1-2025 04 22 KY Non-State DOT Direct Recipient NEPA Checklist.pdf
PDF 459 KB Posted
- Attached to
- Professional Services - Jennings Creek Greenway
- Solicitation number
- 2027-03
- Issued by
- Union County, Kentucky
About this file
This document is a National Environmental Policy Act (NEPA) Checklist template for Local Public Agencies (LPAs) in Kentucky administering direct Federal-aid grant programs, prepared by the Federal Highway Administration (FHWA) Kentucky Division in coordination with the Planning, Environment, and System Performance Team. The checklist serves as a comprehensive guide for LPAs to determine NEPA requirements and documentation necessary for transportation projects, particularly those on the Statewide Transportation Improvement Program (STIP) or Transportation Improvement Program (TIP). The document provides a structured format for project sponsors to document project information, including federal and state project numbers, funding sources, estimated costs, purpose and need statements, project descriptions, alternatives analysis, and logical termini assessments. The checklist requires evaluation of environmental impacts across multiple resource categories including air quality, cultural resources, wetlands, waterway permits, floodplain impacts, threatened and endangered species, farmlands, Section 4(f) properties, and community impacts.
The NEPA process documentation must be completed and submitted to FHWA for approval prior to project authorization, with specific requirements for project mapping, photologs, pre-coordination letters with permitting agencies (including OEPA, Army Corps, and floodplain coordinators), and documentation of public involvement. All external resource agency coordination letters showing final concurrence from agencies such as SHPO, USFWS, OHPO, and ODNR must be obtained prior to NEPA approval. The applicant must select an appropriate Categorical Exclusion (CE) classification from 23 CFR 771.117, and certain CEs require additional scrutiny if circumstances involve right-of-way acquisition exceeding minor amounts, bridge permits, adverse effects to historic properties, traffic disruptions, access control changes, or floodplain encroachments. The document emphasizes that FHWA retains final decision-making authority on the level of NEPA documentation required and responsibility for coordination with federal resource agencies and tribal governments, while the applicant is responsible for completing all required technical studies to support the NEPA process and providing those documents to FHWA for agency coordination.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
National Environmental Policy Act (NEPA) Checklist for Local Public Agencies
Kentucky Division
This document is intended to assist local public agencies (LPA) that are administering any direct Federal-aid grant program in determining requirements and documentation requirements under the National Environmental Policy Act (NEPA). FHWA’s NEPA regulations are codified in 23 CFR Part 771. Primary contact for LPAs is the Planning, Environment, and System Performance Team Leader (System Performance Team Leader) assisted by the Environmental Protection Specialist and acts as the Division LPA Program Coordinator. Throughout the development of your project, coordination with the Division Office is imperative as there are certain responsibilities for coordination that remain with FHWA and cannot be delegated to the LPA or it’s consultant (if applicable), such as coordination with the USFWS under Section 7 of the Endangered Species Act or coordination with the SHPO/THPO under Section 106 of the National Historic Preservation Act. FHWA retains responsibility for coordination with all resource and regulatory agencies and tribal governments. It is the expectation of FHWA that the applicant or grantee will be responsible for completing all required technical studies to support the NEPA process and will provide those documents to FHWA for coordination with the appropriate State or Federal agency.
FHWA has the final decision on level of NEPA documentation.
FHWA-KY Categorical Exclusion (CE) Form for Local Public Agencies Date:
Section I) Project Information* Project Sponsor (Applicant): Federal Project #:
Name of Project: State Project #:
Is the project on an approved STIP/TIP? Yes No STIP Reference #:
Funding or Grant Source(s):
Estimated Cost:
Purpose and Need:
Project Description:
Alternatives Analysis:
Logical Termini & Independent Utility:
Is there a previously approved FHWA / State DOT Categorical Exclusion for the project?
Yes Environmental process is complete. Identify State DOT Project and forward CE to FHWA.
No Continue
Is there a previously approved FHWA / State DOT Planning & Environmental Linkage (PEL) study for the project?
Yes Consult PEL documentation and incorporate results.
No Continue
Scope of the Proposed Action Will the proposed project: No Yes Comments Be a facility on a new alignment?
Have any ground disturbing activities?
Be constructed within the existing operational right of way?
Add through traffic lanes to an existing facility?
Provide a substantial change in access control to the roadway?
Result in a permanent alteration of local traffic pattern?
Right-of-Way (R/W) Will the proposed project: No Yes Comments Involve right-of-way acquisition or easements?
How many acres fee simple?
Involve any residential or commercial relocations?
Section II) Environmental Resources Evaluations* Involvement with Resources:
Yes No Studies, Coordination and Comments Air Quality Impacts
Mobile Source Air Toxics (MSAT) NAAQS/Particulate Matter 2.5 (PM 2.5)
Noise Hazardous Materials Cultural Resources (Section 106)
- Archaeological Resources
- Architectural Historic Resources
Native American Consultation Wetlands Streams and Rivers Section 401 Water Quality Certification Section 404 Waterway Permits USCG Section 9 Bridge Permit Stormwater Permits Floodplain Impacts Threatened/Endangered Species Farmlands Section 4(f) Property Section 6(f) Property Economic Impacts Social Impacts Local Land Use & Transportation Plan Community or Title VI Impacts Public Involvement Plan Public Controversy Reasonably Foreseeable Impacts Construction Impacts Environmental Mitigation
Section V) Required Attachments*
• These items MUST BE submitted by the times shown below
By the time of federal NEPA approval for project:
• Project mapping
• Project photolog
• Pre-coordination letters with permitting agencies (OEPA, Army Corps, Floodplain Coordinator, etc.)
• Documentation of Public Involvement
• External resource agency coordination letters showing final agency concurrence with project (SHPO, USFWS, OHPO, ODNR, etc.), which includes completion and agency approval of all requested additional resource studies by any resource agency
Prior to construction for all projects, please provide:
• Copies of all waterway permits
• Copies of all floodplain permits
• Evidence of all environmental commitments as shown in project plans and specifications
Section VI) Class of Action Determination 23 CFR 771.117
• Consult with FHWA if uncertain.
Select a Categorical Exclusion from the drop-down menu below based upon the scope of the project:
Select additional Categorical Exclusion, if needed from the drop-down menu below:
If categorical exclusions (c)(26), (c)(27), or (c)(28) were selected above, do any of the following circumstances apply? If yes, the project must be completed as a d-listed CE, an Environmental Assessment or Environmental Impact Statement as appropriate.
Consult with FHWA for a final determination.
1. An acquisition of more than a minor amount of right-of-way or that would result in any residential or non-residential displacements;
2. An action that needs a bridge permit from the U.S. Coast Guard, or an action that does not meet the terms and conditions of a U.S. Army Corps of Engineers nationwide or general permit under section 404 of the Clean Water Act and/or section 10 of the Rivers and Harbors Act of 1899;
3. A finding of “adverse effect” to historic properties under the National Historic Preservation Act, the use of a resource protected under 23 U.S.C. 138 or 49 U.S.C. 303 (section 4(f)) except for actions resulting in de minimis impacts, or a finding of “may affect, likely to adversely affect” threatened or endangered species or critical habitat under the Endangered Species Act;
4. Construction of temporary access, or the closure of existing road, bridge, or ramps, that would result in major traffic disruptions;
5. Changes in access control;
6. A floodplain encroachment other than functionally dependent uses (e.g., bridges, wetlands) or actions that facilitate open space use (e.g., recreational trails, bicycle and pedestrian paths); or construction activities in, across or adjacent to a river component designated or proposed for inclusion in the National System of Wild and Scenic Rivers.
Section VI) Approval This section must be signed by all parties and approved by FHWA prior to federal authorization of the next phase of the project.
After reviewing the current status of this project, the Applicant considers that the NEPA process and documentation to be completed.
The applicant confirms that there are not unusual circumstances associated with the project as defined by 23 CFR 771.117 (b) that would require completion of either an Environmental Assessment or Environmental Impact Statement.
Unusual circumstances include:
• Significant environmental impacts;
• Substantial controversy on environmental grounds;
• Significant impact on properties protected by section 4(f) of the DOT Act or Section 106 of the National Historic Preservation
Act; or inconsistencies with any Federal, State, or local law, requirement or administrative determination relating to the environmental aspects of the action.
The applicant acknowledges that a reevaluation of the approval will occur if there are any changes to the proposed action. Changes may include 1) changes in scope or location, 2) changes in ability of project to deliver environmental commitments as promised to agencies and/or parties, 3) identification of new environmental impacts not considered in the NEPA document, 4) new information or circumstances relevant to environmental concerns with bearing on the proposed action or its impacts, which would result in substantial environmental impact not considered in the NEPA document.
Form Prepared By:
Applicant Name/Organization Date
Applicant Acceptance of Project:
Project or Program Manager Name and Organization Date
FHWA has reviewed the proposed action and it is our assessment that implementation of the proposed action will not result in any significant impacts to the human and/or natural environment. If during further development of the project there is a substantial change in the impacts of or the scope of the proposed action, the environmental effects need to be reevaluated.
Approval of CE:
For:
FHWA Kentucky Division Administrator
Date
| KY Non-State DOT Direct Recipient NEPA Checklist 2025-01-28 |
| KY Non-State DOT Direct Recipient NEPA Checklist 2025-01-28 page 2 |
| KY Non-State DOT Direct Recipient NEPA Checklist 2025-01-28 |
| Date: |
| Project Sponsor Applicant: |
| Federal Project: |
| Name of Project: |
| State Project: |
| STIP Reference: |
| Funding or Grant Sources: |
| Purpose and Need: |
| Project Description: Scope of Work/Phase: |
__ Planning or Preliminary Engineering leading to NEPA Approval.
__ Final Design leading to Construction contract documents.
__ Construction.
Description of Work:
| Alternative: |
| Independent Utility: |
| No Yes CommentsBe a facility on a new alignment_3: |
| No Yes CommentsHave any ground disturbing activities_3: |
| No Yes CommentsBe constructed within the existing operational right of way_3: |
| No Yes CommentsAdd through traffic lanes to an existing facility_3: |
| No Yes CommentsProvide a substantial change in access control to the roadway_3: |
| No Yes CommentsResult in a permanent alteration of local traffic pattern_3: |
| No Yes CommentsInvolve rightofway acquisition or easements_3: |
| No Yes CommentsHow many acres fee simple_3: |
| No Yes CommentsInvolve any residential or commercial relocations_3: |
| Check Box1: Off |
| Check Box2: Off |
| Check Box3: Off |
| Check Box4: Off |
| Check Box5: Off |
| Check Box6: Off |
| Check Box7: Off |
| Check Box8: Off |
| Check Box9: Off |
| Check Box10: Off |
| Check Box11: Off |
| Check Box12: Off |
| Check Box19: Off |
| Text23: |
| Check Box13: Off |
| Check Box14: Off |
| Check Box15: Off |
| Check Box16: Off |
| Check Box17: Off |
| Check Box18: Off |
| Check Box20: Off |
| Check Box21: Off |
| Check Box22: Off |
| Check Box56: Off |
| Check Box57: Off |
| Check Box58: Off |
| Check Box59: Off |
| Check Box60: Off |
| Check Box61: Off |
| Check Box62: Off |
| Check Box63: Off |
| Check Box64: Off |
| Check Box65: Off |
| Check Box66: Off |
| Check Box67: Off |
| Check Box68: Off |
| Check Box69: Off |
| Check Box70: Off |
| Check Box71: Off |
| Check Box72: Off |
| Check Box73: Off |
| Check Box74: Off |
| Check Box75: Off |
| Check Box76: Off |
| Check Box77: Off |
| Check Box78: Off |
| Check Box79: Off |
| Check Box80: Off |
| Check Box81: Off |
| Check Box82: Off |
| Check Box83: Off |
| Check Box84: Off |
| Check Box85: Off |
| Check Box86: Off |
| Check Box87: Off |
| Check Box88: Off |
| Check Box89: Off |
| Check Box90: Off |
| Check Box91: Off |
| Check Box92: Off |
| Check Box93: Off |
| Check Box94: Off |
| Check Box95: Off |
| Check Box96: Off |
| Check Box97: Off |
| Check Box98: Off |
| Check Box99: Off |
| Check Box100: Off |
| Check Box101: Off |
| Check Box102: Off |
| Check Box103: Off |
| Check Box104: Off |
| Check Box105: Off |
| Check Box106: Off |
| Check Box107: Off |
| Check Box108: Off |
| Check Box109: Off |
| Check Box110: Off |
| Check Box111: Off |
| Check Box112: Off |
| Check Box113: Off |
| Check Box114: Off |
| Check Box115: Off |
| Check Box116: Off |
| Check Box117: Off |
| Check Box118: Off |
| Check Box119: Off |
| Check Box120: Off |
| Check Box121: Off |
| Text58: |
| Text59: |
| Text60: |
| Text61: |
| Text62: |
| Text63: |
| Text64: |
| Text65: |
| Text66: |
| Text67: |
| Text68: |
| Text69: |
| Text70: |
| Text71: |
| Text72: |
| Text73: |
| Text74: |
| Text75: |
| Text76: |
| Text77: |
| Text78: |
| Text79: |
| Text80: |
| Text81: |
| Text82: |
| Text83: |
| Text84: |
| Text85: |
| Text86: |
| Text87: |
| Text88: |
| Text89: |
| Text90: |
| Text94: |
| Text95: |
| Text96: |
| Text97: |
| Dropdown59: [Choose an item] |
| Dropdown60: [Choose an item] |
| Text91: |
| Text92: |
| Text93: |
File details come from the government source that posted it. Updated .