09 RMG Runway Extension P_L Plans.pdf
PDF 33 MB Posted
- Attached to
- RICHARD B. RUSSELL REGIONAL AIRPORT¿ RUNWAY 1/19 AND PARTIAL PARALLEL TAXIWAY EXTENSION ¿¿ PAVIN
- Solicitation number
- PE-65700-NONST-2023-000000007
- Issued by
- Fayette County, Georgia
About this file
This document appears to be construction plans related to a Runway Extension project. The project is being managed by the Regional Metropolitan Government (RMG). The plans detail the proposed runway extension and related site improvements. This appears to be a bid opportunity for contractors to provide construction services for this runway extension project. The plans do not include information about response dates, bidder's meetings, award dates, or contract term.
The plans provide detailed technical specifications and drawings for the construction of the runway extension and associated site work. The project appears to have a significant scope, including earthwork, paving, drainage, lighting, and other civil infrastructure components. No information is provided about pricing terms, funding sources, or other commercial details related to this contract opportunity.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| BID _23_043 RUNWAY 1_19 AND PARALLEL TAXIWAY .pdf | ||
| ADDENDUM _1 Clarification of Scope of Work.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
THE LOCATION, SIZE AND TYPE OF MATERIAL OF EXISTING UNDERGROUND
UTILITIES INDICATED ON THE PLANS IS NOT REPRESENTED AS BEING
ACCURATE, SUFFICIENT OR COMPLETE. IT SHALL BE THE CONTRACTOR'S
RESPONSIBILITY TO DETERMINE THE ACTUAL LOCATION OF ALL SUCH
FACILITIES, INCLUDING SERVICE CONNECTIONS TO UNDERGROUND
UTILITIES. PRIOR TO CONSTRUCTION, THE CONTRACTOR SHALL NOTIFY
THE UTILITY COMPANIES OF HIS OPERATIONAL PLANS AND SHALL OBTAIN
FROM THE RESPECTIVE UTILITY COMPANIES DETAILED INFORMATION AND
ASSISTANCE RELATIVE TO THE LOCATION OF THEIR FACILITIES AND THE
WORKING SCHEDULE OF THE COMPANIES FOR REMOVAL OR ADJUSTMENT
WHERE REQUIRED. IN THE EVENT AN UNEXPECTED UTILITY INTERFERENCE
IS ENCOUNTERED DURING CONSTRUCTION, THE CONTRACTOR SHALL
IMMEDIATELY NOTIFY THE UTILITY COMPANY OF JURISDICTION. THE
ENGINEER SHALL ALSO BE IMMEDIATELY NOTIFIED. ANY SUCH MAINS AND
SERVICES SHALL BE RESTORED TO SERVICE AT ONCE AND PAID FOR BY
THE CONTRACTOR AT NO ADDITIONAL COST TO THE CONTRACT.
COMMON GROUND ALLIANCE
www.call811.com or Phone: 811
CALL 911 IN THE EVENT IN WHICH DAMAGE
RESULTS IN THE RELEASE OF NATURAL GAS.
RUNWAY 1/19 AND PARALLEL TAXIWAY EXTENSION
PAVING, LIGHTING, AND MARKING PACKAGE
ISSUED FOR BID SET
CMT JOB NUMBER:
SUBMITTED BY
DATE
CONSTRUCTION PLANS FOR
GEOMETRIC CRITERIA
DESIGN INFORMATION
AIRCRAFT APPROACH CATEGORY (AAC): C
AIRPLANE DESIGN GROUP (ADG): II
TAXIWAY DESIGN GROUP (TDG): II
TAXIWAY SAFETY AREA (TSA): 79'
TAXIWAY OBJECT FREE AREA (TOFA): 131'
RUNWAY SAFETY AREA WIDTH (RSA):
RUNWAY 1 -19: 500'
RUNWAY 7 - 25: 150'
RUNWAY OBJECT FREE AREA WIDTH (ROFA):
RUNWAY 1 - 19: 800'
RUNWAY 7 - 25: 500'
ATLANTA, GA CHICAGO, IL
COLUMBUS, OH EDWARDSVILLE, IL
INDIANAPOLIS, IN
NASHVILLE, TN ROCKFORD, IL
SPRINGFIELD, IL
ST. LOUIS, MO
SPRINGFIELD, MO
KANSAS CITY, MO
RICHARD B. RUSSELL REGIONAL AIRPORT
ROME, GEORGIA
O ld
D al to n
R d
N E
ROME, GEORGIA
FLOYD COUNTY
AURORA, IL
PEORIA, IL
TOTAL SHEETS: 40
20080302
PROJECT PERIMETER
SHEET LIST TABLE
SHEET NUMBER SHEET TITLE
G-000 COVER SHEET
G-001 CONTRACT QUANTITIES AND GENERAL NOTES
G-100 PROJECT LAYOUT PLAN
G-101 PROJECT SAFETY PHASING PLAN
G-501 PROJECT SAFETY PHASING NOTES
G-502 PROJECT SAFETY PHASING DETAILS
G-801 PROJECT BENCHMARK PLAN
CD-101 EXISTING CONDITIONS AND REMOVALS - 1
CD-102 EXISTING CONDITIONS AND REMOVALS - 2
CD-103 EXISTING CONDITIONS AND REMOVALS - 3
CD-104 EXISTING CONDITIONS AND REMOVALS - 4
CD-105 EXISTING CONDITIONS AND REMOVALS - 5
CD-106 EXISTING CONDITIONS AND REMOVALS - 6
CD-107 EXISTING CONDITIONS AND REMOVALS - 7
C-101 PROPOSED GEOMETRY PLAN
C-301 TYPICAL SECTIONS
CG-101 GRADING AND DRAINAGE - 1
CG-102 GRADING AND DRAINAGE - 2
CG-201 RUNWAY PLAN AND PROFILE
CG-202 TAXIWAY PLAN AND PROFILE
CM-101 MARKING PLAN - 1
CM-102 MARKING PLAN - 2
CM-103 MARKING PLAN - 3
CM-104 MARKING PLAN - 4
CM-105 MARKING PLAN - 5
CM-106 MARKING PLAN - 6
CM-501 MARKING DETAILS
GR-100 GROOVING PLAN AND DETAILS
EL-101 AIRFIELD LIGHTING LAYOUT 1
EL-102 AIRFIELD LIGHTING LAYOUT 2
EL-103 AIRFIELD LIGHTING LAYOUT 3
EL-201 RDR LAYOUT PLAN
EL-501 ELECTRICAL DETAILS - SHEET 1
EL-502 ELECTRICAL DETAILS - SHEET 2
EL-503 ELECTRICAL DETAILS - SHEET 3
EL-504 ELECTRICAL DETAILS - SHEET 4
EL-505 ELECTRICAL DETAILS - SHEET 5
EL-506 ELECTRICAL DETAILS - SHEET 6
EL-507 ELECTRICAL DETAILS - SHEET 7
NOVEMBER, 2023
EC-1 EROSION AND SEDIMENT CONTROL PLAN - COVER SHEET
ECGN-1 - ECGN-3 EROSION CONTROL GENERAL NOTES
WQSP-1 WATER QUALITY SAMPLING PLAN
WQ-1 - WQ-2 WATER QUALITY DETAILS
IEC-1 - IEC-2 EROSION AND SEDIMENT CONTROL PLAN - INITIAL PHASE
GEC-1 - GEC-2 EROSION AND SEDIMENT CONTROL PLAN - GRADING PHASE
FEC-1 - FEC-2 EROSION AND SEDIMENT CONTROL PLAN - FINAL PHASE
ECD-1 - ECD-7 EROSION AND SEDIMENT CONTROL DETAILS
GS-1 GRASSING NOTES AND GRASSING DETAILS
EROSION AND SEDIMENT CONTROL PLAN
SHEET NUMBER SHEET TITLE
AutoCAD SHX Text
POOL
AutoCAD SHX Text
POOL
AutoCAD SHX Text
POOL
AutoCAD SHX Text
POOL
AutoCAD SHX Text
POOL
AutoCAD SHX Text
POOL
AutoCAD SHX Text
POOL
AutoCAD SHX Text
POOL
AutoCAD SHX Text
POOL
AutoCAD SHX Text
POOL
AutoCAD SHX Text
TANK
AutoCAD SHX Text
TANK
AutoCAD SHX Text
TANK
AutoCAD SHX Text
TANK
AutoCAD SHX Text
TANKS
AutoCAD SHX Text
LOCATION MAP
AutoCAD SHX Text N
AutoCAD SHX Text N
AutoCAD SHX Text
SITE PLAN
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text Site
AutoCAD SHX Text
AutoCAD SHX Text
THIS BAR IS EQUAL TO 2" AT FULL SCALE (22X34)
SHEET OF
SHEET TITLE
COPYRIGHT:
CAD DWG FILE:
DRAWN BY:
CHECKED BY:
DESCRIPTIONDATEMARK
CONSULTANTS
P at h:
K
:\r ic ha rd ru ss el la p\
-0
0_ rm gr w y1 -1
9e xt ph 1\
D ra w \S he et s\
-G
-0 1.
dw g
D at e:
T hu rs da y, N ov em be r 2, :3 5:
A
M
DESIGNED BY:
APPROVED BY:
OWNER
CMT PROJECT NO:
CRAWFORD, MURPHY & TILLY, INC. 2021A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
G-001
CONTRACT
QUANTITIES AND
GENERAL NOTES
20080302-G-01.DWG
JMM
JJM
20080302
JMM
MJR
RICHARD B. RUSSELL
REGIONAL AIRPORT
ROME, GA
RUNWAY 1/19 AND
PARALLEL TAXIWAY
EXTENSION
PAVING, LIGHTING, AND
MARKING PACKAGE
ISSUED FOR BID SET
GENERAL NOTES
SAFETY AND SECURITY
HAUL ROUTES, STAGING AREAS AND CONSTRUCTION ACTIVITIES
TEMPORARY MARKINGS, BARRICADES, TRAFFIC CONTROL
EXISTING CONDITIONS/UNDERGROUND AND CONCEALED FACILITIES
ANY LEAKS OR SPILLS OF PETROLEUM PRODUCTS WILL BE THE RESPONSIBILITY OF THE
CONTRACTOR TO CONTAIN, CONTROL, AND REMEDIATE IN ACCORDANCE WITH ALL
LOCAL, STATE AND FEDERAL GUIDELINES, ORDINANCES, AND LAWS.
CONTROL OF POLLUTANTS: POLLUTANTS OF POTENTIALLY HAZARDOUS MATERIALS,
SUCH AS FUELS, LUBRICANTS, LEAD PAINT, CHEMICALS OR BATTERIES, SHALL BE
TRANSPORTED, STORED AND UTILIZED IN A MANNER TO PREVENT LEAKAGE OR SPILLAGE
INTO THE ENVIRONMENT. THE CONTRACTOR SHALL ALSO BE RESPONSIBLE FOR PROPER
AND LEGAL DISPOSAL OF ALL SUCH MATERIALS. EQUIPMENT, ESPECIALLY CONCRETE OR
ASPHALT TRUCKS, SHALL NOT BE WASHED OR CLEANED OUT ON THE PROJECT EXCEPT
IN AREAS WHERE UNUSED PRODUCT CONTAMINANTS CAN BE PREVENTED FROM
ENTERING WATERWAYS.
AN SPCC PLAN WILL BE DEVELOPED BY THE CONTRACTOR AND APPROVED PRIOR TO
INSTALLATION OF FUEL TANKS. THIS PLAN WILL REQUIRE THE FOLLOWING:
1. ALL BARE SOIL AROUND FUELING AREA LINED TO PREVENT SEEPAGE INTO SOIL. IN
ADDITION, A SPILL KIT WILL BE KEPT ON SITE IN CASE OF LEAKS.
2. TERTIARY CONTAINMENT WILL BE PROVIDED IN THE MOBILE TRUCK AREA.
3. SECONDARY CONTAINMENT WILL BE PROVIDED IN THE FORM OF A CONTAINMENT
PAD WITH A VALVE SIZED (OR APPROVED EQUAL) FOR THE APPROPRIATE REFUELING
TRUCK.
SPILL PREVENTION
S-1. THE CONTRACTOR WILL OBTAIN, HAVE KNOWLEDGE OF, AND INCORPORATE THE
FOLLOWING SAFETY PROVISIONS INTO THE CONSTRUCTION PROJECT:
* OPERATIONAL SAFETY ON AIRPORTS DURING CONSTRUCTION
- AC 150/5370-2G.
* AIRPORT SAFETY SELF-INSPECTION - AC 150/5200-18C.
* PAINTING, MARKING, AND LIGHTING OF VEHICLES USED ON AIRPORT
- AC 150/5210-5D.
S-2. CONTRACTORS SHALL MAINTAIN RADIO COMMUNICATION WITH AIRPORT GROUND
CONTROL AT ALL TIMES DURING CONSTRUCTION. THE CONTRACTOR SHALL HAVE
WORKING RADIO(S) ON-SITE AT ALL TIMES DURING CONSTRUCTION AND SHALL
ASSIGN RESPONSIBLE PERSONNEL TO CONTINUOUSLY MONITOR THE GROUND
CONTROL FREQUENCY (123.000MHz). PROVIDE A RADIO AT EACH SEPARATE WORK
LOCATION.
S-3. NOTICE TO AIRMEN (NOTAMS) - THE CONTRACTOR SHALL SCHEDULE AND
PROVIDE THE NECESSARY INFORMATION ON CONSTRUCTION CONDITIONS SO THAT
OWNER CAN ADVISE THE FLIGHT SERVICE STATION AND ISSUE NOTAM(S) IN
ACCORDANCE WITH ESTABLISHED CRITERIA.
S-4. ALL CONSTRUCTION TRAFFIC SHALL ENTER AND EXIT THE PROJECT AREA
THROUGH THE PROJECT ACCESS GATES SHOWN ON THESE PLANS.
CONTRACTOR WILL BE RESPONSIBLE FOR SECURITY OF ALL GATES IN
ACCORDANCE WITH THE AIRPORT'S APPROVED SECURITY PROGRAM.
S-5. AREAS OUTSIDE THE PROJECT LIMITS ARE DESIGNATED AS RESTRICTED AREAS.
THE CONTRACTOR'S FORCES ARE PROHIBITED FROM ENTERING RESTRICTED
AREAS AT ANY TIME, UNLESS SPECIFICALLY AUTHORIZED BY THE ENGINEER OR
AIRPORT OWNER.
S-6. ALL VEHICLES USED ON THE AIRFIELD SHALL MEET AIRPORT REQUIREMENTS FOR
MARKING AND LIGHTING.
S-7. FOR ADDITIONAL SAFETY AND SECURITY REQUIREMENTS, SEE SPECIFICATIONS.
(SECTION 01030).
S-8. WORKING IN SAFETY AREAS OF RUNWAYS OR TAXIWAYS REQUIRES CLOSURE OF
THAT RUNWAY OR TAXIWAY.
C-1. THE CONTRACTOR SHALL CONDUCT HIS CONSTRUCTION OPERATIONS AS
SHOWN ON THE PROJECT LAYOUT AND SAFETY PLAN AND HIS APPROVED
PHASING PLAN. THE CONTRACTOR SHALL COORDINATE ALL CONSTRUCTION
ACTIVITIES WITH THE ENGINEER TO MINIMIZE DISRUPTION TO AIRPORT
OPERATIONS. IT IS THE CONTRACTOR'S RESPONSIBILITY TO INSURE
COMPLIANCE WITH SAFETY REQUIREMENTS AND TO MINIMIZE INTERFERENCE TO
AIRCRAFT OPERATIONS DURING CONSTRUCTION.
C-2. THE CONTRACTOR'S STAGING AREA AND HAUL ROUTES SHOWN ON THE PLANS
ARE GENERAL AND FOR INFORMATION PURPOSES ONLY. THE ACTUAL SIZE AND
LOCATION OF STAGING AREAS AND HAUL ROUTES WILL BE APPROVED BY
OWNER PRIOR TO CONSTRUCTION.
C-3. ALL EXISTING GRASSED AREAS WHICH ARE DISTURBED AS PART OF THE
CONTRACTOR'S ACCESS ROAD, CONTRACTOR'S STAGING AREA, AND HAUL
ROUTES SHALL BE RESTORED TO THEIR ORIGINAL CONDITION AFTER
COMPLETION OF THE PROJECT. IN ADDITION, ALL EXISTING ROADS THAT WILL BE
USED AS THE CONTRACTOR'S HAUL ROUTE SHALL BE MAINTAINED DURING
CONSTRUCTION AND RESTORED TO THEIR PRE-CONSTRUCTION CONDITION. NO
SEPARATE MEASUREMENT OR PAYMENT WILL BE MADE FOR THIS ITEM.
C-4. EXCEPT WHERE DESIGNATED ON PLANS OR AS AUTHORIZED BY ENGINEER,
CONTRACTOR WILL NOT BE ALLOWED TO USE ANY OF THE EXISTING
RUNWAYS OR TAXIWAYS AS PART OF THE HAUL ROAD.
C-5. ALL EQUIPMENT MUST BE RETURNED TO THE STAGING AREA AT THE END OF
EACH WORK DAY AND WHEN NOT ENGAGED IN THE CONSTRUCTION DURING
NON-WORKING DAYS AND NIGHTS. OWNER WILL DESIGNATE AREAS FOR
CONTRACTOR'S EMPLOYEES AUTO PARKING.
C-6. THE CONTRACTOR IS RESPONSIBLE FOR COORDINATING AND PROVIDING ALL
PERMANENT AND TEMPORARY UTILITY CONNECTIONS TO THE STAGING AREA.
C-7. CONTRACTOR SHALL MAINTAIN ALL AIRFIELD SAFETY DEVICES SUCH AS STAKED
LIMIT LINES, FOR THE DURATION OF THE PROJECT AS REQUIRED. DAMAGED
STAKES OR FLAGGING SHALL BE REPLACED IMMEDIATELY. CONTRACTOR TO
SUBMIT PLAN SHOWING LOCATION OF LIMIT LINES FOR EACH PHASE AND FOR
PROJECT DURATION TO THE ENGINEER FOR APPROVAL.
C-8. BURNING OF DEBRIS WILL NOT BE ALLOWED ON AIRPORT PROPERTY.
C-9. CONTRACTOR SHALL CONTROL DUST TO AN ACCEPTABLE LEVEL. THE
CONTRACTOR SHALL BE REQUIRED TO KEEP A WATER TRUCK AT THE PROJECT
SITE DURING HAULING OPERATIONS. IF ONE WATER TRUCK IS INADEQUATE TO
CONTROL DUST PROPERLY, THE CONTRACTOR SHALL FURNISH THE PROPER
NUMBER OF TRUCKS OR OTHER SUITABLE MEANS TO ACCOMPLISH THIS ITEM.
C-10. CONTRACTOR SHALL BE REQUIRED TO MOVE MEN AND EQUIPMENT OUTSIDE TAXIWAY AND
RUNWAY SAFETY AREAS AS REQUIRED FOR AIRCRAFT OPERATIONS.
C-11. ALL LIGHTS, SIGNS AND CIRCUITS ARE TO BE TESTED "DAILY" PRIOR TO CONTRACTOR
LEAVING SITE TO ENSURE ALL ITEMS ARE DEEMED TO BE IN PROPER WORKING ORDER.
ALL RUNWAY AND TAXIWAY CIRCUITS SHALL BE OPERATIONAL PRIOR TO THE
CONTRACTOR LEAVING SITE EACH DAY.
C-12. CONTRACTOR MUST COORDINATE WITH OWNER AND OTHERS INVOLVED WITH ALL
CONSTRUCTION PROJECTS AT THE AIRPORT.
C-13. CONTRACTOR IS SOLELY RESPONSIBLE FOR OBTAINING ALL PERMITS REQUIRED FOR THE
PROJECT PRIOR TO ANY CONSTRUCTION ACTIVITIES.
C-14. WHEN THE CONTRACTOR'S OPERATIONS ENCOUNTER WET CONDITIONS ALONG HAUL AND
ACCESS ROUTES, THE CONTRACTOR SHALL EXERCISE CARE WITHIN THESE AREAS TO
MINIMIZE DISTURBANCE. THESE AREAS SHALL BE RESTORED TO THEIR ORIGINAL
CONDITION UPON COMPLETION OF THE WORK. THIS MAY REQUIRE GRADING, BLADING,
DRESSING AND/OR SEEDING TO ENSURE DRAINAGE PATTERNS ARE MAINTAINED AND NOT
COMPROMISED. NO SEPARATE MEASUREMENT OR PAYMENT WILL BE MADE FOR THIS
WORK AS IT IS CONSIDERED INCIDENTAL TO THE PROJECT.
E-1. CONTRACTOR TO FIELD VERIFY EXISTING CONDITIONS PRIOR TO BEGINNING
CONSTRUCTION AND REPORT TO ENGINEER ANY VARIATIONS FROM THE
INFORMATION SHOWN ON CONSTRUCTION PLANS.
E-2. CONTRACTOR SHALL BE RESPONSIBLE FOR THE LOCATION AND IDENTIFICATION OF
ALL EXISTING UTILITIES AND PIPELINES IN THE CONSTRUCTION AREA. ANY EXISTING
UTILITIES OR PIPELINES (ON OR OFF AIRPORT PROPERTY) DAMAGED BY
CONTRACTOR SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR. CONTRACTOR
SHALL REPAIR ALL UTILITIES/PIPELINES DAMAGED BY CONTRACTOR AT NO
ADDITIONAL COST TO OWNER. CONTRACTOR SHALL BE ASSESSED A CABLE CUT
PENALTY OF $1,000 PER OCCURRENCE.
E-3. FAA CABLES WILL BE LOCATED AND MARKED BY FAA PRIOR TO CONSTRUCTION.
CONTRACTOR IS TO NOTIFY FAA 30 DAYS IN ADVANCE SO THAT FAA CAN SCHEDULE
THE REQUIRED MARKING TO PROTECT CABLES DURING CONSTRUCTION. ANY
CABLES DAMAGED DURING CONSTRUCTION WILL BE REPLACED BY CONTRACTOR.
CONTRACTOR SHALL PAY ALL COSTS ASSOCIATED WITH THE REPAIR OF DAMAGED
CABLES AT NO COST TO OWNER.
E-4. CONTRACTOR SHALL PROTECT ALL EXISTING LIGHTING SYSTEMS THAT ARE TO
REMAIN, OR IF TO BE REMOVED, UNTIL THEY ARE DESIGNATED FOR REMOVAL.
E-5. ANY UNPLANNED, UNAPPROVED OR ACCIDENTAL SHUTDOWN OR INTERRUPTION OF
SERVICE TO ANY LIGHTING CIRCUIT OR NAVIGATIONAL AID REQUIRES IMMEDIATE
NOTIFICATION OF THE AIRPORT MANAGER AND ENGINEER BY THE CONTRACTOR.
ALL NECESSARY REPAIRS WILL BE MADE IMMEDIATELY AND AT CONTRACTOR'S
EXPENSE.
E-6. THE CONTRACTOR WILL BE RESPONSIBLE FOR STAKING AND GRADE CONTROL OF
ALL ELEMENTS OF THE CONSTRUCTION.
T-1. SEE SPECIFICATION SECTION 01030 AND 01530.
BASE BID
ITEM SPEC ITEM
NO NO. DESCRIPTION UNIT PLAN FINAL
1 01510 ENGINEER'S FIELD OFFICE L. SUM 1
2 C-105 MOBILIZATION L. SUM 1
3 P-101A MILL ASPHALTIC CONCRETE PAVEMENT, VARIABLE DEPTH SQ. YD. 4900
4 P-101B ASPHALTIC PAVEMENT REMOVAL SQ. YD. 600
5 P-151 TREE CLEARING ACRE 56
6 P-152C DITCH EXCAVATION CU. YD. 21000
7 P-155A LIME TREATED SUBGRADE (6 INCH) LIFT SQ. YD. 52000
8 P-155B LIME TREATED SUBGRADE (6 INCH) LIFT TON 750
9 P-156 INSTALLATION AND REMOVAL OF SILT FENCE LIN. FT. 4000
10 P-209 CRUSHED AGGREGATE BASE COURSE CU. YD. 8700
11 GDOT 402-1 12MM HOT MIX RECYCLED ASPHALT TON 3500
12 GDOT 402-2 19MM HOT MIX RECYCLED ASPHALT TON 7500
13 P-602 BITUMINOUS PRIME COAT GAL. 7800
14 P-603 BITUMINOUS TACK COAT GAL. 5200
15 P-620A PAVEMENT MARKING, WHITE, REFLECTIVE SQ. FT. 106000
16 P-620B PAVEMENT MARKING, YELLOW, REFLECTIVE SQ. FT. 11000
17 P-620C PAVEMENT MARKING, BLACK, NON-REFLECTIVE SQ. FT. 33000
18 P-621 BITUMINOUS PAVEMENT GROOVING SQ. YD. 19000
19 D-699B MAINTENANCE OF TEMPORARY SEDIMENT BASIN EACH 1
20 D-700B STONE RETROFITTING (RT) EACH 1
21 D-753A RIP RAP TON 25
22 D-753B ROCK FILTER DAM EACH 1
23 D-753D CHECK DAM EACH 16
24 E-891 INLET PROTECTION EACH 6
25 E-895A TEMPORARY EROSION CONTROL MATTING SQ. YD. 3500
26 E-895B PERMANENT EROSION CONTROL MATTING SQ. YD. 3500
27 EC-1B FLOC LOG EACH 6
28 T-901A PERMANENT SEEDING ACRE 32
29 T-901B TEMPORARY SEEDING ACRE 32
30 T-904 SODDING SQ. YD. 500
31 T-908 MULCHING ACRE 32
32 L107-5.1 L-806(L) LED SUPPLEMENTAL WIND CONE AND CONCRETE
FOUNDATION, COMPLETE IN PLACE EACH 1
33 L107-5.2 REMOVAL OF EXISTING SUPPLEMENTAL WIND CONE AND
CONCRETE FOUNDATION EACH 1
34 L108-5.1 TRENCHING FOR DIRECT-BURIED CABLE (COUNTERPOISE) AND
BACKFILL LIN. FT. 5600
35 L108-5.2 NO. 8 AWG, 5KV, L-824, TYPE C CABLE, INSTALLED IN TRENCH,
DUCT BANK OR CONDUIT LIN. FT. 6800
36 L108-5.3
NO. 6 AWG, SOLID, BARE COUNTERPOISE WIRE, INSTALLED
ABOVE THE DUCT BANK OR CONDUIT, INCLUDING
CONNECTIONS/TERMINATIONS AND GROUND RODS
LIN. FT. 5600
37 L108-5.4
PAPI 19 CIRCUIT, 3 -#4 TYPE USE, 1#8 GND, IN 1-1/4" UNIT DUCT
LIN. FT. 1300
38 L110-5.1 REMOVE EXISTING CABLE AND CONDUIT LIN. FT. 300
39 L110-5.3 2 - 3 INCH PVC SCH. 40 CONCRETE ENCASED DUCT LIN. FT. 112
40 L115-5.2 ELECTRICAL HANDHOLE EACH 2
41 L125-5.1 REMOVE EXISTING LIGHT - ALL TYPES AND SIZES EACH 29
42 L125-5.2 REMOVE EXISTING SIGN AND CONCRETE PAD EACH 2
43 L125-5.3 REMOVE EXISTING PAPI 19 SYSTEM AND FOUNDATION L. SUM 1
44 L125-5.4 HIGH INTENSITY RUNWAY EDGE LIGHT, LED, BASE MOUNTED,
INSTALLED, COMPLETE EACH 10
45 L125-5.5 Relocate High Intensity Runway Threshold Light, LED, Base Mounted, Installed, Complete EACH 8
46 L125-5.6 Medium Intensity Taxiway Edge Light, LED, Base Mounted, Installed, Complete EACH 69
47 L125-5.7 Replace Fixture of High Intensity Runway Edge Light, LED, Base Mounted, Complete EACH 9
48 L125-5.8 Replace Fixture of High Intensity Runway Edge Light, LED, Flush Mount In-pavement, Complete EACH 1
49 L125-5.10 PAPI 19 SYSTEM AND FOUNDATION. LED, INSTALLED, COMPLETE EACH 1
50 L125-5.11 Install Runway Distance Remaining Signs EACH 6
51 L125-5.12 Runway End Identifier Light System, Type L-849I, Style E, Foundation, LED, Install, Complete EACH 1
52 L125-5.14 L-858(L) LED SIGN, SIZE 1, 1-2 CHARACTERS, CONCRETE PAD,
L-867B BASE, IN TURF, COMPLETE IN PLACE EACH 2
53 L125-5.15 L-858(L) LED SIGN, SIZE 2, 3-4 CHARACTERS, CONCRETE PAD,
L-867B BASE, IN TURF, COMPLETE IN PLACE EACH 2
54 GDOT 150-1000 TRAFFIC CONTROL L. SUM 1
55 GDOT 165-0030 MAINTENANCE OF TEMPORARY SILT FENCE TYPE S LIN. FT. 4000
56 GDOT 167-1000 WATER QUALITY MONITORING AND SAMPLING EACH 8
57 GDOT 167-1500 WATER QUALITY INSPECTIONS MONTH 8
RPZ
RPZ
RPZ
RPZ
RPZ
RPZ
RPZ
RPZ
RPZ
RPZ
RPZ
RPZ
RPZ
RPZ
RPZ
R P
Z
RPZ
RPZ
R P
Z
RPZ
RPZ
R P
Z
RPZ
RPZ
R P
Z
RPZ
RPZ
RSA
RSA
RSA
RSA
RSA
RSA
RSA
RSA
RSA
RSA
RSA
RSA
RSA
RSA
RSA
RSA
RSA
RSA
RSA
RSA
RSA
RSA
RSA
RSA
RSA
ROFA
ROFA
ROFA
ROFA
ROFA
ROFA
ROFA
ROFA
ROFA
ROFA
ROFA
ROFA
ROFA
ROFA
ROFA
ROFA
ROFA
ROFA
ROFA
ROFA
ROFA
ROFA
RSA
RSA
ROFA
ROFA
ROFA
ROFA
ROFA
ROFA
ROFA
ROFA
ROFA
ROFA
ROFA
ROFA
ROFA
ROFA
ROFA
ROFA
ROFA
ROFA
ROFA
ROFA
ROFA
ROFA
RSA
RSA
RSA
RSA
RSA
RSA
RSA
RSA
RSA
RSA
RSA
RSA
RSA
RSA
RSA
RSA
RSA
RSA
RSA
RSA
RSA
RSA
RSA
RSA
RSA
RSA
RSA
RSA
RSA
RSA
RSA
RSA
RSA
RSA
RSA
RSA
RSA
RSA
RSA
RSA
RSA
RSA
RSA
RSA
RSA
RSA
RSA
RSA
RSA
RSA
ROFA
ROFA
ROFA
ROFA
ROFA
ROFA
ROFA
ROFA
ROFA
ROFA
ROFA
ROFA
ROFA
ROFA
ROFA
ROFA
ROFA
ROFA
ROFA
ROFA
ROFA
ROFA
RSA
RSA
ROFA
ROFA
ROFA
ROFA
ROFA
ROFA
ROFA
ROFA
ROFA
ROFA
ROFA
ROFA
ROFA
ROFA
ROFA
ROFA
ROFA
ROFA
ROFA
ROFA
ROFA
ROFA
RSA
RSA
RSA
RSA
RSA
RSA
RSA
RSA
RSA
RSA
RSA
RSA
RSA
RSA
RSA
RSA
RSA
RSA
RSA
RSA
RSA
RSA
RSA
RSA
RSA
RSA
RSA
RSA
RSA
RSA
RSA
RSA
RSA
RSA
RSA
RSA
RSA
RSA
RSA
RSA
RSA
RSA
RSA
RSA
RSA
RSA
RSA
RSA
RSA
RSA
ROFA
ROFA
ROFA
ROFA
ROFA
ROFA
ROFA
ROFA
ROFA
ROFA
ROFA
ROFA
ROFA
ROFA
ROFA
ROFA
ROFA
ROFA
ROFA
ROFA
ROFA
ROFA
RSA
RSA
ROFA
ROFA
ROFA
ROFA
ROFA
ROFA
ROFA
ROFA
ROFA
ROFA
ROFA
ROFA
ROFA
ROFA
ROFA
ROFA
ROFA
ROFA
ROFA
ROFA
ROFA
ROFA
RSA
RSA
RSA
RSA
RSA
RSA
RSA
RSA
RSA
RSA
RSA
RSA
RSA
RSA
RSA
RSA
RSA
RSA
RSA
RSA
RSA
RSA
RSA
RSA
RSA
A
B
C
D
E
F
PROJECT PERIMETER
POINT
A
B
C
D
E
F
LATITUDE
N34° 21' 31.77"
N34° 21' 46.83"
N34° 21' 46.23"
N34° 21' 32.41"
N34° 21' 33.04"
N34° 21' 31.63"
LONGITUDE
W85° 09' 34.31"
W85° 09' 32.54"
W85° 09' 23.56"
W85° 09' 24.99"
W85° 09' 32.06"
W85° 09' 32.26"
ELEVATION
623.00
622.00
629.00
617.00
622.00
621.00
G
H
I
J
STAGING AREA
POINT
G
H
I
J
LATITUDE
N34° 21' 40.99"
N34° 21' 40.77"
N34° 21' 36.89"
N34° 21' 37.11"
LONGITUDE
W85° 09' 19.85"
W85° 09' 17.07"
W85° 09' 17.48"
W85° 09' 20.44"
ELEVATION
605.00
601.00
602.00
599.00
S S
WW
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
CB
CB
CB
CB
CB
D
D
CB
CB
THIS BAR IS EQUAL TO 2" AT FULL SCALE (22X34)
SHEET OF
SHEET TITLE
COPYRIGHT:
CAD DWG FILE:
DRAWN BY:
CHECKED BY:
DESCRIPTIONDATEMARK
CONSULTANTS
P at h:
K
:\r ic ha rd ru ss el la p\
-0
0_ rm gr w y1 -1
9e xt ph 1\
D ra w \S he et s\
-G
-1
.d w g D at e:
T hu rs da y, N ov em be r
2, :3
5:
A M
DESIGNED BY:
APPROVED BY:
OWNER
CMT PROJECT NO:
CRAWFORD, MURPHY & TILLY, INC. 2021A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
NOTES
1. THE CONTRACTOR SHALL COORDINATE WITH THE AIRPORT AND
ENGINEER TO OBTAIN APPROPRIATE APPROVALS AND ESTABLISH
WORK CONDITIONS AND TIMING PRIOR TO ANY WORK WITHIN THE
RUNWAY SAFETY AREAS AND RUNWAY PROTECTION ZONES. THE
REQUIRED ACTIONS MAY INCLUDE TEMPORARY RUNWAY CLOSURES
OR LIMITED RUNWAY OPERATIONS.
2. THE CONTRACTOR SHALL NOT MOVE EQUIPMENT OR PERSONNEL
THROUGH ACTIVE PORTIONS OF THE AIRPORT WITHOUT PRIOR
COORDINATION AND APPROVAL FROM THE AIRPORT AND THE
ENGINEER. IT IS THE CONTRACTOR'S RESPONSIBILITY TO AVOID
CONFLICT BETWEEN HIS PERSONNEL, EQUIPMENT, VEHICLES, AND
AIRCRAFT.
3. THE CONTRACTOR SHALL PERFORM CONSTRUCTION OPERATIONS
AS NECESSARY TO MINIMIZE ATTRACTION TO BIRDS CAUSED BY
PONDING WATER AND GRASS SEED.
4. ANY DAMAGE TO EXISTING AIRCRAFT LIGHTING SYSTEMS CAUSED
BY CONSTRUCTION ACTIVITIES SHALL BE IMMEDIATELY NOTED TO
THE OWNER AND REPAIRED BY QUALIFIED PERSONNEL AT
CONTRACTOR'S EXPENSE TO THE SATISFACTION OF THE OWNER.
5. STAGING AREA LOCATION SHOWN IS APPROXIMATE. EXACT
LOCATION TO BE DETERMINED BY ENGINEER. THE ESTABLISHMENT
OF ADDITIONAL STAGING AREAS CAN BE CONSIDERED WITH
COORDINATION OF THE CONTRACTOR, ENGINEER, AND THE
AIRPORT.
CONTRACTOR'S STAGING AREA
HAUL ROUTE
CONSTRUCTION EXIT
LEGEND
ROFA RUNWAY OBJECT FREE AREA
PROPERTY LINE (APPROXIMATE)
RSA RUNWAY SAFETY AREA
(INCIDENTAL TO THE PROJECT)
PROJECT LIMITS
RUNWAY EXTENSION
AIRCRAFT ACCESS ROUTE
LOW PROFILE BARRICADE
CLOSED RUNWAY MARKER
TERMINAL BUILDING
Feet 0 300 600
CONTRACTOR STAGING
AREA
RUNW
AY 1-19
RUNWAY 7-25
TAXIW
AY A
TAXIW
AY D
TAXIW
AY A
TAXIWAY B
TAXIWAY B
TAXIW
AY C
TAXIW
AY E
BARRICADE SCHEDULE
LOCATION OF BARRICADES NUMBER OF BARRICADES
1 5
2 15
3 7
4 15
5 7
6 5
JO
NES M
ILL R
D
W A
R R
E N
R D
N E
G-100
PROJECT LAYOUT
PLAN
20080302-G-100.DWG
JMM
JJM
20080302
JMM
MJR
RICHARD B. RUSSELL
REGIONAL AIRPORT
ROME, GA
RUNWAY 1/19 AND
PARALLEL TAXIWAY
EXTENSION
PAVING, LIGHTING, AND
MARKING PACKAGE
ISSUED FOR BID SET
AutoCAD SHX Text Co
Co
TSA
TSATSATSATSATSATSA
TSA
TSA
RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA
ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA
R S
A R
S A
R S
A
ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA
RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA
RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA
ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA
R S
A R
S A
R S
A
ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA
RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA
RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA
ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA
R S
A R
S A
R S
A
ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA
RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA
SD
SD
G G
G G
G
G
G
G
G G G G
G G
G G
G G G
G
G
G
G
G
G
G
G
G
G
G
G
G
SD
SD
SD
SD
SD
SD
SD
C B
C B
C B
C B
C B
D
D
C B
SD
SD
SD
SD SD SD
C B
PAPI 19PAPI 19PAPI 19PAPI 19
THIS BAR IS EQUAL TO 2" AT FULL SCALE (22X34)
SHEET OF
SHEET TITLE
COPYRIGHT:
CAD DWG FILE:
DRAWN BY:
CHECKED BY:
DESCRIPTIONDATEMARK
CONSULTANTS
P at h:
K
:\r ic ha rd ru ss el la p\
-0
0_ rm gr w y1 -1
9e xt ph 1\
D ra w \S he et s\
-G
-1
.d w g D at e:
T hu rs da y, N ov em be r
2, :3
5:
A M
DESIGNED BY:
APPROVED BY:
OWNER
CMT PROJECT NO:
CRAWFORD, MURPHY & TILLY, INC. 2021A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
APPROXIMATE WORK AREAS
CONTRACTOR'S STAGING AREA
CONTRACTORS HAUL ROUTE
CONSTRUCTION EXIT
LEGEND
TAXIWAY SAFETY AREA
RUNWAY SAFETY AREA
LOW PROFILE BARRICADE
NOTES
1. CLOSED RUNWAY MARKERS SHALL BE PLACED BY THE
CONTRACTOR AT BOTH ENDS OF RUNWAY 1/19 WHEN
PERFORMING WORK WITHIN THE RUNWAY 1/19 SAFETY AREA
(RUNWAY 1/19 CLOSED).
EXISTING
LOCALIZER
0'
(M
IN
0'
M
IN
CONTRACTOR TO PROTECT
GAS LINE EASEMENT
UTILIZE EXISTING GATE
RUNWAY EXTENSION
CLOSED RUNWAY MARKER
REFER TO NOTE 1
PHASE CONSTRUCTION AFFECTED ACTIVE OPERATIONS AREAS (AOA) WORK HOURS SAFETY AND SECURITY CONTRACT TIME
INSTALL EROSION CONTROL. GRADING.
PAVEMENT CONSTRUCTION. AIRFIELD
LIGHTING INSTALLATION. HALF-RATE
PAVEMENT MARKING RESTORATION.
EROSION CONTROL REMOVAL.
WORK AREA ON 19 END OF RUNWAY 1-19.
RUNWAY 1-19 CLOSED. TAXIWAY D CLOSED.
TAXIWAY A CLOSED UP TO TAXIWAY D.
7 AM EST TO 8:15 PM EST
PLACE BARRICADES AND CLOSURE X’S AS SHOWN.
THE CONTRACTOR SHALL NOTIFY THE AIRPORT AT
LEAST 72 HOURS IN ADVANCE OF THE WORK SO
THAT THE AIRPORT CAN ISSUE REQUIRED
NOTAM’S. MAXIMUM EQUIPMENT HEIGHT IS 35’
AGL.
240 DAYS MON-SAT
2 FULL RATE PAVEMENT MARKING
WORK AREA ON 19 END OF RUNWAY 1-19.
RUNWAY 1-19 CLOSED. TAXIWAY D CLOSED.
TAXIWAY A CLOSED UP TO TAXIWAY D.
7 AM EST TO 8:15 PM EST
PLACE BARRICADES AND CLOSURE X'S AS
SHOWN. THE CONTRACTOR SHALL NOTIFY THE
AIRPORT AT LEAST 72 HOURS IN ADVANCE OF
THE WORK SO THAT THE AIRPORT CAN ISSUE
REQUIRED NOTAM'S. MAXIMUM EQUIPMENT
HEIGHT IS 35' AGL.
ONE DAY. (30 DAYS
AFTER PHASE 1
COMPLETION)
RUNWAY 1-19
TAXIWAY A
T A
X
IW
A Y
E
T A
X
IW
A Y
D
JONES MILL RD
G-101
PROJECT SAFETY
PHASING PLAN
20080302-G-100.DWG
JMM
JJM
20080302
JMM
MJR
RICHARD B. RUSSELL
REGIONAL AIRPORT
ROME, GA
RUNWAY 1/19 AND
PARALLEL TAXIWAY
EXTENSION
PAVING, LIGHTING, AND
MARKING PACKAGE
ISSUED FOR BID SET
Feet 0 200 400
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text Co
AutoCAD SHX Text
TSA
AutoCAD SHX Text
RSA
Co
SHEET TITLE
COPYRIGHT:
CAD DWG FILE:
DRAWN BY:
CHECKED BY:
DESCRIPTIONDATEMARK
CONSULTANTS
P at h:
K
:\r ic ha rd ru ss el la p\
-0
0_ rm gr w y1 -1
9e xt ph 1\
D ra w \S he et s\
-G
-1
.d w g D at e:
T hu rs da y, N ov em be r
2, :3
5:
A M
DESIGNED BY:
APPROVED BY:
OWNER
CMT PROJECT NO:
CRAWFORD, MURPHY & TILLY, INC. 2021A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
GENERAL:
1. THIS CSPP HAS BEEN DEVELOPED IN ACCORDANCE WITH THE APPLICABLE REQUIREMENTS OF
FAA ADVISORY CIRCULAR 150/5370-2G AND IS CONSIDERED AN INTEGRAL PART TO THE
CONTRACTOR'S WORK. THE FOLLOWING DRAWINGS ARE CONSIDERED PART OF THE CSPP:
· G-001 GENERAL NOTES
· G-100 PROJECT SAFETY & PHASING PLAN LAYOUT
· G-101 PROJECT SAFETY & PHASING PLAN
· G-501 PROJECT SAFETY & PHASING PLAN NOTES
· G-502 PROJECT SAFETY & PHASING PLAN DETAILS
2. THE 7460 FOR THIS PROJECT WAS SUBMITTED TO THE FAA ON MAY 4, 2018
AND APPROVED BY THE FAA ON JANUARY 16, 2020.
3. THE CONTRACTOR SHALL PREPARE AND SUBMIT FAA FORM 7460-1 DETALING CONSTRUCTION
EQUIPMENT AND PROPOSED PARKING AREAS FOR THIS EQUIPMENT (SUCH AS CRANES AND
GRADING MACHINES). THE CONTRACTOR SHOULD SUBMIT THIS FORM AT THE TIME OF THE
PRE-CONSTRUCTION CONFERENCE OR SUFFICENTLY IN ADVANCE OF THE WORK TO ALLOW FOR
FAA REVIEW AND APROVAL.
4. THE CONTRACTOR SHALL SUBMIT A SAFETY PLAN COMPLIANCE DOCUMENT (SPCD) FOR REVIEW
AND APPROVAL. FOR INFORMATION PERTAINING TO THE REQUIREMENTS OF THIS DOCUMENT,
REFER TO THE SECTION “CONTRACTOR RESPONSIBILITIES”.
5. CONTACT INFORMATION:
· AIRPORT OWNER: RUSSELL REGIONAL AIRPORT
JOHN CARROLL - AIRPORT MANAGER
706.295.7835
· ENGINEER: CRAWFORD, MURPHY & TILLY, INC.
MIKE REITER, PROJECT MANAGER
615.921.5777
· CONTRACTOR: TBD
THE AIRPORT OPERATOR WILL:
1. DEVELOP A CSPP THAT COMPLIES WITH THE SAFETY GUIDELINES OF FAA
ADVISORY CIRCULAR 150/5370-2G.
2. REQUIRE THE REVIEW AND APPROVAL OF THE SPCD PROVIDED BY THE
CONTRACTOR. THIS SPCD SHALL INDICATE HOW THE CONTRACTOR WILL COMPLY
WITH THE CSPP AND PROVIDE DETAILS THAT CANNOT BE DETERMINED BEFORE
CONTRACT AWARD.
3. CONVENE A PRECONSTRUCTION MEETING WITH THE CONSTRUCTION
CONTRACTOR, ENGINEER, AIRPORT EMPLOYEES AND TENANT REPRESENTATIVES
(IF APPROPIATE) TO REVIEW AND DISCUSS PROJECT SAFETY BEFORE BEGINNING
CONSTRUCTION ACTIVITY. THE FAA WILL BE INVITED TO ATTEND THIS MEETING.
4. ENSURE CONTACT INFORMATION IS ACCURATE FOR EACH
REPRESENTATIVE/POINT OF CONTACT IDENTIFIED IN THE CSPP.
5. HOLD WEEKLY OR, IF NECESSARY, DAILY SAFETY MEETINGS WITH ALL AFFECTED
PARTIES TO COORDINATE ACTIVITIES.
6. NOTIFY USERS, ARFF PERSONNEL, AND FAA ATO PERSONNEL OF CONSTRUCTION
AND CONDITIONS THAT MAY ADVERSELY AFFECT THE OPERATIONAL SAFETY OF
THE AIRPORT VIA NOTICES TO AIRMEN (NOTAM) AND OTHER METHODS, AS
APPROPRIATE. CONVENE A MEETING FOR REVIEW AND DISCUSSION IF
NECESSARY.
7. ENSURE CONSTRUCTION PERSONNEL KNOW OF ANY APPLICABLE AIRPORT
PROCEDURES AND OF CHANGES TO THOSE PROCEDURES THAT MAY AFFECT
THEIR WORK.
8. ENSURE CONSTRUCTION CONTRACTORS AND SUBCONTRACTORS UNDERGO
TRAINING REQUIRED BY THE CSPP AND SPCD.
9. ENSURE VEHICLE AND PEDESTRIAN OPERATIONS ADDRESSED IN THE CSPP AND
SPCD ARE COORDINATED WITH AIRPORT TENANTS, THE AIRPORT TRAFFIC
CONTROL TOWER (ATCT), AND CONSTRUCTION CONTRACTORS.
10. AT CERTIFICATED AIRPORTS, ENSURE EACH CSPP AND SPCD IS CONSISTENT
WITH PART 139.
11. CONDUCT INSPECTIONS SUFFICIENTLY FREQUENTLY TO ENSURE CONSTRUCTION
CONTRACTORS AND TENANTS COMPLY WITH THE CSPP AND SPCD AND THAT
THERE ARE NO ALTERED CONSTRUCTION ACTIVITIES THAT COULD CREATE
POTENTIAL SAFETY HAZARDS.
12. RESOLVE SAFETY DEFICIENCIES IMMEDIATELY. AT AIRPORTS SUBJECT TO 49 CFR
PART 1542, AIRPORT SECURITY, ENSURE CONSTRUCTION ACCESS COMPLIES
WITH THE SECURITY REQUIREMENTS OF THAT REGULATION.
13. NOTIFY APPROPRIATE PARTIES WHEN CONDITIONS EXIST THAT INVOKE
PROVISIONS OF THE CSPP AND SPCD (FOR EXAMPLE, IMPLEMENTATION OF
LOW-VISIBILITY OPERATIONS).
14. ENSURE PROMPT SUBMITTAL OF A NOTICE OF PROPOSED CONSTRUCTION OR
ALTERATION (FORM 7460-1) FOR CONDUCTING AN AERONAUTICAL STUDY OF
POTENTIAL OBSTRUCTIONS SUCH AS TALL EQUIPMENT (CRANES, CONCRETE
PUMPS, ETC.), STOCK PILES, AND HAUL ROUTES. A SEPARATE FORM MAY BE
FILED FOR EACH POTENTIAL OBSTRUCTION, OR ONE FORM MAY BE FILED
DESCRIBING THE ENTIRE CONSTRUCTION AREA AND MAXIMUM EQUIPMENT
HEIGHT. IN THE LATTER CASE, A SEPARATE FORM MUST BE FILED FOR ANY
OBJECT BEYOND OR HIGHER THAN THE ORIGINALLY EVALUATED AREA/HEIGHT.
CONSTRUCTION SAFETY AND PHASING PLAN (CSPP)
AIRPORT OPERATOR'S RESPONSIBILITIES:
THE CONTRACTOR SHALL:
1. SUBMIT A SAFETY PLAN COMPLIANCE DOCUMENT (SPCD) TO THE AIRPORT
OPERATOR DESCRIBING HOW IT WILL COMPLY WITH THE REQUIREMENTS
OF THE CSPP AND SUPPLYING ANY DETAILS THAT COULD NOT BE
DETERMINED BEFORE CONTRACT AWARD. THE SPCD MUST INCLUDE A
CERTIFICATION STATEMENT BY THE CONTRACTOR THAT INDICATES IT
UNDERSTANDS THE OPERATIONAL SAFETY REQUIREMENTS OF THE CSPP
AND IT ASSERTS IT WILL NOT DEVIATE FROM THE APPROVED CSPP AND
SPCD UNLESS WRITTEN APPROVAL IS GRANTED BY THE AIRPORT
OPERATOR. ANY CONSTRUCTION PRACTICE PROPOSED BY THE
CONTRACTOR THAT DOES NOT CONFORM TO THE CSPP AND SPCD MAY
IMPACT THE AIRPORT'S OPERATIONAL SAFETY AND WILL REQUIRE A
REVISION TO THE CSPP AND SPCD AND RE-COORDINATION WITH THE
AIRPORT OPERATOR AND THE FAA IN ADVANCE.
2. HAVE AVAILABLE AT ALL TIMES COPIES OF THE CSPP AND SPCD FOR
REFERENCE BY THE AIRPORT OPERATOR AND ITS REPRESENTATIVES,
AND BY SUBCONTRACTORS AND CONTRACTOR EMPLOYEES.
3. ENSURE THAT CONSTRUCTION PERSONNEL ARE FAMILIAR WITH SAFETY
PROCEDURES AND REGULATIONS ON THE AIRPORT. PROVIDE A POINT OF
CONTACT WHO WILL COORDINATE AN IMMEDIATE RESPONSE TO
CORRECT ANY CONSTRUCTION-RELATED ACTIVITY THAT MAY ADVERSELY
AFFECT THE OPERATIONAL SAFETY OF THE AIRPORT. MANY PROJECTS
WILL REQUIRE 24-HOUR COVERAGE.
4. IDENTIFY IN THE SPCD THE CONTRACTOR'S ON-SITE EMPLOYEES
RESPONSIBLE FOR MONITORING COMPLIANCE WITH THE CSPP AND SPCD
DURING CONSTRUCTION. AT LEAST ONE OF THESE EMPLOYEES MUST BE
ON-SITE WHENEVER ACTIVE CONSTRUCTION IS TAKING PLACE.
5. CONDUCT INSPECTIONS SUFFICIENTLY FREQUENTLY TO ENSURE
CONSTRUCTION PERSONNEL COMPLY WITH THE CSPP AND SPCD AND
THAT THERE ARE NO ALTERED CONSTRUCTION ACTIVITIES THAT COULD
CREATE POTENTIAL SAFETY HAZARDS.
6. RESTRICT MOVEMENT OF CONSTRUCTION VEHICLES AND PERSONNEL TO
PERMITTED CONSTRUCTION AREAS BY FLAGGING, BARRICADING,
ERECTING TEMPORARY FENCING, OR PROVIDING ESCORTS, AS
APPROPRIATE AND AS SPECIFIED IN THE CSPP AND SPCD.
7. ENSURE THAT NO CONTRACTOR EMPLOYEES, EMPLOYEES OF
SUBCONTRACTORS OR SUPPLIERS, OR OTHER PERSONS ENTER ANY
PART OF THE AIR OPERATIONS AREA (AOA) FROM THE CONSTRUCTION
SITE UNLESS AUTHORIZED.
8. ENSURE PROMPT SUBMITTAL THROUGH THE AIRPORT OPERATOR OF
FORM7460-1 FOR THE PURPOSE OF CONDUCTING AN AERONAUTICAL
STUDY OF CONTRACTOR EQUIPMENT SUCH AS TALL EQUIPMENT (CRANES,
CONCRETE PUMPS, AND OTHER EQUIPMENT), STOCK PILES, AND HAUL
ROUTES WHEN DIFFERENT FROM CASES PREVIOUSLY FILED BY THE
AIRPORT OPERATOR.
THE CONTRACTOR'S SAFETY PLAN COMPLIANCE DOCUMENT (SPCD) SHALL
INCLUDE A STATEMENT BY THE CONSTRUCTION CONTRACTOR THAT HE/SHE HAS
READ AND WILL ABIDE BY THE CSPP. IN ADDITION, THE SPCD MUST INCLUDE ALL
SUPPLEMENTAL INFORMATION THAT COULD NOT BE INCLUDED IN THE CSPP PRIOR
TO THE CONTRACT AWARD. THE CONTRACTOR STATEMENT SHOULD INCLUDE THE
NAME OF THE CONTRACTOR, THE TITLE OF THE PROJECT CSPP, THE APPROVAL
DATE OF THE CSPP, AND A REFERENCE TO ANY SUPPLEMENTAL INFORMATION
(THAT IS, “I , NAME OF CONTRACTOR , HAVE READ THE TITLE OF PROJECT CSPP,
APPROVED ON DATE , AND WILL ABIDE BY IT AS WRITTEN AND WITH THE
FOLLOWING ADDITIONS AS NOTED:”). THE SUPPLEMENTAL INFORMATION IN THE
SPCD SHOULD BE WRITTEN TO MATCH THE FORMAT OF THE CSPP INDICATING
EACH SUBJECT BY CORRESPONDING CSPP SUBJECT NUMBER AND TITLE. IF NO
SUPPLEMENTAL INFORMATION IS NECESSARY FOR ANY SPECIFIC SUBJECT, THE
STATEMENT, “NO SUPPLEMENTAL INFORMATION,” SHOULD BE WRITTEN AFTER THE
CORRESPONDING SUBJECT TITLE. THE SPCD SHOULD NOT DUPLICATE
INFORMATION IN THE CSPP:
CONTRACTOR RESPONSIBILITIES:
THE CONTRACTOR'S SAFETY PLAN COMPLIANCE DOCUMENT SHALL CONFORM TO
THE FOLLOWING FORMAT:
1. COORDINATION. DISCUSS DETAILS OF PROPOSED SAFETY MEETINGS
WITH THE AIRPORT OPERATOR AND WITH CONTRACTOR EMPLOYEES AND
SUBCONTRACTORS.
2. PHASING. DISCUSS PROPOSED CONSTRUCTION SCHEDULE ELEMENTS,
INCLUDING:
A. DURATION OF EACH PHASE.
B. DAILY START AND FINISH OF CONSTRUCTION, INCLUDING “NIGHT
ONLY” CONSTRUCTION.
C. DURATION OF CONSTRUCTION ACTIVITIES DURING NORMAL RUNWAY
OPERATIONS, CLOSED RUNWAY OPERATIONS AND MODIFIED RUNWAY
“AIRCRAFT REFERENCE CODE” USAGE.
3. AREAS AND OPERATIONS AFFECTED BY THE CONSTRUCTION ACTIVITY.
THESE AREAS ARE SHOWN ON THE CSPP.
4. PROTECTION OF NAVAIDS. DISCUSS SPECIFIC METHODS PROPOSED TO
PROTECT OPERATING NAVAIDS.
5. CONTRACTOR ACCESS. PROVIDE THE FOLLOWING:
A. DETAILS ON HOW THE CONTRACTOR WILL MAINTAIN THE INTEGRITY
OF THE AIRPORT SECURITY FENCE (GATE GUARDS, DAILY LOG OF
CONSTRUCTION PERSONNEL, AND OTHER).
B. LISTING OF INDIVIDUALS REQUIRING DRIVER TRAINING (FOR
CERTIFICATED AIRPORTS AND AS REQUESTED).
C. RADIO COMMUNICATIONS INCLUDING: TYPES OF RADIOS AND BACKUP
CAPABILITIES; WHO WILL BE MONITORING RADIOS; WHOM TO
CONTACT IF THE ATCT CANNOT REACH THE CONTRACTOR'S
DESIGNATED PERSON BY RADIO.
D. DETAILS ON HOW THE CONTRACTOR WILL ESCORT MATERIAL
DELIVERY VEHICLES.
6. WILDLIFE MANAGEMENT. DISCUSS THE FOLLOWING:
A. METHODS AND PROCEDURES TO PREVENT WILDLIFE ATTRACTION.
B. WILDLIFE REPORTING PROCEDURES.
7. FOREIGN OBJECT DEBRIS (FOD) MANAGEMENT. DISCUSS EQUIPMENT AND
METHODS FOR CONTROL OF FOD, INCLUDING CONSTRUCTION DEBRIS
AND DUST.
8. HAZARDOUS MATERIAL (HAZMAT) MANAGEMENT. DISCUSS EQUIPMENT
AND METHODS FOR RESPONDING TO HAZARDOUS SPILLS.
9. NOTIFICATION OF CONSTRUCTION ACTIVITIES. PROVIDE THE FOLLOWING:
A. CONTRACTOR'S POINTS OF CONTACT.
B. CONTRACTOR'S EMERGENCY CONTACT.
C. LISTING OF TALL OR OTHER REQUESTED EQUIPMENT PROPOSED FOR
USE ON THE AIRPORT AND THE TIMEFRAME FOR SUBMITTING 7460-1
FORMS NOT PREVIOUSLY SUBMITTED BY THE AIRPORT OPERATOR.
D. BATCH PLANT DETAILS, INCLUDING 7460-1 SUBMITTAL.
10. INSPECTION REQUIREMENTS. DISCUSS DAILY (OR MORE FREQUENT)
INSPECTIONS AND SPECIAL INSPECTION PROCEDURES.
11. UNDERGROUND UTILITIES. DISCUSS PROPOSED METHODS OF
IDENTIFYING AND PROTECTING UNDERGROUND UTILITIES.
12. PENALTIES. PENALTIES SHOULD BE IDENTIFIED IN THE CSPP AND SHOULD
NOT REQUIRE AN ENTRY IN THE SPCD.
13. SPECIAL CONDITIONS. DISCUSS PROPOSED ACTIONS FOR EACH SPECIAL
CONDITION IDENTIFIED IN THE CSPP.
14. RUNWAY AND TAXIWAY VISUAL AIDS. INCLUDING MARKING, LIGHTING,
SIGNS, AND VISUAL NAVAIDS. DISCUSS PROPOSED VISUAL AIDS
INCLUDING THE FOLLOWING:
A. EQUIPMENT AND METHODS FOR COVERING SIGNAGE AND AIRFIELD
LIGHTS.
B. EQUIPMENT AND METHODS FOR TEMPORARY CLOSURE MARKINGS
(PAINT, FABRIC, OTHER).
C. TYPES OF TEMPORARY VISUAL GUIDANCE SLOPE INDICATORS (VGSI).
15. MARKING AND SIGNS FOR ACCESS ROUTES. DISCUSS PROPOSED
METHODS OF DEMARCATING ACCESS ROUTES FOR VEHICLE DRIVERS.
16. HAZARD MARKING AND LIGHTING. DISCUSS PROPOSED EQUIPMENT AND
METHODS FOR IDENTIFYING EXCAVATION AREAS.
17. PROTECTION OF RUNWAY AND TAXIWAY SAFETY AREAS INCLUDING
OBJECT FREE AREAS, OBSTACLE FREE ZONES, AND
APPROACH/DEPARTURE SURFACES. DISCUSS PROPOSED METHODS OF
IDENTIFYING, DEMARCATING, AND PROTECTING AIRPORT SURFACES
INCLUDING:
A. EQUIPMENT AND METHODS FOR MAINTAINING TAXIWAY SAFETY AREA
STANDARDS.
B. EQUIPMENT AND METHODS FOR SEPARATION OF CONSTRUCTION
OPERATIONS FROM AIRCRAFT OPERATIONS, INCLUDING DETAILS OF
BARRICADES.
18. OTHER LIMITATIONS ON CONSTRUCTION SHOULD BE IDENTIFIED IN THE
CSPP AND SHOULD NOT REQUIRE AN ENTRY IN THE SPCD.
15. PROMPTLY NOTIFY THE FAA AIRPORTS REGIONAL OR DISTRICT OFFICE OF ANY
PROPOSED CHANGES TO THE CSPP PRIOR TO IMPLEMENTATION OF THE CHANGE.
CHANGES TO THE CSPP REQUIRE REVIEW AND APPROVAL BY THE AIRPORT
OPERATOR AND THE FAA. COORDINATE WITH APPROPRIATE LOCAL AND OTHER
FEDERAL GOVERNMENT AGENCIES, SUCH AS EPA, OSHA, TSA, AND THE STATE
ENVIRONMENTAL AGENCY.
G-501
PROJECT SAFETY
PHASING NOTES
20080302-G-100.DWG
JMM
JJM
20080302
JMM
MJR
RICHARD B. RUSSELL
REGIONAL AIRPORT
ROME, GA
RUNWAY 1/19 AND
PARALLEL TAXIWAY
EXTENSION
PAVING, LIGHTING, AND
MARKING PACKAGE
ISSUED FOR BID SET
SHEET TITLE
COPYRIGHT:
CAD DWG FILE:
DRAWN BY:
CHECKED BY:
DESCRIPTIONDATEMARK
CONSULTANTS
P at h:
K
:\r ic ha rd ru ss el la p\
-0
0_ rm gr w y1 -1
9e xt ph 1\
D ra w \S he et s\
-G
-1
.d w g D at e:
T hu rs da y, N ov em be r
2, :3
5:
A M
DESIGNED BY:
APPROVED BY:
OWNER
CMT PROJECT NO:
CRAWFORD, MURPHY & TILLY, INC. 2021A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
TRUCK SIGNAL FLAG
36"
36"
N.T.S.
1. VEHICULAR MARKINGS: CONTRACTOR VEHICLES AND EQUIPMENT SHALL BE MARKED
WITH CHECKERED FLAGS AND LIGHTED WITH FLASHING BEACONS TO COMPLY
WITH REQUIREMENTS OF FAA AC 150/5210-5D.
A) ALL CONSTRUCTION EQUIPMENT, SUCH AS DOZERS, BACKHOES, GRADERS,
END LOADERS, PANS, OFF-ROAD ARTICULATED DUMP TRUCKS, TRADITIONAL
DUMP TRUCKS STATIONED ON-SITE, PAVING TRAIN EQUIPMENT, MILLING
EQUIPMENT, AND SIMILAR EQUIPMENT, SHALL BE MARKED WITH AN
ORANGE/WHITE CHECKERED FLAG ATTACHED TO THE HIGHEST STATIONARY
PART OF THE PIECE OF EQUIPMENT;
B) ALL OTHER CONSTRUCTION-RELATED VEHICLES, SUCH AS
SUPERVISOR'S VEHICLES, EQUIPMENT MAINTENANCE AND SUPPORT
VEHICLES (STEP VANS, ONE-TON PICK-UPS, ETC.), DUMP TRUCKS THAT
TRANSPORT MATERIALS BETWEEN OFF-SITE AND ON-SITE LOCATIONS, AND
SIMILAR EQUIPMENT, SHALL BE LIGHTED WITH A YELLOW FLASHING BEACON
THAT IS VISIBLE DURING BOTH LOW VISIBILITY AND DAYLIGHT CONDITIONS
AND MARKED WITH PERMANENT OR MAGNETIC PLACARDS IDENTIFYING THE
COMPANY NAME ON BOTH SIDES OF THE VEHICLE.
NOTES:
2. THE FLAG SHALL BE A 3 FOOT SQUARE HAVING A CHECKERED PATTERN
OF ORANGE AND WHITE SQUARES AT LEAST 1 FOOT ON EACH SIDE.
3. NO SEPARATE MEASUREMENT OR PAYMENT SHALL BE MADE FOR TRUCK
SIGNAL FLAGS OR FLASHING BEACONS. PAYMENT WILL BE MADE UNDER
THE UNIT PRICE FOR MOBILIZATION (SPECIFICATION SECTION GP-105).
SEE NOTE 4
EXISTING GROUND LINE
FLAG POLE 2" SCHEDULE 40
PVC PIPE OR WOOD LATHE
20" x 20" FLUORESCENT
ORANGE PLASTIC FLAG
SECURE FLAG TO POLE
FLAG LINE DETAIL
N.T.S.
1. SPACE FLAG POLES ON 50 FOOT CENTERS.
2. THE CONTRACTOR SHALL ERECT THE FLAG LINE AT THE
LOCATIONS AS SHOWN ON THE PLANS OR AS DIRECTED BY THE
ENGINEER.
3. THE CONTRACTOR SHALL SECURE THE FLAG POLES SO THAT
THE TOP OF THE FLAG IS 4 FEET ABOVE THE GROUND.
4. THE FLAG POLES SHALL BE ADEQUATELY SECURED TO
WITHSTAND JETBLAST AND REMAIN ERECT AND STABLE.
5. INSPECT FLAGS DAILY. REPAIR OR REPLACE DAMAGED OR
WORN FLAGS AND POLES BY THE START OF THE NEXT DAY'S
WORK ACTIVITIES.
6. INCIDENTAL TO ITEM GP-105 MOBILIZATION.
NOTES:
4'
50'
FLASHING LIGHT (ALL LIGHTS
SHALL HAVE THE ABILITY TO BE
STEADY BURNING AND FLASHING)
TRAILER MOUNTED
CLOSURE CROSS
AVIATION YELLOW
POWER SUPPLY
8'±
OMNI-DIRECTIONAL
SOLAR RED FLASHER
MIN. 6" ORANGE
REFLECTIVE STRIPES
WATER
RELEASE
VALVE
<18"
OMNI-DIRECTIONAL
SOLAR RED FLASHER
1. LIGHTED RUNWAY CLOSED MARKER SHALL MEET THE REQUIREMENTS OF FAA
ADVISORY CIRCULAR 150/5345-55A, SPECIFICATION FOR L-893 LIGHTED VISUAL AID
TO INDICATE TEMPORARY RUNWAY CLOSURE
2. THE CONTRACTOR SHALL PROVIDE TWO (2) MARKERS FOR USE ON THIS PROJECT
3. MARKER SHALL BE PLACED ON THE RUNWAY CENTERLINE WITHIN 250FEET OF
THE RUNWAY END. CONTRACTOR SHALL COORDINATE PLACEMENT WITH THE
AIRPORT
4. THE CONTRACTOR SHALL TRANSPORT, POSITION, OPERATE, FUEL, REPLACE
BULBS (IF REQUIRED), AND MAINTAIN (IN ACCORDANCE WITH MANUFACTURER'S
RECOMMENDATIONS) THE MARKERS DURING THE PROJECT
5. NO SEPARATE MEASUREMENT OR PAYMENT SHALL BE MADE FOR LIGHTED
RUNWAY CLOSURE MARKER. PAYMENTS WILL BE MADE UNDER THE UNIT PRICE
FOR MOBILIZATION (SPECIFICATION SECTION C-105)
NOTES:
NO SEPARATE MEASUREMENT OR PAYMENT SHALL BE MADE FOR CRUSHED
STONE CONSTRUCTION EXIT. PAYMENT WILL BE MADE UNDER THE UNIT
PRICE FOR MOBILIZATION (SPECIFICATION SECTION C-105)
BARRICADE NOTES:
1. FLASHER OR STEADY BURN LIGHTS SHALL BE BATTERY OR SOLAR POWER OPERATED.
LENS SHALL BE RED AND BE ABLE TO ROTATE 90º.
2. FACING OF BARRICADE SHALL BE COVERED WITH REFLECTIVE TAPE OR PAINT.
3. PROVIDE OMNI-DIRECTIONAL LIGHTS (2 PER BARRICADE) AND 20" X 20" SAFETY FLAGS (2
PER BARRICADE).
4. BARRICADES SHALL BE OF LOW MASS, EASILY COLLAPSIBLE UPON CONTACT WITH AN
AIRCRAFT OR ANY OF ITS COMPONENTS, AND WEIGHTED TO AVOID BEING BLOWN OVER.
5. BARRICADES SHALL BE OF A COMMERCIAL DESIGN AND COMPLIANT WITH FAA AC
150/5370-2 (LATEST VERSION).
6. THE CONTRACTOR SHALL BE RESPONSIBLE FOR SUPPLYING, REPLACING, AND DISPOSING
OF BATTERIES. OLD BATTERIES SHALL BE DISPOSED OFF AIRPORT PROPERTY.
14'
3.5
LOW-LEVEL LIGHTED BARRICADE DETAIL
N.T.S.
EXIT DIAGRAM
FLOW
FLOW
(IF NEEDED)
6" MIN.
ENTRANCE ELEVATION
6" MIN.
NOTES:
1. Avoid locating on steep slopes or at curves on public roads.
2. Remove all vegetation and other unsuitable material from the foundation area, grade, and crown for positive drainage.
3. Aggregate size shall be in accordance with National Stone Association R-2 (1.5"-3.5" Stone).
4. Gravel pad shall have a minimum thickness of 6".
5. Pad width shall be equal full width at all points of vehicular egress, but no less than 20'.
6. A diversion ridge should be constructed when grade toward paved area is greater than 2%..
7. Install pipe under the entrance if needed to maintain drainage ditches.
8. When washing is required, it should be done on an area stabilized with crushed stone that drains into an approved sediment trap or sediment basin (divert all surface runoff and drainage from the entrance to a sediment control device).
9. Washracks and/or tire washers may be required depending on scale and circumstance. If necessary, washrack design may consist of any material suitable for truck traffic that remove mud and dirt.
10. Maintain area in a way that prevents tracking and/or flow of mud onto public rights-of-ways. This may require top dressing, repair and/or cleanout of any measures used to trap sediment.
LIGHTED RUNWAY CLOSURE MARKER
N.T.S.
CONSTRUCTION EXIT DETAIL
N.T.S.
G-502
PROJECT SAFETY
PHASING DETAILS
20080302-G-100.DWG
JMM
JJM
20080302
JMM
MJR
RICHARD B. RUSSELL
REGIONAL AIRPORT
ROME, GA
RUNWAY 1/19 AND
PARALLEL TAXIWAY
EXTENSION
PAVING, LIGHTING, AND
MARKING PACKAGE
ISSUED FOR BID SET
TSATSATSATSATSATSA
TSA
TSATSATSATSA
RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA
ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA
R S
A R
S A
R S
A
ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA
RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA
BENCHMARK #1
TERMINAL BUILDING
BENCHMARK #2
BENCHMARK #3
RUNWAY 1-19
TA
X
IW
A
Y
BR
U N
W A
Y 7-25
TAXIWAY A
TAXIWAY A
TAXIW
AY E
TA
X
IW
A
Y B
BENCHMARK #4 BENCHMARK #5
BENCHMARK #6
T A
X
IW
A Y
D
JONES MILL RD
THIS BAR IS EQUAL TO 2" AT FULL SCALE (22X34)
SHEET OF
SHEET TITLE
COPYRIGHT:
CAD DWG FILE:
DRAWN BY:
CHECKED BY:
DESCRIPTIONDATEMARK
CONSULTANTS
P at h:
K
:\r ic ha rd ru ss el la p\
-0
0_ rm gr w y1 -1
9e xt ph 1\
D ra w \S he et s\
-G
-8
.d w g D at e:
T hu rs da y, N ov em be r
2, :3
5:
A M
DESIGNED BY:
APPROVED BY:
OWNER
CMT PROJECT NO:
CRAWFORD, MURPHY & TILLY, INC. 2021A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
BENCHMARK DESCRIPTION
ELEVATION
BM #1
634.42
CITY OF ROME SURVEY MONUMENT
DISC 54
N 1584628.60 E 1995977.32
BENCHMARK DESCRIPTION
ELEVATION
BM #2
631.03
CORNER OF CONCRETE SLAB
N 1585518.97 E 1995882.68
NOTE:
BENCHMARK INFORMATION PROVIDED BY HORNE ASSOCIATES LAND
SURVEYORS FROM SURVEYS CONDUCTED JANUARY 2009. CONTRACTOR IS
RESPONSIBLE FOR VERIFICATION OF EXISTING BENCHMARK DATA AND
RELOCATING AND/OR RE-ESTABLISHING MONUMENTS THAT ARE AFFECTED
BY CONSTRUCTION ACTIVITIES. NO SEPARATE MEASUREMENT OR PAYMENT
WILL BE MADE FOR RELOCATING AND/OR RE-ESTABLISHING MONUMENTS.
COST OF THIS WORK IS CONSIDERED INCIDENTAL TO THE PROJECT.
BENCHMARK DESCRIPTION
ELEVATION
BM #3
626.80
BRASS DISC IN CONCRETE
N 1585841.36 E 1996837.72
BENCHMARK DESCRIPTION
ELEVATION
BM #4
624.04
NAIL IN GRASS
N 1586353.87 E 1997292.71
BENCHMARK DESCRIPTION
ELEVATION
BM #5
622.41
NAIL IN GRASS
N 1587265.29 E 1997377.50
BENCHMARK DESCRIPTION
ELEVATION
BM #6
619.73
NAIL IN GRASS
N 1588313.63 E 1997623.76
BENCHMARK DESCRIPTION
ELEVATION
BM #7
603.97
NAIL IN GRASS
N 1589431.33 E 1997744.42
G-801
PROJECT
BENCHMARK PLAN
20080302-G-800.DWG
JMM
JJM
20080302
JMM
MJR
RICHARD B. RUSSELL
REGIONAL AIRPORT
ROME, GA
RUNWAY 1/19 AND
PARALLEL TAXIWAY
EXTENSION
PAVING, LIGHTING, AND
MARKING PACKAGE
ISSUED FOR BID SET
Feet 0 200 400
TAXIWAY "C"
49+00 50+00 51+00 52+00 53+00 54+00 55+00 56+00 57+00 58+00 59+00 60+00 61+00 62+00
0+
1+
2+
3+
4+
5+
306+00
307+00 308+00 309+00 310+00 311+00 312+00 313+00 314+00 315+00
49+00 50+00 51+00 52+00 53+00 54+00 55+00 56+00 57+00 58+00 59+00 60+00 61+00 62+00
0+
1+
2+
3+
4+
5+
306+00
307+00 308+00 309+00 310+00 311+00 312+00 313+00 314+00 315+00
C B
TXY-ATXY-ATXY-ATXY-ATXY-ATXY-ATXY-A
TXY-A
TXY-A
TXY-A
TXY-A
TXY-A
T X
Y -A
T X
Y -A
T X
Y -A
TX
Y-
A
TXY-A
TXY-A
TXY-A
TXY-A
TXY-A TXY-A TXY-A TXY-A TXY-A TXY-A TXY-A TXY-A TXY-A TXY-A TXY-A
1-19
1-19 1-19 1-19 1-19 1-19 1-19 1-19 1-19 1-19 1-19 1-19
1-19
1-19 1-19
1-19
1-19 1-19 1-19 1-19 1-19 1-19 1-19 1-19 1-19 1-19
1-19 1-19
T X
Y -A
TX
Y-A
T X
Y -A
TX
Y-A PAPI 01
PAPI 01
PAPI 01
PAPI 01 PAPI 01 PAPI 01
PAPI 01
50+00 55+00 60+00
0+
5+
310+00 315+00
THIS BAR IS EQUAL TO 2" AT FULL SCALE (22X34)
SHEET OF
SHEET TITLE
COPYRIGHT:
CAD DWG FILE:
DRAWN BY:
CHECKED BY:
DESCRIPTIONDATEMARK
CONSULTANTS
P at h:
K
:\r ic ha rd ru ss el la p\
-0
0_ rm gr w y1 -1
9e xt ph 1\
D ra w \S he et s\
-C
D -1
.d w g
D at e:
T hu rs da y, N ov em be r 2, :3 6:
A
M
DESIGNED BY:
APPROVED BY:
OWNER
CMT PROJECT NO:
CRAWFORD, MURPHY & TILLY, INC. 2021A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
REMOVE EXISTING THRESHOLD MARKINGS
1. EXISTING LIGHTS, GUIDANCE SIGNS, AND AIRFIELD CIRCUITS, ARE TO
BE PROTECTED FROM DAMAGE. CONTRACTOR IS TO REPAIR ALL
DAMAGED EQUIPMENT AND CIRCUITS AT HIS EXPENSE.
2. CONTRACTOR SHALL FIELD INVESTIGATE AND VERIFY EXISTING
CIRCUIT ROUTING. INSTALL JUMPERS BETWEEN EXISTING LIGHTS TO
KEEP EXISTING CIRCUITS OPERATIONAL FOR EACH CONSTRUCTION
PHASE AS LISTED ON PHASING SHEETS. THE COST OF ALL TEMPORARY
CONNECTIONS SHALL BE INCIDENTAL TO THE CONTRACT.
3. REMOVE EXISTING BLANK PANELS AND INSTALL (OWNER FURNISHED)
PANELS FOR ALL EXISTING RUNWAY DISTANCE REMAINING SIGNS.
NOTES :
M A
T C
H
LIN
E S
E E
S H
E E
T C
D -102
RUNWAY 1-19
TAXIWAY A
LEGEND
EXISTING STORM PIPESD
MARKING REMOVAL
0-2" PAVEMENT MILLING
EXISTING DUCT BANK
EXISTING TAXIWAY SIGN
EXISTING PAVEMENT
PROPOSED PAVEMENT
REMOVE EXISTING LIGHT AND SIGN
EXISTING SPLICE CAN
RUNWAY CIRCUIT 1-19
EXISTING TAXIWAY EDGE LIGHT
EXISTING RUNWAY EDGE LIGHT
EXISTING CATCH BASINCB
TAXIWAY CIRCUIT A
1-19
TXY-A
EXISTING CULVERT
(SEE NOTE 3)
CD-101
EXISTING
CONDITIONS AND
REMOVALS - 1
20080302-CD-100.DWG
JBH
JMM
20080302
JMM
MJR
RICHARD B. RUSSELL
REGIONAL AIRPORT
ROME, GA
RUNWAY 1/19 AND
PARALLEL TAXIWAY
EXTENSION
PAVING, LIGHTING, AND
MARKING PACKAGE
ISSUED FOR BID SET
Feet 0 50 100
AutoCAD SHX Text E
E
62+00 63+00 64+00 65+00 66+00 67+00 68+00 69+00 70+00 71+00 72+00 73+00 74+00 75+00
315+00 316+00 317+00 318+00 319+00 320+00 321+00 322+00 323+00 324+00 325+00 326+00 327+00 328+00
62+00 63+00 64+00 65+00 66+00 67+00 68+00 69+00 70+00 71+00 72+00 73+00 74+00 75+00
315+00 316+00 317+00 318+00 319+00 320+00 321+00 322+00 323+00 324+00 325+00 326+00 327+00 328+00
B
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
TXY-ATXY-ATXY-ATXY-ATXY-ATXY-ATXY-ATXY-ATXY-ATXY-ATXY-ATXY-ATXY-A
T X
Y -A
T X
Y -A
T X
Y -A
T X
Y -A
TXY-ATXY-ATXY-ATXY-ATXY-ATXY-ATXY-ATXY-ATXY-ATXY-ATXY-ATXY-A
T X
Y -A
TXY-A TXY-A TXY-A
TXY-A
T X
Y -A
T X
Y -A
T X
Y -A
T X
Y -A
1-19 1-19
1-19 1-19 1-19 1-19 1-19 1-19 1-19 1-19 1-19 1-19 1-191-19 1-19
1-
1-19 1-19 1-19 1-19 1-19 1-19 1-19 1-19 1-19
1-19
1-19
1-19
1-
1-19
T X
Y -A
T X
Y -A
PAPI 01 PAPI 01 PAPI 01
PAPI 01
PAPI 01
PAPI 01
PAPI 01
PAPI 01
PAPI 01
PAPI 01 PAPI 01 PAPI 01 PAPI 01 PAPI 01 PAPI 01 PAPI 01 PAPI 01 PAPI 01 PAPI 01 PAPI 01 PAPI 01 PAPI 01 PAPI 01 PAPI 01
65+00 70+00 75+00
315+00 320+00 325+00
THIS BAR IS EQUAL TO 2" AT FULL SCALE (22X34)
SHEET OF
SHEET TITLE
COPYRIGHT:
CAD DWG FILE:
DRAWN BY:
CHECKED BY:
DESCRIPTIONDATEMARK
CONSULTANTS
P at h:
K
:\r ic ha rd ru ss el la p\
-0
0_ rm gr w y1 -1
9e xt ph 1\
D ra w \S he et s\
-C
D -1
.d w g
D at e:
T hu rs da y, N ov em be r 2, :3 6:
A
M
DESIGNED BY:
APPROVED BY:
OWNER
CMT PROJECT NO:
CRAWFORD, MURPHY & TILLY, INC. 2021A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
NOTES :
M A
T C
H L
IN
E
S E
E S
H E
E T
C D
-1
M A
T C
H
LIN
E S
E E
S H
E E
T C
D -103
RUNWAY 1-19
T A
X
IW
A Y
C
TAXIWAY A
1. EXISTING LIGHTS, GUIDANCE SIGNS, AND AIRFIELD CIRCUITS, ARE TO
BE PROTECTED FROM DAMAGE. CONTRACTOR IS TO REPAIR ALL
DAMAGED EQUIPMENT AND CIRCUITS AT HIS EXPENSE.
2. CONTRACTOR SHALL FIELD INVESTIGATE AND VERIFY EXISTING
CIRCUIT ROUTING. INSTALL JUMPERS BETWEEN EXISTING LIGHTS TO
KEEP EXISTING CIRCUITS OPERATIONAL FOR EACH CONSTRUCTION
PHASE AS LISTED ON PHASING SHEETS. THE COST OF ALL TEMPORARY
CONNECTIONS SHALL BE INCIDENTAL TO THE CONTRACT.
3. REMOVE EXISTING BLANK PANELS AND INSTALL (OWNER FURNISHED)
PANELS FOR ALL EXISTING RUNWAY DISTANCE REMAINING SIGNS.
LEGEND
EXISTING STORM PIPESD
MARKING REMOVAL
0-2" PAVEMENT MILLING
EXISTING DUCT BANK
EXISTING TAXIWAY SIGN
EXISTING PAVEMENT
PROPOSED PAVEMENT
REMOVE EXISTING LIGHT AND SIGN
EXISTING SPLICE CAN
RUNWAY CIRCUIT 1-19
EXISTING TAXIWAY EDGE LIGHT
EXISTING RUNWAY EDGE LIGHT
EXISTING CATCH BASINCB
TAXIWAY CIRCUIT A
1-19
TXY-A
EXISTING CULVERT
(SEE NOTE 3)
CD-102
EXISTING
CONDITIONS AND
REMOVALS - 2
20080302-CD-100.DWG
JBH
JMM
20080302
JMM
MJR
RICHARD B. RUSSELL
REGIONAL AIRPORT
ROME, GA
RUNWAY 1/19 AND
PARALLEL TAXIWAY
EXTENSION
PAVING, LIGHTING, AND
MARKING PACKAGE
ISSUED FOR BID SET
Feet 0 50 100
AutoCAD SHX Text E
75+00 76+00 77+00 78+00 79+00 80+00 81+00 82+00 83+00 84+00 85+00 86+00 87+00 88+00
332+00 333+00
334+00 335+00 336+00 337+00 338+00 339+00 340+00 341+00
75+00 76+00 77+00 78+00 79+00 80+00 81+00 82+00 83+00 84+00 85+00 86+00 87+00 88+00
332+00 333+00
334+00 335+00 336+00 337+00 338+00 339+00 340+00 341+00B
B
B
SD
SD
SD
SD
C B
SD SD SD
CB
TXY-ATXY-ATXY-ATXY-A
TX
Y
-A
TXY-A TXY-A
TXY-A
TXY-A
TXY-A
TXY-A
TXY-A
TX
Y
-A
TX
Y
-A
TX
Y
-A
TXY-A
TX
Y
-A
TX
Y
-A
TX
Y
-A
TX
Y
-A
TXY-A TXY-A TXY-A TXY-A TXY-A TXY-A TXY-A TXY-A TXY-A
1-19
1-19
1-19 1-19 1-19 1-19 1-19
1-19
1-19
1-19 1-19
1-
1-19 1-19
1-
1-19 1-19 1-19
1-19
1-19
1-
1-19
1-19
1-19
1-
1-
1-19 1-19 1-19 1-19 1-19 1-19
TX
Y
-A
TX
Y
-A
TX
Y
-A
TX
Y
-A
PAPI 01 PAPI 01 PAPI 01
PAPI 01
PAPI 01
PAPI 01
PAPI 01
PAPI 01
PAPI 01
PAPI 01
PAPI 01 PAPI 01
PAPI 01
PAPI 01
PAPI 01
PAPI 01
PAPI 01 PAPI 01 PAPI 01 PAPI 01 PAPI 01
PAPI 19PAPI 19PAPI 19PAPI 19PAPI 19PAPI 19PAPI 19
PAPI 19
PAPI 19
PAPI 19
PAPI 19
PAPI 19
PAPI 19
PAPI 19 PAPI 19 PAPI 19 PAPI 19 PAPI 19
E E
75+00 80+00 85+00
21.4
20.0
29.8
60.0 57.0 10.4
335+00
340+00
THIS BAR IS EQUAL TO 2" AT FULL SCALE (22X34)
SHEET OF
SHEET TITLE
COPYRIGHT:
CAD DWG FILE:
DRAWN BY:
CHECKED BY:
DESCRIPTIONDATEMARK
CONSULTANTS
P at h:
K
:\r ic ha rd ru ss el la p\
-0
0_ rm gr w y1 -1
9e xt ph 1\
D ra w \S he et s\
-C
D -1
.d w g
D at e:
T hu rs da y, N ov em be r 2, :3 6:
A
M
DESIGNED BY:
APPROVED BY:
OWNER
CMT PROJECT NO:
CRAWFORD, MURPHY & TILLY, INC. 2021A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
NOTES :
M A
T C
H L
IN
E
S E
E S
H E
E T
C D
-1
M A
T C
H
LIN
E S
E E
S H
E E
T C
D -104
RUNWAY 1-19
R U
N W
A Y
7-25
TA
X
IW
A
Y B
TAXIWAY A
LEGEND
EXISTING STORM PIPESD
MARKING REMOVAL
0-2" PAVEMENT MILLING
EXISTING DUCT BANK
EXISTING TAXIWAY SIGN
EXISTING PAVEMENT
PROPOSED PAVEMENT
REMOVE EXISTING LIGHT AND…