This is Addendum No. 1, issued July 13, 2026, for State University of New York at Oneonta's project 091072.06, Schumacher Hall Temp Chiller Tie In, located at 108 Ravine Parkway, Oneonta, New York. The addendum modifies bidding documents by replacing blurred proposal form pages and revising drawing E101 (Partial IRC Ground Floor Plan). Bidders must acknowledge receipt of this addendum in their bid proposals. The project involves installation and tie-in of temporary chilling equipment, with all work required to be completed by April 15, 2027. Sealed bids are due August 18, 2026 at 2:00 p.m., with a mandatory project walkthrough scheduled for August 5, 2026 at 10:00 a.m. at the construction trailer located at 322 West Street, Oneonta. The last date for submitting questions or requests for clarification is August 7, 2026 at 5:00 p.m.

The revised proposal form (Form 7554-07) requires bidders to submit a base bid, any allowances, total bid amount, and proposed alternates or unit prices. Bidders must provide bid security equal to not less than 5 percent of the total bid and complete three similar construction projects as references. Liquidated damages are assessed based on contract amount, ranging from $100 per day for contracts under $100,000 to $700 per day for contracts between $3.5 million and $5 million. Contract documents are available electronically from LaBella PC for a nonrefundable $49.00 deposit, though deposits are waived for certified Minority and Women Owned Businesses and Service Disabled Veteran Owned Businesses. The electrical scope includes providing a complete new feeder installation from the existing main distribution panel to the new chiller, including bus tap connection, fused disconnects, conduit, conductors, grounding, and testing. Bidders must comply with New York State Finance Law sections 139-j and 139-k regarding procurement communications restrictions.

View the file

Other files

File Type Posted
091072.06 Notice to Bidders.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ADDENDUM NO. 1 Date of Addendum: July 13, 2026

Project: SUNY Oneonta

Schumacher Chiller

108 Ravine Parkway

Oneonta, NY 13820

LaBella Project Number: 2262678

Owner: SUNY Oneonta

108 Ravine Parkway

Oneonta, NY 13820

THIS ADDENDUM IS ISSUED PRIOR TO THE EXECUTION OF THE CONTRACT AND IS

INTENDED TO MODIFY AND/OR INTERPRET THE BIDDING DOCUMENTS BY ADDITION,

DELETION, CLARIFICATIONS, AND/OR CORRECTIONS. CONTRACTOR SHALL

ACKNOWLEDGE IN THE BID PROPOSAL, RECEIPT OF THIS ADDENDUM.

GENERAL:

1.1 See attached proposal form pages. These are to replace the pages in the contract book that were blurred out.

DRAWINGS:

1.1 E101 – PARTIAL IRC GROUND FLOOR PLAN

a. REPLACE WITH ATTACHED.

Attachments:

1. 7554-07 Contractor Proposal

2. E101 – PARTIAL IRC GROUND FLOOR PLAN

END ADDENDUM NO. 1

Form 7554-07

Page 1 of 7 SUNY Procedure 7554

Rev. December 2024

NAME OF BIDDER

ADDRESS OF BIDDER

EMAIL ADDRESS OF BIDDER

PROPOSAL FOR

Project Number: ________091072.06__________________ Date: ___________ Project Name:__________Schumacher Hall Temp Chiller Tie In_________________________________________

TO THE STATE UNIVERSITY OF NEW YORK:

1. The Work Proposed Herein Will Be Completed Within the timeframe stated on page one of the Agreement.

In the event the bidder fails to complete such work by said date or dates, or within the time to which such completion may have been extended in accordance with the Contract Documents, the bidder agrees to pay the University liquidated damages in an amount equal to the values indicate in the Liquidated Damages Schedule below for each calendar day of delay in completing the work.

LIQUIDATED DAMAGES SCHEDULE

Contract Amount Liquidated Damages

Under $100,000...........................................................................................................................................................................................$100/day

$100,000-$499,999 .......................................................................................................................................................................................$200/day

$500,000-$999,999 .......................................................................................................................................................................................$300/day

$1MM-$1,999,999 ........................................................................................................................................................................................$400/day

$2MM-$3,499,999 ........................................................................................................................................................................................$500/day

$3.5MM-$5MM ...........................................................................................................................................................................................$700/day

Over $5MM (to be determined by the University in each instance) $_____/day

2. The bidder hereby declares that it has carefully examined all Bidding and Contract Documents and that it has personally inspected the actual location of the work, together with the local sources of supply, has satisfied itself as to all the quantities and conditions, and understands that in signing this Proposal, it waives all right to plead any misunderstanding regarding the same.

3. The bidder further understands and agrees that it is to do, perform and complete all work in accordance with the

Contract Documents and to accept in full compensation therefore the amount of the Total Bid, modified by such additive or deductive alternates, if any, as are accepted by the University.

4. The bidder further agrees to accept the unit prices, if any, set forth in paragraph (5) of this proposal, except as the same may be modified pursuant to the provisions of Section (5) of the Information to Bidders, as full payment for the amount of the credit to the University for any deletions, additions, modifications or changes to the portion or portions of work covered by said unit prices.

Page 2 of 7 SUNY Procedure 7554

5. BID CALCULATION

a. BASE BID (does not include allowances)

(in numbers)

(in words)

b. ALLOWANCES: In accordance with the Schedule II and Section 4.05 of Agreement, the bidder further agrees to the following additions to the Base Bid:

Work or Materials Description

Amount in Words Amount in Figures

None

c. TOTAL BID (base bid + allowances = total bid)

$_________________________________________________(in numbers)

$_________________________________________________ (in words)

d. ALTERNATES: In accordance with Section B of the General Requirements the bidder proposes the following additions to or deductions from the Total Bid for the alternates listed below:

Alternate Number

Add/Deduct

Amount in Words

Amount in Figures

Page 3 of 7 SUNY Procedure 7554

e. UNIT PRICES: In accordance with Section (5) paragraph (2) of the Information to Bidders and Section 4.04 of the Agreement the bidder or the University may insert unit prices for the work or materials listed below for clarification.

Work or Materials Description

Amount in Words Amount in Figures

6. By submission of this bid, each bidder and each person signing on behalf of any bidder certifies, and in the case of a joint bid, each party thereto certifies as to its own organization, under penalty of perjury, that to the best of its knowledge and belief: (a) the prices in this bid have been arrived at independently without collusion, consultation, communication, or agreement, for the purpose of restricting competition, as to any matter relating to such prices with any other bidder or with any competitor; (b) unless otherwise required by law, the prices have been quoted in this bid have not been knowingly disclosed by the bidder and will not knowingly be disclosed by the bidder prior to opening, directly or indirectly, to any other bidder or to any competitor; and (c) no attempt has been made or will be made by the bidder to induce any person, partnership or corporation to submit or not to submit a bid for the purpose of restricting competition.

A bid shall not be considered for award nor shall any award be made where (a), (b) and (c) above have not been complied with; provided, however, that if in any case the bidder cannot make the foregoing certification the bidder shall so state and shall furnish with the bid a signed statement which sets forth in detail the reasons therefor. Where (a), (b), and (c) above shall have not been complied with, the bid shall not be considered for award nor shall any award be made unless the Campus President, or designee, or Vice Chancellor for Capital Facilities, or designee, determines that such disclosure was not made for purposes of restricting competition.

The fact that a bidder (a) has published price lists, rates, or tariffs covering items being procured, (b) has informed prospective customers of proposed or pending publication of new or revised price lists for such items, or (c) has sold the same items to other customers at the same prices being bid, does not constitute, without more, a disclosure within the meaning of this Section.

7. The bidder agrees that if awarded the Contract, it will commence work within (10) calendar days after date of receipt of a fully executed Agreement and that it will fully complete the work by the date stated herein.

8. The bidder acknowledges the receipt of the following addenda, but agrees that it is bound by all addenda whether or not listed herein.

Addendum Number Date Addendum Number Date

Page 4 of 7 SUNY Procedure 7554

9. The bidder submits herewith bid security in an amount not less than five (5) percent of the Total Bid. In the event that (a) the bidder's Total Bid is the lowest one submitted and the bidder does not timely provide the Post-Bid Information required by the Information for Bidders or (b) this Proposal is accepted by the University and the bidder shall refuse or neglect, within ten (10) calendar days after date of receipt of Agreement, to execute and deliver said Agreement in the form provided herein, or to execute and deliver a Performance Bond and a Labor and Material Bond in the amounts required and in the form prescribed, the bidder shall be liable to the University, as liquidated damages, for the amount of the bid security or the difference between the Total Bid of the bidder and the Total Bid of the bidder submitting the next lowest bid, whichever sum shall be higher, otherwise the total amount of the bid security will be returned to the bidder in accordance with the provisions set forth in the Information for Bidders. The University may apply the bid security in full or partial payments, as the case may be, of said liquidated damages and in the event the bid security is less than the amount of liquidated damages to which the University is entitled, the bidder shall pay the difference, upon demand, to the University.

10. The bidder certifies that all wood products that are to be used in the performance of this Contract shall be in accordance with the Specifications and provisions of Section 167 b. of the State Finance Law which Section prohibits the purchase and use of tropical hardwoods.

11. The bidder affirms that it understands and agrees to comply with the procedures of the Fund relative to permissible contacts as required by Sections 139-j(3) and 139-j-(6)(b) of the State Finance Law.

12. The bidder certifies that all information provided or to be provided to the University in connection with this procurement is, as required by Section 139-k of the State Finance Law, complete, true and accurate.

Dated _____/_____/_____

Firm's Federal ID Number or Social Security Number as applicable _________________________________________

Legal name of person, partnership, joint venture or corporation:

By__________________________________________________________________________ (signature)

Title________________________________________________________________________

Page 5 of 7 SUNY Procedure 7554

ACKNOWLEDGMENT FOR THE PROPOSAL

THE LEGAL ADDRESS OF THE BIDDER

Telephone No.____________________________________ Facsimile No.____________________________________________

If a Corporation

Name Address

_____________________________________________________PRESIDENT _________________________________________

_____________________________________________________SECRETARY ________________________________________

_____________________________________________________TREASURER ________________________________________

If a Partnership

Name of Partners Address

If a Joint Venture

Name of Members Address

If an Individual

Name of Individual Address

Attachment A – List of Completed Similar Construction Projects

Page 6 of 7 SUNY Procedure 7554

Bidder Name: Project No.:

Bidders must provide three (3) example projects completed in the past five (5) years in which the Bidder served as the prime contractor. Example projects must be of similar size, scope and complexity to the project currently being bid, as further described in the Description of Work. Each project must include the Owner/Agency, Award Date, Contract Amount, Date Completed, Contact Person, Telephone number of the contact, Architect and/or Engineer’s Name, Contract Number, Contact Email, and the Project Title and a brief scope description. Reference contacts may be used to verify project size, scope, dollar value, percentages and quality of performance.

1.

Agency/Owner

Award Date

Contract Amount

Date Completed

Agency/Owner Contact Person

Telephone No.

Designer Architect and /or Design Engineer

Contract No.

Contact Email

Project Title & Scope

2.

3.

Completed By:

Phone Number:

Email:

Date:

Attachment A – List of Completed Similar Construction Projects

Page 7 of 7 SUNY Procedure 7554

TRANSFORMER

ROOM

B-22

MECHANICAL

ROOM

B-23

TUNNEL STAIR

B-23

CORRIDOR

B-24

Room

225kVA

TRANSFORMER

(FURNISHED BY

OWNER AND

INSTALLED BY

ELECTRICAL

CONTRACTOR)

1000A MDP

(ETR)

400A DISCONNECT

400A FUSES

NEMA 3R

CONCRETE PAD

PROVIDED BY OWNER

600A DISCONNECT

600A FUSES

NEMA 3R

CHILLER FURNISHED AND

SET IN PLACE BY OWNER

(3) 600KCMIL, (1) #3EG, IN 4"C

TWO SETS OF (3) 350KCMIL, (1) #1EG, IN

2-1/2"C

(3) 600KCMIL, (1) #3EG, IN 4"C

WP

CIRCUIT TO NEAREST

CONVENIENCE

RECEPTACLE CIRCUIT

IN ROOM B-23 USING

(2)#12AWG, (1)#12EG

IN 3/4"C CH-1

NOT TO SCALEE101

1 PARTIAL IRC GROUND FLOOR PLAN - ELECTRICAL

GENERAL DRAWING NOTES:

1. ELECTRICAL CONTRACTOR SHALL PROVIDE A COMPLETE NEW FEEDER INSTALLATION

FROM THE EXISTING MDP TO THE NEW CHILLER, INCLUDING BUS TAP CONNECTION, FUSED

DISCONNECTS, CONDUIT, CONDUCTORS, GROUNDING, SUPPORTS, FITTINGS, LABELING,

PENETRATIONS, SEALING, TESTING, AND FINAL CONNECTIONS.

2. NEW CHILLER FEEDER SHALL ORIGINATE FROM A NEW BUS TAP CONNECTION AT THE

EXISTING MDP BUS WITHIN ROOM B-22. BUS TAP SHALL BE MADE USING

LISTED/MANUFACTURER-APPROVED TAP LUGS OR TAP KIT COMPATIBLE WITH THE

EXISTING MDP.

3. PROVIDE NEW FUSED DISCONNECT SWITCH ON WALL IN MAIN ELECTRIC ROOM AT

LOCATION SHOWN ON PLAN. DISCONNECT SHALL SERVE NEW CHILLER ONLY. VERIFY

EXACT LOCATION IN FIELD TO MEET ALL NEC REQUIRED CLEARANCES PRIOR TO

INSTALLATION.

4. ROUTE NEW LINE-SIDE FEEDER FROM NEW MDP BUS TAP TO LINE SIDE OF NEW FUSED

DISCONNECT. ROUTE NEW LOAD-SIDE FEEDER FROM LOAD SIDE OF FUSED DISCONNECT

TO TRANSFORMER. THEN FROM TRANSFORMER TO SECONDARY DISCONNECT, AND FROM

SECONDARY DISCONNECT TO CHILLER.

5. CONTRACTOR SHALL FIELD VERIFY EXACT CONDUIT ROUTING AND COORDINATE WITH

EXISTING EQUIPMENT, STRUCTURE, CEILINGS, PIPING, DUCTWORK, FIRE-RATED

ASSEMBLIES, AND OTHER TRADES PRIOR TO INSTALLATION.

6. PROVIDE WEATHERPROOF RACEWAY, FITTINGS, SEALS, AND TRANSITIONS WHERE

CONDUIT EXITS THE BUILDING OR IS EXPOSED TO EXTERIOR CONDITIONS. FINAL

CONNECTION TO CHILLER SHALL BE MADE IN ACCORDANCE WITH CHILLER MANUFACTURER

REQUIREMENTS.

7. PROVIDE FIRESTOPPING AT ALL PENETRATIONS THROUGH RATED WALLS, FLOORS, OR

CEILINGS. SEAL ALL EXTERIOR WALL PENETRATIONS WEATHER-TIGHT.

8. INTERIOR CONDUITS SHALL BE EMT. EXTERIOR CONDUITS SHALL BE RGS. UTILIZE LFMC

FOR CONNECTION TO TRANSFORMER AND CHILLER.

WP

labellapc.com

300 State Street, Suite 201

Rochester, NY 14614

585-454-6110

DRAWING NAME:

DRAWING NUMBER:

DATE:

ISSUED FOR:

DRAWN BY:

REVIEWED BY:

PROJECT NUMBER:

It is a violation of New York Education Law Art. 145 Sec. 7209 & Art. 147 Sec. 7307, for any person, unless acting under the direction of a licensed architect, professional engineer, or land surveyor, to alter an item in any way. If an item bearing the seal of an architect, engineer, or land surveyor is altered; the altering architect, engineer, or land surveyor shall affix to the item their seal and notation "altered by" followed by their signature and date of such alteration, and a specific description of the alteration.

CERTIFICATE OF AUTHORIZATION NUMBER:

PROFESSIONAL ENGINEERING: 0021272

LAND SURVEYING: 0021271

GEOLOGICAL: 0021659

SUNY ONEONTA PROJECT NUMBER: 091072.06

/1

/2

:0 :3

A

M

E101

PARTIAL IRC GROUND

FLOOR PLAN

CEJ

RAM

JUNE 2026

CONSTRUCTION DOCUMENTS

2262678

108 RAVINE PARKWAY

ONEONTA, NY 13820

SCHUMACHER HALL - TEMP

CHILLER TIE-IN

SUNY ONEONTA

108 RAVINE PARKWAY

ONEONTA, NY 13820

© 2026 LaBella Associates

Revisions

NO: DATE: DESCRIPTION:

1 8/13/2026 ADDENDUM #1

NOT TO SCALEE101

2 OWNER PROVIDED TRANSFORMER PAD DETAIL