Attachment 1 Itemized Work List 080002.xls

XLS spreadsheet 19 KB Posted

Attached to
Repair EPDM and Modified Bitumen roofing for Building #223B at the St Louis Job Corps Center
Solicitation number
080002
Issued by

About this file

Attach 1 Itemized Work List

View the file

Other files

File Type Posted
Attachment 4 ST Louis Location Map.pdf PDF
Attachment 2 Roof Drawings.pdf PDF
Solicitation 080002.doc DOC document
Attachment 3 St Louis Job Corp Center Map.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

ST. LOUIS JOB CORPS CENTER MISCELLANEOUS ROOFING REPAIRS PROJECT WORK ITEM LIST
BUILDING # 223 B- EDUCATION11/22/07
Key No.WORK ITEMCOMMENTS
1Install a 3-ft wide strip patch around the perimeter curb of the RTU with 1- ft of width on vertical face of curb and 2-ft of width on roof surface.Located on southern most RTU.
2Install 2 corner patches on the northeast and southeast corners of the curb for RTU.RTU is located on east side of building slightly north of southern most unit.
3Patch hole at southwest curb corner of lidded box projection.Located in center of roof north of the two RTU's on the south end of the building.
4Install a 1-ft.x 8-ft strip patch over existing roofing seam running east to west.Located 15-ft north of two curbed lidded box projections and 25-ft east of the west parapet.
5Remove two transition ducting units, re-flash curbs and install two new metal cap coverings over curbed openings.Located in the center of old steel support structure in the center of the roof on the west side of the building.
6Remove existing membrane around RTU and replace with new patch 3-ft out from curb and up to top of curb around the entire perimeter of the unit Re-flash the curb up 18-in.. Includes a second curbed lidded box to the east of the unit.RTU located on west side at north quadrant of the building.
7Replace the 2-ft x 3-ft existing patch with 7-ft x 6-ft new patch.Located 8-ft south of northern most RTU on east side of building, and 6-ft west of the east parapet.
8Install a 5-ft wide perimeter strip patch around RTU with 18" coverage up on curb sides.Unit is the northern most RTU on east side of building.