1_03A3892_-_RFQ_NOTICE.pdf
PDF 1 MB Posted
- Solicitation number
- 03A3892
- Issued by
- Del Norte County, California
About this file
This document is a Request for Qualifications (RFQ) issued by the State of California Department of Transportation (Caltrans) for Hazardous Waste Site Investigation and Design Services for Districts 1, 2, and 3 of the North Region Environmental Engineering Office. The services requested include field sampling, construction materials testing, analysis, reports, plant inspection, and testing equipment calibration on an as-needed basis to support Caltrans' transportation facility projects. The estimated contract amount is between $4,410,737 and $7,167,447 with a 3-year term. Statements of Qualifications are due by November 15, 2024 at 10:00 am. Interviews will be held on December 4, 2024, and negotiations with the top-ranked firm will occur during the week of January 14, 2025. The DBE participation goal for this contract is 22%.
The pricing terms include a fee for profit of 10.4% and an escalation schedule for the loaded billing rates over the 3-year contract term. Caltrans does not guarantee any work or services will be required under the contract. A pre-award or post-award audit will be performed, and federal and/or state prevailing wage rates may apply. Caltrans reserves the right to terminate negotiations with the first-ranked firm and begin negotiations with the next firm, or to cancel the procurement, if any actual or potential conflicts of interest are not properly disclosed.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
October 15, 2024 RFQ Number 03A3892
STATE OF CALIFORNIA DEPARTMENT OF TRANSPORTATION
REQUEST FOR QUALIFICATIONS NOTICE
NUMBER 03A3892
Read carefully as the following revisions have been made to this document:
Add date and section(s) to be revised
• On 07/25/24, GENERAL, Executive Order N-12 – Generative Artificial
Intelligence (GenAI) Technology Use and Reporting added
• On 02/15/24, GENERAL the Fee & Escalation table has been revised
• On 03/16/23, GENERAL the Fee & Escalation table has been revised
• On 04/01/22, GENERAL, Ukraine-Russian-related Sanctions
Requirement added
• On 04/01/22, SUBMISSION OF STATEMENTS OF QUALIFICATIONS
(SOQs), the electronic submittal time changed to 10:00am
Note: Questions concerning this Request for Qualifications (RFQ) must be submitted in writing to the attention of Alma Cortez at alma.cortez@dot.ca.gov. Questions must be received no later than seven (7) business days after the RFQ advertisement. Consultants contacting the District or Division directly seeking information about this RFQ will be disqualified from consideration in the selection process.
Proposers are advised that Caltrans has established a federally mandated overall annual DBE goal comprising both race neutral and race conscious elements to ensure equal participation of DBE groups specified in 49 CFR 26.5. In compliance with 49 CFR 26, Caltrans set a contract goal for DBEs participating in this solicitation expressed as a percentage of the total dollar value of the resultant Agreement. The DBE participation goal for this solicitation is twenty-two percent (22%). See section I.H. in this RFQ for requirements.
I. GENERAL INFORMATION
A. Caltrans is soliciting Statements of Qualifications (SOQs) from qualified firms that may lead to the award of a contract for A&E On-Call Hazardous Waste Program, Districts 1, 2 and 3 services. In submitting your SOQ, you shall comply with the instructions found herein. In addition to those programs that are specified in this solicitation, prospective consultants are encouraged to consider programs that are available, such as those for the use of small businesses, disadvantaged businesses, disabled veteran businesses, new emerging firms, and other businesses covered by State and Federal programs.
B. The estimated contract amount is $4,410,737 - $7,167,447.
mailto:alma.cortez@dot.ca.gov
C. The estimated contract term is three years.
D. Interviews will be held via WebEx on December 4, 2024.
Confirmation letters will be sent to those firms short-listed.
E. The most highly qualified consulting firm will be required to submit an electronic copy of the financial documents listed on the appropriate Financial Documents Submittal Checklist available on the AE Contract Information website. The most highly qualified consulting firm will be notified of their selection and receive instructions for the electronic submission of the financial documents.
The most highly qualified consulting firm must submit a complete financial documents package no later than four (4) days after notification of selection. The prime consultant must submit the complete financial documents package in order for Caltrans to have the information necessary to engage in negotiations. The prime consultant is solely responsible for timely and complete submission of financial documents on behalf of the entire proposed team; financial documents will not be accepted from proposed subconsultant firms. Failure to submit a complete financial documents package by the specified due date may result in termination of negotiations with the most highly qualified consulting firm.
F. Negotiations will be held with the top-ranked firm by teleconference/WebEx during the week of January 14, 2025. The fee for profit shall be ten-point four percent, and the escalation shall be as follows:
Year Period Escalation
1 11/15/2024 - 11/30/2025 2.08% 2 12/01/2025 - 11/30/2026 4.17% 3 12/01/2026 - 11/30/2027 4.17% 4 12/01/2027 - 01/30/2028 4.17%
Notes:
1. Partial year will only occur on the last year of the contract term. All other periods are full years.
2. Increases to the loaded billing rates after contract execution is not authorized for any reason per Article IV, Section 17 and Article XVI, Section 6 of the California Constitution.
G. The scheduled date to complete cost negotiations and submit final cost proposal is January 27, 2025.
H. Disadvantaged Business Enterprise Program
1. This solicitation and resultant Agreement is financed in whole or in part with federal funds and therefore subject to Title 49, Code of Federal Regulations, Part 26 (49 CFR 26) entitled "Participation by https://dot.ca.gov/programs/procurement-and-contracts/ae-contract-information
Disadvantaged Business Enterprises in Department of Transportation Financial Assistance Programs." To ensure equal participation for Disadvantaged Business Enterprise (DBE) groups specified in 49 CFR 26.5, Caltrans specifies a contract goal for DBE participation. The required goal for DBE participation in this solicitation is not less than twenty-two percent.
2. Only participation by certified DBEs will count toward the contract goal for this solicitation. In order to count toward a contract goal, a firm must be certified as a DBE by the California Unified Certification Program (CUCP) and possess the NAICS and work codes applicable to the type of work the firm will perform on the Agreement by the SOQ submittal due date. NAICS and Work codes are provided by the Office of Civil Rights website.
3. It is the proposer’s responsibility to verity that the DBE firm is certified as a DBE by the specified SOQ submittal due date and time. The list of DBEs certified by the CUCP are located on the Office of Civil Rights website.
4. A DBE must perform a commercially useful function (CUF) for the type of work it will perform on the Agreement as provided in 49 CFR 26.55I(1)-(4). A DBE performs a CUF when it is responsible for the execution of a distinct element of the work of the Agreement and is carrying out its responsibilities by actually performing, managing, and supervising the work involved.
5. See “Statement of Qualifications Submittal Instructions and General Contract Process Information” for detailed information and references to the required forms. Required forms will be made a part of the Agreement. Failure to meet the DBE goal or Good Faith Effort requirements and provide required DBE participation at due date and time of SOQ submittal may result in the SOQ submittal being rejected
I. Federal and/or State prevailing wage rates may apply. This requirement, if applicable, will be specified in the draft Agreement.
See SOQ Submittal Instructions, Section I., H. regarding the California Department of Industrial Relations (DIR) Consultant/Contractor Registration Program on the AE Contract Information website.
J. Caltrans does not guarantee, either expressly or by implication, that any work or services will be required under any contract issued as a result of this RFQ.
K. A Pre-award or Post-award Audit will be performed on any contract issued as a result of this RFQ.
L. Contract boilerplate can be obtained on the AE Contract Information website.
M. Pursuant to Executive Order (EO) N-6-22 issued March 4, 2022, persons identified in the list established by the US Department of the Treasury are ineligible to bid on, submit a proposal for, enter into, or renew any Agreement with the State for any goods and/or services.
Any person who submits a bid or proposal to Caltrans certifies that it is not identified in the most current lists located https://dot.ca.gov/programs/civil-rights https://dot.ca.gov/programs/civil-rights https://dot.ca.gov/programs/civil-rights https://home.treasury.gov/policy-issues/financial-sanctions/sanctions-programs-and-country-information/ukraine-russia-related-sanctions.
If applicable, any person who submits a bid or proposal to Caltrans certifies that its subcontractors are not identified in the most current lists located https://home.treasury.gov/policy-issues/financial-sanctions/sanctions-programs-and-country-information/ukraine-russia-related-sanctions
N. Pursuant to Executive Order N-12 – Generative Artificial Intelligence (GenAI) Technology Use and Reporting
1. The State of California seeks to realize the potential benefits of GenAI, through the development and deployment of GenAI tools, while balancing the risks of these new technologies.
2. Bidder / Offeror / Contractor must notify the State in writing if their solution or service includes, or makes available, any GenAI including GenAI from third parties or subcontractors.
3. The State has developed a GenAI Reporting and Factsheet (STD 1000) to be completed by the Bidder / Offeror / Contractor.
4. Failure to submit the GenAI Reporting and Factsheet (STD 1000) will result in disqualification of the Bidder / Offeror / Contractor.
5. Failure to report GenAI to the State may void any resulting contract.
The State reserves its right to seek any and all relief it may be entitled to as a result of such non-disclosure.
6. Upon receipt of a Bidder / Offeror / Contractor GenAI Reporting and Factsheet (STD 1000), the state reserves the right to incorporate GenAI Special Provisions into the final contract or reject bids/offers that present an unacceptable level of risk to the state.
II. SCOPE OF WORK/DELIVERABLES
The work to be performed for this RFQ is described in the Scope of Work/Deliverables and is hereby incorporated as Attachment 1.
III. CONFLICT OF INTEREST
A. Conflicts of interest may occur due to direct or indirect financial or business interests in the work to be performed or in any real property acquired for such project. Conflicts of interest can include, but are not limited to, past, existing or planned activities or because of relationships with other persons or firms. If there is a conflict of interest, the proposed team, including both the prime consultants and subconsultants, and individual employees of team members would actually or potentially be unable to render impartial assistance or advice to Caltrans. The proposer’s objectivity or availability in performing the contract work may be impaired due to actual or potential conflicts of interest.
B. If the proposed team determines that any actual or potential conflicts of interest exists, it must identify and describe in detail each conflict of interest to Caltrans, using the Disclosure of Potential Conflict of Interest Form, which can be found on the AE Contract Information website. Along with the description of the actual or potential conflicts of https://home.treasury.gov/policy-issues/financial-sanctions/sanctions-programs-and-country-information/ukraine-russia-related-sanctions https://home.treasury.gov/policy-issues/financial-sanctions/sanctions-programs-and-country-information/ukraine-russia-related-sanctions https://home.treasury.gov/policy-issues/financial-sanctions/sanctions-programs-and-country-information/ukraine-russia-related-sanctions https://home.treasury.gov/policy-issues/financial-sanctions/sanctions-programs-and-country-information/ukraine-russia-related-sanctions https://home.treasury.gov/policy-issues/financial-sanctions/sanctions-programs-and-country-information/ukraine-russia-related-sanctions https://www.documents.dgs.ca.gov/dgs/fmc/pdf/std1000.pdf https://www.documents.dgs.ca.gov/dgs/fmc/pdf/std1000.pdf interest, the proposed team shall also offer measures to avoid, neutralize, or mitigate all listed conflicts. The list of conflicts, including conflicts that apply to individuals as well as firms, and the mitigation measures on the Disclosure of Potential Conflict of Interest Form must be submitted as a separate section in the Statement of Qualifications.
Disclosure of information will not disqualify a proposed team from competing for a contract. The existence of actual or potential conflicts of interest will be used as a criterion to evaluate team availability during the evaluation and selection process. Caltrans reserves the right to terminate negotiations with the first selected firm and begin negotiations with the next selected firm or to cancel the procurement prior to execution if Caltrans learns that the selected team failed to disclose any actual or potential conflicts, which it knew or should have known about, or if the proposed team provided or omitted information on the disclosure form that results in the information being false or misleading.
C. After award, conflict of interest guidelines and policies shall continue to be monitored and enforced by the Caltrans Contract Manager.
Additional information about Conflict-of-Interest issues can be found in the SOQ Submittal Instructions and General Contract Process Information document (Section V. Post Government Employment Restrictions and Section VI. Conflict of Interest Concerning Consultant(s)) found on the AE Contract Information website (see link below). The State and Federal contract boilerplates on DPAC’s website also contain information on conflict-of-interest issues (Exhibit D) and can be found on the AE Contract Information website (see link below).
D. The prime consultant and subconsultants may be proposed on SOQs for other Caltrans A&E on-call contracts; however, the Caltrans Contract Manager may prohibit work on specific project(s) where Caltrans determines that a conflict of interest exists.
IV. SUBMISSION OF STATEMENTS OF QUALIFICATIONS (SOQs) A. IMPORTANT: Download “Statement of Qualifications Submittal
Instructions and General Contract Process Information” from the AE Contract Information website (Dated Rev. 10/07/2020) .
Failure to follow these instructions may result in rejection of your SOQs.
B. SOQ Package Submittal Instructions Read instructions below carefully. You will be required to submit an electronic SOQ file to Sacramento.
1. The electronic submission of a single unprotected (i.e. not password protected) PDF file of the SOQ is required. The electronic submittal will be accepted until 10:00 a.m. on 11/15/2024. Hard copies of the SOQs are NOT required. Fax copies or copies transmitted by email will not be allowed.
2. You will be required to create a Novell Filr account with Caltrans.
Send an email message to the Contract Analyst, Alma Cortez, at alma.cortez@dot.ca.gov containing the information listed below for a link and instructions to complete the self-registration page and submit the SOQ electronically.
• Your firm’s name
• Your email address
• The solicitation number for which you would like to submit a SOQ The file name shall include the contract number, consultant name (max. 25 characters) separated by an underscore (_), ending with the “.pdf” extension.
Example A: 50A0694_JohnDoeConsulting.pdf Example B: 50A0694_aaa1234engineer.pdf
3. SOQ submittals will be considered non-responsive if the electronic submittal is not received by the date and time specified in this RFQ.
C. Request for RFQ Copies Copies of this RFQ may be obtained on the CaleProcure website.
mailto:alma.cortez@dot.ca.gov https://www.caleprocure.ca.gov/pages/index.aspx
Attachment 1
Revised 6/15/2021
SCOPE OF WORK/DELIVERABLES
Hazardous Waste Site Investigation and Design Services for Caltrans, Division of North Region Environmental Engineering Office, Hazardous Waste Program, Districts 1, 2 and 3.
On-Call Contract
FOR ENVIRONMENTAL - HAZARDOUS WASTE: (Hazardous Waste, Hazardous Waste Site Investigation and Design)
A. Purpose of Work.
The Consultant shall perform consultation, research, professional and technical services required for Hazardous Waste Site Investigation and Design Services, including, but not limited to, field sampling, construction materials testing, analysis, reports, plant inspection and work related to testing equipment calibration, on an “as-needed” basis to support the Department of Transportation (Caltrans, Division of North Region Environmental Engineering Office, Hazardous Waste Program Districts 1, 2, and 3, from 0 phase to 3 phase completion of variousprojects, in the maintenance, development and construction of proposed Caltrans transportation facilities. The Caltrans Contract Manager shall assign specific work to the Consultant to assist the Caltrans work force through the issuance of Task Orders describing in detail the services to be performed. The Consultant shall only perform work that is assigned in an authorized Task Order. The Contract does not guarantee that a Task Order shall be issued. The Consultant may provide services to Caltrans including, but not limited to, site investigation, remedial design work; Phase I Environmental Site Assessments, Initial Site Assessments (Phase I); Site Investigations (Phase II); Aerially Deposited Lead Investigation; Limited site assessments and site investigations (Limited Phase I and Phase II); risk assessments, hazardous materials surveys; record research and review; field review and survey; historic material research and review; submitting findings in a report; site characterizations, applying for and complying with regulatory permits; proposing and evaluating remedial alternatives or feasibility studies; development, design and preparation of plans, estimate and specification (PS&E) for hazardous waste removal/clean-up projects; development and preparing cost estimates for remedial activities; hazardous waste identification; long term soil and/or groundwater monitoring; remediation work plan/preliminary design; remedial investigations;
construction-phase design support as requested by the Caltrans Resident Engineer; post-construction monitoring of facility operations; purchase of hazardous wastes radius maps and plans from vendors, who sell these based on "on-line" Geographic Information System and Management Information System related to roadway projects; utilization of a Geographic Information Systems and Management Information System; permit preparation, toxicology studies; evaluation, monitoring, and report of hazardous materials remediation systems impacted with hazardous materials from leaking underground storage tanks (USTs) or other sources; related work pertaining to the study of known or suspected contamination and/or hazardous waste sites.
1. Exclusion of Work.
The Contract does not include services related to the implementation of remedial action or environmental cleanup, as defined in Chapter 6.85 of the California Health and Safety Code Section 25396.
B. Location of Work.
The work shall be performed on projects to improve the State transportation system throughout the counties of Del Norte, Humboldt, Lake, Mendocino, Lassen, Modoc, Plumas, Shasta, Siskiyou, Tehama, Trinity, Butte, Colusa, El Dorado, Glenn, Nevada, Placer, Sacramento, Sierra, Sutter, Yuba, and Yolo in California, within the limits of Districts 1, 2, and 3. The specific location within the above-described geographical limits of the work to be performed within this geographic area shall be identified in each Task Order. Certain California County projects may also require studies/work that extends into adjacent counties adjoining Caltrans' Districts 1, 2, and 3 outside of the boundary of Caltrans’ Districts 1, 2, and 3. In some instances, data collection may involve regional analysis beyond the counties identified or into adjoining states to properly assess the context and intensity of impacts to the concerned resources. In such instances, the project work shall not extend more than a thirty (30)-mile radius from the District/County, North Region Environmental Engineering Office, Hazardous Waste Program, Districts 1, 2, and 3 geographic boundary. These services shall be required to be provided domestically within the continental U.S.A. The Consultant shall be capable of delivering the Hazardous Waste Site Investigation and Design Services in the USA. The Hazardous Waste Site Investigation and Design Services work shall be performed at North Region Environmental Engineering Office, Hazardous Waste Program, Districts 1, 2, and 3.
Consultant will not work on projects in the Planning (K) phase.
C. Required Services.
1. Pursuant to an authorized Task Order, the Consultant shall provide Hazardous Waste Site Investigation and Design Services within the geographical jurisdiction of the Contract set forth in “Location of Work” Section, and all necessary personnel, material, transportation, lodging, instrumentation, and the specialized facilities and equipment necessary to satisfy all appropriate agencies and required to ensure compliance with all applicable Federal, State, and Local statutes, laws, codes, regulations, policies, procedures, ordinances, standards, specifications, performance standards, and guidelines, applicable to the Consultant's services and work product. The Consultant shall assist Caltrans, Division of North Region Environmental Engineering Office, Hazardous Waste Program, Districts 1, 2, and 3to produce a plan by developing a complete and biddable Plans, Specifications and Estimate (PS&E) package.
2. Provided in Required Services, section 5, is a list of proposed Caltrans projects;
Division of North Region Environmental Engineering Office, Hazardous Waste Program, Districts 1, 2, and 3, however, this list is not exclusive and it does not constitute a commitment that the projects will be initiated or completed or work assigned to the Consultant. Caltrans reserves the right to add or delete from this list of projects that are within the geographical jurisdiction of the Contract set forth in “Location of Work” Section within the Division of North Region Environmental Engineering Office, Hazardous Waste Program, Districts 1, 2, and 3,’s jurisdiction.
Caltrans intends to utilize the Contract to complete a specific piece of work as long as it is located within the geographical jurisdiction of the Contract set forth in the “Location of Work” for each of the projects listed in the Contract utilizing the services described in this Scope of Work and as described in a Task Order. In the future, Caltrans may find it necessary to create a separate contract (or contracts) that involves a specific project listed in the Contract and includes part of the work contained in the Contract. Caltrans reserves the right to procure Architectural and Engineering (A&E) services involving the listed projects or unlisted projects (within the geographical jurisdiction of the Contract set forth in “Location of Work” Section) involving in whole or in part the same work using a project-specific agreement if the schedule to complete performance of the specific project extends beyond the term of the Contract or the cost to complete the specific project exceeds the dollar balance remaining in the Contract after accounting for amounts due to the Consultant for work previously performed and for work that is scheduled to be performed in executed task orders.
Should a project-specific agreement be procured under these provisions, the parties mutually agree that, in accordance with Exhibit D, Section III, Termination of the Contract, Caltrans shall terminate for convenience the portion of the Contract that includes the common scope of work identified in the project-specific agreement per Exhibit D, Section III, Termination of the Contract. Such partial termination for convenience shall be processed by amendment to the Contract. Unless otherwise required by law, regulation, or Caltrans policy or procedure, the Consultant may compete for these project-specific Contracts.
3. In the Contract is a list of proposed personnel classifications for which services are anticipated to be needed by Caltrans during the term of the Contract; however, this is not an exclusive list of the personnel classifications of Hazardous Waste Site Investigation and Design Services that may be requested. Caltrans reserves the right to add/or delete personnel classifications from this list. Consultant personnel will work under the general direction of a Caltrans Senior.
4. Consultant agrees that:
a. The Consultant Contract Manager or designee shall manage, instruct and supervise all Consultant employees and subcontractors, and shall not allow any other party to manage, instruct and supervise such parties.
b. Consultant shall employ and discharge its own employees and subcontractors.
c. Unless approved in writing by the Caltrans Contract Manager, Consultant shall not hire employees or subcontractors to exclusively and only work on Caltrans matters. Consultant may hire employees and subcontractors for a specific Caltrans matter provided such party has the skills and knowledge to work on other matters and they are assigned to other matters from time to time.
d. The work performed by Consultant, its employees and its subcontractors shall be a regular part of Consultant’s regular and established business.
e. Consultant shall make all of its own business (including personnel) decisions and bear the risk for its decisions.
f. Consultant shall provide its own tools, equipment and supplies, and Consultant shall not rely on Caltrans to provide such tools, equipment and supplies. Notwithstanding the foregoing, Caltrans may, during the term of the Agreement, allow Consultant to access selected items of equipment;
provide non-employee userids and related access to Caltrans computer systems to Consultant employees and subcontractors; and provide non-employee access cards and other such forms of identification to Consultant employees and subcontractors.
g. Consultant shall provide its own training to its employees and subcontractors, and Consultant shall not rely upon Caltrans to provide such training.
5. The projects that Caltrans, Division of North Region Environmental Engineering
Office, Hazardous Waste Program, Districts 1, 2, and 3, plans to work on under the Contract are as follows:
Project
Project ID or
EA
Co-Rte-Post Description
0120000135 DN-101-M0/46.492 Culvert Rehabilitation & Fish Passage 0119000121 HUM-101-125.7/131.77 DN to HUM-101 CAPM 0122000047 HUM-299-29.2/43.035 HUM-299 East CAPM 0122000046 HUM-101-73.3/75.4 Broadway CS - Shared Path 0100000154 MEN-001-43.3/44.2 Albion River Bridge 0122000135 LAK-020-R43.9/R44.2 Abbot Mine Curve Improvement 0221000132 TRI-003-5/11 Hayfork Pavement 0221000128 TRI-299-64/70 Trinity Dam Pavement 0219000156 TRI-VAR-0/0 Weaverville Fishwalk
0120000111 MEN-001-42.9/43.6 Salmon Creek Sandblast Waste Abatement 0122000045 HUM-096-R38.9/38.9 Orleans MS and Buckhorn CVEF
0119000014 DN-199-33.41/33.41 COLLIER SRRA WATER UPGRADE
0121000080 MEN-001-20.6/20.64 Manchester Pedestrian Path 0124000134 MEN-128-28/28 Boonville Storage Bunkers 0123000032 LAK-029-31.4/33.7 Bottle Rock Safety 0123000066 HUM-101-79.5/80.2 Eureka Slough Bridges Replacement 0123000200 DN-101-23.8/42.54 Crescent City to Smith River Pavement 0123000208 HUM-299-38.74/38.83 Hoopa Drainage 0123000140 HUM-096-36.95/39.654 Orleans Pedestrian and Bicyclist Connectivity 0123000137 HUM-101-1.61/1.61 Humboldt Fish Passage
0117000166 HUM-101-70.3/71 TOMPKINS HILL BRIDGE PROJECT
0124000186 HUM-101-72.8/74.8 Humboldt Hill Safety Improvements 0123000203 HUM-101-74.8/74.8 Herrick Mobility Hub 0122000131 HUM-101-79.9/85 Eureka/Arcata 101 SLR Resilience 0123000166 HUM-101-91.99/91.99 Hiller Seismic Retrofit 0123000206 HUM-211-R77/78.8 Ferndale Access 0122000132 HUM-299-4/5.7 Annie & Mary Trail PIR 0123000017 LAK-029-7.4/8.9 Middletown North Safety 0113000024 MEN-001-62.2/69.7 PCBR Improvements 0123000165 MEN-101-R25.72/R25.72 Ukiah Seismic Retrofit 0123000201 MEN-101-26.3/R33.7 Calpella Rehab 0124000190 MEN-128-19.5/20.4 Philo Greenwood Shoulder Widening 0121000094 MEN-222-0.41/2.15 Talmage Complete Streets 0123000136 HUM-101-R10.269/23.89 Pavement - Pavement Preservation 0123000204 Facilities - Maintenance 0125000008 MEN-128-28.7/29.2 Bicycle and Pedestrian Infrastructure 0123000200 DN-101-23.8/42.54 Pavement - Pavement Preservation 0123000212 HUM-101-11.5/11.5 Facilities - Maintenance 0124000177 MEN-101-80.74/80.74 Drainage - Fish Passage 0224000079 TRI-003-58/67.5 Drainage 0221000119 TRI-299-6.26/6.5 Gray Creek Bridge
0316000063 SAC-005-25.3/34.4 North Sac 5 CapM 0316000113 SAC-051-1.05/4.8 SR 51 Managed Lanes Project 0316000190 SAC-005-23.6/24.3 I-5 West End Viaduct 0317000349 59V03-005-0/0 I-5 Vertical Clearance (Colusa & Yolo) 0318000336 SAC-005-22.4/34.4 I-5 Managed Lanes
0319000278 GLE-005-R20/R28.821 GLE-5 CAPM
0319000282 SAC-099-21.3/R24.351 Sac 99 Fruitridge CAPM
0319000284 BUT-070-0/0 Butte 70 CAPM 0319000286 SAC-VAR-0/0 SAC 99/51/160 Five Pump Plant Project 0319000302 SAC-080-11.7/13.2 SAC 80 - Planting Rehab 0319000303 SAC-VAR-0/0 SAC 99/51 Pump Plant Project 0319000304 59V03-VAR-0/0 Scour Mitigation at various locations 0321000023 SAC-099-6.04/7.06 Willow Slough Replacement 0321000195 59V03-080-0/0 I-80 CAPM Antelope to Sierra College 0321000198 SAC-012-0.7/6.11 SAC-12 Terminous Safety
0321000201 SUT-099-T30.7/T35.8 SUT 99 2R
0321000202 YOL-005-R22.8/R28.92 Dunnigan 5 Rehab 0322000012 SAC-050-21.5/21.5 US 50/E Bidwell St IC & OC 0322000064 COL-005-R24.3/R24.3 Maxwell SB SRRA Rehab 0322000086 YOL-016-15.1/20.5 Cache Creek Rehab 0322000146 SUT-113-0.4/1.1 Jennings/Knights Curve Improvement 0322000248 SAC-012-3.5/3.8 Jackson Slough Road Intersection Improvement 0322000275 SUT-020-15.79/16.08 Stafford Way Intersection Safety Improvement 0323000033 SAC-160-R44.9/R45.1 Safety Lighting - NB Off to Del Paso 0323000171 SAC-005-0.21/4.63 I-5 Grade Raise 0323000182 SAC-051-6.69/6.69 Meter HOVPL-NB 51 at Fulton Ave 0323000285 YOL-016-21.2/21.9 Yol-16 Vision Zero Shoulder Widening 0323000294 SAC-080-12.4/17.5 Foothill Farms Pavement Rehab 0323000295 SAC-099-16.485/18.2 SB SAC-99 HOV Mitigation 0323000300 COL-020-0/R22.1 Salt Creek Canyon 0324000052 59V03-VAR-0/0 SAC-YUB-COL Pump Plant Project 0324000055 SAC-005-33.8/33.8 Elkhorn SB SRRA Rehabilitation 0324000056 YUB-020-R17.7/R18.1 Yuba River Parks Bar Bridge Preservation 0324000057 BUT-070-28.15/28.85 West Branch Feather River Bridge Deck Preservation 0324000060 59V03-VAR-0/0 Elkhorn-Enterprise North Mobility Hubs 0324000104 BUT-099-R36/45.975 Chico-Vina CAPM 0318000302 PLA-049-6.5/6.7 PLA 49 Auburn Creekside Center 0323000204 NEV-080-15.661/15.661 Truckee Wash Rack Sewer Connection.
0322000312 PLA-049-4.6/4.9 Placer 49 Sidewalk 0312000185 PLA-080-5/6 Rocklin Rd. IC
0324000218 59V03-VAR-0/0 El Dorado and Placer County Traffic Signal Operational Improvements
0324000219 59V03-VAR-0/0 Sutter, Yolo, and Placer County Traffic Signal Operation
0300000243 59V03-VAR-0/0 Empire Ranch Road I/C 0323000002 NEV-VAR-0/0 Donner Creek Restoration Project
0300000259 ED-050-79.8/80.4 Realign US 50 @ Stateline 0322000028 ED-089-24.4/25.3 Meeks Bay Restoration Project 0322000123 PLA-089-10/18 Truckee River Recreational Access Project 0322000089 NEV-020-R12.12/R13.65 Wolf Creek Multiuse Trail Project 0322000303 PLA-080-3.1/3.1 Roseville MS Structure Replacements 0323000220 PLA-080-4.2/5.9 Rocklin Rd to SR65/I80 Auxiliary Lane 0324000188 PLA-080-8.52/8.9 Pla-80 Horseshoe Bar Road Interchange 0324000193 59V03-VAR-12.7/13 Grass Valley Peanut Roundabout 0322000029 ED-050-0.7/1.1 Latrobe Rd/El Dorado Hills Blvd
Interchange Improvements 0323000082 ED-089-24.4/25.3 Meeks Bay Restoration Project (IIJA) 0319000289 ED-050-77.3/80.44 South Tahoe CAPM 0323000003 NEV-080-0/0 Donner Summit SRRA ACP Replacement 0318000016 NEV-080-27.6/28.5 Acid Flats 0324000189 NEV-049-15.07/16.1 Nev-49 Multimodal Corridor Project 0323000087 NEV-049-2.1/9.8 Grass Valley Wildfire Evacuation Route(IIJA)
0321000193 59V03-049-0/0 ED 49 CAPM
0321000197 PLA-267-0/9.63 PLA 267 CAPM
0323000170 PLA-049-0/0 Placer 49 2R 0323000286 NEV-049-17.4/17.95 Nev-49 Vision Zero Shoulder Widening 0321000200 SIE-089-0/15.2 State Route 89 Henness Pass CAPM 0322000303 PLA-080-3.1/3.1 Roseville MS Structure Replacements 0322000022 59V03-VAR-0/0 Borehole Removal Program 0321000189 ED-049-14.2/16.5 Placerville 49 CAPM 0321000194 PLA-080-17.2/R26.5 Placer 80 Rehabilitation 0321000192 NEV-080-15.5/25.5 Nev 80 Trout Creek 0324000173 PLA-080-50.7/50.7 Whitmore MS Dormitory Replacement 0300000352 ED-050-R8.3/R8.7 Ponderosa Road Interchange 0323000293 PLA-089-0/13.1 West Lake CAPM 0324000054 PLA-080-0/0 PLA-80 Bridge Rehabilitation at 3 Locations 0323000292 NEV-020-0/R12.2 Penn Valley CAPM
0321000190 ED-050-0/R9 ED 50 2R
0324000058 NEV-080-15.661/15.661 Truckee Maintenance Station Relocation 0323000290 ED-050-R28.6/39.7 Pollock Pines Pavement Preservation 0324000235 ED-050-48.8/70 ED-50 Vision Zero Improvements 0219000154 MOD-299-56.7/58 Cedarville ADA and CAPM
0221000121 SIS-096-52.5/52.5 Thompson Creek Bridge 0219000164 59V02-005-0/0 Flume Creek CAPM 0219000134 SIS-003-R48.6/54.187 Montague CAPM
0220000065 SHA-005-R20.3/R27.9 Fawndale Culverts 0220000057 SHA-044-R26.8/71.38 Shingle Station Paving and Drainage 0219000152 SHA-299-57.5/59 Potato Cut 0224000021 SHA-299-57.5/59 Potato Truck 0221000142 SHA-005-61.75/61.75 Sweetbrier Deck Replacement 0218000057 PLU-089-0.001/8.71 Graeagle Cap & Flood 0222000012 TEH-005-R28.3/R28.3 Satellite Rural TMC 0220000059 SIS-263-54.51/56.35 SIS 263 Bridge Repairs 0223000122 SHA-273-12.85/14.1 273 Median Barrier Safety 0223000194 PLU-VAR-0/0 Chester Pavement 0224000071 59V02-070-0/0 Long Valley Bridge Rehabilitation 0224000084 LAS-395-R20/29.9 Doyle Pavement 0221000137 59V02-VAR-0/0 Far North TMS 0221000141 59V02-VAR-0/0 Sac Valley ITS 0221000140 59V02-VAR-0/0 Sac Canyon ITS 0221000139 LAS-VAR-0/0 Lassen County ITS 0221000129 MOD-395-47/61.563 Goose Lake Pavement 0221000144 59V02-005-0/0 Herbert Miles SRRA Water Wastewater 0221000042 SIS-005-R58.2/R69.293 Hilt Pavement Rehab 0221000136 SHA-005-R15.7/R17.3 East Palisades Class I Path 0220000062 LAS-395-5.6/R20 Red Rock Pavement 0223000178 LAS-395-7.5/R19 Red Rock Safety 0223000119 TEH-032-21.05/21.2 Elam Safety 0221000133 59V02-VAR-0/0 Highway Curve Warning Signs 0216000125 SIS-096-71.23/71.23 Scott River Bridge 0221000130 LAS-036-16.7/22.4 Susan River Pavement 0221000118 SIS-VAR-0/0 Weed Blvd Pavement 0222000060 SHA-005-56.7/66.5 Flume Creek Leftover Culverts 0219000169 PLU-089-24/30 Wolf Creek Pavement 0221000115 PLU-070-33/47 Quincy Pavement 0219000016 59V02-395-0/0 Secret Valley SRRA 0221000131 MOD-299-33.5/37.5 Crowder Flat Pavement 0221000117 SIS-089-0/21.1 Bartle CAPM 0221000116 SHA-VAR-0/0 Downtown Redding CAPM 0223000066 SIS-089-24.75/24.75 McCloud Intersection Safety 0221000120 59V02-VAR-0/0 Tehama Plumas Scour Mitigation 0223000192 SIS-005-R38.6/R51.162 Yreka Interstate Pavement 0223000196 SIS-097-0/0 Grass Lake Pavement 0223000197 TEH-036-78.4/92 Mineral Pavement 0223000195 SHA-089-30.6/43.345 Harlow-Pondosa
0223000199 SIS-003-28/36 Fort Jones Pavement 0223000128 SHA-299-76/78 Burney to Johnson Park Connector 0223000129 SIS-097-8.5/9.8 Whitney Creek Climate Adaptation
0223000130 SHA-299-25/27.2 North East Redding Multi Modal Connector 0219000171 TEH-036-0/0 Red Bluff Signals 0221000143 SHA-299-13.55/14.58 Whiskey Creek Deck Replacement 0224000066 TEH-005-R0.7/R14.6 McClure Cable Median 0224000078 SIS-096-0/0 SIS Hwy 96 Rock Drapery 0224000088 SHA-005-R16.1/R16.1 Hilltop Bridge Multi-Modal Connector 0224000098 LAS-395-133.75/133.75 Sage Hen Summit CCTV & RWIS 0223000126 SIS-VAR-0/0 SIS 139/161 Pavement and Drainage 0224000110 LAS-395-29.9/59 Red Rock To Susanville Culverts 0224000111 SHA-044-33.94/33.94 Shingletown Sand House Rehabilitation 0224000113 TEH-099-13.4/13.9 Butler Taft Safety 0224000118 SHA-VAR-0/0 Redding Signals 0224000119 SHA-044-R27/R27.64 West Shingletown Shoulder Widening 0223000198 LAS-139-0/0.74 Ash Street Pavement 0224000155 TEH-005-R24.4/R25.2 South Main-Diamond Ave Roadside Rehab 0224000175 SIS-005-R16.7/R17.24 Vista Drive Ditch Fix 0224000134 59V02-395-0/0 395 Vaults & Fiber 0220000113 SHA-005-R26.4/M30.1 Pit River Bridge 0315000073 59V03-VAR-0/0 Underground Storage Tank and Superfund for N. Region
The above list is not an exclusive list of projects.
6. At the sole discretion of Caltrans, Consultant may be required to provide the required services on safety projects, emergency projects, Emergency Storm Damage Projects, excess parcel assessments, or other current/future transportation projects, including minor projects not listed above, except for those specially excluded above, within the geographical jurisdiction of the Contract set forth in “Location of Work” Section. However, the dollar value of the services not listed in the Contract shall not exceed 10% of the total value of services that are listed and performed in the Contract.
7. The potential projects may vary in scope and size, and may encompass any type of improvement for the State transportation system including, but not limited to, roadway rehabilitation, widening and/or realignment of existing facilities, relocation of existing facilities, and construction of new facilities. The project location, project limits, purpose, expected results, project deliverables, period of performance, project schedule, and scope of work to be performed shall be described in each Task Order.
8. Consultant shall be available, on two (2) days’ written notice:
a. To meet with Caltrans; to participate in internal Project Development Team (PDT) meetings or other Caltrans meetings.
b. To attend public meetings (day and evening) where an expert is required.
c. To participate in any public hearings necessary for a Project.
d. To provide technical expertise on an “as-needed” basis.
9. Maintaining a stable work force is essential to the successful completion of Caltrans, Division of North Region Environmental Engineering Office, Hazardous Waste Program, Districts 1, 2, and 3, work. Consultant shall implement a personnel retention plan strategy and shall submit a written plan with the Statement of Qualification submittal.
10. The Consultant may be expected to spend time for extended assignments to perform A&E services at Caltrans offices. At the sole discretion and convenience of Caltrans, Caltrans may permit Consultant to use office space, office equipment (such as copiers, printers and telephones) and furniture at various Caltrans (field) offices on a short-term, temporary basis. Consultant will provide its own computers, office supplies, and related work materials. The Consultant, including its Subconsultants, shall include the Field Office Indirect Cost Rate in its cost proposals and use the Field Office Indirect Cost Rate in billing Caltrans for those personnel utilizing Caltrans’ (field) office facilities. The cost rates will reflect the Consultant’s lower costs where Caltrans provides office space, office equipment and furniture. If the Consultant, including its Subconsultants, does not currently have a Field Office Indirect Cost Rate, it will develop and use a Field Office Indirect Cost Rate to reflect an equitable distribution of allowable costs to the contract (as specified in 48 CFR 31.203(f). When working on-site in the Caltrans Facilities, the Consultant shall adjust its hours to meet the business needs of
Caltrans and shall generally work and be present during Caltrans building business hours (which are 8:00 a.m. - 5:00 p.m.). The business hours can be adjusted in different Task Orders.
11. The Consultant shall perform activities which shall include, but not be limited to, the following:
a. Environmental Data Resources (EDR) Reports and Surveys.
b. Site Investigation of Soil & Ground Water.
c. Ground Water Monitoring.
d. Feasibility Study, Treatability Study and Design Work.
e. Pre-demolition Inspection Survey.
f. Container Inspection and Material Identification.
12. All Site Assessment, Site Investigation, Site survey, groundwater monitoring, and remediation system evaluation, monitoring, and regulatory reporting work shall be completed in accordance with a site-specific Health and Safety Plan developed by the Consultant and signed by a Certified Industrial Hygienist (CIH) for conditions expected during the survey work. The Health and Safety Plan shall be reviewed by the Caltrans Contract Manager or Caltrans designee prior to the start of work. The Consultant shall notify the Caltrans Contract Manager or Caltrans designee in writing at a minimum one (1) week before it begins any investigative or field work. If the nature of the work requires the presence of the CIH during field work, time for the CIH shall be paid. Costs for development of the Health and Safety Plan shall be paid per the Health and Safety Plan.
13. The Consultant and Subconsultant personnel shall not meet, discuss, nor confer with the public, Caltrans personnel, Agency personnel, State personnel, Federal personnel or any person other than the Caltrans Contract Manager or Caltrans designee, and approved Consultant personnel. Any communications with any person, excluding the Caltrans Contract Manager or Caltrans designee and approved Consultant personnel, require prior written approval from the Caltrans Contract Manager.
14.
15. The Consultant shall not negotiate or make decisions in Caltrans' name. Caltrans shall retain responsibility for initiating and managing all final consultation, both informal and formal, with other consultants; other contractors; Federal, State, and Local resource and regulatory agencies; and other involved agencies, regarding regulatory, project, project impacts, project mitigation proposals, project mitigation, project compensation, project proposals, and any issues. The Consultant shall be available (within two (2) working day(s) written notice) to provide advice and to participate in such consultations as required in each Task Order, as directed by the Caltrans Contract Manager in coordination with the Caltrans Task Order Manager, and at the request of Caltrans. Should specific permits or agreements be required, Caltrans may require the Consultant to prepare appropriate information.
16. The Caltrans Contract Manager shall decide the manner in which the coordination of individual matters is undertaken. At the Caltrans Contract Manager’s option in coordination with the Caltrans Task Order Manager, such coordination may be performed by the Consultant’s direct contact personnel, by the Consultant acting on behalf of Caltrans, or by Caltrans only. When coordination efforts require agreements, such agreements shall be obtained by Caltrans.
17. The Consultant shall assist Caltrans in obtaining necessary approvals and permits.
The Consultant shall identify all necessary approvals and permits, prepare signature-ready permit applications, and track the status of permit applications, as specified in each Task Order.
D. Workplan Standards Guide Codes.
Task Orders are based on the Caltrans Workplan Standards Guide (WSG). The latest WSG is found in the Guide to Project Delivery Workplan Standards Guide, which is available from the Caltrans’ Publication Unit and on the Internet at http://www.dot.ca.gov/hq/projmgmt/guidance.htm. The WSG references the Work Breakdown Structure (WBS) categories, which are potential and related work activities applicable to the Contract. The WGS references WBS categories which present the potential and related work activities that the Consultant may be required to perform. All revisions to the current version of the Work Breakdown Structure (WBS) shall apply during the life of the Contract. Task Orders may include, but not be limited to, the Capital Project WBS 165 through WBS 285 elements listed below.
The WBS activities below applicable to the Contract are limited to those set forth below:
160.30.10 Surveys and Mapping For Environmental Studies
160.30.15 Property Access Rights for Environmental/Engineering studies 165 Perform Environmental Studies and Prepare Draft Environmental
Document (DED) (See Note 1)
165.10.35 Water Quality Studies
165.10.80 Hazardous Waste Initial Site Assessments/Investigations
165.10.85 Hazardous Waste Preliminary Site Investigations
185 Base Maps and Plan Sheets for PS&E Development
185.25.25 Water Well Abandonment Needs Determination
195 Right Of Way Property Management and Excess Land
195.40.30 Hazardous Waste and Hazardous Materials
205 Permits and Agreements during PS&E Component
205.05 Required Permits
205.10 Permits
235 Mitigate Environmental Impacts and Clean Up Hazardous Waste
235.05 Environmental Mitigation
235.10 Detailed Site Investigation for Hazardous Waste
http://www.dot.ca.gov/hq/projmgmt/guidance.htm
235.10.05 Right or Permit for Hazardous Waste Site Investigations (SI)
235.10.10 Hazardous Waste Sites Survey
235.10.15 Detailed Hazardous Waste Site Investigation
235.15 Hazardous Waste Management Plan
235.20 Hazardous Waste PS&E
235.25 Hazardous Waste Clean-Up
235.30 Certificate of Sufficiency
235.35 Long Term Mitigation Monitoring
255.10 Updated PS&E Package
260.80 Draft Contract Ready
270.66 Technical Support
280.50 Other Environmental Compliance
285.10.15 Other Functional Support
The Consultant shall not work on any projects that are in the planning phase (K-Phase) and the Consultant shall not be reimbursed for any work performed during this phase of a project.
E. General Personnel Requirements.
1. The Consultant’s personnel shall be capable, competent, and experienced in performing the types of work in the Contract with minimal instruction. Personnel skill level should match the specific job classifications, as set forth herein or in the Consultant’s Cost Proposal, Attachment 2 and task complexity. The Consultant’s personnel shall be knowledgeable about, and comply with, all applicable Federal, State, and Local laws and regulations.
2. The Consultant is required to submit a written request and obtain the Caltrans Contract Manager’s prior written approval for any substitutions, additions, alterations, or modifications to the Consultant’s originally proposed personnel and project organization, as depicted on the proposed Consultant’s Organization Chart or the Consultant’s cost proposals. The Consultant personnel shall have the same job classification, as set forth herein or in the Consultant’s Cost Proposal, Attachment 2, not exceed the billing rate, and meet or exceed the qualifications and experience level of the previously assigned personnel, at no additional cost to Caltrans. The Consultant personnel shall have significant experience in the work involving a similar transportation facility for at a minimum two (2) previous projects, unless otherwise approved by the Caltrans Contract Manager.
3. In responding to Caltrans’ Task Order and in consultation with the Caltrans Contract Manager, the Consultant Contract Manager shall identify the specific individuals proposed for the task and their job assignments. The Consultant shall provide documentation that proposed personnel meet the appropriate minimum qualifications as required by the Contract.
4. The Consultant’s personnel shall typically be assigned to and remain on specific Caltrans projects/deliverables until completion and acceptance of the project/deliverables by Caltrans. Personnel assigned by the Consultant shall be available at the start of a Task Order and after acceptance of the project/deliverable by Caltrans.
5. After the Caltrans Contract Manager’s approval of the Consultant’s personnel proposal and finalization of a Task Order, the Consultant may not add, delete or substitute personnel without the Caltrans Contract Manager’s prior written approval.
6. Resumes containing the qualifications and experience of the Consultant’s and Subconsultant’s personnel, which include existing and additional personnel, and copies of their minimum required certifications, shall be submitted to the Caltrans Contract Manager for review before assignment on a project or Task Order. The resume and copies of current certification for each candidate shall be submitted to the Caltrans Contract Manager within one (1) week of receiving the request.
7. The Caltrans Contract Manager may interview the Consultant’s personnel for the qualifications and experience. The Caltrans Contract Manager’s decision to select the Consultant’s personnel shall be binding to the Consultant and its Subconsultants. The Consultant shall provide adequate qualified personnel to be interviewed by the Caltrans Contract Manager within one (1) week of receiving the request.
8. The Caltrans Contract Manager shall evaluate the adequacy (quality and quantity) of the work performed by the Consultant’s personnel, and determining whether the deliverables satisfy the acceptance tests and criteria. The Caltrans Contract Manager may reject any Consultant personnel who are determined by the Caltrans Contract Manager to lack the minimum qualifications. If at any time the level of performance is below expectations, the Caltrans Contract Manager may direct the Consultant to immediately remove Consultant personnel from the project specified in a Task Order and request that the Consultant provide another qualified person be assigned as needed. The Consultant personnel shall meet the qualifications required by the Contract for performance of the work as demonstrated by a resume and copies of current certifications submitted by the Consultant. Consultant personnel shall receive prior written approval from the Caltrans Contract Manager. Invoices with charges for personnel not pre-approved by the Caltrans Contract Manager for work on the Contract and for each Task Order shall not be reimbursed.
9. The Consultant shall not remove or replace any existing personnel assigned to Task Orders without the prior written consent of the Caltrans Contract Manager.
The removal or replacement of personnel without the written approval from the Caltrans Contract Manager shall be violation of the Contract and may result in termination of the Contract per Exhibit D, Section III, Termination of the Contract.
10. When assigned consultant personnel is on approved leave and required by the Caltrans Contract Manager, the Consultant Contract Manager shall provide a temporary substitute employee until the assigned employee returns to work from the approved leave.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .