About this file
Project Manual and Bid Package Summary
This is a Project Manual and Bid Package issued by Tinicum Township, Delaware County, Pennsylvania, for the furnishing of equipment, labor, and supervision for sewer maintenance, emergency repairs, and other construction-related projects. The township seeks an annual contractor capable of providing equipment with qualified operators, laborers, and on-site supervision for various sewage system maintenance and repair tasks on an as-needed basis throughout Tinicum Township. The contract includes 37 line items covering specialized equipment such as loaders, backhoes, bulldozers, dump trucks, compaction equipment, pumps, generators, vacuum excavator trucks, jetting trucks, and tank cleaning trucks, along with labor for superintendents, equipment operators, truck drivers, and general laborers. Proposals must be submitted online via the PennBID Program no later than 2:00 P.M. Prevailing Time on Tuesday, April 14, 2026, with public bid opening scheduled for 6:30 P.M. the same day at The Historic Lazaretto, 97 Wanamaker Avenue, Tinicum Township, Pennsylvania. Bid documents have been available at no cost since Monday, March 16, 2026, through www.PennBID.net. The township reserves the right to award two one-year contracts with an option for a third year at its discretion with the successful bidder's concurrence. The contract requires the successful contractor to mobilize equipment and personnel within two hours of emergency notification and maintain adequate inventory of standard pipe sizes, couplings, and aggregate materials.
Bidders must submit a certified check or bid bond equal to no less than 10 percent of the total bid amount, along with statements of bidder's qualifications, certificates of authority, non-collusion affidavits, and public works employment verification forms. The successful bidder must furnish both a Contractor's Performance Bond and a Labor and Materialmen's Bond, each in the amount of 100 percent of the accepted bid, with the surety company maintaining no less than an "A" rating from Best or equivalent and authorization to conduct business in Pennsylvania without reinsurance. Hourly unit prices for equipment with operators and labor apply to the first eight hours worked Monday through Friday, with overtime compensation at one-half the hourly rate for hours exceeding eight per day or work performed on weekends and legal holidays. The contractor must comply with Pennsylvania Prevailing Wage Requirements, the Pennsylvania Human Relations Act, the Steel Products Procurement Act, Act 287 regarding underground utility location, and the Public Works Employment Verification Act requiring E-Verify compliance. All work must adhere to confined space entry procedures, lockout/tagout requirements, personal protective equipment standards, and comprehensive health and safety protocols as outlined in the specifications. The contract includes extensive technical specifications for pipe materials, installation methods, testing procedures, restoration requirements, and contractor responsibilities for utility protection, traffic control, and property restoration.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT MANUAL AND BID PACKAGE
FOR
FURNISHING EQUIPMENT, LABOR, & SUPERVISION
FOR
SEWER MAINTENANCE, EMERGENCY REPAIRS, &
OTHER CONSTRUCTION-RELATED PROJECTS
IN
TINICUM TOWNSHIP, DELAWARE COUNTY, PA
MARCH 3, 2026
HERBERT E. MACCOMBIE, JR., P.E.
CONSULTING ENGINEERS & SURVEYORS, INC.
P.O. BOX 118
BROOMALL, PA 19008
HEM@HEMENGINC.COM
MARCH 2026
mailto:hem@hemenginc.com
TABLE OF CONTENTS
Section 100
Invitation for Bids 100-1 & 2
Section 200
Information for Bidders
1. Form and Submission of Proposals 200-1
2. Papers Accompanying Proposals 200-1
3. Acceptance of Proposal and Its Effect 200-1 & 2
4. Execution of Form of Contract 200-2
5. Security for Faithful Performance 200-2
6. Liquidated Damages 200-2 & 3
7. Return of Certified Checks 200-3
8. Right to Accept and Reject Proposals 200-3 & 4
9. Qualification of Bidders 200-4
10. Equipment 200-4
11. Examination of Site 200-4
12. Conditions of Work 200-5
13. Obligation of Bidder 200-5
14. Addenda and Interpretations 200-5
15. Subcontractors 200-5 & 6
16. Pennsylvania Human Relations Act 200-6
17. Sales and Use Tax 200-6
18. Steel Products Procurement Act 200-7
19. Environmental Impact Statement 200-7
20. Pennsylvania Prevailing Wage Act 200-7 & 8
21. Public Works Employment Verification Act 200-8
22. Form of Statement of Bidder’s Qualifications 200-9 to 14
Section 300
Documents to be submitted with the Proposal
Contract Documents
Letter of Intent 300-1
Certificate of Authority 300-2
Non-Collusion Affidavit 300-3
Section 400
Form of Contract
Witness 400-1
Certificate and Acknowledgment of Authority 400-2
Acknowledgment of Contractor 400-3 & 4
Contractors Performance Bond 400-5 & 6
Contractors Labor and Materials Bond 400-7-& 8
Section 500
Form of Proposal
Schedule of Items and Prices 500-1 to 11 i
Section 600
General Provisions 600-1 to 3
Section 700
General Conditions 700-1 to 4
Section 800
Specifications 800-1 to 870-1
Section 900
Technical Specifications 900-1 to 910-3
APPENDIX A
Prevailing Minimum Wage Documentation from the Department of Labor and Industry
APPENDIX B
Public Works Employment Verification Form
APPENDIX C
Health and Safety Procedures
APPENDIX D
Tinicum Township Standard Sewer Details
APPENDIX E
Tinicum Township Sewer Map
APPENDIX F
Tinicum Township Bypass Pump Specification ii
SECTION 100
INVITATION FOR BIDS
FURNISHING EQUIPTMENT, LABOR, & SUPERVISION
FOR
SEWER MAINTENANCE, EMERGENCY REPAIRS, &
OTHER CONSTRUCTION-RELATED PROJECTS
IN
TINICUM TOWNSHIP, DELAWARE COUNTY, PA
PROPOSALS will be received online via the PennBID Program by the Board of
Commissioners, Tinicum Township, Delaware County, Pennsylvania until 2:00 P.M., Prevailing Time, on Tuesday, April 14, 2026, for the following:
The bid for an annual contractor for the furnishing of equipment, labor, and supervision for sewer maintenance, emergency repairs, and other construction related projects in Tinicum
Township, Delaware County, PA., for the Tinicum Township, Delaware County Sewage
Authority, and Tinicum Township.
All Bids received will be publicly read aloud by the Tinicum Township Secretary at 6:30
P.M. Prevailing Time, on Tuesday, April 14, 2026, at The Historic Lazaretto, 97 Wanamaker Avenue, Tinicum Township, PA 19029.
Copies of the Form of Proposal and Specifications are available at no cost at www.PennBID.net beginning Monday, March 16, 2026.
Each Bidder must deposit with his bid, security in the form of a certified check or bid bond in the amount of not less than ten percent (10%) of the total bid made payable to the order of Tinicum
Township, Delaware County, PA.
All Forms and Papers required to accompany the bid must be up-loaded to PennBID prior to the date and time bids are to be received.
The successful Bidder will be required to furnish a Contractor’s Performance Bond and a Labor and Materialmen’s Bond in an amount of the accepted bid. The Surety Company and form of surety shall be subject to the approval of Tinicum Township, Delaware County, PA. The Bond
Company should have no less than an “A” rating (Best Rating) and provide documentation of their authority to do business in the Commonwealth of Pennsylvania. In addition, the Bond should be provided without a reinsurer.
No bidder may withdraw his bid within ninety (90) days after the date set for the receiving and opening of bids.
The Commonwealth of Pennsylvania Prevailing Wage Rates and Federal Guidelines for confined space entry will apply to this project, in addition to any and all other applicable federal, state, and local laws, statutes, ordinances, rules and regulations.
100-1 http://www.pennbid.net/
The Township reserves the right to accept and or reject any and all bids or parts thereof, for any cause whatsoever, and to waive informalities in the bidding as they deem for the best interest of the Township.
Each bid must be accompanied by a signed commitment of the proposed surety offering to execute a Performance Bond as well as the Statement of Bidder’s Qualifications and all forms required by the County of Delaware including but not limited to Bid Bond or Certified
Check, the Letter of Intent, Certificate of Authority/Statement Accompanying Proposal, the
Non-Collusion Affidavit, Statement of Bidders Qualifications, and Subcontractor Declaration
Form.
All Bidders are reminded that should the Township award a contract, the Successful Bidder will be required to pay all fees associated with PennBid.
By Order of Tinicum Township
Board of Commissioners
David D. Schreiber, Tinicum Township Manager/ Secretary
100-2
SECTION 200
INFORMATION FOR BIDDERS
1. FORM AND SUBMISSION OF PROPOSALS
Tinicum Township, Delaware County, hereinafter called “owner”, invites proposals in the annexed form. Proposals must be submitted through PennBid no later than the given time in
Section 100, “Invitation for Bids.” All bids received will be publicly read aloud at the given time in Section 100, “Invitation for Bids.”
2. PAPERS ACCOMPANYING PROPOSALS
Each proposal must be accompanied by the following papers, which, unless otherwise indicated, shall be submitted with the Proposal.
(a) If the bidder is a corporation, a statement of the names and residences of its officers and directors, a certified copy of its certificate of incorporation, and proof of its authority to do business in the Commonwealth of Pennsylvania. If a partnership, a statement of the names and residences of its members, indicating which are general and which are special partners. If an individual, a statement of his residence. (Page
300-2)
(b) A certified check or Bid Bond in the amount of ten percent (10%) of the Total Bid, made payable to the order of Tinicum Township Delaware County Sewage Authority.
(c) A Signed commitment of the proposed surety, authorized to do business in this
Commonwealth, offering to execute both a Performance Bond and a Labor and
Materialmen’s Bond in the form set forth in Section 400 herein.
(d) The Form of Proposal bound herewith, with his/her bid prices inserted in the clause thereof entitled "Schedule of Items and Prices". This form of proposal shall be signed.
(Page 500-11) Prices for items of work must be extended and totaled;
(e) The Statement of Bidders Qualifications (Pages 200-9 to 16)
(f) The Notice of Intent, Certificate of Authority, and Non-Collusion Affidavit forms as
Required in Proposal contained herein including. (Pages 300-1, 300-2, & 300-3)
(g) The Public Works Employment Verification Form (Appendix B)
(h) Sub-Contractors Declaration
3. ACCEPTANCE OF PROPOSAL AND ITS EFFECT
Within Ninety (90) days after the opening of the Proposals, the Township will accept one of the proposals, or will reject all bids.
200-1
3. ACCEPTANCE OF PROPOSAL AND ITS EFFECT (CONTINUED)
Within Ninety (90) days after the opening of the Proposals, the Owner will accept one of the proposals, or will reject all bids. The Owner will make formal acceptance of the Proposal by a notice in writing signed by the Chairman of the Tinicum Township, Delaware County, and mailed to or delivered at the Office designated in the Proposal. No other act of the Owner, its officers, agents, or employees shall constitute the acceptance of a Proposal. The acceptance of the Proposal shall effect an agreement between the Owner and the successful bidder, of which time shall be of the essence, for the execution of the Form of Contract and an analysis of his bid prices, and for liquidated damages, all as hereinafter provided. It shall not effect a
Contract for the doing of the things provided in the Form of Contract, but the rights and obligations therein provided shall become effective and binding upon the parties only with its formal execution. Neither the acceptance of his Proposal nor the formal execution of the
Form of Contract shall constitute an approval of the bidder's proposed plan, equipment, method and program of work or sureties.
4. EXECUTION OF FORM OF CONTRACT
Within ten (10) days, Sundays and Holidays excepted, after the acceptance of his Proposal, the Township shall present or mail to the successful bidder in quadruplicate, the Form of
Contract bound herewith, with the blanks filled out in accordance with his Proposal. Within ten (10) days, Sundays and Holidays excepted thereafter, the successful bidder shall deliver all copies to the Secretary of the Tinicum Township Board of Commissioners duly executed by him as Contractor. Upon their receipt and upon receipt of satisfactory security for the bidder’s faithful performance, as hereinafter provided, the Township shall execute all copies and shall return one to the successful bidder.
5. SECURITY FOR FAITHFUL PERFORMANCE
When he returns the copies of the Form of Contract, the successful bidder shall also deliver to the Township, security for his faithful performance in an amount not less than the estimated total contract price contained in the Form of Contract annexed to his Proposal.
The Contractor shall furnish bonds as such security; they shall be in the form bound herewith entitled "Contractor's Performance Bond and Labor and Materialmen's Bond” and shall be duly executed by the successful bidder as principal, and by the signers of the Agreement of Proposed Surety as sureties. If, however the Township has theretofore given notice to him that Township is dissatisfied with any surety proposed, he shall, within three (3) days thereafter, deliver to the Township in lieu thereof, other bonds in the same form and penal sum, similarly executed, except that the sureties thereon shall be such as are satisfactory to the Township.
6. LIQUIDATED DAMAGES
In as much as the damages to the Township from a breach by the successful bidder of the
Agreement created by the acceptance of his Proposal will include among others, those resulting from interference with its predetermined progress for the construction of public improvements, such as interest upon funds raised for the construction thereof, engineering, and other items whose accurate amount will be difficult or impossible to compute, such damages shall be liquidated in the sum of the following amounts:
200-2
6. LIQUIDATED DAMAGES (CONTINUED)
(a) The excess, if any, of the total contract price shown in the Form of Contract annexed to the Proposal finally accepted, over that in the one annexed of the
Proposal of the original successful bidder.
(b) The expense of such new advertisement of the Contract, if any, as may be deemed by the Township.
(c) The sum of Five Hundred Dollars ($500.00) for each and every day, including
Sundays and Holidays, that the Township shall be delayed in entering into the
Contract for the performance of the work by reason of such failure of the original successful bidder or once the contract has been entered into for the execution of required work beyond the allotted time contained in the form of proposal.
In the recovery of the damages above specified, the Township may proceed against the sum represented by the certified check deposited with it, or upon the Agreement of the Proposed
Surety, or take such other action as it may be advised.
7. RETURN OF CERTIFIED CHECKS
Within ten (10) days after the opening of the Proposals, the Township will return all certified checks deposited by bidders, except those deposited by the three (3) lowest bidders to be selected by the Township which will be returned within seven (7) days after successful bidder selection. The return of a Bidder's check shall not, however, be deemed to be a rejection of his proposal.
8. RIGHT TO ACCEPT AND REJECT PROPOSALS
The Township reserves the unqualified right, at its sole and absolute discretion, to reject any or all Proposals and to waive any informalities therein. The Township also reserves the right to omit any item or items from the bid in formulating the final bid package amount to be awarded for budgetary reasons or any other reason deemed necessary in the best interest of the Township. The items making up the amount of the Contact shall be the basis for determining the lowest responsible bidder. The award if any, will be made to the lowest responsible bidder on the basis of the total of the sum of all items making up that particular contract. In the event that a successful bidder defaults upon the agreement created by the acceptance of his Proposal, the Township reserves the option to accept the Proposal of the next lowest bidder within eighteen (18) days from such default, in which case, such acceptance shall have the same effect as to such bidder as though he were the originally successful bidder.
Each bidder must inform himself fully of the conditions relating to construction and labor under which the work is now or will be performed. In so far as possible, the Contractor, in the carrying out of his work, must employ such methods or means as will not cause any interruption of or interference with the work of any other Contractor.
200-3
8. RIGHT TO ACCEPT AND REJECT PROPOSALS (Continued)
Bids will be compared on the basis of the prices bid for the Items in the Schedule of Items and Prices. No bid will be accepted which does not contain a price for each item.
Proposals, which contain any unbalanced bid items, or which are conditioned or obscure, or which contain additions not called for, erasures, omissions, qualifying letters, alterations or irregularities of any kind, may be rejected.
9. QUALIFICATION OF BIDDERS
Bidders shall be experienced in the kind of work required to be performed, have the necessary equipment therefore, and sufficient capital to properly execute the work within the time allowed. Therefore, Bids received from bidders who have previously failed to complete contracts within the time required thereof, or who have previously performed similar work in an unsatisfactory manner, or who do not have the required equipment or capital to properly execute the work, may be rejected. The bidders must furnish a statement showing funds immediately available for the execution of the work upon which the bidder is bidding, also, a statement regarding other work of a similar character performed by the bidder. The bidder must provide at least three references along with the names, addresses and telephone numbers of Township, Engineers and Inspectors of Projects in which they have faithfully completed of similar construction and size.
10. EQUIPMENT
The Bidders must use the equipment specified for the work and approvals must be secured for any deviations therefrom before submitting proposals. The bidders must also list the names and addresses of principal subcontractors they intend to use in the work. Before the award of a Contract, the successful bidder shall furnish a statement giving the name, location and sources of supply of the various equipment that will be used in the work.
11. EXAMINATION OF SITE
Each bidder shall and is hereby directed to inspect the entire site of the proposed work and judge for himself/herself as to all the circumstances affecting the cost and progress of the work and shall assume all patent and latent risks in connection therewith.
12. CONDITIONS OF WORK
Each bidder must inform himself/herself fully to the conditions relating to the construction of the project and the employment of labor thereon. Failure to do so will not relieve a successful bidder of his/her obligation to furnish all material and labor necessary to carry out the provisions of his/her contract. Insofar as possible, the contractor in carrying out the work, must employ such methods or means as will not cause any interruption of or interference with the work of any other contractor.
200-4
13. OBLIGATION OF BIDDER
At the time of the opening of bids each bidder will be presumed to have inspected the site and to have read and to be thoroughly familiar with the plans and contract documents (including all addenda). The failure or omission of any bidder to examine any form, instrument or document shall in no way relieve any bidder from any obligation in respect of his/her bid.
The Bidder understands that the due to the scale of the drawings and the nature of the proposed work it is not possible to show every detail, part or piece, connection, accessory, fastener, sub-assembly and other appurtenances that maybe required. The Bidders shall carefully investigate all conditions and details that may affect the work and include all materials and other appurtenances. The cost of all materials and other appurtenances shall be considered incidental and as such included in part of the overall bid price.
All Construction shall be in accordance with all Local and State Codes that may be applicable, where conflicts occur between the specifications and the codes, the codes shall prevail. All such conflicts shall be taken into account in the preparation of the bid. It is the responsibility of each bidder to notify the Engineer of such conflicts prior to the bid.
14. ADDENDA AND INTERPRETATIONS
No official interpretation of the meaning of the plans, specifications or other pre-bid documents will be made to any Bidder orally. Every request for such interpretation or request to use alternate products or materials shall be submitted in writing via the
“Questions” feature within PennBID for review by the Tinicum Township Engineer, and to be given consideration, must be received at least seven (7) days prior to the date fixed for the opening of bids. Any and all such interpretations and any supplemental instructions will be in the form of written addenda to the specifications which, if issued, will be distributed to all prospective Bidders via PennBID, not later than three (3) days prior to the date fixed for the opening of bids. Failure of any bidder to receive any such addendum or interpretation shall not relieve such bidder from any obligation under his/her bid as submitted. All addenda so issued shall become part of the contract documents.
15. SUBCONTRACTORS
If the Bidder determines it will be necessary to employ Subcontractors or Materialmen in order to perform the work, then the Bidder must submit with his bid a list of all such Subcontractors and Materialmen as well as identification of the portion of the work to be done by each
Subcontractor. Each list shall be accompanied by a Form of Statement of Bidder’s
Qualifications for each Subcontractor and Materialman listed. The Bidder must make every reasonable effort to submit the Form of Statement of Bidder’s Qualifications for each
Subcontractor at the time of bid. If the Subcontractor’s Financial Statement information is not with the low bid, then the apparent low bidder will have 48 hours to submit the Financial
Statement information or risk disqualification.
200-5
15. SUBCONTRACTORS (Continued)
If the Township of Tinicum, after due investigation, has reasonable objection to any proposed
Subcontractor, the Township of Tinicum before giving the Notice of Award may request the apparent Successful Bidder to submit an acceptable substitute without an increase in Bid price.
If the apparent Successful Bidder declines to make such substitution, the Contract shall not be awarded to such Bidder, but his declining to make any such substitution will not constitute grounds for sacrificing his Bid security. Any Subcontractor or Materialman so listed and to whom the Township of Tinicum does not make written objection prior to the giving of the
Notice of Award will be deemed acceptable to the Township of Tinicum.
After the Notice of Award, the Contractor may not subcontract any other portions of the work not previously identified to be performed by a Subcontractor without first providing written notification to the Township of Tinicum and receiving the Township’s written consent to such use of a Contractor.
If a Subcontractor is to be used, then either the Contractor or the Subcontractor must first provide a Certificate of Insurance for the Subcontractor with the same coverage and terms and conditions as is required to be provided by the Contractor for its own operations. The Contractor may comply with this requirement by adding the Subcontractor as an additional insured to the
Contractor’s Certificate of Insurance.
Any delays created by the failure to identify the use of a Subcontractor prior to the Notice of
Award and/or failure to provide the required Form of Statement of Bidder’s Qualifications and/or the Certificate of Insurance, shall be imputed to the Contractor and may result in an assessment of appropriate penalties for failure to perform in a timely manner.
No Contractor shall be required to employ any Subcontractor, other person or organization against whom he has reasonable accommodation.
16. PENNSYLVANIA HUMAN RELATIONS ACT
Bidders will be required to comply with the provisions of the Pennsylvania Human relations
Act, 43 P.S., § 951-963, as amended. The Contractor and all Subcontractors shall not discriminate against any group because of race, color, religious creed, ancestry, national origin, age, sex, or disability.
17. SALES AND USE TAXES
The Bidder shall be familiar with all the relevant tax laws for the jurisdiction in which the work is being done, particularly so-called “Sales and Use Taxes” for which he is liable as a consumer or user of goods. The Bid shall be made in accordance with such laws and shall reflect exclusion of such taxes where exemptions exist. The Bidder shall obtain all applicable exemptions for work being done for a tax-exempt authority.
200-6
18. STEEL PRODUCTS PROCUREMENT ACT
Bidders will be required to comply with the provisions of the Steel Products Procurement Act, 73 P.S. § 1881-1887, as amended which applies to all contracts for construction, reconstruction, alteration, repair, improvement, or maintenance of public work which are performed for a public agency within the Commonwealth of Pennsylvania. Under this act, any steel or cast-iron products which are to be used in the performance of this project, must be produced in the United
States or its territories. This act also prohibits payments under the agreement unless the
Township of Tinicum is satisfied that the Contractor has fully complied with the Act.
19. ENVIRONMENTAL IMPACT STATEMENT
Pursuant to Act 247 of 1972 of the General Assembly of the Commonwealth of Pennsylvania, 53 P.S., § 1611, the contractor shall be familiar with and comply with the provisions of Federal and State statutes, rules, and regulations dealing with the prevention of environmental pollution, and the preservation of public, natural resources that affect the Project.
20. PENNSYLVANIA PREVAILING WAGE ACT
A. Bidders will be required to comply with the provisions of the Pennsylvania Prevailing
Wage Act, 43 P.S. § 165, as amended. This act requires public bodies proposing the making of a contract for any project of public work to determine the prevailing minimum wage rates which shall be paid by the contractor to the workmen upon such project, and to incorporate the prevailing minimum wage into such contract. Public work is defined as “construction, reconstruction, demolition, alteration and/or repair work other than maintenance work being done under contract and paid for in whole or in part out of the funds of a public body where the estimated cost of the total project is in excess of $25,000”.
If the owner projects that the proposed work is a “Public Work” pursuant to this definition, further requirements and the appropriate wage determination will appear below in Section 20B, the owner has determined that the work is not a “Public Work” and the provisions of Act No. 442 do not apply.
B. Every Contractor and Subcontractor must abide by the requirements of the Pennsylvania
Prevailing Wage Act, 43 P.S., § 165, as amended, and the regulation issued pursuant thereto of the Pennsylvania Department of Labor & Industry; and conform to the applicable determination made by the Secretary of the Department of Labor & Industry as to the Prevailing Minimum Wage Rates in the locality where this work is being performed. The Wage determination and all requirements cited in “Duties of Awarding
Agencies Under Pennsylvania’s Prevailing Wage Act” are made an integral part of these
Specifications and are included immediately following the Specifications.
Contractor shall post the hereinafter contained minimum wage rates, include the effective date of any changes thereof, in prominent and easily accessible places on the site of the work, or at such place or places as are used by the contractor to pay workmen their wages.
200-7
20. PENNSYLVANIA PREVAILING WAGE ACT (Continued)
Before final payment will be made, Contractor and his Subcontractor shall file statements in writing with the Secretary certifying to the amount then due and owing from such contractor and subcontractor filing such statement to any and all workmen, setting forth therein the names of persons whose wages are unpaid and the amount due to each respectively, which statement so as to be files shall be verified by the oath of the contractor and subcontractor, as the case may be, that he has read such statement subscribed by him, knows the contents thereof, and that is the same is true of his own knowledge.
21. PUBLIC WORKS EMPLOYMENT VERIFICATION ACT
Pursuant to Act 127 of 2012 of the General Assembly of the Commonwealth of Pennsylvania
(43 § 167.1 – 167.11), the contractor shall comply with the Federal E - verify employee system, which was signed into law December 2012 and became effective January 1, 2013. The act requires contractors and subcontractors, as a precondition to receiving a contract on public works projects (defined under the Prevailing Wage Act), to submit employee verification forms to the public body (Tinicum Township). These forms, checked through the Department of
Homeland Security, are to determine the eligibility of an employee to work in the Unites States.
Public Works contractors and every subcontractor performing work under a Public Works contract shall utilize the Employment Verification System to verify the employment eligibility of each new employee hired after January 1, 2013. The contractor is also required to submit the form to the Township of Tinicum to ensure compliance with the Act.
200-8
22. FORM OF STATEMENT OF BIDDER'S QUALIFICATIONS
STATEMENT OF BIDDER'S QUALIFICATIONS
All questions must be answered and the data given must be clear and comprehensive. This statement must be notarized.
1. Name of Bidder
2. Permanent main office address
3. When organized
4. Where incorporated
5. How many years have you been engaged in the contracting business under your present firm name?
6. *Contracts on hand: (Schedule these, showing gross amount of each contract and the approximate anticipated dates of completion)
7. *General character of work performed by your company.
8. Have you ever failed to complete any contract awarded to you?
If so, where and why?
9. *Have you ever defaulted on a Contract? If so, where and why?
10.*List the more important structures recently erected by your company, stating approximate cost for each, and the month and year completed.
11.*List your major equipment available for this contract.
12.*Experience in construction work similar in importance to this project.
13.*Background and experience of the principal personnel of your
Company, including the officers.
14.*Credit available, furnish written evidence.
15. Financial statement no more than 60 days old in the following form.
* To Be Submitted Separately
200-9
BALANCE SHEET
AS OF
ASSETS
Current Assets:
Cash:
On Hand $
In Banks $
Total $
Notes Receivable:
Due within 90 days (Hypothecated) $
Due after 90 days (Hypothecated) $
Past Due (Hypothecated) $
Less: Estimated Uncollectibles $
Accounts Receivable:
Completed Contracts $
Deferred & Unbilled Contract Costs $
Unfinished Contract Costs $
Other Receivable $
Less: Estimated Uncollectibles $
Deposits on Bids $
Raw Materials & Supplies (State Basis) $
Other Current Assets $
Total Current Assets $
Investments:
Stocks & Bonds (Market Value) $
200-10
Other $
Total Investments $
Fixed Assets:
Land $
Buildings (Depreciated Value) $
Machinery & Equipment (Deprec. Value) $
Furniture & Fixtures (Depreciated Value) $
Total Fixed Assets $
Other Assets:
Intangible Assets, Goodwill, Patents $
Deferred Charges & Prepaid Expenses $
Restricted Cash $
Total Other Assets $
Total Assets $
LIABILITIES
Current Liabilities:
Notes Payable:
To Banks $
For Machinery & Equipment $
For Merchandise & Raw Materials $
Total Notes Payable: $
Accounts Payable:
200-11
Not Past Due $
Past Due $
Unfinished Subcontract Costs $
Accrued Expenses (Interest, Wages, etc.) $
Advances from Stockholders, Directors & Others $
State and Federal Taxes $
Long Term Det (Due within one year) $
Estimated Liability for Damages, etc.(Indeterminate in amount but due within one year) $
Other Current Liabilities $
Total Current Liabilities $
Deferred Credits:
Deferred Income - Uncompleted Contracts $
Unamortized Bond Premium $
Total Deferred Credits $
Funded Debt:
Mortgage Payable (Date,interest rate, monthly payments if applicable, etc.) $
Total Funded Debt $
TOTAL LIABILITIES $
Capital and Surplus:
Capital:
Preferred Stock(Shares Issued, par value,etc.) $
Common Stock (Shares Issued, par value, etc.) $
200-12
Total Capital $
Surplus:
Capital Surplus $
Earned Surplus $
Total Surplus $
TOTAL LIABILITIES, CAPITAL AND SURPLUS $
FOOTNOTES (When Applicable)
1. Where assets have been pledged against any liabilities, that fact and the nature and amount of the assets pledged should be stated.
2. Contingent liabilities, liability as guarantor on contracts or accounts of others, etc.
3. Amount of preferred stock dividends in arrears.
4. Amount of defaults in principal, interest or sinking fund provisions of funded debt.
5. Where the value of fixed assets includes appreciation that fact and the amount of appreciation for each should be stated.
6. Will you, upon request, fill out a detailed financial statement and furnish any other information that may be required by the Authority.
7. The undersigned hereby authorizes and requests any person, firm, or corporation to furnish any information requested by the
Authority in verification of the recitals comprising this Statement of Bidder's Qualifications.
(Bidder may submit additional information if desired)
200-13
BIDDER’S QUALIFICATION CERTIFICATION
Dated at this day of 20
(Name of Bidder)
By
State of )
County of ) being duly sworn deposes and says that he is of and that the answers
(Name of Organization) to the foregoing questions and all statements therein contained are true and correct.
Sworn to before me this day of
Notary Public
My Commission expires
200-14
SECTION 300
Letter of Intent
To: Tinicum Township, Delaware County, PA
The Undersigned, (*) hereby offers to enter into a Contract with The Tinicum Township, Delaware County, PA in the form entitled "Form of Contract" bound herewith. The prices inserted by the undersigned in the clause of said Form of Contract entitled "Schedule of Items and Prices" form part of this Proposal.
To induce the acceptance of this Proposal, the undersigned hereby makes each and every representation and warranty made by the Contractor in said form of Contract, and agrees that the acceptance of this Proposal shall have the effect provided in the information for Bidders bound herewith, and that effect only.
Said information for Bidders, all papers required by it, and submitted herewith, said Form of
Contract and all papers made part thereof by its terms, are made part of this Proposal.
If this Proposal is accepted, the undersigned will furnish the security and guarantees for his faithful performance and operation required by the Information for Bidders.
The undersigned hereby designates room number on the
_______________ floor of number Street, City of
State of as his office to which notices may be delivered or mailed.
Dated 20
By (**) (L.S.) Title
(*) Insert bidder's name; if a corporation, give the state of incorporation, using the phrase "A corporation organized under the laws of "; if a partnership, give names of partners, using also the phrase "Co-partners doing business under the firm name of
", if an individual "Doing business under the trade of " ".
(**) If Proposal is signed by an officer or agent, give title and address.
300-1
CERTIFICATE OF AUTHORITY, IF CONTRACTOR IS A CORPORATION
I, the undersigned, as Secretary of the corporation submitting the foregoing Proposal, hereby certify that under and pursuant to the by-laws and resolutions of said corporation, each officer who has signed said Proposal on behalf of the corporation is fully and completely authorized to do so.
(Seal) By (**) , Secretary
(*) Insert bidder's name; if a corporation, give the state of incorporation, using the phrase "A corporation organized under the laws of "; if a partnership, give names of partners, using also the phrase "Co-partners doing business under the firm name of
", if an individual "Doing business under the trade of " ".
(**) If Proposal is signed by an officer or agent, give title and address.
STATEMENT ACCOMPANYING PROPOSAL
Names and residences of officers and directors, if bidder is a corporation
Name Title Residence (X)
Names and residences of partners, if bidder is a partnership
Name General or Residence (X)
Limited Partner
Bidder's Residence, if an individual. (X)
If Bidder is a corporation, annex certified copy of certificate for incorporation and evidence of qualification to do business in the Commonwealth of Pennsylvania.
(X) Give Street Addresses.
300-2
NONCOLLUSION AFFIDAVIT
State of
BID Identification
CONTRACTOR , being first duly sworn, deposes and says that he is
(sole owner, a partner, president, secretary, etc.) the party making the foregoing BID; that such BID is not made in the interest of or on behalf of any undisclosed person, partnership, company, association, organization, or corporation: that such BID is genuine and not collusive or sham; that said BIDDER has not directly or indirectly induced or solicited any other BIDDER to put in a false or sham BID, and has not directly or indirectly colluded, conspired, connived, or agreed with any BIDDER or any one else to put in a sham BID, or that any one shall refrain from bidding; that said BIDDER has not in any manner, directly or indirectly, sought by agreement, communication or conference with any one to fix the BID price of said BIDDER or of any other BIDDER, or to fix any overhead, profit or cost element of such BID price, or of that of any other BIDDER, or to secure any advantage against the OWNER awarding the contract or anyone interested in the proposed contract; that all statements contained in such BID are true; and, further, that said BIDDER has not, directly or indirectly, submitted his BID price or any breakdown thereof, or the contents thereof or divulged information or data relative thereto, or paid and will not pay any fee in connection therewith, to any corporation, partnership, company, association, organization, BID depository, or to any member or agent thereof or to any other individual except to such person or persons as have a partnership or other financial interest with said
BIDDER in his general business.
Signed:
Subscribed and sworn to before me this day of , 20 .
Seal of Notary
300-3
SECTION 400
This agreement, entered _____ day of ____________, 20_____, by Tinicum Township, Delaware County, and ______________________________________________ (Contractor)
WITNESS, that the parties hereto do mutually agree as follows:
The Contractor agrees to furnish all labor, superintendents, materials, workmen, employees, permits, and other utilities and facilities for, to perform all work necessary for and incidental to, and to perform all other obligations of this Contract complete in all respects, including appurtenances, in accordance with the quantities and unit prices in section
500.
WITNESS
IN WITNESS WHEREOF, the parties have hereunto set their hands and seals, and such of them as are corporations have caused these presents to be signed by their duly authorized officers.
Tinicum Township, Delaware County, PA
By:
President, Board of Commissioners Date
Printed Name
Attest:
Secretary
(SEAL)
Contractor:
Name of Contractor
Address:
(SEAL, if a
Corporation.)
Signature Date
Title
400-1
CERTIFICATE OF AUTHORITY, IF CONTRACTOR IS A CORPORATION
I, the undersigned, as Secretary of the Corporation named as Contractor in the foregoing
Form of Contract, hereby certify that under and pursuant to the by-laws and resolutions of said corporation, the officer who has signed said Form of Contract on behalf of the corporation is fully and completely authorized to do so.
Signature
(SEAL)
ACKNOWLEDGMENT OF TOWNSHIP
STATE OF PENNSYLVANIA)
)SS:
COUNTY OF DELAWARE)
On this day of 20 before me personally came and appeared to me known, who, being by me duly sworn, did depose and say that he resides at and that he is the
President of the Tinicum Township, Board of Commissioners, described in and who executed the foregoing instrument; that he knows the Seal of the Township aforesaid, that one of the seals affixed to said instrument is such Seal; that it was so affixed by order of the Tinicum
Township, Board of Commissioners and that he signed his name thereto by like order.
400-2
ACKNOWLEDGMENT OF CONTRACTOR, IF A CORPORATION
STATE OF )
) SS:
COUNTY OF )
On this day of 20 before me personally
Came to me known, who being by me duly sworn, did depose and say that he resides at , that he is the of
, the corporation described in and which executed the foregoing instrument; that he knows the Seal of said corporation; that one of the seals affixed to said instrument is such Seal; that it was so affixed by order of the directors of said corporation, and that he signed his name thereto by like order.
400-3
ACKNOWLEDGMENT OF CONTRACTOR, IF A PARTNERSHIP
STATE )
On this day of 20 before me personally appeared to me known and known to me to be one of the members of the firm of described in and who executed the foregoing instrument and he acknowledged to me that he executed the same as and for the act and deed of said firm.
ACKNOWLEGMENT OF CONTRACTOR, IF AN INDIVIDUAL
STATE OF )
On this day of 20 before me personally appeared to me known and known to me to be the person described in and who executed the foregoing instrument and acknowledged that he executed the same.
400-4
CONTRACTOR'S PERFORMANCE BOND
KNOW ALL MEN BY THESE PRESENTS, that we the undersigned _________
As Principal and as Surety or Sureties are hereby held and firmly bound unto Tinicum Township, Delaware County, PA in the sum of Dollars and Cents ($ ), lawful money of the United States, for the payment of which sum well and truly to be made, we hereby jointly and severally bind ourselves, our heirs, administrators, successors and assignees.
The condition of the above obligation is such that whereas the above-named principal is about to enter into a Contract in writing with the Tinicum Township Delaware County, PA for work known as a copy of which said Contract is annexed and made a part of this bond as though set out in full.
NOW, THEREFORE, THE CONDITION OF THIS OBLIGATION IS SUCH, that if the Principal shall faithfully perform the contract on his part at the time and in the manner therein provided and satisfy all claims and demands incurred in or for the same, or growing out of the same or for injury or damage to persons or property in the performance thereof, and shall fully indemnify and save harmless the said Township from any and all cost and damage which the said Township may suffer by reason of failure so to do, and shall fully reimburse and repay the said Township any and all outlay and expense which they may incur by reason of any such default, then this obligation shall be null and void; otherwise it shall remain in full force and effect; it being expressly understood and agreed that the liability of the surety for any and all claims hereunder shall in no event exceed the amount of this obligation as herein stated.
The surety or sureties, for value received, hereby stipulate and agree that the obligations of said surety, sureties and its or their bond shall be in no way be impaired or affected by an extension of time, modification, omission, additions or change in or to the said Contract or the work to be performed thereunder, or by any payment thereunder before the time required therein or by a waiver of any provision thereof, or by any assignment, subletting or other transfer thereof or of any part thereof of any work to be performed or any monies due or to become due thereunder and said surety or sureties do hereby waive notice of any and all of such extensions; modifications, omissions, additions, changes, payments, waivers, assignments, subcontracts and transfers, and hereby expressly stipulate and agree that any and all things done and omitted to be done by and in relation to assignees, subcontractors and other transferees shall have the same effect as to said surety or sureties as though done or omitted to be done by or in relations to said principal.
400-5
(Contractor's Performance Bond)
The surety or sureties, for value received, further stipulate and agree to arbitrate disputes involving its or their liability upon this bond, to the extent and in the manner provided in the clause of General Conditions entitled "Bonds".
This bond, without further notice to the Surety, shall be in full force and effect from and after the date that the President of the Board of Commissioners and the Contractor have affixed their signatures to the Contract.
IN WITNESS WHEREOF, The principal and the surety or sureties have hereunto set their hands and seals, and such of them as are corporations have cause their corporate seals to be hereto affixed and these presents to be signed by their proper officers, the day and year first set forth above.
(L.S.)
Principal
Surety
Attach here acknowledgments of Parties of Executions also Power of Attorney of Officer of
Surety Company and Financial Statement of Surety Company.
400-6
CONTRACTOR'S LABOR AND MATERIALMEN'S BOND
KNOW ALL MEN BY THESE PRESENTS, that we the undersigned
As Principal and as Surety or Sureties are hereby held and firmly bound unto Tinicum Township, Delaware County, PA in the sum of Dollars and Cents ($ ), lawful money of the United States, for the payment of which sum well and truly to be made, we hereby jointly and severally bind ourselves, our heirs, administrators, successors and assignees.
The condition of the above obligation is such that whereas the above-named principal is about to enter into a Contract in writing with the Tinicum Township Delaware County, PA for work known as a copy of which said Contract is annexed and made a part of this bond as though set out in full.
NOW, THEREFORE, THE CONDITION OF THIS OBLIGATION IS SUCH THAT if said Principal and all subcontractors to whom any portion of the work provided for in the said contract is sublet and all assignees of said principal and of such subcontractors shall promptly make payments in the prosecution of the work provided for in said contract, or in any amendment or extension of or addition to said contract, then the above obligation shall be void; otherwise to remain in full force and effect. PROVIDED, however, that this bond is subject to the following conditions and limitations.
(a) All persons who have performed labor, rendered services or furnished materials or machinery as aforesaid and who have not been paid therefore, shall have a direct right of action against the Principal and Surety on this bond, which right of action shall be asserted in proceedings instituted in the State in which such labor was performed, services rendered or materials furnished and under said contract in more than one State, than in any such State.
Such right of action be asserted in the proceeding instituted in the name of the person instituting such action and of all other persons having claims hereunder, and any other person having a claim hereunder shall have the right to be made a party to such proceeding (but not later than one year after the complete performance of such contract and final settlement thereof) and to have such claim adjudicated in such action and judgment rendered thereon.
(b) The Surety shall not be liable hereunder for any damages or compensation recoverable under any workmen's compensation or employer's liability statue.
(c) In no event shall the Surety be liable for a greater sum than the amount of this bond, or subject to any suit, action or proceeding thereon that is instituted later than one year after the complete performance of said contract and final settlement thereof.
(d) As used herein: The term "Person" refers to any person, firm, or corporation who has furnished materials or machinery to be used on or incorporated in the work or the prosecution thereof, provided for in said contract, or in any amendment or extension of, or addition to, said contract and/or to any person engaged in the prosecution of the work provided for in said
400-7 contract or in any amendment or extension of or addition to said contract, who is an agent, servant or employee of the Principal or of any subcontractor or of any assignee of said
Principal or of any subcontractor, and also anyone so engaged who performs the work of a laborer or of a mechanic regardless of any contractual relationship between the Principal or any subcontractor, or any assignee of said Principal or said subcontractor, and such laborer or mechanic, but shall not include office employees not regularly stationed at the site of the work.
The said Surety, for value received, hereby stipulates and agrees that no change, extension of time, alteration or addition to the terms of this contract or to the work to be performed thereunder or the specifications accompanying the same, shall in any way affect its obligations on this bond, and it does hereby waive notice of any such change, extension of time, alterations or addition to the terms of the contract or to the work or to the specifications.
Principal
Surety
(Attach here acknowledgment of Parties of Execution, also Power of Attorney of Officer of
Surety Company and Financial Statement of Surety Company.)
400-8
SECTION 500
FORM OF PROPOSAL
FOR
FURNISHING EQUIPTMENT, LABOR, & SUPERVISION
FOR
SEWER MAINTENANCE, EMERGENCY REPAIRS, &
OTHER CONSTRUCTION-RELATED PROJECTS
IN
TINICUM TOWNSHIP, DELAWARE COUNTY, PA
To: The Board of Commissioners
The Township of Tinicum
Historic Lazaretto
97 Wanamaker Avenue
Essington, PA. 19029
Dear Authority Members:
The undersigned hereby proposes to furnish all labor, tools, materials and equipment necessary and to do all work required for “Furnishing Equipment, Labor, & Supervision for
Sewer Maintenance, Emergency Repairs, & Other Construction-Related Projects” in accordance with the plans and specifications attached hereto and in strict accordance with the
Form of Proposal, Information to Bidders and General Provisions hereto annexed and made a
Part of this agreement, and all State and Local Ordinances relating thereto. Also including all appurtenant work necessary to complete project, in a first-class workmanlike manner to the satisfaction and approval of the Tinicum Township, Delaware County for the submitted unit prices:
"SCHEDULE OF ITEMS AND PRICES” – YEAR 1
Item Approx. Quantity Items & Unit Price Unit Total
In Writing Price Price
1. 25 Hours Rubber-Tired Combination
Front End Loader/Backhoe
W/Operator 14 Ft.
Digging Depth.
(Unit Price in Writing)
2. 25 Hours Rubber-Tired Combination
W/Operator 18 Ft. Digging
Depth.
500-1
3. 20 Hours Crawler Backhoe w/Operator., 22 FT. Digging Depth 50,000
Lb. Operating Wt. (O.W.)
4. 20 Hours Crawler Backhoe w/Operator., 27 Ft. Digging Depth 100,000
Lb. Operating Wt. (O.W.)
5. 5 Hours Bulldozer with Operator., D-4
6. 5 Hours Bulldozer with Operator., D-6
7. 10 Hours Front End Loader w/Operator, 1-1/2 C.Y. Capacity, 24,000
Lb. O.W., 120-140 HP20
8. 20 Hours Front End Loader W/Operator, 3-1/2 C.Y. Capacity, 35,000
Lb. O.W., 160-180 HP20
9. 20 Hours Single Axle Dump Truck
W/Driver, 6-8 C.Y. Capacity
10. 20 Hours Tri-Axle Dump Truck
W/Driver, 15-20 C.Y.
Capacity.
500-2
11. 5 Hours Tractor-Trailer Dump
Truck W/Driver, 25 C.Y.
Capacity
12. 5 Hours Tandem-Axle Dump Truck
W/Driver, 10-12 C.Y.
Capacity
13. 30 Hours Pickup or Utility Truck, Truck Only
14. 30 Hours Portable Air Compressor w/
Necessary Tools/Accessories, Min. Rating, 175-185 CFM
15. 30 Hours Upright Trench Compactor
16. 20 Hours Vibratory Plate Compactor
(Price in Writing)
17. 10 Hours Vibratory Roller Min. Rating
1 Ton
18. 10 Hours Static Roller Min. Rating
10 Ton
19. 20 Hours Three Inch Trash Pump w/
Both Suction and Discharge
Hoses.
500-3
20. 10 Hours Six Inch Trash Pump W/
Hoses.
21. 20 Hours Electric Generator, 3,500
Watts
22. 10 Hours Electric Generator, 7,500
23. 20 Hours Self-Propelled Power Broom
24. 30 Hours Gasoline Cut-Off Saw
25. 100 Each/Day Barricades W/ Lights
26. 20 Each/Day Concrete Median Barriers
Min. 10 Ft. Long
27. 5 Each/Day Flashing Arrow Board
28. 400 S.F./Day ¾” To 1 ¼” Steel Traffic
Plates In Various Sizes
29. 100 Hours One (1) Job Superintendent
(Including Transportation To/From
Site, Taxes, Insurance, Overhead, And Profit).
500-4
30. 100 Hours One (1) Equipment Operator
Site, Taxes, Insurance, Overhead, And Profit).
31. 100 Hours One (1) Truck Driver
Site, Taxes, Insurance, Overhead, And Profit).
32. 200 Hours One (1) Laborer with Necessary
Tools and Wearing Apparel
(Including Transportation To/From
Site, Taxes, Insurance, Overhead, And Profit).
33. 30 Deliveries All Equipment Delivered to Work…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .