The file's text, extracted by GovTribe without its formatting.
Rate Sheet
| EMERGENCY GENERATOR MAINTENANCE, INSPECTION, AND REPAIR SERVICES |
| Electronic bid packages include an Excel version of this Rate Sheet (Exhibit B-1) in addition to the PDF file in order to assist bidders in computing accurate totals. Bidders should download the Excel version and complete ALL highlighted cells. |
| The Contractor will be compensated for services performed in accordance with the applicable rate(s) specified on the Exhibit B-1. Rate Sheet which shall include all labor, personnel, transporation (including travel, per diem, fuel, and mileage), materials supplies, tools, any necessary equipment, permits, licenses, taxes, fee, shipping/freight charges, and every other item of expense necessary (unless otherwise specified herein) to provide all services identified herein for the California Department of Corrections and Rehabilitation (CDCR) locations identified on the Exhibit E, List of Participating Locations. |
| Bidders may bid on one or more locations. Bidders are not required to bid on all locations; however, bidders must include a rate for all items within that location. Failure to indicate a dollar amount (blank cell) on any item may be grounds to reject the entire bid for that location. A zero dollar amount ($0.00 or $-) listed for any and /or all items shall be interpreted and understood by the State to mean that the bidder will perform any such services at NO COST to the State. |
| Any and all services performed outside the scope of this Agreement shall be at the sole risk and expense of the Contractor. All prices and notations must be printed in ink or typewritten. All prices must be bid in U.S. currency and shall emcompass every item of expense necessary to perform the services. |
| Any quantities of equipment and service listed on Exhibit B-1, Rate Sheet are CDCR’s estimates only and are offered as a basis for the comparison of bids. The State does not expressly or by implication agree that the actual amount of equipment and service will correspond therewith and reserves the right to increase/omit portions of the equipment and service as may be deemed necessary or advisable by the State. |
| Each participating location's total basis of award includes a Rate Sheet line item totaling 25% of the sum of the bidder's service rate(s) to allow for additional as-needed, unforeseeable services. As-needed services will be payable at the applicable service rate(s) on the Exhibit |
B-1, Rate Sheet.
| All CDCR estimated quantities and Contractor provided rate are for the entire term of this agreement. |
| Contractor may offer a discount on invoices paid within thirty (30) days of receipt. Discount offered must be at least one percent and a minimum of $50.00. |
| Discount offered on invoices paid within 30 days of receipt = |
| In the event of a tie, absent other determining factors, the lowest responsible bid with the highest discount shall prevail. If the highest discounts' also tie, the awarded bidder shall be determined by a public coin toss. |
| There are no guarantees that any services will be requested from this agreement. |
| 1. CALIFORNIA CORRECTIONAL CENTER (CCC) |
| A. ANNUAL MAINTENANCE/INSPECTION SERVICES | | | | | | | |
| Equipment Description | Unit Cost | X | Estimated Quantity of Equipment | X | Estimated Quantity of Service | = | Total |
| 2000 KW Generator | | X | 1 | X | 3 | = | $ - 0 |
| 600 KW Generator | | X | 1 | X | 3 | = | $ - 0 |
| 375 KW Generator | | X | 1 | X | 3 | = | $ - 0 |
| 12.5 KW Generator | | X | 1 | X | 3 | = | $ - 0 |
| 100 KW Generator | | X | 1 | X | 3 | = | $ - 0 |
| 60 KW Generator | | X | 1 | X | 3 | = | $ - 0 |
| 45 KW Generator | | X | 1 | X | 3 | = | $ - 0 |
| TOTAL FOR LINE A | | | | | | $ - 0 |
| B. QUARTERLY MAINTENANCE/INSPECTION SERVICES | | | | | | | |
| Equipment Description | Unit Cost | X | Estimated Quantity of Equipment | X | Estimated Quantity of Service | = | Total |
| 2000 KW Generator | | X | 1 | X | 12 | = | $ - 0 |
| 600 KW Generator | | X | 1 | X | 12 | = | $ - 0 |
| 375 KW Generator | | X | 1 | X | 12 | = | $ - 0 |
| 12.5 KW Generator | | X | 1 | X | 12 | = | $ - 0 |
| 100 KW Generator | | X | 1 | X | 12 | = | $ - 0 |
| 60 KW Generator | | X | 1 | X | 12 | = | $ - 0 |
| 45 KW Generator | | X | 1 | X | 12 | = | $ - 0 |
| TOTAL FOR LINE B | | | | | | $ - 0 |
| C. ONE-TIME SERVICE | | | | | | | |
| Equipment Description | Unit Cost | X | Estimated Quantity of Equipment | X | Estimated Quantity of Service | = | Total |
| 2000 KW Generator | | X | 1 | X | 1 | = | $ - 0 |
| 600 KW Generator | | X | 1 | X | 1 | = | $ - 0 |
| 375 KW Generator | | X | 1 | X | 1 | = | $ - 0 |
| 12.5 KW Generator | | X | 1 | X | 1 | = | $ - 0 |
| 100 KW Generator | | X | 1 | X | 1 | = | $ - 0 |
| 60 KW Generator | | X | 1 | X | 1 | = | $ - 0 |
| 45 KW Generator | | X | 1 | X | 1 | = | $ - 0 |
| TOTAL FOR LINE C | | | | | | $ - 0 |
| D. LOAD BANK TESTING | | | | | | | |
| Equipment Description | Unit Cost | X | Estimated Quantity of Equipment | X | Estimated Quantity of Service | = | Total |
| 2000 KW Generator | | X | 1 | X | 3 | = | $ - 0 |
| 600 KW Generator | | X | 1 | X | 3 | = | $ - 0 |
| 375 KW Generator | | X | 1 | X | 3 | = | $ - 0 |
| 12.5 KW Generator | | X | 1 | X | 3 | = | $ - 0 |
| 100 KW Generator | | X | 1 | X | 3 | = | $ - 0 |
| 60 KW Generator | | X | 1 | X | 3 | = | $ - 0 |
| 45 KW Generator | | X | 1 | X | 3 | = | $ - 0 |
| TOTAL FOR LINE D | | | | | | $ - 0 |
| 1. CALIFORNIA CORRECTIONAL CENTER (CCC) | | | | |
| E. NORMAL BUSINESS HOURLY REPAIR RATE | | | | |
| Rate per Hour | Estimated Hours | | | Total |
| | X | 100 | $ - 0 |
| F. OUTSIDE NORMAL BUSINESS HOURS REPAIR RATE | | | | | |
| Rate per Hour | Estimated Hours | | | | Total |
| Calculation: Repair Hourly Rate times 1.5 | | X | 40 | HOURLY X 1.5 | $ - 0 |
| G. EMERGENCY CALL HOURLY RATE | | | | |
| Rate per Hour | Estimated Hours | | | Total |
| | X | 40 | $ - 0 |
H. Estimated Parts/Generator Rental/Replacement for Entire Contract Term $ 200,000.00
I. As-Needed Services $ - 0
TOTAL BASIS OF AWARD FOR CCC (A+B+C+D+E+F+G+H) $ - 0
| 2. CENTRAL CALIFORNIA WOMEN'S FACILITY (CCWF) | | | | | | | |
| A. ANNUAL MAINTENANCE/INSPECTION SERVICES | | | | | | | |
| Equipment Description | Unit Cost | X | Estimated Quantity of Equipment | X | Estimated Quantity of Service | = | Total |
| 1000 KW Generator | | X | 2 | X | 3 | = | $ - 0 |
| 400 KW Generator | | X | 1 | X | 3 | = | $ - 0 |
| 500 KW Generator | | X | 1 | X | 3 | = | $ - 0 |
| 125 KW Generator | | X | 1 | X | 3 | = | $ - 0 |
| 50 KW Generator | | X | 1 | X | 3 | = | $ - 0 |
| 15 KW Generator | | X | 1 | X | 3 | = | $ - 0 |
| Fire Pump | | X | 1 | X | 3 | = | $ - 0 |
| TOTAL FOR LINE A | | | | | | $ - 0 |
| B. QUARTERLY MAINTENANCE/INSPECTION SERVICES | | | | | | | |
| Equipment Description | Unit Cost | X | Estimated Quantity of Equipment | X | Estimated Quantity of Service | = | Total |
| 1000 KW Generator | | X | 2 | X | 12 | = | $ - 0 |
| 400 KW Generator | | X | 1 | X | 12 | = | $ - 0 |
| 500 KW Generator | | X | 1 | X | 12 | = | $ - 0 |
| 125 KW Generator | | X | 1 | X | 12 | = | $ - 0 |
| 50 KW Generator | | X | 1 | X | 12 | = | $ - 0 |
| 15 KW Generator | | X | 1 | X | 12 | = | $ - 0 |
| Fire Pump | | X | 1 | X | 12 | = | $ - 0 |
| TOTAL FOR LINE B | | | | | | $ - 0 |
| C. ONE-TIME SERVICE | | | | | | | |
| Equipment Description | Unit Cost | X | Estimated Quantity of Equipment | X | Estimated Quantity of Service | = | Total |
| 1000 KW Generator | | X | 2 | X | 3 | = | $ - 0 |
| 400 KW Generator | | X | 1 | X | 3 | = | $ - 0 |
| 500 KW Generator | | X | 1 | X | 3 | = | $ - 0 |
| 125 KW Generator | | X | 1 | X | 3 | = | $ - 0 |
| 50 KW Generator | | X | 1 | X | 3 | = | $ - 0 |
| 15 KW Generator | | X | 1 | X | 3 | = | $ - 0 |
| Fire Pump | | X | 1 | X | 3 | = | $ - 0 |
| TOTAL FOR LINE C | | | | | | $ - 0 |
| D. LOAD BANK TESTING | | | | | | | |
| Equipment Description | Unit Cost | X | Estimated Quantity of Equipment | X | Estimated Quantity of Service | = | Total |
| 1000 KW Generator | | X | 2 | X | 3 | = | $ - 0 |
| 400 KW Generator | | X | 1 | X | 3 | = | $ - 0 |
| 500 KW Generator | | X | 1 | X | 3 | = | $ - 0 |
| 125 KW Generator | | X | 1 | X | 3 | = | $ - 0 |
| 50 KW Generator | | X | 1 | X | 3 | = | $ - 0 |
| 15 KW Generator | | X | 1 | X | 3 | = | $ - 0 |
| Fire Pump | | X | 1 | X | 3 | = | $ - 0 |
| TOTAL FOR LINE D | | | | | | $ - 0 |
| 2. CENTRAL CALIFORNIA WOMEN'S FACILITY (CCWF) | | | | |
| E. NORMAL BUSINESS HOURLY REPAIR RATE | | | | |
| Rate per Hour | Estimated Hours | | | Total |
| | X | 100 | $ - 0 |
| F. OUTSIDE NORMAL BUSINESS HOURS REPAIR RATE | | | | | |
| Rate per Hour | Estimated Hours | | | | Total |
| Calculation: Repair Hourly Rate times 1.5 | | X | 100 | HOURLY X 1.5 | $ - 0 |
| G. EMERGENCY CALL HOURLY RATE | | | | |
| Rate per Hour | Estimated Hours | | | Total |
| | X | 100 | $ - 0 |
H. Estimated Parts/Generator Rental/Replacement for Entire Contract Term $ 500,000.00
I. As-Needed Services $ - 0
TOTAL BASIS OF AWARD FOR CCWF (A+B+C+D+E+F+G+H) $ - 0
| 3. CALIFORNIA HEALTH CARE FACILITY (CHCF) | | | | | | | |
| A. ANNUAL MAINTENANCE/INSPECTION SERVICES | | | | | | | |
| Equipment Description | Unit Cost | X | Estimated Quantity of Equipment | X | Estimated Quantity of Service | = | Total |
| 15 KW Generator | | X | 1 | X | 3 | = | $ - 0 |
| 2 MW Generator | | X | 6 | X | 3 | = | $ - 0 |
| 218 HP Generator | | X | 1 | X | 3 | = | $ - 0 |
| TOTAL FOR LINE A | | | | | | $ - 0 |
| B. QUARTERLY MAINTENANCE/INSPECTION SERVICES | | | | | | | |
| Equipment Description | Unit Cost | X | Estimated Quantity of Equipment | X | Estimated Quantity of Service | = | Total |
| 15 KW Generator | | X | 1 | X | 12 | = | $ - 0 |
| 2 MW Generator | | X | 6 | X | 12 | = | $ - 0 |
| 218 HP Generator | | X | 1 | X | 12 | = | $ - 0 |
| TOTAL FOR LINE B | | | | | | $ - 0 |
| C. ONE-TIME SERVICE | | | | | | | |
| Equipment Description | Unit Cost | X | Estimated Quantity of Equipment | X | Estimated Quantity of Service | = | Total |
| 15 KW Generator | | X | 1 | X | 1 | = | $ - 0 |
| 2 MW Generator | | X | 6 | X | 1 | = | $ - 0 |
| 218 HP Generator | | X | 1 | X | 1 | = | $ - 0 |
| TOTAL FOR LINE C | | | | | | $ - 0 |
| D. LOAD BANK TESTING | | | | | | | |
| Equipment Description | Unit Cost | X | Estimated Quantity of Equipment | X | Estimated Quantity of Service | = | Total |
| 15 KW Generator | | X | 1 | X | 3 | = | $ - 0 |
| 2 MW Generator | | X | 6 | X | 3 | = | $ - 0 |
| 218 HP Generator | | X | 1 | X | 3 | = | $ - 0 |
| TOTAL FOR LINE D | | | | | | $ - 0 |
| E. NORMAL BUSINESS HOURLY REPAIR RATE | | | | |
| Rate per Hour | Estimated Hours | | | Total |
| | X | 100 | $ - 0 |
| F. OUTSIDE NORMAL BUSINESS HOURS REPAIR RATE | | | | | |
| Rate per Hour | Estimated Hours | | | | Total |
| Calculation: Repair Hourly Rate times 1.5 | | X | 60 | HOURLY X 1.5 | $ - 0 |
| G. EMERGENCY CALL HOURLY RATE | | | | |
| Rate per Hour | Estimated Hours | | | Total |
| | X | 60 | $ - 0 |
H. Estimated Parts/Generator Rental/Replacement for Entire Contract Term $ 500,000.00
I. As-Needed Services $ - 0
TOTAL BASIS OF AWARD FOR CHCF (A+B+C+D+E+F+G+H) $ - 0
| 4. RICHARD A. MCGEE CORRECTIONAL TRAINING CENTER (CTC) | | | | | | | |
| A. ANNUAL MAINTENANCE/INSPECTION SERVICES | | | | | | | |
| Equipment Description | Unit Cost | X | Estimated Quantity of Equipment | X | Estimated Quantity of Service | = | Total |
| 300 KW Generator | | X | 1 | X | 3 | = | $ - 0 |
| TOTAL FOR LINE A | | | | | | $ - 0 |
| B. QUARTERLY MAINTENANCE/INSPECTION SERVICES | | | | | | | |
| Equipment Description | Unit Cost | X | Estimated Quantity of Equipment | X | Estimated Quantity of Service | = | Total |
| 300 KW Generator | | X | 1 | X | 12 | = | $ - 0 |
| TOTAL FOR LINE B | | | | | | $ - 0 |
| C. ONE-TIME SERVICE | | | | | | | |
| Equipment Description | Unit Cost | X | Estimated Quantity of Equipment | X | Estimated Quantity of Service | = | Total |
| 300 KW Generator | | X | 1 | X | 1 | = | $ - 0 |
| TOTAL FOR LINE C | | | | | | $ - 0 |
| D. LOAD BANK TESTING | | | | | | | |
| Equipment Description | Unit Cost | X | Estimated Quantity of Equipment | X | Estimated Quantity of Service | = | Total |
| 300 KW Generator | | X | 1 | X | 3 | = | $ - 0 |
| TOTAL FOR LINE D | | | | | | $ - 0 |
| E. NORMAL BUSINESS HOURLY REPAIR RATE | | | | |
| Rate per Hour | Estimated Hours | | | Total |
| | X | 60 | $ - 0 |
| F. OUTSIDE NORMAL BUSINESS HOURS REPAIR RATE | | | | | |
| Rate per Hour | Estimated Hours | | | | Total |
| Calculation: Repair Hourly Rate times 1.5 | | X | 0 | HOURLY X 1.5 | $ - 0 |
| G. EMERGENCY CALL HOURLY RATE | | | | |
| Rate per Hour | Estimated Hours | | | Total |
| | X | 0 | $ - 0 |
H. Estimated Parts/Generator Rental/Replacement for Entire Contract Term $ 100,000.00
I. As-Needed Services $ - 0
TOTAL BASIS OF AWARD FOR CTC (A+B+C+D+E+F+G+H) $ - 0
| 5. DEUEL VOCATIONAL INSTITUTION (DVI) | | | | | | | |
| A. ANNUAL MAINTENANCE/INSPECTION SERVICES | | | | | | | |
| Equipment Description | Unit Cost | X | Estimated Quantity of Equipment | X | Estimated Quantity of Service | = | Total |
| 550 KW Generator | | X | 1 | X | 3 | = | $ - 0 |
| 200 KW Generator | | X | 1 | X | 3 | = | $ - 0 |
| 125 KW Generator | | X | 1 | X | 3 | = | $ - 0 |
| 2 MW Generator | | X | 1 | X | 3 | = | $ - 0 |
| 1 MW Generator | | X | 1 | X | 3 | = | $ - 0 |
| TOTAL FOR LINE A | | | | | | $ - 0 |
| B. QUARTERLY MAINTENANCE/INSPECTION SERVICES | | | | | | | |
| Equipment Description | Unit Cost | X | Estimated Quantity of Equipment | X | Estimated Quantity of Service | = | Total |
| 550 KW Generator | | X | 1 | X | 12 | = | $ - 0 |
| 200 KW Generator | | X | 1 | X | 12 | = | $ - 0 |
| 125 KW Generator | | X | 1 | X | 12 | = | $ - 0 |
| 2 MW Generator | | X | 1 | X | 12 | = | $ - 0 |
| 1 MW Generator | | X | 1 | X | 12 | = | $ - 0 |
| TOTAL FOR LINE B | | | | | | $ - 0 |
| C. ONE-TIME SERVICE | | | | | | | |
| Equipment Description | Unit Cost | X | Estimated Quantity of Equipment | X | Estimated Quantity of Service | = | Total |
| 550 KW Generator | | X | 1 | X | 1 | = | $ - 0 |
| 200 KW Generator | | X | 1 | X | 1 | = | $ - 0 |
| 125 KW Generator | | X | 1 | X | 1 | = | $ - 0 |
| 2 MW Generator | | X | 1 | X | 1 | = | $ - 0 |
| 1 MW Generator | | X | 1 | X | 1 | = | $ - 0 |
| TOTAL FOR LINE C | | | | | | $ - 0 |
| D. LOAD BANK TESTING | | | | | | | |
| Equipment Description | Unit Cost | X | Estimated Quantity of Equipment | X | Estimated Quantity of Service | = | Total |
| 550 KW Generator | | X | 1 | X | 3 | = | $ - 0 |
| 200 KW Generator | | X | 1 | X | 3 | = | $ - 0 |
| 125 KW Generator | | X | 1 | X | 3 | = | $ - 0 |
| 2 MW Generator | | X | 1 | X | 3 | = | $ - 0 |
| 1 MW Generator | | X | 1 | X | 3 | = | $ - 0 |
| TOTAL FOR LINE D | | | | | | $ - 0 |
| E. NORMAL BUSINESS HOURLY REPAIR RATE | | | | |
| Rate per Hour | Estimated Hours | | | Total |
| | X | 120 | $ - 0 |
| F. OUTSIDE NORMAL BUSINESS HOURS REPAIR RATE | | | | | |
| Rate per Hour | Estimated Hours | | | | Total |
| Calculation: Repair Hourly Rate times 1.5 | | X | 120 | HOURLY X 1.5 | $ - 0 |
| G. EMERGENCY CALL HOURLY RATE | | | | |
| Rate per Hour | Estimated Hours | | | Total |
| | X | 80 | $ - 0 |
H. Estimated Parts/Generator Rental/Replacement for Entire Contract Term $ 100,000.00
I. As-Needed Services $ - 0
TOTAL BASIS OF AWARD FOR DVI (A+B+C+D+E+F+G+H) $ - 0
| 6. FOLSOM STATE PRISON (FSP) | | | | | | | |
| A. ANNUAL MAINTENANCE/INSPECTION SERVICES | | | | | | | |
| Equipment Description | Unit Cost | X | Estimated Quantity of Equipment | X | Estimated Quantity of Service | = | Total |
| 2500 KWGenerator | | X | 1 | X | 3 | = | $ - 0 |
| 400 KWGenerator | | X | 1 | X | 3 | = | $ - 0 |
| 250 KW Generator FWF | | X | 1 | X | 3 | = | $ - 0 |
| 52 KW Generator | | X | 2 | X | 3 | = | $ - 0 |
| 75 KW Generator | | X | 1 | X | 3 | = | $ - 0 |
| 20 KW Generator | | X | 1 | X | 3 | = | $ - 0 |
| 10 KW Generator FWF | | X | 1 | X | 3 | = | $ - 0 |
| TOTAL FOR LINE A | | | | | | $ - 0 |
| B. QUARTERLY MAINTENANCE/INSPECTION SERVICES | | | | | | | |
| Equipment Description | Unit Cost | X | Estimated Quantity of Equipment | X | Estimated Quantity of Service | = | Total |
| 2500 KWGenerator | | X | 1 | X | 12 | = | $ - 0 |
| 400 KWGenerator | | X | 1 | X | 12 | = | $ - 0 |
| 250 KW Generator FWF | | X | 1 | X | 12 | = | $ - 0 |
| 52 KW Generator | | X | 2 | X | 12 | = | $ - 0 |
| 75 KW Generator | | X | 1 | X | 12 | = | $ - 0 |
| 20 KW Generator | | X | 1 | X | 12 | = | $ - 0 |
| 10 KW Generator FWF | | X | 1 | X | 12 | = | $ - 0 |
| TOTAL FOR LINE B | | | | | | $ - 0 |
| C. ONE-TIME SERVICE | | | | | | | |
| Equipment Description | Unit Cost | X | Estimated Quantity of Equipment | X | Estimated Quantity of Service | = | Total |
| 2500 KWGenerator | | X | 1 | X | 1 | = | $ - 0 |
| 400 KWGenerator | | X | 1 | X | 1 | = | $ - 0 |
| 250 KW Generator FWF | | X | 1 | X | 1 | = | $ - 0 |
| 52 KW Generator | | X | 2 | X | 1 | = | $ - 0 |
| 75 KW Generator | | X | 1 | X | 1 | = | $ - 0 |
| 20 KW Generator | | X | 1 | X | 1 | = | $ - 0 |
| 10 KW Generator FWF | | X | 1 | X | 1 | = | $ - 0 |
| TOTAL FOR LINE C | | | | | | $ - 0 |
| D. LOAD BANK TESTING | | | | | | | |
| Equipment Description | Unit Cost | X | Estimated Quantity of Equipment | X | Estimated Quantity of Service | = | Total |
| 2500 KWGenerator | | X | 1 | X | 3 | = | $ - 0 |
| 400 KWGenerator | | X | 1 | X | 3 | = | $ - 0 |
| 250 KW Generator FWF | | X | 1 | X | 3 | = | $ - 0 |
| 52 KW Generator | | X | 2 | X | 3 | = | $ - 0 |
| 75 KW Generator | | X | 1 | X | 3 | = | $ - 0 |
| 20 KW Generator | | X | 1 | X | 3 | = | $ - 0 |
| 10 KW Generator FWF | | X | 1 | X | 3 | = | $ - 0 |
| TOTAL FOR LINE D | | | | | | $ - 0 |
| 6. FOLSOM STATE PRISON (FSP) | | | | |
| E. NORMAL BUSINESS HOURLY REPAIR RATE | | | | |
| Rate per Hour | Estimated Hours | | | Total |
| | X | 120 | $ - 0 |
| Rate per Hour | Estimated Hours | | | | Total |
| Calculation: Repair Hourly Rate times 1.5 | | X | 60 | HOURLY X 1.5 | $ - 0 |
| G. EMERGENCY CALL HOURLY RATE | | | | |
| Rate per Hour | Estimated Hours | | | Total |
| | X | 50 | $ - 0 |
H. Estimated Parts/Generator Rental/Replacement for Entire Contract Term $ 500,000.00
I. As-Needed Services $ - 0
TOTAL BASIS OF AWARD FOR FSP (A+B+C+D+E+F+G+H) $ - 0
| 7. HIGH DESERT STATE PRISON (HDSP) | | | | | | | |
| A. ANNUAL MAINTENANCE/INSPECTION SERVICES | | | | | | | |
| Equipment Description | Unit Cost | X | Estimated Quantity of Equipment | X | Estimated Quantity of Service | = | Total |
| 1750 KW Generator | | X | 4 | X | 3 | = | $ - 0 |
| 300 KW Generator | | X | 2 | X | 3 | = | $ - 0 |
| 12.5 KW Generator | | X | 1 | X | 3 | = | $ - 0 |
| Fire Pump | | X | 1 | X | 3 | = | $ - 0 |
| TOTAL FOR LINE A | | | | | | $ - 0 |
| B. QUARTERLY MAINTENANCE/INSPECTION SERVICES | | | | | | | |
| Equipment Description | Unit Cost | X | Estimated Quantity of Equipment | X | Estimated Quantity of Service | = | Total |
| 1750 KW Generator | | X | 4 | X | 12 | = | $ - 0 |
| 300 KW Generator | | X | 2 | X | 12 | = | $ - 0 |
| 12.5 KW Generator | | X | 1 | X | 12 | = | $ - 0 |
| Fire Pump | | X | 1 | X | 12 | = | $ - 0 |
| TOTAL FOR LINE B | | | | | | $ - 0 |
| C. ONE-TIME SERVICE | | | | | | | |
| Equipment Description | Unit Cost | X | Estimated Quantity of Equipment | X | Estimated Quantity of Service | = | Total |
| 1750 KW Generator | | X | 4 | X | 1 | = | $ - 0 |
| 300 KW Generator | | X | 2 | X | 1 | = | $ - 0 |
| 12.5 KW Generator | | X | 1 | X | 1 | = | $ - 0 |
| Fire Pump | | X | 1 | X | 1 | = | $ - 0 |
| TOTAL FOR LINE C | | | | | | $ - 0 |
| D. LOAD BANK TESTING | | | | | | | |
| Equipment Description | Unit Cost | X | Estimated Quantity of Equipment | X | Estimated Quantity of Service | = | Total |
| 1750 KW Generator | | X | 4 | X | 3 | = | $ - 0 |
| 300 KW Generator set | | X | 2 | X | 3 | = | $ - 0 |
| 12.5 KW Generator | | X | 1 | X | 3 | = | $ - 0 |
| Fire Pump | | X | 1 | X | 3 | = | $ - 0 |
| TOTAL FOR LINE D | | | | | | $ - 0 |
| E. NORMAL BUSINESS HOURLY REPAIR RATE | | | | |
| Rate per Hour | Estimated Hours | | | Total |
| | X | 64 | $ - 0 |
| F. OUTSIDE NORMAL BUSINESS HOURS REPAIR RATE | | | | | |
| Rate per Hour | Estimated Hours | | | | Total |
| Calculation: Repair Hourly Rate times 1.5 | | X | 24 | HOURLY X 1.5 | $ - 0 |
| G. EMERGENCY CALL HOURLY RATE | | | | |
| Rate per Hour | Estimated Hours | | | Total |
| | X | 24 | $ - 0 |
H. Estimated Parts/Generator Rental/Replacement for Entire Contract Term $ 500,000.00
I. As-Needed Services $ - 0
TOTAL BASIS OF AWARD FOR HDSP (A+B+C+D+E+F+G+H) $ - 0
| 8. MULE CREEK STATE PRISON (MCSP) | | | | | | | |
| A. ANNUAL MAINTENANCE/INSPECTION SERVICES | | | | | | | |
| Equipment Description | Unit Cost | X | Estimated Quantity of Equipment | X | Estimated Quantity of Service | = | Total |
| 2000 KW Generator | | X | 4 | X | 3 | = | $ - 0 |
| 9 KW Generator | | X | 1 | X | 3 | = | $ - 0 |
| 600 KW Generator | | X | 1 | X | 3 | = | $ - 0 |
| 275 KW Generator | | X | 1 | X | 3 | = | $ - 0 |
| 100 KW Generator | | X | 2 | X | 3 | = | $ - 0 |
| 62 KW Generator | | X | 1 | X | 3 | = | $ - 0 |
| 33 KW Generator | | X | 2 | X | 3 | = | $ - 0 |
| 15 KW Generator | | X | 2 | X | 3 | = | $ - 0 |
| TOTAL FOR LINE A | | | | | | $ - 0 |
| B. QUARTERLY MAINTENANCE/INSPECTION SERVICES | | | | | | | |
| Equipment Description | Unit Cost | X | Estimated Quantity of Equipment | X | Estimated Quantity of Service | = | Total |
| 2000 KW Generator | | X | 4 | X | 12 | = | $ - 0 |
| 9 KW Generator | | X | 1 | X | 12 | = | $ - 0 |
| 600 KW Generator | | X | 1 | X | 12 | = | $ - 0 |
| 275 KW Generator | | X | 1 | X | 12 | = | $ - 0 |
| 100 KW Generator | | X | 2 | X | 12 | = | $ - 0 |
| 62 KW Generator | | X | 1 | X | 12 | = | $ - 0 |
| 33 KW Generator | | X | 2 | X | 12 | = | $ - 0 |
| 15 KW Generator | | X | 2 | X | 12 | = | $ - 0 |
| TOTAL FOR LINE B | | | | | | $ - 0 |
| C. ONE-TIME SERVICE | | | | | | | |
| Equipment Description | Unit Cost | X | Estimated Quantity of Equipment | X | Estimated Quantity of Service | = | Total |
| 2000 KW Generator | | X | 4 | X | 1 | = | $ - 0 |
| 9 KW Generator | | X | 1 | X | 1 | = | $ - 0 |
| 600 KW Generator | | X | 1 | X | 1 | = | $ - 0 |
| 275 KW Generator | | X | 1 | X | 1 | = | $ - 0 |
| 100 KW Generator | | X | 2 | X | 1 | = | $ - 0 |
| 62 KW Generator | | X | 1 | X | 1 | = | $ - 0 |
| 33 KW Generator | | X | 2 | X | 1 | = | $ - 0 |
| 15 KW Generator | | X | 2 | X | 1 | = | $ - 0 |
| TOTAL FOR LINE C | | | | | | $ - 0 |
| D. LOAD BANK TESTING | | | | | | | |
| Equipment Description | Unit Cost | X | Estimated Quantity of Equipment | X | Estimated Quantity of Service | = | Total |
| 2000 KW Generator | | X | 4 | X | 3 | = | $ - 0 |
| 9 KW Generator | | X | 1 | X | 3 | = | $ - 0 |
| 600 KW Generator | | X | 1 | X | 3 | = | $ - 0 |
| 275 KW Generator | | X | 1 | X | 3 | = | $ - 0 |
| 100 KW Generator | | X | 2 | X | 3 | = | $ - 0 |
| 62 KW Generator | | X | 1 | X | 3 | = | $ - 0 |
| 33 KW Generator | | X | 2 | X | 3 | = | $ - 0 |
| 15 KW Generator | | X | 2 | X | 3 | = | $ - 0 |
| TOTAL FOR LINE D | | | | | | $ - 0 |
| 8. MULE CREEK STATE PRISON (MCSP) | | | | |
| E. NORMAL BUSINESS HOURLY REPAIR RATE | | | | |
| Rate per Hour | Estimated Hours | | | Total |
| | X | 160 | $ - 0 |
| F. OUTSIDE NORMAL BUSINESS HOURS REPAIR RATE | | | | | |
| Rate per Hour | Estimated Hours | | | | Total |
| Calculation: Repair Hourly Rate times 1.5 | | X | 100 | HOURLY X 1.5 | $ - 0 |
| G. EMERGENCY CALL HOURLY RATE | | | | |
| Rate per Hour | Estimated Hours | | | Total |
| | X | 100 | $ - 0 |
H. Estimated Parts/Generator Rental/Replacement for Entire Contract Term $ 500,000.00
I. As-Needed Services $ - 0
TOTAL BASIS OF AWARD FOR MCSP (A+B+C+D+E+F+G+H) $ - 0
| 9. NORTHERN CALIFORNIA WOMEN'S FACILITY (NCWF) | | | | | | | |
| A. ANNUAL MAINTENANCE/INSPECTION SERVICES | | | | | | | |
| Equipment Description | Unit Cost | X | Estimated Quantity of Equipment | X | Estimated Quantity of Service | = | Total |
| 475 KW Generator | | X | 1 | X | 3 | = | $ - 0 |
| 125 KW Generator | | X | 1 | X | 3 | = | $ - 0 |
| TOTAL FOR LINE A | | | | | | $ - 0 |
| B. QUARTERLY MAINTENANCE/INSPECTION SERVICES | | | | | | | |
| Equipment Description | Unit Cost | X | Estimated Quantity of Equipment | X | Estimated Quantity of Service | = | Total |
| 475 KW Generator | | X | 1 | X | 12 | = | $ - 0 |
| 125 KW Generator | | X | 1 | X | 12 | = | $ - 0 |
| TOTAL FOR LINE B | | | | | | $ - 0 |
| C. ONE-TIME SERVICE | | | | | | | |
| Equipment Description | Unit Cost | X | Estimated Quantity of Equipment | X | Estimated Quantity of Service | = | Total |
| 475 KW Generator | | X | 1 | X | 1 | = | $ - 0 |
| 125 KW Generator | | X | 1 | X | 1 | = | $ - 0 |
| TOTAL FOR LINE C | | | | | | $ - 0 |
| D. LOAD BANK TESTING | | | | | | | |
| Equipment Description | Unit Cost | X | Estimated Quantity of Equipment | X | Estimated Quantity of Service | = | Total |
| 475 KW Generator | | X | 1 | X | 3 | = | $ - 0 |
| 125 KW Generator | | X | 1 | X | 3 | = | $ - 0 |
| TOTAL FOR LINE D | | | | | | $ - 0 |
| E. NORMAL BUSINESS HOURLY REPAIR RATE | | | | |
| Rate per Hour | Estimated Hours | | | Total |
| | X | 100 | $ - 0 |
| F. OUTSIDE NORMAL BUSINESS HOURS REPAIR RATE | | | | | |
| Rate per Hour | Estimated Hours | | | | Total |
| Calculation: Repair Hourly Rate times 1.5 | | X | 40 | HOURLY X 1.5 | $ - 0 |
| G. EMERGENCY CALL HOURLY RATE | | | | |
| Rate per Hour | Estimated Hours | | | Total |
| | X | 40 | $ - 0 |
H. Estimated Parts/Generator Rental/Replacement for Entire Contract Term $ 100,000.00
I. As-Needed Services $ - 0
TOTAL BASIS OF AWARD FOR NCWF (A+B+C+D+E+F+G+H) $ - 0
| 10. NORTHERN CALIFORNIA YOUTH CORRECTIONAL CENTER (NCYCC) | | | | | | | |
| A. ANNUAL MAINTENANCE/INSPECTION SERVICES | | | | | | | |
| Equipment Description | Unit Cost | X | Estimated Quantity of Equipment | X | Estimated Quantity of Service | = | Total |
| 1000 KW Generator | | X | 1 | X | 3 | = | $ - 0 |
| 80 KW Generator | | X | 1 | X | 3 | = | $ - 0 |
| 75 KW Generator | | X | 1 | X | 3 | = | $ - 0 |
| 45 KW Generator | | X | 2 | X | 3 | = | $ - 0 |
| 30 KW Geneter | | X | 1 | X | 3 | = | $ - 0 |
| 25 KW Generator | | X | 1 | X | 3 | = | $ - 0 |
| 1 M Generator | | X | 1 | X | 3 | = | $ - 0 |
| TOTAL FOR LINE A | | | | | | $ - 0 |
| B. QUARTERLY MAINTENANCE/INSPECTION SERVICES | | | | | | | |
| Equipment Description | Unit Cost | X | Estimated Quantity of Equipment | X | Estimated Quantity of Service | = | Total |
| 1000 KW Generator | | X | 1 | X | 12 | = | $ - 0 |
| 80 KW Generator | | X | 1 | X | 12 | = | $ - 0 |
| 75 KW Generator | | X | 1 | X | 12 | = | $ - 0 |
| 45 KW Generator | | X | 2 | X | 12 | = | $ - 0 |
| 30 KW Geneter | | X | 1 | X | 12 | = | $ - 0 |
| 25 KW Generator | | X | 1 | X | 12 | = | $ - 0 |
| 1 M Generator | | X | 1 | X | 12 | = | $ - 0 |
| TOTAL FOR LINE B | | | | | | $ - 0 |
| C. ONE-TIME SERVICE | | | | | | | |
| Equipment Description | Unit Cost | X | Estimated Quantity of Equipment | X | Estimated Quantity of Service | = | Total |
| 1000 KW Generator | | X | 1 | X | 1 | = | $ - 0 |
| 80 KW Generator | | X | 1 | X | 1 | = | $ - 0 |
| 75 KW Generator | | X | 1 | X | 1 | = | $ - 0 |
| 45 KW Generator | | X | 2 | X | 1 | = | $ - 0 |
| 30 KW Geneter | | X | 1 | X | 1 | = | $ - 0 |
| 25 KW Generator | | X | 1 | X | 1 | = | $ - 0 |
| 1 M Generator | | X | 1 | X | 1 | = | $ - 0 |
| TOTAL FOR LINE C | | | | | | $ - 0 |
| D. LOAD BANK TESTING | | | | | | | |
| Equipment Description | Unit Cost | X | Estimated Quantity of Equipment | X | Estimated Quantity of Service | = | Total |
| 1000 KW Generator | | X | 1 | X | 3 | = | $ - 0 |
| 80 KW Generator | | X | 1 | X | 3 | = | $ - 0 |
| 75 KW Generator | | X | 1 | X | 3 | = | $ - 0 |
| 45 KW Generator | | X | 2 | X | 3 | = | $ - 0 |
| 30 KW Geneter | | X | 1 | X | 3 | = | $ - 0 |
| 25 KW Generator | | X | 1 | X | 3 | = | $ - 0 |
| 1 M Generator | | X | 1 | X | 3 | = | $ - 0 |
| TOTAL FOR LINE D | | | | | | $ - 0 |
| 10. NORTHERN CALIFORNIA YOUTH CORRECTIONAL CENTER (NCYCC) | | | | |
| E. NORMAL BUSINESS HOURLY REPAIR RATE | | | | |
| Rate per Hour | Estimated Hours | | | Total |
| | X | 40 | $ - 0 |
| F. OUTSIDE NORMAL BUSINESS HOURS REPAIR RATE | | | | | |
| Rate per Hour | Estimated Hours | | | | Total |
| Calculation: Repair Hourly Rate times 1.5 | | X | 5 | HOURLY X 1.5 | $ - 0 |
| G. EMERGENCY CALL HOURLY RATE | | | | |
| Rate per Hour | Estimated Hours | | | Total |
| | X | 5 | $ - 0 |
H. Estimated Parts/Generator Rental/Replacement for Entire Contract Term $ 100,000.00
I. As-Needed Services $ - 0
TOTAL BASIS OF AWARD FOR NCYCC (A+B+C+D+E+F+G+H) $ - 0
| 11. CALIFORNIA STATE PRISON-SACRAMENTO (SAC) | | | | | | | |
| A. ANNUAL MAINTENANCE/INSPECTION SERVICES | | | | | | | |
| Equipment Description | Unit Cost | X | Estimated Quantity of Equipment | X | Estimated Quantity of Service | = | Total |
| 750 KW Generator | | X | 1 | X | 3 | = | $ - 0 |
| 500 KW Generator | | X | 4 | X | 3 | = | $ - 0 |
| 300 KW Generator | | X | 2 | X | 3 | = | $ - 0 |
| 150 KW Generator | | X | 1 | X | 3 | = | $ - 0 |
| 100 KW Generator | | X | 1 | X | 3 | = | $ - 0 |
| 15 KW Generator | | X | 1 | X | 3 | = | $ - 0 |
| Fire Pump | | X | 1 | X | 3 | = | $ - 0 |
| TOTAL FOR LINE A | | | | | | $ - 0 |
| B. QUARTERLY MAINTENANCE/INSPECTION SERVICES | | | | | | | |
| Equipment Description | Unit Cost | X | Estimated Quantity of Equipment | X | Estimated Quantity of Service | = | Total |
| 750 KW Generator | | X | 1 | X | 12 | = | $ - 0 |
| 500 KW Generator | | X | 4 | X | 12 | = | $ - 0 |
| 300 KW Generator | | X | 2 | X | 12 | = | $ - 0 |
| 150 KW Generator | | X | 1 | X | 12 | = | $ - 0 |
| 100 KW Generator | | X | 1 | X | 12 | = | $ - 0 |
| 15 KW Generator | | X | 1 | X | 12 | = | $ - 0 |
| Fire Pump | | X | 1 | X | 12 | = | $ - 0 |
| TOTAL FOR LINE B | | | | | | $ - 0 |
| C. ONE-TIME SERVICE | | | | | | | |
| Equipment Description | Unit Cost | X | Estimated Quantity of Equipment | X | Estimated Quantity of Service | = | Total |
| 750 KW Generator | | X | 1 | X | 1 | = | $ - 0 |
| 500 KW Generator | | X | 4 | X | 1 | = | $ - 0 |
| 300 KW Generator | | X | 2 | X | 1 | = | $ - 0 |
| 150 KW Generator | | X | 1 | X | 1 | = | $ - 0 |
| 100 KW Generator | | X | 1 | X | 1 | = | $ - 0 |
| 15 KW Generator | | X | 1 | X | 1 | = | $ - 0 |
| Fire Pump | | X | 1 | X | 1 | = | $ - 0 |
| TOTAL FOR LINE C | | | | | | $ - 0 |
| D. LOAD BANK TESTING | | | | | | | |
| Equipment Description | Unit Cost | X | Estimated Quantity of Equipment | X | Estimated Quantity of Service | = | Total |
| 750 KW Generator | | X | 1 | X | 3 | = | $ - 0 |
| 500 KW Generator | | X | 4 | X | 3 | = | $ - 0 |
| 300 KW Generator | | X | 2 | X | 3 | = | $ - 0 |
| 150 KW Generator | | X | 1 | X | 3 | = | $ - 0 |
| 100 KW Generator | | X | 1 | X | 3 | = | $ - 0 |
| 15 KW Generator | | X | 1 | X | 3 | = | $ - 0 |
| Fire Pump | | X | 1 | X | 3 | = | $ - 0 |
| TOTAL FOR LINE D | | | | | | $ - 0 |
| 11. CALIFORNIA STATE PRISON-SACRAMENTO (SAC) | | | | |
| E. NORMAL BUSINESS HOURLY REPAIR RATE | | | | |
| Rate per Hour | Estimated Hours | | | Total |
| | X | 300 | $ - 0 |
| F. OUTSIDE NORMAL BUSINESS HOURS REPAIR RATE | | | | | |
| Rate per Hour | Estimated Hours | | | | Total |
| Calculation: Repair Hourly Rate times 1.5 | | X | 50 | HOURLY X 1.5 | $ - 0 |
| G. EMERGENCY CALL HOURLY RATE | | | | |
| Rate per Hour | Estimated Hours | | | Total |
| | X | 50 | $ - 0 |
H. Estimated Parts/Generator Rental/Replacement for Entire Contract Term $ 500,000.00
I. As-Needed Services $ - 0
TOTAL BASIS OF AWARD FOR SAC (A+B+C+D+E+F+G+H) $ - 0
| 12. SIERRA CONSERVATION CENTER (SCC) | | | | | | | |
| A. ANNUAL MAINTENANCE/INSPECTION SERVICES | | | | | | | |
| Equipment Description | Unit Cost | X | Estimated Quantity of Equipment | X | Estimated Quantity of Service | = | Total |
| 2000 K Generator | | X | 1 | X | 3 | = | $ - 0 |
| 500 KW Generator | | X | 1 | X | 3 | = | $ - 0 |
| 126 KW Generator | | X | 1 | X | 3 | = | $ - 0 |
| 125 KW Generator | | X | 1 | X | 3 | = | $ - 0 |
| 100 KW Generator | | X | 3 | X | 3 | = | $ - 0 |
| 82.5 KW Generator | | X | 2 | X | 3 | = | $ - 0 |
| 15 KW Generator | | X | 1 | X | 3 | = | $ - 0 |
| TOTAL FOR LINE A | | | | | | $ - 0 |
| B. QUARTERLY MAINTENANCE/INSPECTION SERVICES | | | | | | | |
| Equipment Description | Unit Cost | X | Estimated Quantity of Equipment | X | Estimated Quantity of Service | = | Total |
| 2000 K Generator | | X | 1 | X | 12 | = | $ - 0 |
| 500 KW Generator | | X | 1 | X | 12 | = | $ - 0 |
| 126 KW Generator | | X | 1 | X | 12 | = | $ - 0 |
| 125 KW Generator | | X | 1 | X | 12 | = | $ - 0 |
| 100 KW Generator | | X | 3 | X | 12 | = | $ - 0 |
| 82.5 KW Generator | | X | 2 | X | 12 | = | $ - 0 |
| 15 KW Generator | | X | 1 | X | 12 | = | $ - 0 |
| TOTAL FOR LINE B | | | | | | $ - 0 |
| C. ONE-TIME SERVICE | | | | | | | |
| Equipment Description | Unit Cost | X | Estimated Quantity of Equipment | X | Estimated Quantity of Service | = | Total |
| 2000 K Generator | | X | 1 | X | 1 | = | $ - 0 |
| 500 KW Generator | | X | 1 | X | 1 | = | $ - 0 |
| 126 KW Generator | | X | 1 | X | 1 | = | $ - 0 |
| 125 KW Generator | | X | 1 | X | 1 | = | $ - 0 |
| 100 KW Generator | | X | 3 | X | 1 | = | $ - 0 |
| 82.5 KW Generator | | X | 2 | X | 1 | = | $ - 0 |
| 15 KW Generator | | X | 1 | X | 1 | = | $ - 0 |
| TOTAL FOR LINE C | | | | | | $ - 0 |
| D. LOAD BANK TESTING | | | | | | | |
| Equipment Description | Unit Cost | X | Estimated Quantity of Equipment | X | Estimated Quantity of Service | = | Total |
| 2000 K Generator | | X | 1 | X | 3 | = | $ - 0 |
| 500 KW Generator | | X | 1 | X | 3 | = | $ - 0 |
| 126 KW Generator | | X | 1 | X | 3 | = | $ - 0 |
| 125 KW Generator | | X | 1 | X | 3 | = | $ - 0 |
| 100 KW Generator | | X | 3 | X | 3 | = | $ - 0 |
| 82.5 KW Generator | | X | 2 | X | 3 | = | $ - 0 |
| 15 KW Generator | | X | 1 | X | 3 | = | $ - 0 |
| TOTAL FOR LINE D | | | | | | $ - 0 |
| 12. SIERRA CONSERVATION CENTER (SCC) | | | | |
| E. NORMAL BUSINESS HOURLY REPAIR RATE | | | | |
| Rate per Hour | Estimated Hours | | | Total |
| | X | 110 | $ - 0 |
| F. OUTSIDE NORMAL BUSINESS HOURS REPAIR RATE | | | | | |
| Rate per Hour | Estimated Hours | | | | Total |
| Calculation: Repair Hourly Rate times 1.5 | | X | 25 | HOURLY X 1.5 | $ - 0 |
| ] | | | | | |
| G. EMERGENCY CALL HOURLY RATE | | | | | |
| Rate per Hour | Estimated Hours | | | | Total |
| | X | 25 | | $ - 0 |
H. Estimated Parts/Generator Rental/Replacement for Entire Contract Term $ 500,000.00
I. As-Needed Services $ - 0
TOTAL BASIS OF AWARD FOR SCC (A+B+C+D+E+F+G+H) $ - 0
| 13. VALLEY STATE PRISON (VSP) | | | | | | | |
| A. ANNUAL MAINTENANCE/INSPECTION SERVICES | | | | | | | |
| Equipment Description | Unit Cost | X | Estimated Quantity of Equipment | X | Estimated Quantity of Service | = | Total |
| 2000 KW Generator | | X | 2 | X | 3 | = | $ - 0 |
| 350 KW Generator | | X | 2 | X | 3 | = | $ - 0 |
| 12.5 KW Generator | | X | 1 | X | 3 | = | $ - 0 |
| Fire Pump | | X | 1 | X | 3 | = | $ - 0 |
| TOTAL FOR LINE A | | | | | | $ - 0 |
| B. QUARTERLY MAINTENANCE/INSPECTION SERVICES | | | | | | | |
| Equipment Description | Unit Cost | X | Estimated Quantity of Equipment | X | Estimated Quantity of Service | = | Total |
| 2000 KW Generator | | X | 2 | X | 12 | = | $ - 0 |
| 350 KW Generator | | X | 2 | X | 12 | = | $ - 0 |
| 12.5 KW Generator | | X | 1 | X | 12 | = | $ - 0 |
| Fire Pump | | X | 1 | X | 12 | = | $ - 0 |
| TOTAL FOR LINE B | | | | | | $ - 0 |
| C. ONE-TIME SERVICE | | | | | | | |
| Equipment Description | Unit Cost | X | Estimated Quantity of Equipment | X | Estimated Quantity of Service | = | Total |
| 2000 KW Generator | | X | 2 | X | 1 | = | $ - 0 |
| 350 KW Generator | | X | 2 | X | 1 | = | $ - 0 |
| 12.5 KW Generator | | X | 1 | X | 1 | = | $ - 0 |
| Fire Pump | | X | 1 | X | 1 | = | $ - 0 |
| TOTAL FOR LINE C | | | | | | $ - 0 |
| D. LOAD BANK TESTING | | | | | | | |
| Equipment Description | Unit Cost | X | Estimated Quantity of Equipment | X | Estimated Quantity of Service | = | Total |
| 2000 KW Generator | | X | 2 | X | 3 | = | $ - 0 |
| 350 KW Generator | | X | 2 | X | 3 | = | $ - 0 |
| 12.5 KW Generator | | X | 1 | X | 3 | = | $ - 0 |
| Fire Pump | | X | 1 | X | 3 | = | $ - 0 |
| TOTAL FOR LINE D | | | | | | $ - 0 |
| E. NORMAL BUSINESS HOURLY REPAIR RATE | | | | |
| Rate per Hour | Estimated Hours | | | Total |
| | X | 40 | $ - 0 |
| F. OUTSIDE NORMAL BUSINESS HOURS REPAIR RATE | | | | | |
| Rate per Hour | Estimated Hours | | | | Total |
| Calculation: Repair Hourly Rate times 1.5 | | X | 50 | HOURLY X 1.5 | $ - 0 |
| G. EMERGENCY CALL HOURLY RATE | | | | |
| Rate per Hour | Estimated Hours | | | Total |
| | X | 50 | $ - 0 |
H. Estimated Parts/Generator Rental/Replacement for Entire Contract Term $ 500,000.00
I. As-Needed Services $ - 0
TOTAL BASIS OF AWARD FOR VSP (A+B+C+D+E+F+G+H) $ - 0
&12 California Department of Corrections and Rehabilitation (CDCR) Rate Sheet
&"Arial,Bold"&U &12Bid Number C5612893-D Exhibit B-1
&11Page &P of &N