indian Financing Act of 1974 (25 U.S.C.
1452). That Act defines “economic enterprise” to mean any Indian-owned commercial, industrial, or business activity established or organized for the purpose of profit, except that the Indian ownership must constitute not less than 51 percent of the enterprise; “Indian organization” to mean the governing body of any Indian tribe or entity established or recognized by such governing body; “Indian” to mean any person who is a member of any tribe, band, group, pueblo, or community which is recognized by the Federal Government as eligible for services from the Bureau of Indian Affairs and any “Native” as defined in the Alaska Native Claims Settlement Act; and Indian “tribe” to mean any Indian tribe, band, group, pueblo, or community including Native villages and Native groups (including
Walnut Manor Elevator Modernization
00 21 00 - 4
INSTRUCTIONS TO BIDDERS - HUD 5369
05.14.2026
X corporations organized by Kenai, Juneau, Sitka, and Kodiak) as defined in the Alaska Native Claims Settlement Act, which is recog-nized by the Federal Government as eligible for services from the Bureau of Indian Affairs.
(b) (1) The successful Contractor under this solicitation shall com-ply with the requirements of this provision in awarding all subcon-tracts under the contract and in providing training and employment opportunities.
(2) A finding by the IHA that the contractor, either (i) awarded a subcontract without using the procedure required by the IHA, (ii) falsely represented that subcontracts would be awarded to Indian enterprises or organizations; or, (iii) failed to comply with the contractor’s employment and training preference bid statement shall be grounds for termination of the contract or for the assessment of penalties or other remedies.
(c) If specified elsewhere in this solicitation, the IHA may restrict the solicitation to qualified Indian-owned enterprises and Indian organi-zations. If two or more (or a greater number as specified elsewhere in the solicitation) qualified Indian-owned enterprises or organiza-tions submit responsive bids, award shall be made to the qualified enterprise or organization with the lowest responsive bid. If fewer than the minimum required number of qualified Indian-owned enter-prises or organizations submit responsive bids, the IHA shall reject all bids and readvertise the solicitation in accordance with paragraph
(d) below.
(d) If the IHA prefers not to restrict the solicitation as described in paragraph (c) above, or if after having restricted a solicitation an insufficient number of qualified Indian enterprises or organizations submit bids, the IHA may advertise for bids from non-Indian as well as Indian-owned enterprises and Indian organizations. Award shall be made to the qualified Indian enterprise or organization with the lowest responsive bid if that bid is -
(1) Within the maximum HUD-approved budget amount estab-lished for the specific project or activity for which bids are being solicited; and
(2) No more than the percentage specified in 24 CFR 905.175(c) higher than the total bid price of the lowest responsive bid from any qualified bidder. If no responsive bid by a qualified Indian-owned economic enterprise or organization is within the stated range of the total bid price of the lowest responsive bid from any qualified enterprise, award shall be made to the bidder with the lowest bid.
(e) Bidders seeking to qualify for preference in contracting or subcontracting shall submit proof of Indian ownership with their bids.
Proof of Indian ownership shall include but not be limited to:
(1) Certification by a tribe or other evidence that the bidder is an Indian. The IHA shall accept the certification of a tribe that an individual is a member.
(2) Evidence such as stock ownership, structure, manage-ment, control, financing and salary or profit sharing arrangements of the enterprise.
(f) (1) All bidders must submit with their bids a statement describ-ing how they will provide Indian preference in the award of subcon-tracts. The specific requirements of that statement and the factors to used by the IHA in determining the statement’s adequacy are included as an attachment to this solicitation. Any bid that fails to include the required statement shall be rejected as nonresponsive.
The IHA may require that comparable statements be provided by subcontractors to the successful Contractor, and may require the Contractor to reject any bid or proposal by a subcontractor that fails to include the statement.
(2) Bidders and prospective subcontractors shall submit a certification (supported by credible evidence) to the IHA in any instance where the bidder or subcontractor believes it is infeasible to provide Indian preference in subcontracting. The acceptance or rejection by the IHA of the certification shall be final. Rejection shall disqualify the bid from further consideration.
(g) All bidders must submit with their bids a statement detailing their employment and training opportunities and their plans to provide preference to Indians in implementing the contract; and the number or percentage of Indians anticipated to be employed and trained.
Comparable statements from all proposed subcontractors must be submitted. The criteria to be used by the IHA in determining the statement(s)’s adequacy are included as an attachment to this solicitation. Any bid that fails to include the required statement(s), or that includes a statement that does not meet minimum standards required by the IHA shall be rejected as nonresponsive.
(h) Core crew employees. A core crew employee is an individual who is a bona fide employee of the contractor at the time the bid is submitted; or an individual who was not employed by the bidder at the time the bid was submitted, but who is regularly employed by the bidder in a supervisory or other key skilled position when work is available. Bidders shall submit with their bids a list of all core crew employees.
(i) Preference in contracting, subcontracting, employment, and training shall apply not only on-site, on the reservation, or within the IHA’s jurisdiction, but also to contracts with firms that operate outside these areas (e.g., employment in modular or manufactured housing construction facilities).
(j) Bidders should contact the IHA to determine if any additional local preference requirements are applicable to this solicitation.
(k) The IHA [ ] does [ ] does not [Contracting Officer check applicable box] maintain lists of Indian-owned economic enterprises and Indian organizations by specialty (e.g., plumbing, electrical, foundations), which are available to bidders to assist them in meeting their responsibility to provide preference in connection with the administration of contracts and subcontracts.
Walnut Manor Elevator Modernization
00 21 00 - 5
INSTRUCTIONS TO BIDDERS - HUD 5369
Walnut Manor 00 22 00 -1 05.14.2026
Elevator Modernization BID SUBMITTAL CHECKLIST BID DOCUMENTS
BID SUBMITTAL CHECKLIST
The following represents a list of those documents and materials, which will be required in connection with the project. Certain items will be required at the time of the bid submission; failure to submit them will render the bid nonresponsive, which may result in the rejection of the bid by the Owner in accordance with
Pennsylvania law; other items will be required after award of the contract but no later than time set for the contract execution. Specific review should be made of bidding documents contained in the Project Manual to ascertain what those documents are and when they are required to be submitted.
This reminder summary is to act as a courtesy to potential bidders to remind them what documents or materials need to be submitted.
Submissions required with the bid:
[ ] Form of Bid
[ ] Representations, Certifications, & Other Statements (HUD 5369-A – 11/92)
[ ] Form of Non-Collusive Affidavit
[ ] Statement of Bidders’ Qualification
[ ] Previous Participation Certification (HUD 2530 – 02/2013)
[ ] Certified Statement (Debarment)
[ ] Form of Bid Bond
[ ] Certificate as to Corporate Principal
Once again, this reminder list is submitted to the bidders strictly as courtesy and is not to be binding on the Owner. Responsibility for ascertaining and submitting the documents needed for consideration of the bid, and at appropriate time, falls upon each and every bidder.
Submissions required after award of the contract and on or before the contract execution:
[ ] Allentown Business License
[ ] Corporate Resolution
[ ] W9 Form
[ ] Certificate of Liability Insurance
[ ] Performance and Payment Bonds
THIS PAGE INTENTIONALLY LEFT BLANK
BID FORM
ALLENTOWN HOUSING AUTHORITY
WALNUT MANOR ELEVATOR MODERNIZATION
GENERAL CONSTRUCTION CONTRACT
Submitted To: Submitted By:
Allentown Housing Authority ___________________________________
1337 West Allen Street ___________________________________
Allentown, PA 18102 ___________________________________
THIS BID FORM SHALL NOT BE ALTERED IN ANY MANNER
BASE BID DESCRIPTION AS FOLLOWS
Having carefully examined the Contract Documents, together with all Clarifications thereto, and being familiar with the various conditions affecting the Work, the undersigned herein agrees to furnish all materials, perform all labor, and do all else necessary to complete the
General Contract in accordance with the Contract Documents, dated May 14, 2026, for the
BASE BID Sum of:
Dollars
(written)
(numbers)
ALTERNATES
The undersigned Bidder proposes the amount below be added to or deducted from the Base Bid as indicated if alternates are accepted by the Owner. Amounts listed for each alternate include costs of related coordination, modification, or adjustment.
A. The Bidder shall be responsible for determining from the Contract Documents the effects of each alternate on the Contract Time and the Contract Sum.
B. Owner reserves the right to accept or reject any alternate, in any order, and to award or amend the Contract accordingly within 60 days of the Notice of Award unless otherwise indicated in the
Contract Documents.
C. Acceptance or non-acceptance of any alternates by the Owner shall have no effect on the Contract
Time.
Walnut Manor 00 41 05 - 2 05.14.2026
Elevator Modernization FORM OF BID (GENERAL CONSTRUCTION) BID DOCUMENTS
Alternate #1 – Increase elevator speed from 150 FPM to 250 FPM.
Add / Deduct $ _______
(circle one) (numbers)
______ Dollars
Alternate #2 – Provide monthly cost for two-year preventative maintenance contract.
Add / Deduct $ _______
(circle one) (numbers)
______ Dollars
The bidder represents that he (has) (has not) participated in a previous contract or subcontract to either the equal opportunity clause herein or the clause originally contained in Section 301 of the Executive Order
No. 10925; that he (has) (has not) filed all required compliance reports signed by the proposed subcontractors, which will be obtained prior to subcontract awards. The bidder further represents that he will, if required, submit and require proposed subcontractors to submit a compliance report prior to the award of the contract or subcontract.
Certification of Non-segregated Facilities - By signing this bid, the bidder certifies that he does not maintain or provide for his employees any segregated facilities at any of his establishments and that he does not permit his employees to perform their services at any location, under his control, where segregated facilities are maintained. He certifies further that he will not maintain or provide for his employees any segregated facilities at any of his establishments and that he will not permit his employees to perform their services at any location, under his control where segregated facilities are maintained. The bidder agrees that a breach of the certification is a violation of the Equal Opportunity Clause in this Contract. As used in this certification, the term, “Segregated Facilities” means any waiting rooms, work areas, rest rooms and wash rooms, restaurants or other eating locations, time clocks, locker rooms and other storage or dressing areas, parking lots, drinking fountains, recreation or entertainment areas, transportation and housing facilities provided for employees which are segregated by explicit directive or are in fact segregated on the basis of race, color, religion or national origin, because of habit, local custom or otherwise. He further agrees that
(except where he has obtained identical certifications from proposed subcontractors for specific time periods) he will obtain identical certifications from proposed subcontractors prior to the award of subcontracts exceeding $10,000.00 which are not exempt from the provisions of “the Equal Opportunity
Clause” and that he will retain such certifications in his files; and that he will forward a notice to his proposed subcontractors as provided in the Instructions to Bidders.
NOTE: The penalty for making false statements in offers is prescribed in 18 U.S.C. 1001.
I hereby acknowledge receipt of:
Addendum No. dated
Walnut Manor 00 41 05 - 3 05.14.2026
Elevator Modernization FORM OF BID (GENERAL CONSTRUCTION) BID DOCUMENTS
The Housing Authority of the City of Allentown retains the right to award the Base Bid based upon the best interest of the Owner.
Company: _________________________________________
Signature: _________________________________________
Title: _________________________________________
Date: _________________________________________
Sealed Bids due through the Penn Bid Program on or before Tuesday, June 16, 2026 at the time set forth in te Invitation to Bid. Bids must be firm for 60 days from the date due.
��-,./#$��0������� � �&���1�� ��2)
3��
���%/����4��5��6��������
����������������������������������-� ������������7�
��%/�$,��8,-9/-�:/�$�;�7-,�$��� �*'�$,-�4�3/#:� +#�'�0�� <���
| ���;�3� | (�� |
| ����!� ����� |
��2))))))))))))))))))))))=���)����������������)5� 4444444444444444444444444444444444444444444444444444444444444444 �%,+'����4��5�����������
����������������������������������-� ������������7�
%,+'/-3�9/-))))))))))))))))))))))=���)����������������)�5 4444444444444444444444444444444444444444444444444444444444444444 �%-������4��5����������5
����������������������������������-� ������������7�
%-+#9'�>/-�0+� ��� �&2))))))))))))))))))))))))=���)���������������6)65 3��, �4��$, /))))))))))))))))))))=���)���������������6)65 4444444444444444444444444444444444444444444444444444444444444444 �%-������4�6������������
����������������������������������-� ������������7�
$+'/�7+ 4444444444444444444444444444444444444444444444444444444444444444 �#�-����64��������������
����������������������������������-� ������������7�
$/-�0+� ���
| � | ��� |
| ���#� |
3� ���� ���+�� ���� �&<�7����8��?<��� 3� ���7���( 3� ���-��1�+�� ���� � �11����%� �&�0/A ��� 3�����!�%� ?2<��
Walnut Manor Elevator Modernization
00 43 00 - 1
DAVIS - BACON WAGE RATE DETERMINATION
| ��� | ������ | ��������� | ����� | |
| ������� | ��������� | ������ | ��� | |
| ������ ! | "# $% | &' (# |
| � | |
| )*(&+#�((, | (-.(+.&(&- |
���/)�0�1 ! -+ && ", $&
| � | |
| )*(&-+�((# | (-.(+.&(&- |
| )*�21�) | 3����� | ������� | ||
| ��������� | ������ | ��� | ����� | |
| 4���� ! | %+ &" | &# $# |
5 ����("$-�(++ (,.(+.&(&-
����1)��� 2 3��������
| ������������� | ������������ | �6 | |||
| 7���� | ��� | ������������� | |||
| 7������� | ��� | ������� | /������ | ||
| ��� | 7���� | *���� | /����� | ��� | |
| ������������� ! | -( (( | &- #" |
14) 2�� ! ,+ %+ "' %"-8�89
�441241�7:
| 1�42 | �)�;�1: | �������� | ������9���� | '< | 9���� | =����� | ���� | ||||||
| 6�� | - | ����� | �� | ���� | �6 | ���>��� | �� | >������� | ��� | ������� | ��� | ||
| ,< | 6�� | , | ����=� | �� | - | ����� | �6 | ���>��� |
| ? | ���=� | *��� | �������� | 3���>���� | �������� | =�� | ���@�� | - | |||
| ���������>� | ���� | 9�6��� | ��� | �=� | ���@��� | ��� | �6��� | �=� | |||
| =�������: | 2�� | A����B� | ;��� | ||||||||
| ������� | ;��� | ������������ | ;��� | ||||||||
| ��9�� | ;��� | �������B� | ;��� | 1=��@���>��� | ;�� | ��� | �=� | ������ | |||
| �6��� | 1=��@���>��� | ;��� | ��� | �=������� | ;�� |
�20�((,,�(%, (,.(+.&(+%
| *4/�) | �CD�* |
| �21 | 4*�) |
14) �20�(-%&�("- (-.(+.&(+$
| *4/�) | �CD�* |
| �21 | 4*�) |
14)
| ?��@=��.����>����.1���@=��� | |||
| ?�9���.7@��.7����.7@�� | |||
| �������?���� | ?�����E��� | ||
| �������� | *���� | ����� | 3/��= |
Walnut Manor Elevator Modernization
00 43 00 - 2
DAVIS - BACON WAGE RATE DETERMINATION
� &�'0 ()�������������( �' ������������1� �����2���� &��) 00�������������. )/ 3333333333333333333333333333333333333333333333333333333333333333 �4�25�(�(3��0��06�.6���(
4�2572�8"���2�59 "5�9� &�'0 �*������������'� *' 3333333333333333333333333333333333333333333333333333333333333333 ��9:2..0(3�.���/6�.6��.0
�9:2�"��� �����7�����;���,-��� ������� &��/ ')������������.0 '( �%�7���� �����2 �%�;�1
| �� | ��� |
| �%�;� | ��� |
���3:�� � &��* 0(������������.0 '( ��� &��* 0(������������.0 '( 3333333333333333333333333333333333333333333333333333333333333333 ��945.�*)3��.��/6�.6��./
�945�"���:�$������������� 1-��%� &��* (/������������.* '� �945�"�����%������� �6��-� ��2 �%� &��0 �.������������.* '� 3333333333333333333333333333333333333333333333333333333333333333 ���< �(��3�..��/6�.6���(
�4�"�4��"���4 ���=9���� ��-��4 � &�/) */������������(� 0+ 3333333333333333333333333333333333333333333333333333333333333333 ���< �*)�3�.���/6�.6���/
3333333333333333333333333333333333333333333333333333333333333333 ��22���'�3�.���/6�.6���.
�22�"���"# 7����-����� 3333333333333333333333333333333333333333333333333333333333333333 �1��9�**)3��(��.6�.6���*
Walnut Manor Elevator Modernization
00 43 00 - 3
DAVIS - BACON WAGE RATE DETERMINATION
��������0 ������������������������������� ��
�))��)��1����,�#0��,�21����*��0 �/�2 3�4'-5"�'"�� ���$%�$% � �
| �'6)���1��&��0 | ��� | ,���"��� |
| .�7� | �%.0 | *������������������������ ��8�������������$��8$ |
3�4'-5"�'"�� !��$%�$% � �
��7�����+���.0 ��0�����
��������0 �) �2��������������������������������������8� ���4�' �$$"�� ��8% �% �$�
�#������� ����������������$���8 5�'9
�5������������ !� �������������$����
�)�()����:����4.�4�'������������������������������� ��$$ �'6)���1��.0770 �0��5� ������������ ��� ������������$ ��� )���'�)�1��/����������������������� 8���������������$���8 )���'�)�1��5��,��������������������� ���������������$8��� )���'�)�1��5��,��%6��,�������������� ��$������������$���8 )���'�)�1����;�����'��<���:���
���:�� ,�.0 *��������������������$������������$8��� �))���1�(������00=� �) �2��������� 8�!�������������$8�� ��4.��/� -��1��/+7����+*����������� ���!���������������!�
(��/����"���*��;�����������*��>�,�=0��*��=�����=0�7�
| 0������0 | ��0�?<�*<�?��,� | |
| ����� | *�,� | ���� |
�0��1��A�*+��;��)�,�����)��$���!:�����>���<� =0����,�����.0 ���*�0������������0�����*0 ���*����+>B�*���0��<�
Walnut Manor Elevator Modernization
00 43 00 - 4
DAVIS - BACON WAGE RATE DETERMINATION
| �� | � |
| � | � |
| ��� | ���� |
| � | )��� |
| ����� | ||
| � | ����� | * |
| $���� | ���� |
| ����� | ||
| � | ����� | * |
| $���� | ���� |
| ����� | � |
| ������� | * |
| �� | ������� |
| ��-����#� | �� |
| � | � |
| $�������� | � |
| � | ��� |
0���.
�&('1
| � | � |
| �� | ���� |
�2� �&('1 3������ �&('1� 4�&�&�
5��
| �� | ������� |
| ��-����#� | �� |
| � | � |
| $�������� | � |
| � | ��� |
�&('1
6 ������
| ������ | � |
| ����� |
| �� | |
| � | ������ |
| ��� | ����� |
| �� | ����� |
��2783
5��
| ������ | � |
| � | � |
| �� | �������� |
| � | � |
5��
| ������ | � |
| � | �� |
| �*������� |
6 �� 3���
99:699� 996�;<99� =:7=
>?6@��21���' ��/��/���A� >?6@
��21
| � | �� |
| �# �� |
| ��� | ��� |
| �# �� |
��21� 5��
| �,� |
| �# ��� |
| � | ��� | �� |
| �# �� |
5�� ��/��/���A
| ����� | � |
| �*������� |
Walnut Manor Elevator Modernization
00 43 00 - 5
DAVIS - BACON WAGE RATE DETERMINATION
| ���������� | � |
| ����� | ���� |
| ��� | ������ |
��"#./�.&&%&�&%0&%01&12����"#������ ���3
!�����4
| ����4 | �� |
| �$���� | ���� |
�$�&%0&%01&12 ����4 ��
�������� �5� �$����
5����6 �� �5$�
| � | ������ | |
| ��� | ��� | ������ |
3����5��
!���773�77�����
| ������ | � |
| ���� | �������������18��9��%�1������ |
��������5���� ��� �����������5
| ���� | ������ | |
| ��� | ��� | ���� |
| ��� | ������� |
��������5�����
| ������ | |
| �������� | ������ |
��������5$�� �� 5
| �������� | ������.������� |
| ����(4 | �� |
�-�3�9,1&11.&&:
;01:01&12��3�������
| ����� | ������ | |
| ��� | ��� | �����������5�� |
| ����� |
�����9,������ ���3
�����9 ���� ��1&11���� 5� ����� ��������5����������
| ������ | |
| ����� | ���� |
| ��� | �� |
| � | �����!�����4 |
| ����4 | �� |
| �$���� | ���� |
;01:01&12���� ����4 �� ��������5�����
| ������ | |
| ����� | ���� |
<3�<�� ���� 5���
5���� ����������� � ����������5 ���������18��9��%�;����%��
!���773�77�����
| ������ | |
| ����� | �� |
| ���� | � |
| ����� | ���� |
��5� ��
| ��� | |
| ���������18���9���%�=���.������(4 | �� |
�-�3�*(1&1=.&&:
&%0&=01&12��3�����
���3
| �����* | �����1&1=���� |
| ���5� | ��������������� |
��������5����������
| ���� | ||
| ��� | ���� | �����!�����4 |
| ����4 | �� |
| �$���� | � |
�$�&%0&=01&12���� ����4 ��
| ������ | |
| ����� | ���� |
���<3�<�����
��#(��(!(�* ?�! /?��++(�,3�+�/�(33
| %��� | �� |
| ���������� | ����� |
Walnut Manor Elevator Modernization
00 43 00 - 6
DAVIS - BACON WAGE RATE DETERMINATION
| ������ | ���� |
| ��������������� | ������� |
| ������ | ���� | |
| ���� | �� | ���������������������� |
| ���������������� | �� |
| � | �������������� | ||
| ����������� | �������� | ������� | ��� |
| ������������%! !��������� | �����&���� | ||
| ������������'((�)� | �������� | �*�� | ����+!�! |
| ������ | ���� | ��������������� |
| �� | ����� | ��� |
| ������ | ����������������� | ������ |
| ������ | ������� |
| ��������������� | ������)� | �������� | ��� |
| ��������� | ���� | �! | |
| "���������� | ������������ |
| ��������������� | ������)� | �������� | ��� |
| ��������� | ���� | � |
| ������������%! !��������� | �����&���� | ||
| ������������'((�)� | �������� | �*�� | ����+!�! |
| '��.��� | �� | ������ | |
| ������ | �������� | ������ | |
| ����� | �� | ��� | ������� |
| ������ | ��� | ����������������� |
| ����� | �� | |
| ������ | ������������ |
�� ���������� ���'/�)0"�1����,!2�� �'/�)0"�1����3�!
| ����� | �� | |
| ������ | ��� | ������������ |
| ��!���� | �� |
| ������ | # |
| �� | �������� | ||
| ������������%! !��������� | �����&���� | ||
| ������������'((�)� | �������� | �*�� | ����+!�! |
4����������������
| ����������� | �� | ||
| ������������������ | �������� | ||
| � | ������� | ||
| ������5��������� | �� | ||
| �� | ��� | �������� | ���� |
| ������� | � |
��������6����
| ��������� | �����������������������������!������ |
| ���������������� | �� |
| ���������� | ��������������! |
7��.������
| ������ | ��������* | |
| �� | ������������ | ��������������� |
| � | ������� |
| ������������%! !��������� | �����&���� | ||
| ������������'((�)� | �������� | �*�� | ����+!�! |
8888888888888888888888888888888888888888888888888888888888888888
����������9+���0�:9+9"*&��9). .�+;
Walnut Manor Elevator Modernization
00 43 00 - 7
DAVIS - BACON WAGE RATE DETERMINATION
form HUD-5369-A (11/92)Previous edition is obsolete
Representations, Certifications, and Other Statements of Bidders
Public and Indian Housing Programs
U.S. Department of Housing and Urban Development Office of Public and Indian Housing
Walnut Manor Elevator Modernization
00 45 00 - 1
REPRESENTATIONS - HUD 5369A
Representations, Certifications, and Other Statements of Bidders Public and Indian Housing Programs
Table of Contents
Clause Page
1. Certificate of Independent Price Determination 1
2. Contingent Fee Representation and Agreement 1
3. Certification and Disclosure Regarding Payments to Influence Certain Federal Transactions 1
4. Organizational Conflicts of Interest Certification 2
5. Bidder's Certification of Eligibility 2
6. Minimum Bid Acceptance Period 2
7. Small, Minority, Women-Owned Business Concern Representation 2
8. Indian-Owned Economic Enterprise and Indian Organization Representation 2
9. Certification of Eligibility Under the Davis-Bacon Act 3
10. Certification of Nonsegregated Facilities 3
11. Clean Air and Water Certification 3
12. Previous Participation Certificate 3
13. Bidder's Signature 3
1. Certificate of Independent Price Determination
(a) The bidder certifies that--
(1) The prices in this bid have been arrived at independently, without, for the purpose of restricting competition, any consultation, communication, or agreement with any other bidder or competitor relating to (i) those prices, (ii) the intention to submit a bid, or (iii) the methods or factors used to calculate the prices offered;
(2) The prices in this bid have not been and will not be knowingly disclosed by the bidder, directly or indirectly, to any other bidder or competitor before bid opening (in the case of a sealed bid solicitation) or contract award (in the case of a competitive proposal solicitation) unless otherwise required by law; and
(3) No attempt has been made or will be made by the bidder to induce any other concern to submit or not to submit a bid for the purpose of restricting competition.
(b) Each signature on the bid is considered to be a certification by the signatory that the signatory--
(1) Is the person in the bidder's organization responsible for determining the prices being offered in this bid or proposal, and that the signatory has not participated and will not participate in any action contrary to subparagraphs (a)(l) through (a)(3) above; or
(2) (i) Has been authorized, in writing, to act as agent for the following principals in certifying that those principals have not participated, and will not participate in any action contrary to subparagraphs (a)(l) through (a)(3) above.
_______________________________________________ [insert full name of person(s) in the bidder's organization responsible for determining the prices offered in this bid or proposal, and the title of his or her position in the bidder's organization];
(ii) As an authorized agent, does certify that the principals named in subdivision (b)(2)(i) above have not participated, and will not participate, in any action contrary to subparagraphs (a)(1) through (a)(3) above; and
(iii) As an agent, has not personally participated, and will not participate in any action contrary to subparagraphs (a)(1) through (a)(3) above.
(c) If the bidder deletes or modifies subparagraph (a)2 above, the bidder must furnish with its bid a signed statement setting forth in detail the circumstances of the disclosure.
[ ] [Contracting Officer check if following paragraph is applicable]
(d) Non-collusive affidavit. (applicable to contracts for construction and equipment exceeding $50,000)
(1) Each bidder shall execute, in the form provided by the PHA/ IHA, an affidavit to the effect that he/she has not colluded with any other person, firm or corporation in regard to any bid submitted in response to this solicitation. If the successful bidder did not submit the affidavit with his/her bid, he/she must submit it within three (3) working days of bid opening. Failure to submit the affidavit by that date may render the bid nonresponsive. No contract award will be made without a properly executed affidavit.
(2) A fully executed "Non-collusive Affidavit" [ ] is, [ ] is not included with the bid.
2. Contingent Fee Representation and Agreement
(a) Definitions. As used in this provision:
"Bona fide employee" means a person, employed by a bidder and subject to the bidder's supervision and control as to time, place, and manner of performance, who neither exerts, nor proposes to exert improper influence to solicit or obtain contracts nor holds out as being able to obtain any contract(s) through improper…