1-2025-SW-17 RFB Precast Manhole and Structures.pdf
PDF 5 MB Posted
- Attached to
- Precast Manhole and Structures Annual Contract
- Solicitation number
- 2025-SW-17
- Issued by
- Clayton County, Georgia
About this file
This is a Request for Bid (RFB) issued by the Clayton County Water Authority (CCWA) for a Precast Manhole and Structures Annual Contract, designated as Bid Number 2025-SW-17. The solicitation seeks to establish a contract for providing precast manhole, structures, and related components for a twelve-month period, with the potential for up to four one-year renewals. The bid is scheduled to be opened virtually via Microsoft Teams on August 8, 2025, at 3:00 p.m. Bidders must submit their proposals electronically through the Bonfire Portal, with a deadline for questions on July 24, 2025, and addendum issued by July 31, 2025. The contract will cover various precast concrete items including base slabs, riser sections, reducer slabs, top cones, catch basin components, and associated accessories for storm water and sanitary sewer applications.
The bid emphasizes local and small business participation, offering a Small Local Business Enterprise (SLBE) bid discount for evaluation purposes. Pricing will be determined on a unit price basis, with the authority reserving the right to award both primary and backup bidders for required items. Delivery requirements include transportation to the Clayton County Water Authority's facility in Morrow, Georgia, with a 72-hour delivery window for ordered items. The specifications are detailed, requiring compliance with specific ASTM and GADOT standards, including concrete strength minimums, specific manufacturing requirements, and quality control measures. The bid also includes provisions for warranties, with manufacturers required to guarantee products against defects in construction, materials, and workmanship for twelve months from the date of purchase.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 2-2025-SW-17 Addendum 1.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REQUEST FOR BID
Precast Manhole and Structures Annual Contract
Bid Number 2025-SW-17
CLAYTON COUNTY WATER AUTHORITY
1600 Battle Creek Road Morrow, GA 30260
SCHEDULE OF EVENTS DATE
Deadline for Questions Questions must be submitted online through the Bonfire Portal at:
https://ccwa.bonfirehub.com/.
July 24, 2025 at 3:30 p.m.
Addendum Issued Answers will be answered via addendum online through the Bonfire Portal at: https://ccwa.bonfirehub.com/
July 31, 2025
Bid Opening Responses will be opened during a virtual meeting via Microsoft Teams. Solicitations must be submitted through the online Bonfire Portal at:
https://ccwa.bonfirehub.com/. Submissions by other methods will not be accepted.
August 8, 2025 at 3:00 p.m.
https://ccwa.bonfirehub.com/ https://ccwa.bonfirehub.com/
2025-SW-17 Precast Manhole and Structures Page 2 of 61
Table of Contents
Division 1 General Overview Section 1 Request for Bids Section 2 General Information
2.1 Intent and Purpose
2.2 Coordination and Safety
2.3 Bid Submission
2.4 Bid Evaluation
2.5 Addendum
Division 2 Bid Requirements Section 1 Instructions to Bidders Section 2 Risk Management Requirements Section 3 Bid Submittals
3.1 Bid Submittal Requirements
3.2 Required Post Award Submittals
Section 4 Bid Form Section 5 Georgia Bid Bond………………………………………………………….21 Section 6 Bidder Qualification Information Section 7 Contractor Affidavit & Agreement Section 8 Small Local Business Enterprises (SLBE) General Information
Division 3 Contract Forms Section 1 Agreement Form Section 2 Performance Bond (Not Required) Section 3 Payment Bond (Not Required) Section 4 Non-Collusion Certificate Section 5 Certification of Absence of Conflict of Interest for Development of Specifications of Scope of Work
Division 4 Specifications Section 1 General Information
1.1 Scope of Work
1.2 Bid Item Descriptions
2025-SW-17 Precast Manhole and Structures Page 3 of 61
Attachments
A. W-9 Form B. Vendor Information Form
END OF TABLE OF CONTENTS
2025-SW-17 Precast Manhole and Structures Page 4 of 61
Division 1 General Information Section 1: Request for Bids
Clayton County Water Authority 1600 Battle Creek Road Morrow, Georgia 30260
Name of Project: 2025-SW-17 Precast Manhole and Structures Annual Contract
The Clayton County Water Authority will open sealed bids from vendors via a Virtual Teams Meeting on August 8, 2025 at 3:00 p.m. (local time) for 2025-SW-17 Precast Manhole and Structures Annual Contract. Any bids received after the specified time will not be considered.
Please use the following call-in instructions to attend the Bid Opening meeting:
Join the meeting now
Meeting ID: 222 028 726 389 6
Passcode: tp2Zq3vj
Dial in by phone
+1 912-483-5368,,439942986# United States, Savannah
Find a local number
Phone conference ID: 439 942 986#
CCWA encourages Small Local, Minority and Women-Owned business to participate and respond to this bid request.
In an effort to promote responsible environmental practices this bid package is available in electronic (Adobe PDF) format and can be requested by calling 770-960-5223, M-F, 8:00 am - 5:00 pm, or by e-mail to ccwa_procurement@ccwa.us. Bidders will need to provide contact information and an email address, and any file size transfer limits to ensure email transmittals can be made. A hardcopy bid package can also be requested at a cost of $25.
Clayton County Water Authority
By: Marcia Jones, Purchasing Manager https://teams.microsoft.com/l/meetup-join/19%3ameeting_M2NjZjUwNTAtMTVlNy00YjI0LWE2NmUtNmYzMThiMWFiOTY1%40thread.v2/0?context=%7b%22Tid%22%3a%228fea069c-f6d5-44d1-abd6-59e36bb5e36f%22%2c%22Oid%22%3a%220639e4c1-1042-4810-b0c5-ae3cd225b26f%22%7d https://dialin.teams.microsoft.com/39bf213b-c2b2-402d-baa0-32d31baf6811?id=439942986
2025-SW-17 Precast Manhole and Structures Page 5 of 61
Division 1 General Information Section 2: General Overview
2.1 General Information
This is an invitation for your firm to submit a sealed bid for 2025-SW-17 Precast Manhole and Structures Annual Contract for a twelve-month period, to the Clayton County Water Authority (CCWA). CCWA will not guarantee any minimum or maximum quantities during the contract term.
The successful bidder(s) will be required to sign a contract written by CCWA. A sample agreement has been provided with this document.
The contract will be awarded for a twelve (12) month period and may be renewed for up to four (4) one-year terms upon mutual written consent by both parties. By submitting a sealed bid, bidders must agree to provide all stated services at the same terms, conditions, and bid prices for the specified twelve-month period.
Work under this contract will be determined and assigned by CCWA on an “as-needed”, “when-needed” basis. CCWA does not guarantee any minimum or maximum work under this contract and reserves the right to procure any similar type of work as a separate solicitation at its sole discretion.
In submitting this bid, bidder certifies that he/she is qualified to do business in the State of Georgia as required by laws, rules, and regulations or, if allowed by statute, covenants to obtain such qualification prior to bid award. If your company is a corporation, it must be registered with the Georgia Secretary of State.
2.2 Coordination and Safety
The Contractor shall be responsible for coordinating the work in accordance with the requirements of local, state and federal authorities and jurisdictions as required. The Contractor shall provide CCWA with copies of permits, certifications, etc. upon request, to document compliance with these requirements. Also, the Contractor will need to coordinate the planned work with CCWA staff to prevent any interruptions to operations, customers and the general public.
2.3 Bid Submission
Solicitations must be submitted through the online Bonfire Portal at https://ccwa.bonfirehub.com/. Submissions by other methods will not be accepted.
2.4 Bid Evaluation
A contract will be awarded to the lowest responsive, responsible bidder whose bid conforms to the Request for Bid specifications and will be the most advantageous to CCWA. An evaluation will also be performed to ensure the bidder complies with the required submittals. Determination of the best responsive responsible, bidder will be the sole judgment of the CCWA.
2025-SW-17 Precast Manhole and Structures Page 6 of 61
In case the lowest responsive responsible bidder cannot meet the requirements of this RFB, the Clayton County Water Authority reserves the right to offer the work to the next lowest responsive responsible bidder.
At the discretion of CCWA, the bid items have been separated into two sections:
“REQUIRED BID ITEMS” AND “OPTIONAL BID ITEMS”. “REQUIRED BID ITEMS”
consist of products that CCWA tends to use on a more frequent basis. “OPTIONAL BID ITEMS” consist of products that are used on a less frequent basis.
In order to be considered responsive, each bidder must provide pricing for each item listed in the bid table titled “REQUIRED BID ITEMS”.
The CCWA reserves the right to award the REQUIRED bid items to a Primary Bidder, as well as a Back-Up Bidder (to the second lowest responsive responsible bidder) to ensure that our requests under this annual bid can be provided as needed. Materials will mainly be purchased from the Primary Bidder. If the Primary Bidder cannot deliver ordered material within a 72-hour period, CCWA will request/purchase item from the awarded Back-Up Bidder.
CCWA reserves the right to award the “OPTIONAL BID ITEMS” to multiple vendors based on the lowest unit price for each listed item.
This procurement has a SLBE bid discount for evaluation purposes only, which will be given to CCWA certified SLBE primes only. For more details, please refer to Division 2, Section 8 of this bid package.
2.4 Addendum
Bidders may submit questions regarding this contract prior to the bid opening. To be considered, all questions must be submitted online through the Bonfire Portal at https://ccwa.bonfirehub.com/. Responses to all bidder inquiries will be provided in the form of an Addendum, which will be made available online through the Bonfire Portal.
All issued addenda shall become an official part of the Bid Documents.
END OF SECTION
2025-SW-17 Precast Manhole and Structures Page 7 of 61
Division 2 Bid Requirements Section 1: Instructions to Bidders
These instructions are to be followed by every entity proposing to provide the Clayton County Water Authority (CCWA) with goods and/or services. These instructions constitute an integral part of the bid, and any Bidder agrees that tender of a bid constitutes acknowledgment and acceptance of its obligation to adhere to these instructions, which are to be incorporated into and considered part of any contract the Bidder ultimately executes with the CCWA.
1. If there is any question whatsoever regarding any portion of the specifications, it shall be the Bidder’s responsibility to seek clarification immediately from the CCWA, as early as possible prior to the bid opening. Regarding public works projects, requests for interpretations of specifications must be made in writing to the department proposing out the project not later than five (5) days prior to receipt of bids.
2. Unless it is otherwise stated in the bid documents, it shall be the responsibility of the bidder to inform itself as to all conditions of the work site and to make and take account thereof in calculating and submitting its bid. Documents may be made available by the CCWA during the bidding process; no warranty of accuracy is made in regard to these documents, and it is the responsibility of the bidder to make its own investigations as to the nature of the work and the conditions under which it shall be performed, and to make its own independent assumptions as to these matters. The burden of anticipating unforeseen circumstances, either hidden or latent, and the conditions of the work site and all related circumstances, and the cost of accommodating therefore should unanticipated circumstances be later encountered shall rest upon the bidder.
3. Pre-bid meeting or any other information session will be held at the location as indicated in the solicitation. Unless indicated otherwise, attendance is not mandatory, although vendors are strongly encouraged to attend. However, in the event the meeting is mandatory, then a representative of the vendor must attend the meeting in its entirety to be considered eligible for solicitation award. Late entry to the meeting will not be allowed.
4. In the event that, after the acceptance of a bid by the Board of Directors of the CCWA, any unsuccessful bidder wishes to contest such action, a written “Notice of Contest” must be filed with the General Manager no later than close of business on the 5th business day after the selection of successful bidder by the Board.
Failure to timely file such notice shall forever preclude the filing of a contest of the award, or any civil action in the courts of the State of Georgia or of the United States.
2025-SW-17 Precast Manhole and Structures Page 8 of 61
5. Information submitted by the Bidder in the bid process shall be subject to disclosure after bid award in accordance with the Georgia Open Records Act.
Proprietary information must be identified and be accompanied by a signed affidavit outlining the redacted information. Entire bids may not be deemed proprietary.
6. Bids must be made on the Bid Table on the e-procurement platform or as directed.
7. The name of the person, firm, or corporation making the bid must be printed in ink, along with the Bidder’s signature, on all separate sheets of the bid Form. If a bid is made by an individual, his name and post office address must be shown. If made by a firm, or partnership, the name and the post office address of each member of the firm or partnership must be shown. If made by a Corporation, the person or persons signing the bid must show the name of the State under the laws of which the Corporation is chartered and his, or their, authority for signing same.
The names, titles and addresses of the President, Secretary and the Treasurer and the corporate authority for doing business in this state shall be listed and returned with the bid Form.
8. All bids must be received by the CCWA Procurement Department electronically through the Bonfire portal at https://ccwa.bonfirehub.com/. Upon submission, all responses will be electronically time- and date- stamped once all documents have been successfully uploaded and received.
9. If published price books are a part of your bid, one price book must be included with your bid Form, and the successful Bidder is required to furnish additional current price books after the award of the bid.
10. Alterations to the documents are strictly prohibited and shall result in automatic disqualification of the Bidder's bid. If there are "exceptions" to the specifications or comments to any of the solicitation requirements or other language, then the bidder may ask questions regarding those requirements or submit additional documentation as to the variation from the specifications but may not alter any of the language contained in the solicitation.
11. In the case of goods, the person, firm or corporation making the bid may propose all items. All items may be considered separately, at the discretion of the CCWA.
12. Bids for public works whose price exceeds one hundred thousand dollars ($100,000.00) must be accompanied by a certified check, cashier's check, or acceptable bid bond in an amount not less than five percent (5%) of the amount bid.
13. Bidders for construction contracts where the laws of Georgia or the United States of America require a license in order to perform such construction must list the license number and class in their bid submittal.
2025-SW-17 Precast Manhole and Structures Page 9 of 61
14. When public work is let out for bid, no person shall prevent or attempt to prevent competition in such bid. Such Bidders must make an oath filed with the officer who makes payments under the contract that they have not prevented or attempted to prevent competition in the bid process. Such oath must be signed by: if a partnership, all partners and any officer or agent or other person who acted on the partnership’s behalf during the bid process; if a corporation, all officers, agents, or other persons who acted for the corporation in the bid process.
15. Bids shall not be withdrawn or cancelled by the Bidder past the bid opening date and time. No modification or corrections will be allowed subsequent to the bid opening.
16. By tendering a bid, a Bidder agrees to leave the bid open for acceptance by the CCWA for ninety (90) days after the date set for the opening thereof.
17. By tendering a bid, the Bidder certifies that the Bidder has carefully examined these instructions and the terms and specifications applicable to and made a part of the bid. The Bidder further certifies that the prices shown in any schedule of items on which the Bidder is proposing are in accordance with the conditions, terms and specifications of the bid and that they are aware that any exception taken thereto may disqualify the bid. Bidders are required to inform themselves fully as to the availability of materials and the conditions relating to construction and labor under which any work will be or is now being performed. No error or misjudgment nor any lack of information on local conditions, general laws or regulations on the part of the Bidder shall merit the withdrawal of the bid.
18. Copies of all communication pertaining to bids must be sent to the Contracts, Compliance and Risk Management Section.
19. The purpose of this bid is to establish contract prices. Unit price extension and net total must be shown if applicable. Cash discounts should be indicated separately.
Any applicable sales taxes should be included in the unit prices for all materials to be provided by the successful Bidder.
20. Bidders are hereby notified and agree by submission of a bid Form that if additional items not listed in the bid Form become necessary and require unit prices not established by the bid Form, the unit prices of such items shall be negotiated and shall be directly proportional to the established unit prices of similar items in the bid Form.
21. All prices on goods shall be for delivery, our destination, f.o.b. freight prepaid Jonesboro, Georgia, and/or Morrow, Georgia, unless otherwise shown. Any deliveries shall be made as needed and requested throughout the contract period.
22. Quantities when shown are estimates only, based on anticipated needs. CCWA reserves the right to purchase more or less based on actual need at contract price.
If a Bidder intends to offer minimum or maximum shipment quantities, such intent
2025-SW-17 Precast Manhole and Structures Page 10 of 61 and such quantities should be specified on the bid Form. Otherwise, none will be assumed.
23. The time for completion of the work is stated in the bid Form. Failure to complete the work within this period shall result in payment to the CCWA of liquidated damages in an amount provided for by contract for each calendar day in excess of the Contract time.
24. The Bidder must employ such methods and means in carrying out the work as will not cause any interruption of or interference with any other Bidder.
25. The successful Bidder must comply with the applicable Risk Management Requirements prior to beginning performance, and during the contract period.
26. The Contract between the CCWA and the Bidder shall be executed on a form provided by CCWA and will be subject to all requirements of the contract documents (which include but may not be limited to the Contract, these instructions, any Purchase Orders, and the Risk Management Requirements), and shall form a binding contract between the contracting parties. Any seals to be applied to the Contract by Bidders shall be in the form of ink seals.
27. Failure to execute the Contract, any required Surety Performance and Payment Bonds, or to furnish any required satisfactory proof of carriage of required insurance within ten (10) days from the date of notice of award of the Contract shall be just cause for the annulment of the award and for forfeiture of the bid guaranty to the CCWA, not as a penalty, but in liquidation of damages sustained.
At the discretion of the CCWA, the award may then be given to the next lowest responsible vendor, or the work may be re-advertised or constructed by the
CCWA.
28. Any Contract and Contract Bonds shall be executed in duplicate. Any seals to be applied to the Contract or Contract Bonds shall be in the form of ink seals.
29. Award of this bid shall be by action of the CCWA Board of Directors at a regularly scheduled or called meeting.
30. The CCWA reserves the right, with or without notice or cause, to accept any bid regardless of the cost thereof; to reject any bid, or any number of bids; to negotiate with any Bidder for a reduction of or alterations in its bid; to reject all bids and to call for additional bids upon the same or different invitations to bid, plans or specifications; to be sole judge, in its discretion, on all questions as to whether or not a bid complies with the invitation to bid, the plans or the specifications, and as to the solvency and sufficiency of any and all sureties on all bonds.
31. The apparent low bid for goods shall be considered to be the lowest aggregate total price of specified products at their unit prices times the estimated required quantities of these specified products.
2025-SW-17 Precast Manhole and Structures Page 11 of 61
32. Bids received from two (2) or more vendors that are identical in price, delivery and meet the requirements of the bid specifications shall be awarded on the following basis:
a. The bid submitted by a vendor who does not have a documented negative vendor performance record.
b. The bid submitted by a vendor who is located within Clayton County.
c. The bid submitted by a vendor who is certified by our Small Local Business Enterprise Program.
d. If the tie bids meet all the above criteria, and it is not in CCWA’s best interest (at its sole discretion) to split the award, the bid award is based on the toss of a coin by CCWA staff in a public session. The vendors involved will be invited to attend the coin toss at a stated date and time. One or more witnesses from both CCWA Procurement and the Request Department may be present. A simple coin toss (called by the vendor listed first in the alphabet) will break the tie and decide the award.
33. While price is the prime criteria, and the CCWA intends to purchase at the lowest responsible bid available, price shall not be the sole criteria utilized by the CCWA in evaluating the bid package submitted. The following criteria shall also be utilized by CCWA in determining the lowest responsible bid:
a. Ability of bidder to perform in the time frame needed by the CCWA.
b. Reputation of the bidder in its industry.
c. Reasonableness of the bid in relation to anticipated costs.
d. Ongoing relationships with CCWA based on above-average prior performance of work with CCWA.
e. Preference for local vendors where there is no significant variance in price or service.
34. Bidders are notified that CCWA reserves the right except in the case of public works contracts to include among the factors considered in awarding the contract the proximity of each Bidder's place of business to any affected Authority facility.
CCWA further reserves the right to award the contract to a Bidder other than the Bidder offering the lowest price where: (a) the difference in price between the low Bidder and the preferred Bidder is nominal: and (b) CCWA's Board determines that the preferred bid provides the most cost-effective option due to the closer proximity of the preferred Bidder's place of business to the affected Authority facility or facilities. In such a situation, by responding to this bid, the Bidder waives any cause of action against CCWA for frustration of bid or under any similar legal theory; furthermore, the Bidder agrees to pay all costs and expenses, including but not limited to attorney fees, incurred by CCWA in defending against any such claim.
2025-SW-17 Precast Manhole and Structures Page 12 of 61
35. It is the policy of the Clayton County Water Authority (CCWA) to promote award of sub-agreements for goods and/or services to qualified minority and women-owned businesses. Bidders are encouraged to solicit minority and women-owned businesses whenever they are potential sources.
36. Bidders are encouraged to utilize the services and assistance of the U.S. Small Business Administration (SBA), and the office of the Department of Commerce Minority Business Development Agency (MBDA). These agencies can provide assistance in securing the names of qualified minority and women-owned businesses. Additionally, it is encouraged that Bidders access certified Small Local Business Enterprise (SLBE) vendors from Clayton County, DeKalb County, and City of Atlanta.
The Georgia Department of Transportation (DOT) has established a list of qualified Disadvantaged Business Enterprises. Information is available online under the tab for “Directories”, link for “UCP Directory - Excel” at:
http://www.dot.ga.gov/PS/Business/DBE.
The successful Bidder will be asked to provide, along with his Request for Payment each month a list of qualified SLBE and MBE/WBE businesses utilized on this Project.
GEORGIA SECURITY AND IMMIGRATION COMPLIANCE ACT OF 2006
37. Pursuant to the Georgia Security and Immigration Compliance Act of 2006, the successful Bidder understands and agrees that compliance with the requirements of O.C.G.A.13-10-91 and Georgia Department of Labor Rule 300-10-02 are conditions of this bid and contract document. The Bidder further agrees that such compliance shall be attested by the Bidder and any of his Subcontractors by execution of the appropriate Affidavit and Agreement included after the Agreement Form of these documents.
http://www.dot.ga.gov/PS/Business/DBE
2025-SW-17 Precast Manhole and Structures Page 13 of 61
Section 2: Risk Management Requirements The Contractors and any potential CCWA approved Subcontractors will provide minimum insurance coverage and limits as per the following:
The Contractor/Subcontractor will file with the Clayton County Water Authority (the “Authority”) Certificates of Insurance, certifying the required insurance coverage and stating that each policy has been endorsed to provide a minimum of thirty (30) day advance written notice to the Authority in the event of cancellation, material change, or nonrenewal of policies required under the contract to the Authority. All bonds and insurance coverage must be placed with an insurance company approved by the Authority, licensed, or approved to do business in the State of Georgia, and rated Secure (“A-”, “VII” or better) by A.M. Best’s Insurance Guide throughout the duration of the contract. The letter denotes the company’s financial strength, and the Roman numeral represents the financial size of the carrier. Worker’s Compensation self-insurance for individual Contractors must be approved by the Worker’s Compensation Board, State of Georgia and/or Self-Insurance pools approved by the Insurance Commissioner, State of Georgia. The insurer shall agree to waive all rights of subrogation against the Authority, its elected or appointed officers, officials, agents, authorized volunteers, and employees for losses paid under the terms of this policy which arise from work performed by the Named Insured for the Authority, but this provision applies regardless of whether or not the Authority has received a waiver of subrogation from the insurer.
As the Risk Management Requirements herein are minimum required insurance coverage and limits, the Authority’s Risk Manager may require additional and/or increase in coverage and limits driven by the complexity of the relevant contract.
The Authority requires insurance on an “occurrence” basis whenever possible. Policies written on a “claims made” basis (e.g. cyber, professional liability and pollution liability) require the inclusion of the following provisions:
(a) The retroactive date must be shown on the certificate of insurance (or provided a copy of the declarations page showing it).
(b) Insurance must be maintained for at least two (2) years after completion of the work and/or contract.
(c) If coverage is canceled or non-renewed after the work has been completed and/or the contract has ended, the contractor must purchase the extended reporting period for at least two (2) years.
2025-SW-17 Precast Manhole and Structures Page 14 of 61
APPLICABLE TO ALL CONTRACTS AS APPLICABLE (Marked with an “X”)
Worker’s Compensation – Required for all contracts, including any sole proprietor, individual consultants, or small businesses.
Worker’s Compensation coverage on a statutory basis for the State of Georgia with an Employer’s Liability MINIMUM limits of $500,000 bodily injury for each Accident, $500,000 bodily injury for each Disease, and $500,000 bodily injury by Disease for each Employee. Other States: If any work is performed out of state including any remote workers, then those states must be covered as well. Maritime endorsements: If there is an exposure of injury to any contractors or providers to any maritime exposures then coverage shall include the appropriate endorsements such as USL&H (United States Longshore and Harbor Workers Comp Act), Jones Act or other federal statutes. Waiver of subrogation: The insurer agrees to waive all rights of subrogation against the Authority, its elected or appointed officers, officials, agents, authorized volunteers, and employees for losses paid under the terms of this policy which arise from work performed by the Named Insured for the Authority, but this provision applies regardless of whether or not the Authority has received a waiver of subrogation from the insurer. An umbrella policy may increase the employer’s liability limits to meet the minimum requirements.
Commercial General Liability – Required for all contracts. Coverage to be provided on “occurrence” not “claims made” basis. The coverage is to include Contractual liability, Per Project Limit of Liability, losses caused by Explosion, Collapse and Underground (“xcu”) perils, the “Clayton County Water Authority” is to be added as an Additional Insured and Products and Completed Operations coverage is to be maintained for three (3) years following completion of work. The general aggregate and products & completed operations aggregate should be at least twice the minimum required occurrence limit. Policy shall be written on an
Crime Liability – Required for all contracts involving any use, care, custody, or control of any cash, money, securities, and/or wire transfers.
Any use of crypto currencies must be pre-approved by the Risk Management Department.
Cyber Liability – Required for all software, computer hardware installation, data access, data integrations, data usage, cloud storage, SaaS, and or technology related contracts.
Coverage shall include the minimum: a) Information Security & Privacy Liability; b) Regulatory Fines and Penalties; c) Payment Card Industry (PCI) if credit cards and/or banking information is obtained or accessed, and d) Ransomware. Since cyber insurance policies are written on a claims-made basis, insurance must be maintained for at least two (2) years after completion of the work and/or contract.
Professional Liability Insurance (Errors & Omissions) – Required for all professional service contracts. This shall include any consultants, medical, legal, technical, insurance agents, or other professions that require proper licenses. Since professional insurance policies are written on a claims-made basis, insurance must be maintained for at least two (2) years after completion of the work and/or contract.
Terrorism Liability – Required on specific contracts stated by the Risk Management Department including but not limited to: 1) all contracts involving access or use of any water, gas, electric utilities shall require third parties to have TRIA and third-party liability limits of at least $5,000,000; and 2) all special events that are highly visible, politically sensitive, or have more than 1,000 attendees should require at least $1,000,000 of terrorism liability for any event sponsors.
2025-SW-17 Precast Manhole and Structures Page 15 of 61
Insurance Services Office (ISO) industry form CG0001 2010 or newer. Contracts involving any youths or children under 18 should also be required to provide proof of coverage for sexual abuse & molestation coverage that it is either;
clearly not excluded on the general liability or purchased as a stand-alone policy. Should the coverage be on a claims-made basis, insurance should remain in force for the life of the contract and up to the date to which the youngest youth/child at the start of the contract turns age 18 plus two years.
Automobile Liability – Required for all contracts except for products or services that are remote only or are delivered by a professional delivery service. ISO policy form CA0001 or its equivalent liability coverage. Coverage shall be included for any owned, leased, hired, or non-owned autos (ISO symbol 1 is preferred). For any contracts involving the transportation of hazardous materials, limited pollution endorsement ISO form CA9948 or its equivalent shall be on the policy. Sole proprietors shall provide the same limits as stated above via a personal auto policy plus an umbrella. Uninsured motorist coverage should be equal to the per occurrence limit except for contracts with other governmental entities.
Aviation Liability – Required for all Drones/UAV (Unmanned Aerial Vehicles), general aviation contracts, and Fixed base operators (FBO). Coverage should include owned, hired, and non-owned aircraft/aviation.
Liquor Liability – Required for all third-party services and contracts involving selling, distributing, or serving alcohol. Coverage should be full liquor liability and not “host” liquor if it is being sold.
Sexual Abuse & Molestation Liability – Required for all contracts and services involving youths, children, special needs, or senior citizens. Must be maintained for at least two (2) years after completion of the work and/or contract.
Builder’s Risk – Recommended for most construction projects. The limit of coverage should be equal to the value of the contract or GREATER. Covered perils should be at least fire, wind, theft, vandalism, flood, and earthquake.
Umbrella Liability – Recommended for all contracts. The umbrella or Excess Liability Policy may be used to combine with underlying policies to obtain the limits required. The Management of the Authority may elect to require higher limits.
The underlying coverage shall be General Liability, Automobile Liability, and Employers Liability (Workers Compensation). Concurrent policy dates with primary liability policies except for Workers Compensation.
MINIMUM LIMITS OF LIABILITY ON NEXT PAGE
2025-SW-17 Precast Manhole and Structures Page 16 of 61
INSURANCE COVERAGE LIMIT
Worker’s Compensation Bodily Injury by Accident - Each Accident $500,000 Bodily Injury by Disease – Each Disease $500,000 Bodily Injury by Disease – Each Employee $500,000
Commercial General Liability
General Aggregate $2,000,000 Products & Completed Operations Aggregate $2,000,000 Each Occurrence $1,000,000 Personal & Advertising Injury $1,000,000 Damages to Premises / Fire Legal $500,000 Medical Payments $5,000
Automobile
Combined Single Limit OR $1,000,000 Per Person $500,000 Per Occurrence $500,000 Property Damage $100,000 Medical Payments $1,000
Crime
Employee Dishonesty $1,000,000 Funds Transfer Fraud $1,000,000 Money & Securities $100,000 Computer Crime $1,000,000 Social Engineering or its equivalent $100,000
Cyber Insurance
Each Claim/Wrongful Act $1,000,000 Annual Aggregate $2,000,000 Business Interruption $1,000,000 Data Recovery $1,000,000 Cyber Extortion Expenses $500,000 Cyber Extortion/Ransom Payments $50,000
Professional Liability Each Claim/Wrongful Act $1,000,000 General Aggregate $2,000,000
Terrorism Access/use of water, electric or gas utilities $5,000,000 Special events $1,000,000
Aviation Each Occurrence $5,000,000 Automobile Liability $1,000,000 Pollution Liability (FBOs Only) $1,000,000
Liquor Each Occurrence $1,000,000 General Aggregate $2,000,000
Sexual Abuse & Molestation Each Claim/Wrongful Act $1,000,000 General Aggregate $2,000,000
MINIMUM LIMITS OF LIABILITY
Section 3: Required Bid Submittals
3.1 Bid Submittal Requirements:
The following items are required to be included as part of the bid submittal. Failure to include any of these items may result in the bid being deemed non-responsive:
For your convenience, a check box is provided next to the required items, which include but are not limited to:
A. Bid Form – Bidders must submit their completed and signed Bid Form.
B.
Bidder Qualification Information Form, including References. Failure to provide satisfactory references will result in the bid being deemed non-responsive.
C. Georgia Security and Immigration Compliance Act of 2006 form.
D. Contractor Affidavit and Agreement form.
E. Subcontractor Affidavit form.
An indication of “N/A” for “not applicable” must be noted as appropriate.
If a Contractor/Subcontractor will not be performing any services under this contract, the Contractor/company submitting the bid MUST also complete, sign, date, and have both Affidavit forms notarized and make proper notation of "N/A"
- Not Applicable.
CCWA cannot consider any bid which does not include completed affidavits. It is not the intent of this notice to provide detailed information or legal advice concerning the Georgia Security & Immigration Compliance Act of 2006, as amended on May 11, 2009. All Bidders intending to do business with CCWA are responsible for independently apprising themselves and complying with the requirements of that law and its effect on CCWA procurements and their participation in those procurements.
F.
CCWA SLBE Certificate and/or required SLBE Forms (as applicable).
An indication of “N/A” for “not applicable” must be noted as appropriate.
G. Non-Collusion Certificate.
H. Certification of Absence of Conflict of Interest.
I. Vendor Information Form. Company name must match the W-9 Form.
J. W-9 Form. Company name must match the Vendor Information Form and must be registered with the Georgia Secretary of State.
https://ecorp.sos.ga.gov/BusinessSearch
2025-SW-17 Precast Manhole and Structures Page 18 of 61
3.2 Required Post Award Submittals:
The following is required from the successful bidder:
a. A current Certificate of Insurance.
b. An endorsement including CCWA as an additional insured for the Commercial General Liability only.
c. A 30-day cancellation endorsement for ALL policies on your Certificate of Insurance.
d. Completion of Georgia Bid Bond Requirements.
K. Copies of all licenses required to perform the work (if applicable).
L.
Any other items as required in this RFB including but not limited to the items contained in the Instructions to Bidders, Bid Form and Specifications sections.
M. All addenda issued.
N. Georgia Bid Bond Form
O.
Manufacturers’ brochures, catalogs, or supporting documentation verifying that all specified components meet the requirements of this solicitation.
2025-SW-17 Precast Manhole and Structures Page 19 of 61
Section 4: Bid Form
Bid of _________________________________________________________________ (Hereinafter "Bidder"), organized and existing under the laws of the State of , doing business as _____________________________________(insert "a corporation," "a partnership," or "an individual" or such other business entity designation as is applicable).
To the Clayton County Water Authority (hereinafter "Owner").
In compliance with the Request for Bids, Bidder hereby proposes to perform all Work for 2025-SW-17 Precast Manhole and Structures Annual Contract in strict accordance with the Contract Documents as enumerated in the Request for Bids, within the time set forth therein, and at the prices stated below.
CCWA guarantees no minimum or maximum quantities and additionally reserves the right to purchase more or less at the unit price, based on actual need.
Total amounts are products of the unit prices multiplied by the estimated quantities. In the event of a conflict between the amounts and the unit prices, the unit prices shall govern.
By submission of this bid, Bidder certifies, and in the case of joint bid each party thereto certifies as to the party’s own organization that this bid has been arrived at independently, without consultation, communication, or agreement as to any matter relating to this bid with any other Bidder or with any competitor. Bidder also certifies compliance with the Instructions to Bidders.
In submitting this bid, Bidder certifies Bidder is qualified to do business in the state of Georgia as required by laws, rules, and regulations or, if allowed by statute, covenants to obtain such qualification prior to contract award.
CONTRACT EXECUTION:
The undersigned Bidder agrees, if this bid is accepted, to enter into an Agreement with OWNER on the form included in the Documents to perform and furnish Work as specified or indicated in the Documents for the Contract Price derived from the bid and within the times indicated herein and in accordance with the other terms and conditions of the Documents.
Bidder accepts the terms and conditions of the Documents.
INSURANCE:
Bidder further agrees that bid amount(s) stated herein includes specific consideration for the specified insurance coverages.
PAYMENT TERMS:
2025-SW-17 Precast Manhole and Structures Page 20 of 61
Payment terms are Net 30 days after receipt of an invoice and acceptance of the work by
CCWA.
ADDENDA:
Bidder acknowledges receipt of the following Addenda:
Bid Cost to be submitted on the Bonfire Portal.
Is the Bidder a CCWA certified SLBE? YES – COUNTY:_____________________ NO
Submitted by:
(NAME OF BIDDER)
By:
(SIGNATURE)
(TITLE)
(DATE)
(SEAL)
(ATTEST)
2025-SW-17 Precast Manhole and Structures Page 21 of 61
Section 5: Georgia Bid Bond
BOND NO._______________________
KNOW ALL MEN BY THESE PRESENTS, that herein after called the PRINCIPAL, and a corporation duly organized under the laws of the State of having its principal place of business at
______________________________in the State of and authorized to do business in the State of Georgia as SURETY, are held and firmly bound unto Clayton County Water Authority, as OWNER, hereinafter called the OBLIGEE, in the amount of five percent (5%) of the Total Bid Amount for the payment for which we bind ourselves, our heirs, executors, administrators, successors, and assigns, jointly and severally, firmly by these presents.
THE CONDITION OF THIS BOND IS SUCH THAT:
WHEREAS, the Principal is herewith submitting his or its Bid for the Precast Manhole and Structures Annual Contract project, and said Bid, by reference thereto, being hereby made a part hereof.
WHEREAS, the PRINCIPAL contemplates submitting or has submitted a Bid to the OBLIGEE for the furnishing of all labor, materials (except those to be specifically furnished by the Owner), equipment, machinery, tools, apparatus, means of transportation for, and the performance of the work covered in the Bid and the documents, titled: Precast Manhole and Structures Annual Contract.
2025-SW-17 Precast Manhole and Structures Page 22 of 61
WHEREAS, it was a condition precedent to the submission of said Bid that a cashier’s check, certified check, or Bid Bond in the amount of five percent (5%) of the Total Bid Amount be submitted with said Bid as a guarantee that the Bidder would, if awarded the Contract, enter into a written Contract with the Owner for the performance of said Contract, within 10 consecutive calendar days after written notice having been given of the award of the Contract.
NOW THEREFORE, the conditions of this obligation are such that if the PRINCIPAL within 10 consecutive calendar days after written notice of such acceptance, enters into a written Contract with the OBLIGEE and furnishes a Performance Bond and Payment Bond in an amount equal to one hundred percent (100%) of the contract amount, satisfactory to the Owner, then this obligation shall be void; otherwise the sum herein stated shall be due and payable to the OBLIGEE and the SURETY herein agrees to pay said sum immediately upon demand of the OBLIGEE in good and lawful money of the United States of America, as liquidated damages for failure thereof of said PRINCIPAL.
Signed and sealed this_____________day of___________________20_______.
PRINCIPAL
By___________________________________
SURETY
By___________________________________ Attorney-In-Fact
2025-SW-17 Precast Manhole and Structures Page 23 of 61
Section 6: Bidder Qualification Information
COMPANY NAME OF BIDDER: _____________________________________
NUMBER OF YEARS IN BUSINESS
BUSINESS ADDRESS OF COMPANY:
TELEPHONE NUMBER:
POINT OF CONTACT NAME: _____________________________________
POINT OF CONTACT EMAIL ADDRESS: ________________________________
COMPANY TAX ID NUMBER:
COMPANY WEBSITE: _____________________________________
ENTITY TYPE: Individual/Sole Proprietor Employee Owned Company
Privately Held Corporation/LLC Partnership
Publicly Owned Company Attorney
Other (specify): _______________________________________
NAME OF PRINCIPAL OFFICERS:
2025-SW-17 Precast Manhole and Structures Page 24 of 61
REFERENCES
The bid must contain at least three (3) references of similar experience in the past five (5) years. References must include a contact person, address, and phone number. The Clayton County Water Authority should not be included as a reference.
COMPANY/GOV’T ENTITY NAME: ______________________________________________
CONTACT NAME: ___________________________________________________________
EMAIL ADDRESS: ___________________________________________________________
PHONE NUMBER: ___________________________________________________________
COMPANY/GOV’T ENTITY NAME: ______________________________________________
CONTACT NAME: ___________________________________________________________
2025-SW-17 Precast Manhole and Structures Page 25 of 61
Section 7: Contractor Affidavit and Agreement
GEORGIA SECURITY AND IMMIGRATION COMPLIANCE ACT OF 2006
A. Pursuant to the Georgia Security and Immigration Compliance Act of 2006, the Contractor understands and agrees that compliance with the requirements of O.C.G.A. § 13-10-91 and Georgia Department of Labor Rule 300-10-.02 are conditions of this Agreement. The Contractor further agrees that such compliance shall be attested by the Contractor through execution of the contractor affidavit required by Georgia Department of Labor Rule 300-10-1-.07, or a substantially similar contractor affidavit. The Contractor’s fully executed affidavit is attached hereto and is incorporated into this Agreement by reference herein.
B. By initialing in the appropriate line below, the Contractor certifies that the following employee-number category as identified in O.C.G.A. § 13-10-91 is applicable to the Contractor:
1. 500 or more employees.
2. 100 or more employees.
3. Fewer than 100 employees.
C. The Contractor understands and agrees that, in the event the Contractor employs or contracts with any subcontractor or subcontractors in connection with this Agreement, the Contractor shall:
1. Secure from each such subcontractor an indication of the employee-number category as identified in O.C.G.A. § 13-10-91 that is applicable to the subcontractor.
2. Secure from each such subcontractor an attestation of the subcontractor’s compliance with O.C.G.A. § 13-10-91 and Georgia Department of Labor Rule 300-10-1-.02 by causing each such subcontractor to execute the subcontractor affidavit required by Georgia Department of Labor Rule 300-10-1-.08, or a substantially similar subcontractor affidavit. The Contractor further understands and agrees that the Contractor shall require the executed subcontractor affidavit to become a part of the agreement between the Contractor and each such subcontractor. The Contractor agrees to maintain records of each subcontractor attestation required hereunder for inspection by the Clayton County Water Authority at any time.”
Contractor
Authorized Signature:
Name:
Title:
Date:
2025-SW-17 Precast Manhole and Structures Page 26 of 61
CONTRACTOR AFFIDAVIT AND AGREEMENT
By executing this affidavit, the undersigned contractor verifies its compliance with O.C.G.A. 13-10- 91, stating affirmatively that the individual, firm, or corporation which is contracting with the Clayton County Water Authority has registered with, is participating in, uses, and will continue to use for the duration of the contract, the federal work authorization program - EEV/Basic Pilot Program operated by the U. S. Citizenship and Immigration Services Bureau of the U.S. Department of Homeland Security, in conjunction with the Social Security Administration (SSA), commonly known as E-Verify, in accordance with the applicability provisions established in O.C.G.A. 13-10-91.
The undersigned further agrees that, in connection with the physical performance of services pursuant to this contract with the Clayton County Water Authority, the contractor will only employ or contract with subcontractor(s), who can present a similar affidavit verifying the subcontractor’s compliance with O.C.G.A. 13-10-91. Contractor further agrees to maintain records of such compliance and provide a copy of each such verification to the Clayton County Water Authority within five days of the subcontractor(s) presenting such affidavit(s) to the contractor.
EEV / Basic Pilot Program* User Identification Number
Enter the four to seven-digit number
Date of Authorization
Name of Contractor (Printed)
BY: Authorized Officer or Agent of Contractor (Signature) Date
Printed Name of Contractor’s Authorized Officer or Agent
Title of Authorized Officer or Agent of Contractor
SUBSCRIBED AND SWORN BEFORE ME ON THIS ______ DAY OF ________________
20_____.
Notary Public My Commission Expires https://www.lexis.com/research/buttonTFLink?_m=6e948dd47c0cb6ad150cdda4766c52bd&_xfercite=%3ccite%20cc%3d%22USA%22%3e%3c%21%5bCDATA%5bGa.%20Comp.%20R.%20%26%20Regs.%20r.%20300-10-1-.07%5d%5d%3e%3c%2fcite%3e&_butType=4&_butStat=0&_butNum=2&_butInline=1&_butinfo=GACODE%2013-10-91&_fmtstr=FULL&docnum=1&_startdoc=1&wchp=dGLzVtb-zSkAz&_md5=349f3c83204d82fcf6d6dac8e4c313ef https://www.lexis.com/research/buttonTFLink?_m=6e948dd47c0cb6ad150cdda4766c52bd&_xfercite=%3ccite%20cc%3d%22USA%22%3e%3c%21%5bCDATA%5bGa.%20Comp.%20R.%20%26%20Regs.%20r.%20300-10-1-.07%5d%5d%3e%3c%2fcite%3e&_butType=4&_butStat=0&_butNum=2&_butInline=1&_butinfo=GACODE%2013-10-91&_fmtstr=FULL&docnum=1&_startdoc=1&wchp=dGLzVtb-zSkAz&_md5=349f3c83204d82fcf6d6dac8e4c313ef https://www.lexis.com/research/buttonTFLink?_m=6e948dd47c0cb6ad150cdda4766c52bd&_xfercite=%3ccite%20cc%3d%22USA%22%3e%3c%21%5bCDATA%5bGa.%20Comp.%20R.%20%26%20Regs.%20r.%20300-10-1-.07%5d%5d%3e%3c%2fcite%3e&_butType=4&_butStat=0&_butNum=3&_butInline=1&_butinfo=GACODE%2013-10-91&_fmtstr=FULL&docnum=1&_startdoc=1&wchp=dGLzVtb-zSkAz&_md5=8128bc37dfa8e7479d04f95855000f5b https://www.lexis.com/research/buttonTFLink?_m=6e948dd47c0cb6ad150cdda4766c52bd&_xfercite=%3ccite%20cc%3d%22USA%22%3e%3c%21%5bCDATA%5bGa.%20Comp.%20R.%20%26%20Regs.%20r.%20300-10-1-.07%5d%5d%3e%3c%2fcite%3e&_butType=4&_butStat=0&_butNum=4&_butInline=1&_butinfo=GACODE%2013-10-91&_fmtstr=FULL&docnum=1&_startdoc=1&wchp=dGLzVtb-zSkAz&_md5=211884364c4e255e3ce1bcf82b2a567a
2025-SW-17 Precast Manhole and Structures Page 27 of 61
SUBCONTRACTOR AFFIDAVIT AND AGREEMENT
By executing this affidavit, the undersigned subcontractor verifies its compliance with O.C.G.A. 13- 10-91, stating affirmatively that the individual, firm or corporation which is engaged in the physical performance of services under a contract with ________________
__________________________________________________________ on behalf of the Clayton County Water Authority has registered with, is participating in, uses, and will continue to use for the duration of the contract the federal work authorization program -…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .