08_Repair__and_Rework_Of__Nonconforming_material.pdf

PDF 108 KB Posted

Attached to
F-16 Rocket Motors Federal contract opportunity
Solicitation number
FA821322R3002
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Hill Air Force Base

View the file

Other files for this federal contract opportunity

Other files attached to F-16 Rocket Motors, newest first.
File Type Posted
Solicitation FA8213-22-R-3002-0003.pdf PDF
01_AirSpecFD20202350078.pdf PDF
Solicitation FA8213-22-R-3002-0001.pdf PDF
03_ADC_SOW_Jan_2018.pdf PDF
02_REPSHIP.pdf PDF
09_Ship_in_Place_and_Temporary_Storage_of_FMS_Munitions_Items.pdf PDF
05_7872ES_Item_Description.pdf PDF
14_JFQR_01_517_5493_F_16_CJRM.pdf PDF
04_5499ES_EDL.pdf PDF
11_SPI_F010580122.pdf PDF
12_22-50071_CDRLs.pdf PDF
14_JFQR_01_327_7872_F_16_CJRM.pdf PDF
14_JFQR_01_327_7873_F_16_CJRM.pdf PDF
01_FD2020_22_50071_Air_Specs.pdf PDF
10_CADPAD_Item_Marking_Instruction.pdf PDF
05_5499ES_Item_Description.pdf PDF
13_Packaging_SOW.pdf PDF
05_5493ES_Item_Description.pdf PDF
04_7873ES_EDL.pdf PDF
04_7872ES_EDL.pdf PDF
06_GFM_table.pdf PDF
14_JFQR_01_517_5499_F_16_CJRM.pdf PDF
05_7873ES_Item_Description.pdf PDF
04_5493ES_EDL.pdf PDF
07_CJRM_info_table.pdf PDF
Show all 25

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 5

(ES7034)

REWORK AND REPAIR OF NONCONFORMING MATERIAL

Jan 2012 (version)

(a) Rework and Repair are defined as follows:

(1) Rework - The reprocessing of nonconforming material to make it conform completely to the drawings, specifications or contract requirements.

(2) Repair - The reprocessing of nonconforming material in accordance with approved written procedures and operations to reduce, but not completely eliminate, the nonconformance. The purpose of repair is to bring nonconforming material into a usable condition. Repair is distinguished from rework in that the item after repair still does not completely conform to all of the applicable drawings, specifications or contract requirements.

(b) Rework procedures along with the associated inspection procedures shall be documented by the Contractor and submitted to the Government Quality Assurance Representative (QAR) for review prior to implementation. Rework procedures are subject to the QAR's disapproval.

(c) Repair procedures shall be documented by the Contractor and submitted on a Request for Deviation/Waiver, DD Form 1694, to the Contracting Officer for review and written approval prior to implementation.

(d) Whenever the Contractor submits a repair or rework procedure for Government review, the submission shall also include a description of the cause for the non-conformances and a description of the action taken or to be taken to prevent recurrence.

(e) The rework or repair procedure shall also contain a provision for re-inspection which will take precedence over the Technical Data Package requirements and shall, in addition, provide the Government assurance that the reworked or repaired items have met reprocessing requirements.

(f) Rework and repair is a supply chain flow-down requirement that applies to contractors and their suppliers, vendors or subcontractors.

(ES7034)

(ES7034)

File details come from the government source that posted it. Updated .