About this file

This is a General Services Administration (GSA) Request for Lease Proposals (RLP) for office space in Alton, Illinois, issued June 5, 2026, with offers due by July 6, 2026, at 5:00 PM EST.

The Government seeks to lease between 4,941 and 5,189 rentable square feet (RSF) of office space in a prime commercial office district within Alton's designated area of consideration. The lease term is 15 years total with an initial firm term of 10 years and 90-day termination rights; no option term is included. The space must be located in a modern quality building with permanent facade materials, contiguous on a single floor, and include accessible main public and separate employee entrances. Parking must meet current local code requirements, with facilities located within 1,320 walkable feet of the building. The building must provide 24/7 access to the space with normal operating hours Monday through Friday 7:00 AM to 5:30 PM. Transit accessibility via subway, light rail, or bus is required within 1,320 walkable feet of the principal entrance.

Offerors must submit a complete proposal through the Requirement Specific Acquisition Platform (RSAP) including GSA Form 1364 (Proposal to Lease Space) and Form 1217 (Lessor's Annual Cost Statement) with fully serviced lease rates per ABOA and RSF. The offer must clearly itemize building shell rental, tenant improvement (TI) rate, Building Specific Amortized Capital (BSAC) rate, operating costs, and parking costs. A $56.00 per ABOA SF tenant improvement allowance is provided. The Government will award to the lowest priced technically acceptable offeror using present value price evaluation discounted at 5 percent annually. Jones Lang LaSalle, Inc. serves as the authorized broker, and the offeror must execute a Commission Agreement. The lease must comply with Energy Independence and Security Act requirements, including ENERGY STAR® certification within the past year or demonstration of cost-effective energy efficiency improvements. Fire protection and life safety documentation, seismic safety compliance (for high seismicity areas), zoning evidence, ownership documentation, proof of signing authority, and SAM registration are required at due diligence.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

GSA TEMPLATE R100A (5/25)

GSA

REQUEST

FOR LEASE

PROPOSALS

NO. 0IL2403

Alton, IL

Offers due by 07/06/2026

In order to be considered for award, offers conforming to the requirements of the RLP shall be received no later than 5:00 PM EST on the date above. See “Receipt of Lease Proposals” herein for additional information.

This Request for Lease Proposals ("RLP") sets forth instructions and requirements for proposals for a Lease described in the RLP documents. Proposals conforming to the RLP requirements will be evaluated in accordance with the Method of Award set forth herein to select an Offeror for award. The Government will award the Lease to the selected Offeror, subject to the conditions herein.

The information collection requirements contained in this Solicitation/Contract, that are not required by regulation, have been approved by the Office of Management and Budget pursuant to the Paperwork Reduction Act and assigned the OMB Control No. 3090-0086.

SLAT RLP

TABLE OF CONTENTS

SLAT RLP

SECTION 1 STATEMENT OF REQUIREMENTS

1.01 GENERAL INFORMATION (SLAT) (OCT 2023)

1.02 AMOUNT AND TYPE OF SPACE AND LEASE TERM (SLAT) (OCT 2020)

1.03 NEIGHBORHOOD AND PARKING (SLAT) (OCT 2021)

1.04 LIST OF RLP DOCUMENTS (SLAT) (OCT 2023)

1.05 LEASE DESCRIPTION (SLAT) (MAY 2025)

1.06 AUTHORIZED REPRESENTATIVES (OCT 2020)

1.07 BROKER COMMISSION AND COMMISSION CREDIT (OCT 2020)

1.08 PRICING OF SECURITY REQUIREMENTS (OCT 2022)

1.09 NORTH AMERICAN INDUSTRY CLASSIFICATION SYSTEM (NAICS) CODE AND SMALL BUSINESS SIZE

STANDARD (OCT 2023)

SECTION 2 ELIGIBILITY AND PREFERENCES FOR AWARD

2.01 EFFICIENCY OF LAYOUT (SLAT) (OCT 2020)

2.02 FLOOD PLAINS (OCT 2022)

2.03 SEISMIC SAFETY – MODERATE SEISMICITY (MAY 2025) INTENTIONALLY DELETED

2.04 SEISMIC SAFETY – HIGH SEISMICITY (MAY 2025)

2.05 ENERGY INDEPENDENCE AND SECURITY ACT (MAY 2025)

2.06 DUE DILIGENCE AND NATIONAL ENVIRONMENTAL POLICY ACT REQUIREMENTS - RLP (OCT 2023)

INTENTIONALLY DELETED

2.07 NATIONAL HISTORIC PRESERVATION ACT REQUIREMENTS - RLP (SMALL) (OCT 2023) INTENTIONALLY

DELETED

SECTION 3 HOW TO OFFER

3.01 GENERAL INSTRUCTIONS (SLAT) (OCT 2020)

3.02 RECEIPT OF LEASE PROPOSALS (SLAT) (OCT 2024)

3.03 STEP 1: OFFER SUBMITTAL (SLAT) (OCT 2023)

3.04 STEP 2: DUE DILIGENCE - ADDITIONAL SUBMITTALS (SLAT) (OCT 2024)

3.05 BUILDING TOUR (SLAT) (OCT 2020)

3.06 TENANT IMPROVEMENTS INCLUDED IN OFFER (SLAT) (OCT 2020)

3.07 OPERATING COSTS REQUIREMENTS INCLUDED IN OFFER (JUN 2012)

3.08 UTILITIES SEPARATE FROM RENTAL / BUILDING OPERATING PLAN (JUN 2012) INTENTIONALLY DELETED 13

3.09 SECURITY IMPROVEMENTS INCLUDED IN OFFER (OCT 2022) INTENTIONALLY DELETED

SECTION 4 METHOD OF AWARD

4.01 NEGOTIATIONS (SLAT) (OCT 2023)

GSA FORM R100A (5/25)

4.02 HUBZONE SMALL BUSINESS CONCERN PRICE PREFERENCE WAIVER (SLAT) (OCT 2023)

4.03 AWARD BASED ON PRICE (OCT 2023)

4.04 PRESENT VALUE PRICE EVALUATION (OCT 2024)

4.05 AWARD (SLAT) (OCT 2023)

SECTION 5 ADDITIONAL TERMS AND CONDITIONS

5.01 MODIFIED RLP PARAGRAPHS (OCT 2016) INTENTIONALLY DELETED

5.02 SWING SPACE - RLP (OCT 2022) INTENTIONALLY DELETED

RLP NO. 0IL2403, PAGE 1 GSA TEMPLATE R100A (10/24)

REQUEST FOR LEASE

PROPOSALS NO. 0IL2403

June 5, 2026 SLAT RLP GSA TEMPLATE R100A (October 2024)

SECTION 1 STATEMENT OF REQUIREMENTS

1.01 GENERAL INFORMATION (SLAT) (OCT 2023)

A. This Request for Lease Proposals (RLP) sets forth instructions and requirements for proposals for a Lease described in the RLP documents.

The Government will evaluate proposals conforming to the RLP requirements in accordance with the Method of Award set forth below to select an Offeror for award. The Government will award the Lease to the selected Offeror, subject to the conditions below.

B. Included in the RLP documents is a lease template setting forth the lease term and other terms and conditions of the Lease contemplated by this RLP and a GSA Proposal to Lease Space (GSA Form 1364) on which Offeror shall submit its offered rent and other price data, together with required information and submissions. The Lease paragraph titled “Definitions and General Terms” shall apply to the terms of this RLP.

C. Do not attempt to complete the lease template. GSA will transcribe the successful Offeror’s final offered rent and other price data included on the GSA Form 1364 into the lease and transmit the completed Lease, including any appropriate attachments, to the successful Offeror for execution. Neither the RLP nor any other part of an Offeror’s proposal shall be part of the Lease except to the extent expressly incorporated therein. The Offeror should review the completed Lease for accuracy and consistency with his or her proposal, sign and date the first page, initial each subsequent page of the Lease, and return it to the Lease Contracting Officer (LCO).

D. The Offeror's executed Lease shall constitute a firm offer. No Lease shall be formed until the LCO executes the Lease and delivers a signed copy to the Offeror.

E. Offeror may not use Federal agency name(s) and/or acronym(s), e.g., General Services Administration, GSA, in the entity name that owns and/or leases the Space to GSA.

1.02 AMOUNT AND TYPE OF SPACE AND LEASE TERM (SLAT) (OCT 2020)

A. The Space shall be located in a modern quality Building of sound and substantial construction with a facade of stone, marble, brick, stainless steel, aluminum or other permanent materials in good condition and acceptable to the LCO. If not a new Building, the Space offered shall be in a Building that has undergone, or will complete by occupancy, modernization, or adaptive reuse for the Space with modern conveniences. Buildings with Property boundary(ies) on the boundary streets are deemed to be within the delineated Area of Consideration.

CITY, STATE ALTON, IL

AREA OF CONSIDERATION NORTHERN BOUNDARY: IL-255, IL-111, AIRPORT

ROAD

WESTERN BOUNDARY: PIERCE LANE, DELLMAR AVE,

STATE STREET, HWY 67, HWY 143, LEWIS AND CLARK

BLVD

SOUTHERN BOUNDARY: HWY 143

EASTERN BOUNDARY: HWY 255, VAUGHN RD,

EDWARDSVILLE RD, 9TH STREET, AIRLINE, HWY 255

SPACE TYPE(S) OFFICE

MINIMUM SQ. FT. (ABOA) 4,941

MAXIMUM SQ. FT. (ABOA) 5,189

RESERVED PARKING SPACES (TOTAL) LOCAL CODE REQUIREMENTS

RESERVED PARKING SPACES (SURFACE) LOCAL CODE REQUIREMENTS

RESERVED PARKING SPACES (STRUCTURE) LOCAL CODE REQUIREMENTS

INITIAL FULL TERM 15 YEARS

INITIAL FIRM TERM 10 YEARS

TERMINATION RIGHTS 90 DAYS

OPTION TERM N/A

ADDITIONAL REQUIREMENTS

• PARKING-TO-SQUARE-FOOT RATIO

AVAILABLE ON-SITE SHALL AT LEAST MEET

CURRENT LOCAL CODE REQUIREMENTS

• SPACE MUST BE LOCATED IN A PRIME

COMMERCIAL OFFICE DISTRICT WITH

RLP NO. 0IL2403, PAGE 2 GSA TEMPLATE R100A (4/25)

ATTRACTIVE SURROUNDINGS WITH A

PREVALENCE OF MODERN DESIGN AND/OR

TASTEFUL REHABILITATION IN MODERN

USE.

• OFFERED SPACE MUST BE LOCATED IN

CONTIGUOUS SPACE AND ON ONE FLOOR.

• OFFERED SPACE SHALL ALLOW FOR AN

ACCESSIBLE MAIN PUBLIC ENTRANCE AND

AN ACCESSIBLE SEPARATE EMPLOYEE

ENTRANCE AS PART OF THE SHELL RATE.

• EMPLOYEE AND VISITOR ENTRANCES OF

THE BUILDING MUST BE CONNECTED TO

PUBLIC SIDEWALKS OR STREET BY

CONTINUOUS, ACCESSIBLE SIDEWALKS.

• IF SPACE OFFERED IS ABOVE GROUND

LEVEL, AT LEAST TWO (2) ACCESSIBLE

ELEVATORS WILL BE REQUIRED.

• THE GOVERNMENT WILL HAVE ACCESS TO

THE SPACE 24 HOURS A DAY, 7 DAYS A

WEEK. NORMAL HOURS OF OPERATION

ARE MONDAY THROUGH FRIDAY 7:00 A.M.

TO 5:30 P.M. (EXCLUDING SATURDAYS,

SUNDAYS AND FEDERAL HOLIDAYS).

1.03 NEIGHBORHOOD AND PARKING (SLAT) (OCT 2021)

A. Neighborhood and Parking: Inside City Center. Space shall be located in a prime commercial office district with attractive, prestigious, and professional surroundings with a prevalence of modern design and/or tasteful rehabilitation in modern use. Streets and public sidewalks shall be well maintained. Parking facilities with an adequate availability of parking spaces open to the general public to accommodate employees and visitors shall be located within the immediate vicinity of the Building but generally not exceeding a walkable 1,320 feet of the employee entrance of the offered Building as determined by the LCO. These parking facilities do not substitute for the required parking under Paragraph 1.02(C).

B. Transit Accessibility. A subway, light rail, or bus stop shall be located within the immediate vicinity of the Building, but generally not exceeding a safely accessible, walkable 1,320 feet from the principal functional entrance of the building, as determined by the LCO.

1.04 LIST OF RLP DOCUMENTS (SLAT) (OCT 2023)

A. The following documents are attached to and included as part of this RLP package:

DOCUMENT NAME

NO. OF PAGES

EXHIBIT

Lease No. LIL00782 (Template L100A) 33 A

Security Requirements for Level II 8 B

PUBLIC FACING OFFICES TECHNICAL DESIGN GUIDE 179 C

GSA 3516A, Solicitation Provisions 8 D

GSA 3517A, General Clauses 11 E

Proposal to Lease Space (GSA Form 1364) 4 F

GSA Form 1217, Lessor's Annual Cost Statement 3 G

GSA Form 12000 for Prelease Fire Protection and Life Safety Evaluation for an Office Building (Part A or Part B) (See Section 3 for applicable requirements)

6 H

FAR 52.204-24, Representation Regarding Certain Telecommunications and Video Surveillance Services or Equipment

4 I

Broker Exhibit 1 J

Broker Commission Agreement 3 K

B. In addition to the documents identified above, this RLP package includes additional agency requirements containing sensitive information that is only available to Offerors upon request to the LCO or Alternate Government Contact as listed under Section 1 of this RLP.

1.05 LEASE DESCRIPTION (SLAT) (MAY 2025)

RLP NO. 0IL2403, PAGE 3 GSA TEMPLATE R100A (4/25)

A. Offeror shall examine the Lease template included in the RLP documents to understand the Government's and the Lessor's respective rights and responsibilities under the contemplated Lease.

B. The Lease contemplated by this RLP includes:

1. The term of the Lease, and renewal option, if any.

2. Terms and Conditions of the Lease, including Definitions, Standards, and Formulas applicable to the Lease and this RLP.

3. Building Shell standards and requirements.

4. Information concerning the tenant agency's buildout requirements, to be supplemented after award.

5. Security Requirements.

6. A description of all services to be provided by the Lessor.

C. Should the Offeror be awarded the Lease, the terms of the Lease shall be binding upon the Lessor without regard to any statements contained in this RLP.

D. The Lease contemplated by this RLP is a fully serviced Lease. Rent shall be based upon a proposed rental rate per Rentable Square Foot

(RSF), limited by the offered rate and the maximum ABOA SF solicited under this RLP. Although certain Tenant Improvement (TI) requirements information is provided with this RLP and will be incorporated into the Lease, the TIs to be delivered by the Lessor will be based on the final design to be developed after award of the Lease, which reflects the Agency’s full requirements. The Lessor shall design and build the TIs and will be compensated for TI costs, together with design and project management fees to be set under the Lease.

Although the TI requirements will not be developed fully until after award, Offerors shall provide the allowance stated in the Tenant Improvement Allowance paragraph of the Lease.

Unless the Government prepares Design Intent Drawings (DIDs), after award the Lessor must prepare DIDs for the leased Space conforming to the lease requirements and other Government-supplied information related to the client agency’s interior build-out requirements. The Government will have the opportunity to review the Lessor's DIDs to determine that the Lessor's design meets the requirements of the Lease. Only after the Government approves the DIDs and a final price for TIs is negotiated will the Lessor be released to proceed with buildout. The Lease also provides that the Government may modify the TI requirements, subject to the Lessor's right to receive compensation for such changes.

E. The security pricing process is described in a separate paragraph.

F. Upon completion and acceptance of the leased Space, the Space will be measured for establishing the actual annual rent, and the lease term shall commence. In instances involving an incumbent Lessor where the Government commences the lease term pending completion of TI and/or BSAC alterations, the Government shall withhold TI and/or BSAC rent pursuant to Section 1 of the Lease until such time as the TI and/or BSAC is completed and accepted by the Government. During the term of the Lease, rent will be adjusted for changes to the Lessor's operating costs and real estate taxes, pursuant to paragraphs set forth in the Lease.

G. Offerors are advised that doing business with the Government carries special responsibilities with respect to sustainability, fire protection and life safety, and security, as well as other requirements not typically found in private commercial leases. These are set forth both in the lease template and in the GSA 3517A, Solicitation Provisions, and will be made part of the Lease.

1.06 AUTHORIZED REPRESENTATIVES (OCT 2020)

With respect to all matters relating to this RLP, only the Government's LCO designated below shall have the authority to amend the RLP and award a Lease. The Government shall have the right to substitute its LCO by notice, without an express delegation by the prior LCO.

Lease LCO:

Alanna Fitzpatrick

(347) 277-0795

ALANNA.FITZPATRICK@GSA.GOV

As to all other matters, Offerors may contact the Alternate Government Contact designated below.

Alternate Government Contact:

Clarissa Mahoney

(312) 888-6581

CLARISSA.MAHONEY@GSA.GOV

1.07 BROKER COMMISSION AND COMMISSION CREDIT (OCT 2020)

A. For the purposes of this RLP, JONES LANG LASALLE, INC (the Broker) is the authorized contractor real estate broker representing

GSA. The Government expects the Lessor to pay a commission to the Broker. By submitting an offer, the Offeror agrees that if the Offeror mailto:alanna.fitzpatrick@gsa.gov mailto:clarissa.mahoney@gsa.gov

RLP NO. 0IL2403, PAGE 4 GSA TEMPLATE R100A (4/25)

is paying a commission or fee in connection with this Lease to a listing agent, an offering agent, or broker, property manager, developer, or any other agent or representative, then the Offeror will pay a commission to the Broker to which the Broker would ordinarily be entitled consistent with local business practices, as evidenced through a brokerage agreement between the Offeror and the Broker. The commission will be negotiated between the Offeror and the Broker and will be based on a Lease term not to exceed the Firm Term of the Lease contemplated by this RLP. Commissions will not be negotiated or collected on option periods or for Lease terms beyond the Firm Term of the Lease. As part of the offer, the Offeror shall disclose all commissions and/or fees to be paid by the Offeror including both the Offeror’s agent(s), broker(s), property manager, developer, or any other agent or representative and the Broker. The Offeror shall enter the commission amounts for its representative and the amount to GSA’s Broker in blocks 31a and 31b respectively on GSA Form 1217, Lessors Annual Cost Statement. An executed commission agreement reflecting this agreement shall be submitted with the initial offer.

B. Offerors are advised that there is a potential for a dual agency situation to arise under this procurement, whereby the Broker’s Company may represent both GSA and another Offeror under this lease action. By submitting an offer, the Offeror acknowledges the potential for a dual agency situation. Should there be an actual dual agency, the Broker will notify all Offerors of the actual dual agency and request written acknowledgement statements from all Offerors.

C. For the benefit of the Government, the Broker has agreed to forego a percentage of any commission that it is entitled to receive in connection with the contemplated Lease. This amount shall be specifically set forth at time of lease award. The resulting total dollar value of the foregone commission (the Commission Credit) shall be applied in equal monthly amounts against rental payments due and owing under the Lease. The rental amount payable shall be reduced by the Commission Credit at the commencement of the Lease, over the minimum number of months that will not exceed the monthly shell rental, until the Commission Credit has been fully recaptured. The parties agree to execute a Lease Amendment setting forth the full nature, extent, terms, and conditions of commissions paid to the Broker and the Commission Credit to be applied against the Government’s rental payment obligations under the Lease. Commissions and/or credits shall be treated as confidential financial information and Offerors will refrain from public disclosure or using the information for any other purpose than that for which it was furnished without consent of the GSA LCO.

D. For purposes of price evaluation, the Commission Credit shall be treated as a deduction from the rent in accordance with the Method of

Award. The amount of any commission paid to the Broker shall not be considered separately as part of this price evaluation since the value of the commission is included in the rental consideration.

1.08 PRICING OF SECURITY REQUIREMENTS (OCT 2022)

A. The proposed Lease contains an attachment with the security requirements and obligations for the Building, which are based on the facility security level (FSL). The Federal Government determines the facility’s FSL rating, which ranges from FSL I to FSL IV. The FSL is based on client agency mix, required size of space, number of employees, use of the space, location, configuration of the site and lot, and public access into and around the facility.

B. The security requirements attached to this Lease includes a general list of countermeasures that may be installed in the leased Space as part of the Building Specific Amortized Capital (BSAC). The final list of security countermeasures will be determined during the design phase and identified in the design intent drawings and construction documents. After completing the construction documents, the Lessor shall submit a list of the itemized costs. Such costs shall be subject to negotiation. The Lessor shall design and build the BSAC and will be compensated for BSAC costs, together with design and project management fees to be set under the Lease.

C. There shall be no charge to the Government for any items that already exist in the offered Building or facility.

1.09 NORTH AMERICAN INDUSTRY CLASSIFICATION SYSTEM (NAICS) CODE AND SMALL BUSINESS SIZE STANDARD (OCT 2023)

A. The North American Industry Classification System (NAICS) code for this acquisition is 531120 (Exception).

B. The small business size standard for the applicable NAICS code is found HTTPS://WWW.SBA.GOV/SIZE-STANDARDS/.

https://www.sba.gov/size-standards/

RLP NO. 0IL2403, PAGE 5 GSA TEMPLATE R100A (4/25)

SECTION 2 ELIGIBILITY AND PREFERENCES FOR AWARD

2.01 EFFICIENCY OF LAYOUT (SLAT) (OCT 2020)

In order to be acceptable for award, the offered Space must provide for an efficient layout as determined by the LCO. To demonstrate potential for efficient layout, GSA may request the Offeror to provide a test fit layout at the Offeror’s expense.

2.02 FLOOD PLAINS (OCT 2022)

A Lease will not be awarded for any offered Property located within a 1-percent-annual-chance floodplain (formerly referred to as 100-year floodplain) unless the Government has determined that there is no practicable alternative. An Offeror may offer less than its entire site in order to exclude a portion of the site that falls within a floodplain, so long as the portion offered meets all the requirements of this RLP and does not impact the Government’s full use and enjoyment of the Premises. If an Offeror intends that the offered Property that will become the Premises for purposes of this Lease will be something other than the entire site as recorded in tax or other property records the Offeror shall clearly demarcate the offered Property on its site plan/map submissions and shall propose an adjustment to property taxes on an appropriate pro rata basis. For such an offer, the Government may determine that the offered Property does not adequately avoid development in a 1-percent-annual-chance floodplain.

In addition, a Lease will not be awarded for any offered Property adjacent to a 1-percent-annual-chance floodplain, where such an adjacency would, as determined by the Government, restrict ingress or egress to the Premises in the event of a flood, unless there is no practicable alternative.

2.03 SEISMIC SAFETY – MODERATE SEISMICITY (MAY 2025) INTENTIONALLY DELETED

2.04 SEISMIC SAFETY – HIGH SEISMICITY (MAY 2025)

In accordance with the Earthquake Hazards Reduction Act of 1977, the following apply:

A. The Government intends to award a Lease to an Offeror of a Building that is in compliance with the Seismic Standards. If an offer is received which is in compliance with the Seismic Standards and the other requirements of this RLP, then other offers which do not comply with the Seismic Standards must not be considered. If none of the offers is in compliance with the Standards, the LCO will make the award to the Offeror whose offer meets the other requirements of this RLP and provides the best value to the Government, taking into account price, seismic safety and any other evaluation factors specified in this RLP.

B. An offered Building will be considered to be in compliance with the Seismic Standards if it meets one of the following conditions:

1. The offer includes a representation that the Premises will be in a one-story Building of steel light frame or wood construction with less than 3,000 ABOA SF of space in the Building (Seismic Form D).

2. The offer includes a Seismic Certificate certifying that the Building is a Benchmark Building (Seismic Form A).

3. The offer includes a Seismic Certificate based on a Tier I Evaluation showing that the Building meets the Seismic Standards

(Seismic Form B). The submission must include the checklists and backup calculations from the Tier 1 Evaluation.

4. The offer includes a Seismic Certificate based on a Tier 2 or Tier 3 Evaluation showing that the Building complies with the Seismic

Standards (Seismic Form B). If the certificate is based on a Tier 2 or Tier 3 Evaluation, the data, working papers, calculations and reports from the evaluation must be made available to the Government.

5. The offer includes a commitment to retrofit the Building to satisfy all of the Basic Safety Objective requirements of ASCE/SEI 41

(Seismic Form C, Part 1). If the Offeror proposes to retrofit the Building, the offer must include a Tier 1 report with all supporting documents, a narrative explaining the process and scope of retrofit and a schedule for the seismic retrofit. The Offeror shall provide a construction schedule, concept design for the seismic upgrade and supporting documents for the retrofit, including structural calculations, drawings, specifications, and geotechnical report to the Government for review and approval prior to award. The documentation must demonstrate the seismic retrofit will meet the seismic standards and be completed within the time frame required.

6. The offer includes a pre-award commitment to construct a new Building, using local building codes (Seismic Form C, Part 2).

C. The LCO may allow an Offeror to submit a Seismic Certificate after the deadline for final proposal revisions. However, the LCO is not obligated to delay award in order to enable an Offeror to submit a Seismic Certificate.

D. Definitions. For the purpose of this paragraph:

1. “ASCE/SEI 31” means the American Society of Civil Engineers standard, Seismic Evaluation of Existing Buildings. You can purchase ASCE/SEI from ASCE at (800) 548-2723 or by visiting HTTP://WWW.ASCE.ORG/PUBLICATIONS/.

2. “ASCE/SEI 41” means American Society of Civil Engineers standard, Seismic Rehabilitation of Existing Buildings. You can purchase

ASCE/SEI from ASCE at (800) 548-2723 or by visiting HTTP://WWW.ASCE.ORG/PUBLICATIONS/.

http://www.asce.org/publications/ http://www.asce.org/publications/

RLP NO. 0IL2403, PAGE 6 GSA TEMPLATE R100A (4/25)

3. “Benchmark Building” means a building that was designed and built, or retrofitted, in accordance with the seismic provisions of the applicable codes specified in Section 1.3.1 of RP 8.

4. “Engineer” means a professional engineer who is licensed in Civil or Structural Engineering and qualified in the structural design of buildings. They must be licensed in the state where the property is located.

5. “RP 8” means “Standards of Seismic Safety for Existing Federally Owned and Leased Buildings ICSSC Recommended Practice 8

(RP 8),” issued by the Interagency Committee on Seismic Safety in Construction as ICSSC RP 8 and the National Institute of Standards and Technology as NIST GCR 11-917-12. RP 8 can be obtained from HTTPS://WWW.NIST.GOV/PUBLICATIONS/.

6. “Seismic Certificate” means a certificate executed and stamped by an Engineer on the appropriate Certificate of Seismic

Compliance form included with this RLP together with any required attachments.

1. “Seismic Standards” means the requirements of RP 8 Section 2.2 for Life Safety Performance Level in ASCE/SEI 31 or the Basic

Safety Objective in ASCE/SEI 41, unless otherwise specified.

2. “Tier 1 Evaluation” means an evaluation by an Engineer in accordance with Chapters 2.0 and 3.0 of ASCE/SEI 31. A Tier 1

Evaluation must include the appropriate Structural, Nonstructural and Geologic Site Hazards and Foundation Checklists.

3. “Tier 2 Evaluation” means an evaluation by an Engineer in accordance with Chapter 4.0 of ASCE/SEI 31.

4. “Tier 3 Evaluation” means an evaluation by an Engineer in accordance with Chapter 5.0 of ASCE/SEI 31.

2.05 ENERGY INDEPENDENCE AND SECURITY ACT (MAY 2025)

A. The Energy Independence and Security Act (EISA) establishes requirements for Government leases relating to energy efficiency standards and potential cost-effective energy efficiency and conservation improvements.

B. Subject to the exceptions below, unless one of the statutory exceptions listed in sub-paragraph C below applies, GSA may award a lease for a Building only if the Building has earned the ENERGY STAR® label conferred by the U.S. Environmental Protection Agency (EPA) within the most recent year prior to the due date for final proposal revisions. The term “most recent year” means that the date of award of the ENERGY STAR® label by EPA must not be more than 1 year prior to the due date of final proposal revisions. For example, an ENERGY STAR® label awarded by EPA on October 1, 2023, is valid for all lease procurements where final proposal revisions are due on or before September 30, 2024. Notwithstanding the above, buildings that meet any of the following are considered as equivalent to having an Energy Star label in the most recent year, provided they achieve an ENERGY STAR® label within 18 months after occupancy by the Government:

1. All new Buildings being specifically constructed for the Government, provided they achieve an ENERGY STAR® label within 18 months after occupancy by the Government, and received the “Designed to Earn the Energy Star®” certification prior to construction;

2. All existing Buildings that have had an Energy Star® label but are unable to obtain a label in the most recent year (i.e., within 12 months prior to the due date for final proposal revisions) because of insufficient occupancy;

3. Newly built Buildings that have used Energy® Star’s Target Finder tool and either achieved a “Designed to Earn the Energy Star®” certification or received an unofficial score (in strict adherence to Target Finder’s usage instructions, including the use of required energy modeling) of 75 or higher prior to the due date for final proposal revisions and who are unable to obtain a label in the most recent year because of insufficient occupancy; or

4. An existing Building that is unable to obtain a label because of insufficient occupancy but that can produce an indication, through the use of energy modeling or past utility and occupancy data input into Energy Star’s® Portfolio Manager tool or Target Finder, that it can receive an unofficial score of 75 or higher using all other requirements of Target Finder or Portfolio Manager, except for actual data from the most recent year.

C. Subject to subparagraph D below, EISA allows a Federal agency to lease Space in a Building that does not have an ENERGY STAR®

Label if:

1. No Space is offered in a Building with an ENERGY STAR® Label that meets RLP requirements, including locational needs;

2. The agency will remain in a Building it currently occupies;

3. The Lease will be in a Building of historical, architectural, or cultural significance listed or eligible to be listed on the National Register of Historic Places; or

4. The Lease is for 10,000 RSF or less.

D. If one or more of the statutory exceptions applies, and the offered Space is not in a Building that has earned the ENERGY STAR® Label within one year prior to the due date for final proposal revisions, Offerors are required to include in their lease proposal an agreement to renovate the Building for all energy efficiency and conservation improvements that it has determined would be cost effective over the Firm https://www.nist.gov/publications/standards-seismic-safety-existing-federally-owned-and-leased-buildings-icssc

RLP NO. 0IL2403, PAGE 7 GSA TEMPLATE R100A (4/25)

Term of the Lease, if any, prior to acceptance of the Space (or not later than one year after the Lease Award Date of a succeeding or superseding lease). Such improvements may consist of, but are not limited to, the following:

1. Heating, Ventilating, and Air Conditioning (HVAC) upgrades, including boilers, chillers, and Building Automation System

(BAS)/Monitoring/Control System (EMCS).

2. Lighting Improvements.

3. Building Envelope Modifications.

E. The term "cost effective" means an improvement that will result in substantial operational cost savings to the landlord by reducing electricity or fossil fuel consumption, water, or other utility costs. The term "operational cost savings" means a reduction in operational costs to the landlord through the application of Building improvements that achieve cost savings over the Firm Term of the Lease sufficient to pay the incremental additional costs of making the Building improvements.

F. Instructions for obtaining an ENERGY STAR® Label are provided at HTTP://WWW.ENERGYSTAR.GOV/BUILDINGS/FACILITY-

OWNERS-AND-MANAGERS/EXISTING-BUILDINGS/ (use “Portfolio Manager” to apply). The ENERGY STAR® Building Upgrade Manual HTTPS://WWW.ENERGYSTAR.GOV/BUILDINGS/TOOLS-AND-RESOURCES/) and Building Upgrade Value Calculator (HTTP://WWW.ENERGYSTAR.GOV/BUILDINGS/TOOLS-AND-RESOURCES/) are tools which can be useful in considering energy efficiency and conservation improvements to Buildings.

G. If one or more of the statutory exceptions applies, and the offered Space is not in a Building that has earned the ENERGY STAR® Label within one year prior to the due date for final proposal revisions, the successful Offeror will be excused from performing any agreed-to energy efficiency and conservation renovations, and benchmarking with public disclosure (as provided in (I) below, if it obtains the ENERGY STAR® Label prior to the Government’s acceptance of the Space (or not later than one year after the Lease Award Date for succeeding and superseding leases).

H. If no improvements are proposed, the Offeror must demonstrate to the Government using the ENERGY STAR® Online Tools why no energy efficiency and conservation improvements are cost effective. If such explanation is unreasonable, the offer may be rejected.

I. As described in Section 3 of the Lease, successful Offerors meeting one of the statutory exceptions above must agree to benchmark and publicly disclose the Building’s current ENERGY STAR® score, using EPA’s Portfolio Manager online software application. See the Lease for additional details.

J. All new Buildings being specifically constructed for the Government must achieve the ENERGY STAR® Label within 18 months after occupancy by the Government.

K. INTENTIONALLY DELETED

2.06 DUE DILIGENCE AND NATIONAL ENVIRONMENTAL POLICY ACT REQUIREMENTS - RLP (OCT 2023) INTENTIONALLY DELETED

2.07 NATIONAL HISTORIC PRESERVATION ACT REQUIREMENTS - RLP (SMALL) (OCT 2023) INTENTIONALLY DELETED http://www.energystar.gov/buildings/facility-owners-and-managers/existing-buildings/earn-recognition/energy-star-certification http://www.energystar.gov/buildings/facility-owners-and-managers/existing-buildings/earn-recognition/energy-star-certification https://www.energystar.gov/buildings/tools-and-resources/building-upgrade-manual http://www.energystar.gov/buildings/tools-and-resources/building-upgrade-value-calculator

RLP NO. 0IL2403, PAGE 8 GSA TEMPLATE R100A (4/25)

SECTION 3 HOW TO OFFER

3.01 GENERAL INSTRUCTIONS (SLAT) (OCT 2020)

Offeror shall prepare a complete offer, using the forms provided with this RLP, and submit the completed lease proposal package to the Government as indicated below. The Government will evaluate the offers received as outlined below and further described in this section.

Step 1: Offer Submittal Offeror shall submit an offer using the instructions in paragraph 3.02 Receipt of Lease Proposals (SLAT) and 3.03 Step 1: Offer Submittal (SLAT).

The LCO will evaluate the offers that are received by the due date identified for submission of offers in this RLP. The LCO may elect to proceed based on initial offers or to conduct negotiations in accordance with paragraph 4.01 Negotiations (SLAT). The Offeror whose offer is identified as the apparent lowest priced offer and is otherwise responsive to the terms identified in the solicitation will proceed to step 2. Proceeding to step 2 does not constitute award of a contract.

Step 2: Due Diligence The Offeror with the apparent lowest priced offer shall be notified by the LCO and requested to submit the information requested in paragraph 3.04 Step 2: Due Diligence - Additional Submittals (SLAT), in addition to signing the Lease form which will be completed with the details of the Offeror’s price submittal. No further discussions will occur between the Government and the apparent lowest priced offeror regarding the Additional Submittals.

Should the Offeror submitting the apparent lowest priced offer fail to complete any of the requirements of the solicitation or, upon further review be found to not meet the requirements of the solicitation during any part of the evaluation process, the LCO will consider other offers received in response to the solicitation.

Building Tour As part of the Government’s due diligence review of the offer, the LCO may notify the Offeror of the date and time for the Government to physically tour the building.

Award Upon completion of the Government’s review of the apparent lowest priced offer’s Due Diligence – Additional Submittals and a determination that the offer meets the requirements of the solicitation, the LCO will counter-sign the Lease document and furnish notification of execution to the Offeror. This execution and notification by the LCO shall constitute award of a contract.

3.02 RECEIPT OF LEASE PROPOSALS (SLAT) (OCT 2024)

Online method - Submission through the Requirement Specific Acquisition Platform (RSAP):

A. Unless otherwise authorized by the LCO or his/her designated representative, offers may only be submitted electronically to GSA using the Requirement Specific Acquisition Platform (RSAP) located at https://leasing.gsa.gov. RSAP enables Offerors to electronically offer space for lease to the Federal Government. The offer submission process is web-enabled, allowing all registered participants to submit and update offers to lease space to the Government in response to a single RLP for a specific space requirement.

B. In order to be considered for award, offers conforming to the requirements of the RLP shall be submitted through LOP/RSAP no later than

July 6, 2026, 5:00 PM EST.

C. Offerors must submit all documentation identified in this RLP using RSAP. RSAP generates the Lessor's Annual Cost Statement (GSA

Form 1217) and Proposal to Lease Space (GSA Form 1364) based on the Offeror’s inputs to the online workflow. These auto-populated forms are available for review on the attachments page of the RSAP workflow and are automatically included as part of the offer upon submission; there is no need for the Offeror to manually complete the attached blank version of these two forms. Offerors can revise the auto-generated GSA Form 1217 and/or GSA Form 1364 by changing the inputs to the online workflow. Any subsequent revisions to offer documents must be submitted through RSAP. There is no paper-based submission process under this RLP and paper submissions will not be considered, unless otherwise authorized by the LCO.

3.03 STEP 1: OFFER SUBMITTAL (SLAT) (OCT 2023)

Offeror shall provide the following information:

A. Price Offer

1. GSA Form 1217, Lessor’s Annual Cost Statement. Complete all sections of the 1217.

2. GSA Form 1364, Proposal to Lease Space. Complete all sections of the 1364, including, but not limited to:

a. A fully serviced Lease rate (gross rate) per ABOA and RSF, clearly itemizing the total Building shell rental, TI rate, Building Specific Amortized Capital (BSAC) rate, operating costs, and parking (itemizing all costs of parking above base local code requirements or otherwise already included in shell rent).

https://leasing.gsa.gov/

RLP NO. 0IL2403, PAGE 9 GSA TEMPLATE R100A (4/25)

b. Improvements. All improvements in the base Building, lobbies, common areas, and core areas shall be provided by the

Lessor, at the Lessor’s expense. This Building shell rental rate shall also include, but is not limited to, property financing (exclusive of TIs and BSAC), insurance, taxes, management, profit, etc., for the Building. The Building shell rental rate shall also include all basic Building systems and common area buildout, including base Building lobbies, common areas, core areas, etc., exclusive of the ABOA Space offered as required in this RLP.

c. The annual cost per ABOA and rentable square foot (RSF) for the cost of services and utilities for ABOA and RSF, respectively. This equals line 27 of GSA Form 1217, Lessor’s Annual Cost Statement, divided by the Building size (shown on the top of both GSA Form 1364, Proposal to Lease Space, and Form 1217) for ABOA and RSF, respectively.

d. The annual rent to amortize the Tenant Improvements. Such amortization shall be expressed as a cost per ABOA and RSF per year. This shall be all alterations for the Space above the Building shell and BSAC build-out. Such alterations shall be described and identified in the drawings used to construct the Space. If the Offeror chooses to amortize the TI for a period exceeding the Firm Term of the Lease, the Offeror shall indicate the extended time in the offer. If the Government terminates the Lease after the Firm Term or does not otherwise renew or extend the term beyond the Firm Term, the Government shall not be liable for any unamortized TI costs resulting from an extended amortization period.

e. The annual rent to amortize the Building Specific Amortized Capital (BSAC) costs, if any. Such amortization shall be expressed as a rate per ABOA and RSF per year. Refer to the security requirements attached to the Lease.

f. A shell rate per ABOA and RSF for that portion of the lease term extending beyond the Firm Term. The rate proposed for this portion of the term shall not reflect any TIs or BSAC as they will have been fully amortized over the Firm Term.

g. An hourly overtime rate for overtime use of heating and cooling, and, if applicable, Adjustment for Reduced Services. NOTE:

Refer to the Lease document for additional guidance.

h. Adjustment for Vacant Leased Premises. NOTE: Refer to the Lease document for additional guidance.

i. Lessor’s Fees to complete Tenant Improvements and Building Specific Amortized Capital (BSAC). Provide a listing of proposed (i) Lessor’s Project Management fee and (ii) Lessor’s A/E design costs to prepare construction documents, to complete the Tenant Improvements and BSAC, if applicable. State the basis for determining each component, (e.g., flat fee, cost per ABOA SF, etc.). State any assumptions used to compute the dollar costs for each fee component.

j. Rent concessions being offered. Indicate either on the GSA Form 1364 Proposal to Lease Space or in separate correspondence.

k. Compensation (expressed as %) to Offeror’s broker and/or representative arising from an agreement between the Offeror and the Offeror’s representative, agent(s), broker(s), property manager, developer, employee, or any other agent or representative in connection with the Lease contemplated herein shall be entered in block 26.b., and if GSA is using a Tenant Representative Broker, compensation (expressed as %) to GSA’s Broker reflecting the agreement between Offeror and GSA’s Broker, shall be entered in block 26.a.

l. If the Offeror requests any deviations, all deviations must be documented on Form 1364 in block labeled “Additional

Remarks or Conditions with Respect to this Offer.” If the Offeror requests any deviations, GSA at its sole discretion will make the decision whether to accept the deviation.

3. INTENTIONALLY DELETED

4. INTENTIONALLY DELETED

5. Any Brokerage Commission Agreement between GSA’s Tenant Representative and the Lessor for commissions identified in the

GSA Form 1217

B. Initial Documentation. As part of the Step 1 offer submission process, Offerors must submit the following:

1. Scaled floorplans of the offered Space(s)

2. A plan and short narrative as necessary to explain how the Offeror will meet the parking requirements.

3. Authorization from the ownership entity to submit an offer on the ownership entity’s behalf, if the offeror is not the owner of the

Property.

4. If the Offeror does not yet have a vested interest in the Property, but rather has a written agreement to acquire an interest, then the

Offeror shall submit a fully executed copy of the written agreement with its offer, together with a statement from the current owner that the agreement is in full force and effect and that the Offeror has performed all conditions precedent to closing, or other form of documentation satisfactory to the LCO prior to award. These submittals must remain current. The Offeror is required to submit updated documents as required.

5. Additional offeror attachments, such as the Acknowledgements of Multiple Representation (by broker or agent).

RLP NO. 0IL2403, PAGE 10 GSA TEMPLATE R100A (4/25)

6. Riders, Clarifications to Offer, Exceptions to Offer and other additions, deletions, or changes to the terms of the RLP may not be accepted by the Government and may cause the Offeror to be excluded from further consideration.

7. INTENTIONALLY DELETED

STEP 1: PRICE SUBMITTAL LIST OF DOCUMENTS

Proposal to Lease Space (GSA Form 1364)

Lessor’s Annual Cost Statement (GSA Form 1217)

Scaled Floorplan showing the offered Space

Parking Plan

Authorization to submit offer on behalf of ownership (if Offeror is not the owner)

Fully executed copy of contract to acquire an interest in the Property (if Offeror is not the owner)

Commission Agreement

3.04 STEP 2: DUE DILIGENCE - ADDITIONAL SUBMITTALS (SLAT) (OCT 2024)

If identified as the apparent lowest priced Offeror, the LCO will request the following items which shall be submitted in a timely manner as determined by the LCO:

A. Satisfactory evidence of at least a conditional commitment of funds in an amount necessary to prepare the Space, including Shell, TI, and

BSAC improvements. Such commitments shall be signed by an authorized bank officer, or other legally authorized financing official, and at a minimum shall state: amount of loan, term in years, annual percentage rate, and length of loan commitment. Alternatively, if the Offeror is self-financing, Offeror must demonstrate, to the satisfaction of the LCO, that it has adequate financial resources to self-finance the necessary improvements, e.g., income statements, cash flow statements, balance sheets, three (3) months of bank statements showing sufficient on hand stable cash reserves to fund the improvements, letter from the entity’s financial officer.

B. Evidence that the Property is zoned in compliance with local zoning laws, including evidence of variances, if any, approved by the proper local authority. If the current zoning is not in compliance, the Offeror must submit a plan and time schedule outlining how they will obtain all necessary zoning approvals prior to construction and how long the necessary zoning approvals will take.

C. Evidence of ownership or control of Building or site. If the Offeror owns the Property being offered or has a long- term leasehold interest, the deed or lease must be submitted to the LCO evidencing the Offeror's stated interest in the Property and any encumbrances on the Property.

D. Required Proof of Signing Authority: As a condition of lease award, the Government will require one of the following forms of proof of signing authority before the Government executes the Lease:

1. Corporation. Copy of Articles of Incorporation and bylaws. In addition, a copy of the resolution, signed by the necessary directors of the corporation authorizing the corporate officer who will sign the lease to bind the corporation to the Lease.

2. Partnership. Copy of Partnership Agreement, Statement of Partnership, or Statement of Limited Partnership and evidence of authority of signatory to bind the partnership if not expressly authorized by the Partnership Agreement.

3. Limited Liability Company. Copy of the Articles of Organization and Operating Agreement. Also, evidence of the authority of the signing manager (if company is manager owned) or member (if the company is member managed) to sign, if not expressly authorized by the Articles of Organization and/or Operating Agreement.

4. Joint Venture. Copy of Joint Venture Agreement and evidence of authority of signatory to bind the Joint Venture to the Lease.

E. If claiming an historic preference in accordance with the Historic Preference paragraph in RLP Section 2, Eligibility and Preferences for

Award, Offeror must submit one of the following as documentation that the Property is historic or the site of the offered Property is within a Historic District: a letter from the National Park Service stating that the Property is listed in the National Register of Historic Places (NRHP) or eligible for listing, with a date of the listing/decision; a letter from the State Historic Preservation Office stating that the Property is listed in the(NRHP, or on a statewide register, or eligible for inclusion, with a date of the listing/decision; or, the NRHP Identification Number and date of listing available from the NRHP Database found at WWW.NPS.GOV/NR.

F. If there is a potential for conflict of interest because of a single agent representing multiple owners, present evidence that the agent disclosed the multiple representation to each entity and has authorization from each ownership entity offering in response to this RLP package.

Owners and agents in conflicting interest situations are advised to exercise due diligence with regard to ethics, independent pricing, and Government procurement integrity requirements. In such cases, the Government reserves the right to communicate with the owner directly.

G. The Offeror must submit the Fire Protection and Life Safety (FPLS) Submittal Information in sub-paragraph 1, unless the Building meets either exemption in sub-paragraph 2 or 3 below.

1. FPLS Submittal Information.

file://///e04bmv-cifs01.ent.ds.gsa.gov/R13_PBSShare$/PR/PR%20-%20Shareall/Center%20for%20Lease%20Policy%20(PRBB)/FY%202023%20Updates%20to%20RLP-Lease%20Docs/1)%20Working%20Drafts/www.nps.gov/nr

RLP NO. 0IL2403, PAGE 11 GSA TEMPLATE R100A (4/25)

a. Completed GSA Form 12000, Prelease Fire Protection and Life Safety Evaluation for an Office Building (Part A or Part B, as applicable).

b. A copy of the previous year’s fire alarm system maintenance record showing compliance with the requirements in NFPA 72 (if a system is installed in the Building).

c. A copy of the previous year’s automatic fire sprinkler system maintenance record showing compliance with the requirements in NFPA 25 (if a system is installed in the Building).

d. A valid Building Certificate of Occupancy (C of O) issued by the local jurisdiction. If the Building C of O is not available or the local jurisdiction does not issue a Building C of O, a report prepared by a licensed fire protection engineer with their assessment of the Building regarding compliance with all applicable local Fire Protection and Life Safety-related codes and ordinances must be provided.

2. If the Space offered is 10,000 RSF or less in area and is located on the 1st floor of the Building, Offeror is not required to submit to GSA the FPLS Submittal Information listed in sub-paragraph 1 above.

3. If the Offeror provides a Building C of O obtained under any edition of the International Building Code (IBC), and the offered Space meets or will meet all the requirements of the Lease with regard to Means of Egress, Automatic Fire Sprinkler System, and Fire Alarm System prior to occupancy, then Offeror is not required to submit to GSA the FPLS Submittal Information in sub-paragraph 1 above.

H. INTENTIONALLY DELETED

I. The architectural plans for modernization if the offered Building is not a modern office Building.

J. A current asbestos management plan or operations and management plan, along with a current reinspection report (performed within the past 5 years), if the offered Building contains asbestos-containing materials.

K. Computer generated plans set to 1/8" = 1'-0" (preferred meeting sub-paragraphs a through e noted below:

1. All plans submitted for consideration shall include floor plan(s) for which Space is being offered and floor plan(s) of the floor(s) of exit discharge (e.g., street level(s)). Each plan submitted shall include the locations of all exit stairs, elevators, and the Space(s) being offered to the Government.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .