Admended Attachment 1 Itemized Work List 080001.xls

XLS spreadsheet 23 KB Posted

Attached to
Repair EPDM and Modified Bitumen roofing for Building #234 at the St Louis Job Corps Center
Solicitation number
080001
Issued by

About this file

080001 task list is amended. Change on line item 26 and addition of line item 30

View the file

Other files

File Type Posted
Attachment 1 —
Solicitation 080001.doc DOC document
Attachment 3 St Louis Job Corp Center Map.pdf PDF
Attachment 2 Roof Drawings.pdf PDF
Attachment 4 ST Louis Location Map.pdf PDF
Attachment 1 Itemized Work List 080001.xls XLS spreadsheet

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

ST. LOUIS JOB CORPS CENTER MISCELLANEOUS ROOFING REPAIRS PROJECT WORK ITEM LIST
BUILDING #234-ADMINISTRATION11/22/07
Key No.WORK ITEMCOMMENTS
1Remove (3) existing patches and install (1) 3-ft. x 3-ft.patch over the area where the (3) patches were.Location is about 6-ft. south of the RTU (roof top unit) and about 14-ft east of west parapet wall.
2Install a 12-inch square patch.Location is about 6-ft south of the RTU and 11-ft east of the west parapet wall.
3Install patch over hole at curb of RTU.Hole is on the southeast corner of the unit.
4Install a patch to be fitted around the vent pipePipe is located 17-ft south of north parapet and 2-ft west of east parapet.
5Install 2-ft.strip patch over, and centered on, the roofing seam that runs across the width of roof from the east parapet to the west parapetSeam is located about 19-ft south of the north end parapet.
6Remove existing patch and replace with a 12-inch square patch.Patch is located 29-ft south of north parapet and 6-ft east of west parapet.
7Remove existing patch and replace with a 6-ft. x 6-ft. patch.Patch is located just to the east of item 6., above
8Install a 2-ft. wide patch around perimeter of vent box curb.Located approximately 10-ft south of north parapet in the center of the roof.
9Install 3-ft. wide 13-ft. long strip patch from the east parapet to the RTU and over two existing seams.Located about halfway north to south on the roof over conference room.
10Clean existing roof drainTypical for all roof drains on the building roof.
11Patch 1-inch hole at parapetLocated on north parapet 14-ft from east parapet
12Install 4-ft.x 4-ft. patch around 9: dia. pitch pocketLocated 4-ft east of west parapet and 16-ft north of south parapet.
13Install 12-in. x 12-in. patch over hole at curb/wall.Located adjacent to stairway in northwest corner of lower roof.
14Install an 18-in. wide linear patch around perimeter of the lower roof, up and under the parapet flashing.Located on east, south and west parapets.
15Install a 12-in. x 12-in. patch in the northeast corner of the main roof at the parapet curb.Located adjacent to the roof access ladder.
16Install a 4-ft. x4-ft. patch over existing patched adjacent to the RTU on the eastern end of the roof.Located at the southeast corner of the unit.
17Install a 4-ft x 4-ft MBR patch on MBR roof east and adjacent to the RTU located on east side of the center portion of the main roof.Located 7-ft east of the RTU and 12-ft south of the nearby fan unit.
18Patch cracks in drain pocket with mastic.Located on west side of the center portion of the main roof adjacent to a vent fan.
19Install a 2-ft wide EPDM strip at the parapet curb around the perimeter of the back portion of the main center roof. Install so that 6-in is up and behind the flashing and the remaining 18-in of width is out on the roof. Approximately 300 Lin. Ft.Located at the parapet on the south portion of the center part of the main roof. Includes all four sides where the parapet is, up to either end the expansion joint on the north side.
20Install and seal new boot on 2-in. dia. vent.Located at the parapet on the south portion of the back leg of the main roof on the north parapet on the west side, 9-ft. west of the juncture of the parapet and the expansion joint.
21Install a 2-ft x 2-ft patch around the vent pipe.Located on southwest corner of the back portion of the main roof 26-ft east of the west parapet and 8-ft. north of the south parapet.
22Install an 8-ft x 6-ft patch around vent pipe and adjacent electrical junction box.Located on southeast sector of the back portion of the main roof.
23Install a 2-ft wide x 10-ft long EPDM strip at the parapet curb around the perimeter of the back portion of the main center roof. Install so that 6-in is up and behind the flashing and the remaining 18-in of width is out on the roof.Located on the south parapet, east side, on the lower roof south of the back end of the main roof.
24Install a 12-ft x12-ft patch on MBR roof. Spud down alligatoring. Patch and gravel with MBR.Located in center front portion of main roof, 12' south of north parapet and 9' east of front tower west of center of the building.
25Install a 1-fr x1-ft patch at north east corner of west wing of main buildingLocated 1-ft south of north parapet and 1-ft west of expansion joint between west and center wings main roof.
26Install a 5-ft x 5-ft patch around the roof drain.Located next to south parapet south of eastern most AC unit on west wing main roof.
27Replace Corner curb patches on northwest and southwest corners of RTU.RTU located at approximate center of west wing of main roof.
28Replace corner curb on south east corner of RTU.RTU located at approximate west end of west wing of main roof.
29Install a1-ft wide x 7-ft long patch running west to east from the north east corner of the eastern most AC unit on the west wing main roof.Located at the northeast corner of the western most RTU unit on the west wing main roof.
30Rubber membrane is pulling away from firewall. Cut membrane to lay flat and install a 12' X 6' patchLocated next to south parapet souhwest end of cpp, southwest firewall