Project Overview

This is a Summary of Work section from a USPS construction contract for roof replacement at the Main Office/Processing & Distribution Center (P&DC) in Jackson, Mississippi (USPS Project No. C10122), dated July 13, 2023. The contractor must provide all materials, labor, tools, equipment, transportation, superintendence, and temporary construction necessary to complete the roof replacement work across multiple roof areas (B through Q) on the facility. The work shall comply with all applicable codes and local regulations, with the more stringent standard applying in cases of conflict between contract documents and governing codes or between project drawings and the project manual.

Scope of Work and Deliverables

Key work components include: installation of 200,000 square feet of temporary interior protection with unit costs for final adjustments; asbestos testing and removal of non-friable asbestos-containing materials if identified; complete roof removal down to structural deck with inspection and documentation of any damage; removal and replacement of 20,000 square feet of lightweight insulating concrete (LWIC) included in base bid; refastening of structural decks in Roof Areas H, I, and J with unit pricing provided; structural deck and wood blocking repairs as determined by the Owner; installation of asphalt-coated base sheet underlayment; polyisocyanurate insulation systems with varying thicknesses and slopes depending on roof area (ranging from 1-inch to 5-inches total); 1/2-inch high-density wood fiber cover board; fully-adhered, 80-mil minimum PVC roofing membrane meeting ASTM D4434, Type III; PVC and sheet metal flashings; and sealants at specified locations. An alternate price for a 20-year "Total System Warranty" for the roof system is requested.

View the file

Other files

File Type Posted
6._COUPA_Registration_and_User_Guide.pdf PDF
Coupa Supplier Registration Form.docx DOCX document
Event management for suppliers - Coupa.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

011000-1

USPS – Main Office/P&DC Date: 07/13/2023 SUMMARY OF WORK Roof Replacement Jackson, MS USPS Project No. C10122

SECTION 011000

SUMMARY OF WORK

PART 1 - GENERAL

1.1 SCOPE

A. The Contractor must provide all material, labor, tools, supplies, equipment, transportation, superintendence, temporary construction of every nature, and all other services and facilities necessary to complete the specified work, including all incidental work described in the contract documents. For purposes of this construction project, the terms “Offeror” and “Contractor” are interchangeable and refer to the party whose proposal is accepted by the Postal Service. It is the Owner’s sole responsibility to clarify design and construction responsibilities among the Owner’s designers, contractors and other agents.

B. The scope of work is listed within Article 1.2 of this Section.

C. All work shall be in accordance with applicable codes and local regulations that may apply. In case of conflict in or between the Contract Documents and a governing code or ordinance, the more stringent standard shall apply.

D. In case of conflict between the Project Manual and Project Drawings, the more stringent requirement shall apply.

1.2 SUMMARY OF ROOF REPLACEMENT WORK – AREAS B-Q

A. Provide a price to install 200,000 sf of temporary interior protection. Unit costs will be used to adjust final amount. Refer to Section 015617.

B. Asbestos laboratory analysis report: Refer to Section 022623 for information relating to the location of ACM, if applicable, within project areas. If positive refer to Sections 013543 and 028233 for procedures and requirements related to the removal and disposal of non-friable asbestos related to this project.

C. Roof removal and substrate preparation: Remove existing roof system down to the structural deck, including roof membrane(s), and underlying insulation, underlayments, and additional roof membranes. Inspect the existing structural deck, and inform the Owner immediately of observed damage and or deterioration. Temporarily displace rooftop equipment as necessary to complete the specified work. Refer to Section 024100.

1. Note: Contractor to include in their base bid the removal and replacement of 20,000 square feet of LWIC. unit costs will be used to adjust final amount.

D. Roof Areas H, I & J: Provide an alternate price for complete refastening of existing structural decks; provide a unit price for areas of existing structural deck that require refastening. Note that refastening of perimeter wood blocking is required. Refer to Section 053123 for re-fastening requirements.

E. After roof removal and inspection of the existing structural deck and perimeter wood blocking, perform repairs to the structural deck, as determined necessary by the Owner. Refer to Sections 035216 & 053123. Replace damaged or deteriorated wood blocking, as determined necessary by the Owner. Refer to Section 061053.

011000-2

Roof Replacement

F. Provide required wood blocking where indicated on the project drawings. Refer to Section 061053.

G. Roof Areas B, C, D, E, F, G, K, L, M, N, O, P & Q: Provide an underlayment consisting of an asphalt-coated base sheet, mechanically-attached to the existing structural deck as specified in Section 072215. Refer to Section 072215 for product and installation requirements.

H. Roof Areas B, C, D, K, L, M, N, O, P & Q: Provide one layer of 2-1/2 inch polyisocyanurate insulation. If indicated on the project drawings, provide insulation saddles and crickets where shown. Refer to Sections 072221 for additional insulation product and installation requirements.

I. Roof Areas E & F: Provide a tapered polyisocyanurate insulation system with an insulation system slope of 1/16-inch per foot, and a starting thickness of 1-inch, minimum. If indicated on the project drawings, provide insulation saddles and crickets where shown. Refer to Section 072221 for additional insulation product and installation requirements.

J. Roof Area G: Provide a tapered polyisocyanurate insulation system with an insulation system slope of 1/4-inch per foot, and a starting thickness of 1-inch, minimum. If indicated on the project drawings, provide insulation saddles and crickets where shown. Refer to Section 072221 for additional insulation product and installation requirements.

K. Roof Area H: Provide a tapered polyisocyanurate insulation system with an insulation system slope of 1/4-inch per foot, and a starting thickness of 1/2-inch over a base layer of 2-1/2 inch polyisocyanurate insulation. If indicated on the project drawings, provide insulation saddles and crickets where shown. Refer to Section 072223 for additional insulation product and installation requirements.

L. Roof Areas I & J: Provide two layers of 2-1/2 inch polyisocyanurate insulation (5-inches total). If indicated on the project drawings, provide insulation saddles and crickets where shown. Refer to Section 072223 for additional insulation product and installation requirements.

M. Provide a 1/2-inch high density wood fiber cover board over the underlying insulation. Refer to Sections 072221 & 072223 for additional product and installation requirements.

N. Provide a fully-adhered, minimum 80-mil PVC roof system meeting ASTM D4434, Type III. After installation of specified insulation and cover board, install the PVC roofing membrane in bonding adhesive. Provide PVC and sheet metal flashings as specified. Provide an alternate price for a 20-Year, “Total System Warranty” for the roof system. Refer to Sections 075419 and 076207 for product and installation requirements.

O. Provide sealants at locations indicated on the project drawings. Refer to Section 079201.

PART 2 – PRODUCTS

NOT USED

PART 3 – EXECUTION

NOT USED

011000-3

Roof Replacement

END OF SECTION

USPS Master Specifications, issued: 10/1/2017 Last revised: 12/13/2017