08-196.00 Plan sheets and Strip map.pdf

PDF 2 MB Posted

Attached to
Demolition SVC Lincoln Co
Solicitation number
RFB 605 2200000410 1
Issued by
Lawrence County, Kentucky

About this file

This file consists of plan sheets and a strip map for a US Highway 27 improvement project in Lincoln County, Kentucky, prepared by the county's transportation department. The project encompasses roadway reconstruction and drainage improvements along US 27, extending from station 1193+00 to station 1260+00, with additional work on connector roads including Goshen Cutoff, Bell Street, Senior Way, Clubside Drive, Ridgeway Road, Lakeview Drive, and Bank Street. The project involves extensive ditch work with various channel lining types including erosion control blanket (ECB), rock, and crushed limestone (CL II and CL III), with quantities measured in square yards and tons depending on lining type. Additional work includes the installation and removal of guardrails, pipe placement and removal of various sizes (12-inch through 24-inch), entrance construction, and temporary and permanent easements across multiple parcels. The plan sheets are dated January 10, 2020 (revised), with the strip map dated January 17, 2020, and indicate construction limits beginning at US 27 station 1193+00 and right-of-way project work beginning at station 1196+76.86 and ending at station 1247+62.94.

The project involves property interests across numerous parcels with identified owners, including private property holders, the City of Stanford, Lincoln County Fiscal Court, and various commercial entities such as Walmart, Owens Chevrolet, and Murphy Oil USA. The work requires both temporary easements for slope construction and permanent drainage easements. Specific drainage improvements include the placement of various pipe sizes with noted invert and top of grade elevations, removal of existing pipes, and construction of special ditches with specific depths and lining requirements. The plan sheets provide detailed right-of-way information, pavement shoulder specifications (ranging from 4 to 12 feet), and utility considerations including gas lines, electrical infrastructure, water lines, sanitary sewer lines, and telecommunications facilities that must be coordinated during construction.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DITCHES US 27

S I D

E

STA. TO STA. SIZE/TYPE

CHANNEL LINING

TYPE DEPTH QUANTITY

LT 1193+00 - 1196+00 2’ FB SPCL ECB N/A 267 SQYD

LT 1197+00 - 1199+50 2’ FB SPCL ROCK N/A N/A

LT 1199+50 - 1200+50 2’ FB SPCL ROCK N/A N/A

LT 1202+00 - 1203+20 2’ FB SPCL ECB 1.0’ 107 SQYD

LT 1203+80 - 1205+00 2’ FB SPCL ECB 1.0’ 107 SQYD

FP

FP

FP

POST

POSTPOST

POST POST

POST

POST

P O

S T

POST

POST

POST

POST

POST

POST

POST

POST

POST

POST

POST

POST

POST

POST

POST

POST

POST POST

M A

T C

H L I N

E

S

T A

DITCHES US 27

S I D

E

STA. TO STA. SIZE/TYPE

CHANNEL LINING

TYPE DEPTH QUANTITY

RT 1194+50 - 1196+00 2’ FB SPCL ROCK N/A N/A

RT 1197+00 - 1201+61 NORM ROCK N/A N/A

RT 1201+90 - 1203+30 2’ FB SPCL ECB 1.0’ 125 SQYD

RT 1203+67 - 1204+50 2’ FB SPCL ECB 1.0’ 74 SQYD

PLANS

RIGHT OF WAY

REVISED PLAN DATE: JANUARY 10, 2020

SIGN SIGN

SIGN

SIGN

SIG

N

SIGN

SIGN

M

1.

STEP

S

JA

Y

ST

K Y

LANCASTER RD

C O

T T

O N

T

15" RCP

18" RCP

15" CMP

18" CMP

GRAVEL

GATE

ASPHALT

G R

A V

E L

ASPHALT

ASPHALT

US 27

A S

P H

A L

T

?" RCP

A S

P H

A L

T

IE ??

OE ??

{ TO STANFORD

Prop R/W

Prop R/W

Prop R/W

96.60

+77.02

98.00

+76.86

96.50

+14.03

96.49

+18.52

115.93

+18.82

120.00

+51.00

121.00

+55.00

76.29

+75.86

82.00

+04.00 75.00

+50.00

75.55

+58.00

90.00

+58.00

46.22

+75.84

46.17

+31.65

81.17

+40.12

82.19

+55.00

77.70

+89.41

92.38

+88.40 85.21

+99.23

46.02

+25.84

56.02

+25.85

181.00

+65.00

198.00

+80.00

198.00

+38.00

178.00

+38.00

103.47

+63.00

90.76

+02.00

83.75

+33.74

53.75

+33.76

53.79

+86.85

118.00

+59.34

121.00

+56.00

113.00

+03.00 96.00

+06.00

85.07

+08.88

67.70

+33.75

67.97

+86.77

76.00

+90.00

80.00

+50.00

69.00

+90.00 for Landscape Removal

Temp Easement

152.00

+50.76

158.00

+75.00

118.80

+85.00

95.97

+08.60

Prop R/W

95.00

+98.00

115.00

+98.00

115.00

+80.00

68.44

+80.00

95.12

+86.64

12’

12’

12’

12’

7’

7’

10’ PAVED SHLD

10’ PAVED SHLD

4’ PAVED SHLD

P T

P I

1+

1.

1’

96’ @ 8:1 TAPER

POB 20+00.00

POB 10+00.00

1.4

.9

S ’15

"E ’3

"W

N

N34°21’01"E C

P

P

P

P

P

DISTRICT

FIRE PROTECTION

LINCOLN COUNTY

SUSAN ANN CHERRY

SUSAN B. CHERRY &

SHEILA GAIL MULLINS, ET ALROSE C. NOE (WIFE) (1/2)

ROBERT H. &

BARNETT (WIFE) (1/2)

DAN L. & JANE N.

WENDELL R. MORRIS 20% INTEREST

OWENS CHEVROLET INC. 80% INTEREST

P

NEWCOMB OIL CO., LLC

921.21 T/G

922.71

T/G

2’ SPCL DIT

2’ SPCL DIT

2’ SPCL DIT

2’ SPCL DIT

2’ SPCL DIT

2’ SPCL DIT

2’ SPCL DIT

2’ SPCL DIT

15"

15"

REMOVE REMOVE

{ 18" EQ PIPE

P I P

E

920.81

I.E.

920.15

I.E.

920.37

O.E.

919.81

O.E.

18" PIPE

EQ PI

PE {

18"

REMOVE

REMOVE

REMOVE

CONST. LIMIT

CONST. LI

MIT

WM

W M

W V

W V

WM

WM

WM

W M

W V

W V

WM

WM

WM

TV JB

TV JB

TV JB

TV JB

TV JB

TV JB

TV JB

TV JB

TV JB

TV JB

US 27

J a n u a r y

D A

T E

P

L O

T T

E D j o s e p h g o s s a g e

U S

E R

E

S

H E

A

M

M ic r o

S t a t io n v

COUNTY OF ITEM NO. SHEET NO.

LINCOLN 8-196.00 R4

PLAN SHEET

STA. 1197+00 TO 1205+00 SCALE: 1"=50’

U

P R

O J

E C

T S

U

W

V

1\

P L

D G

N F I L

M

EX R/W

EX R/W

0’ 100’ 200’50’

FACE

SINGLE

(LF)

S I D

E

STA. TO

STA.

(EACH)

1RT 1203+63 1205+00

TERMINAL SECT.

GUARDRAIL STEEL "W" BEAM US 27

NO. 1

WIDTH PIPE

STA.

S I D

E

SIZE (IN) LENGTH (FT)(LF) TYPE AREA (SQYD)

SURFACE

EACH

HDWLTYPE

LT ASPH

LT ASPH

N/A

N/AN/A N/A

ENTRANCES - US 27

1200+77

1201+55

1201+75 N/A N/A N/A

1203+49 ASPH 184 N/A

RT

RT

LT 1203+49 ASPH 163 N/A N/A N/A

ASPH

15 41

15 37

137.5

CONST. 100 LF EDGE KEY

STA. 1197+00

US 27 STA 1193+00

BEGIN CONSTRUCTION

For Entr Const

Esmt

Temp

For Building Removal

Temp Easement for Slope Const

Temp Easement for Slope Const

Temp Easement

Jason.baker Text Box Building 1

Jason.baker Text Box Building 2

Jason.baker Polygon

Jason.baker Polygon

Jason.Baker Callout P105 Cherokee 818 Lancaster Road Stanford, KY 40484

FP

POST

POST

POST

POST

POST

POST

POST

POST

POST

POST

POSTPOST

POST

POST

POST

POST

POST

POSTPOST

POST

POST

POST

POST

POST

POST

POST

POST

M

P

IL

E

U

C

S T E P S

S T E P S

S T E P S

S T E P S

S T E P S

S T E P S

S T E P S

S T E P S

S T E P S

D E

N

V

G E T

A T

IO

N

DENSE VEGETATION

DENSE VEGETATION

O B S

C U

R E

D

US 27 LANCASTER RD

M O

B I

H

G O

S H

C

T O

F

15" CMP 15" CMP 15" CMP

" R

C P

" R

C P

15" RCP

18" CP 18" CP 18" CMP

C P 15

" C

P

C P

18"

CMP

" R

C P

15" CMP 18" CMP

18" CMP

18" RCP

C P 15

IP

IP

IP

IP

18" CMP

W A

L M

A

N T

I V

E

ASPHALT

ASPHALT

ASPHALT

A S

P H

A L

T

15" CMP

SLOTTED DRAIN

ASPHALT

A S

P H

A L

T

CONC ASPHALT

GRAVEL

ASPHALT

M A

T C

H L I N

E

S

T A

M A

T C

H L I N

E

S

T A

0' 100' 200'50'

MATCHLINE STA 55+50

GOSHEN CUTOFF STA. 50+00

d

GOSHEN CUTOFF CONNECTOR STA. 10+00.00

GOSHEN CUTOFF STA. 54+73.00 =

U.S. 27 STA. 1215+83.60 =

OF EDGE KEY

CONST. 54 LF

DITCHES US 27

S I D

E

STA. TO STA. SIZE/TYPE

CHANNEL LINING

TYPE DEPTH QUANTITY

RT 1209+17 - 1211+00 2' FB SPCL CL II 1.0' 77 TON

RT 1211+00 - 1212+00 2' FB SPCL CL II 1.0' 70 TON

RT 1212+00 - 1213+00 NORM ROCK N/A N/A

RT 1213+00 - 1215+50 NORM ROCK N/A N/A

RT 1216+50 - 1220+00 NORM ROCK N/A N/A

DITCHES US 27

S I D

E

STA. TO STA. SIZE/TYPE

CHANNEL LINING

TYPE DEPTH QUANTITY

LT 1205+30 - 1207+67 2' FB SPCL ECB 1.0' 238 SQYD

LT 1208+03 - 1208+50 2' FB SPCL ECB 1.0' 42 SQYD

LT 1208+50 - 1209+00 2' FB SPCL CL II 1.0' 28 TON

LT 1209+40 - 1210+40 2' FB SPCL ECB 1.0' 89 SQYD

LT 1211+00 - 1212+00 2' FB SPCL ECB 1.0' 89 SQYD

LT 1212+50 - 1212+85 2' FB SPCL ECB 1.0' 32 SQYD

LT 1214+50 - 1215+00 2' FB SPCL ECB 1.0' 45 SQYD

LT 1216+50 - 1220+00 NORM ROCK N/A N/A

PLANS

RIGHT OF WAY

GAS LINE

CAUTION

GAS LINE

CAUTION

GAS LINE

CAUTION

US 27

N o v e m b e r

D A

T E

P

L O

T T

E h la w le r

U S

E

S

H E

M r o

S t a t io n v

COUNTY OF ITEM NO. SHEET NO.

LINCOLN 8-196.00 R6

PLAN SHEET

STA. 1205+00 TO STA. 1220+00 SCALE: 1"=50'

V

A C

T I V

E

T R

A N

S P

O R

T A

T I O

N

D E S I G

N

D R

A W I N

G

P L

A N S

H E

E T

S

P L

D G

N F I

M

(Goshen Cutoff)

Prop R/W Prop R/W Prop R/W

Prop R/W

Prop R/W

Prop R/W

Pro p R /W

174.00

+08.00

92.68

+05.00

93.00

+18.00

91.74

+30.82

80.00

+50.00

104.00

+18.00 98.52

+56.66 85.00

+52.00 70.00

+78.00

70.00

+61.00

70.00

+68.00

128.00

+61.00

128.00

+21.45

75.00

+18.52

50.00

+00.00

69.00

+53.00

254.80

+25.00

273.76

+30.00 214.00

+09.00

69.00

+24.00

82.44

+98.10

80.00

+68.81

88.00

+51.00

112.00

+82.00

119.00

+50.00 115.00

+31.00

82.00

+53.00

74.40

+75.74

74.52

+25.74

78.16

+57.34

121.00

+22.00

75.34

+22.00

74.75

+56.84

121.00

+90.00

74.18

+90.00

85.76

+56.13

95.55

+55.47

71.32

+57.05

81.00

+75.74

71.00

+75.75

109.00

+92.00

109.00

+04.01

81.95

+05.74

109.00

+05.00

82.00

+17.00

86.00

+35.00

64.59

+17.00

75.00

+35.00

64.68

+35.00 85.69

+52.65

85.16

+53.15

72.06

+53.94

75.00

+48.00

85.01

+07.28

85.00

+12.00

72.60

+07.12

105.00

+46.00

95.00

+46.00

73.00

+46.00

94.00

+81.00

104.03

+05.78

87.00

+81.00

104.00

+10.00

98.00

+10.00

85.54

+05.55 92.00

+69.00

85.00

+85.00

75.00

+83.00

72.00

+48.00

73.03

+56.96

109.00

+09.00

75.00

+53.17

258.62

+07.01

P r o p

R

W

P r o p

R

W

64.74

+11.00

75.00

+11.00

75.00

+22.00 64.83

+22.00

121.00

+53.83

R/W

Prop

(Goshen Cutoff)

95.75

+41.07

90.78

+40.58

96.65

+31.96

97.98

+18.49 100.52

+93.66

105.47

+92.95

99.11

+83.76

104.06

+83.05

76.00

+00.00

48.00

+07.00

12'

12'

12'

12'

7'

7'

12'

12'

12'

12'

7'

7'

12'

10' PAVED SHLD

10' PAVED SHLD

10' PAVED SHLD

10' PAVED SHLD

11'11'11'

=R

R

55+00

PC 51+94.30

PT 52+77.45

PI 52+35.95

11' -11.00'

+65.00

22' -22.00'

+00.00

T A

P E

R

11'11'

180' @ 15:1 TAPER

P O

E

1.

N34°21'01"E

S '3

"E

S '5

"E

S42°17'25"W d d d

E=1.44'

R=600.00'

L=83.15'

T=41.64'

D

PI STA=52+35.95

GOSHEN CUTOFF RD

S '5

"E

R

2=R '5

R' 52=R

R

R'

R

R

4=R

R

2= R

'5 2=

R

=R

CONN. NO. 1

GOSHEN CUTOFF

P

P

P

P

P 110

P

P

P

P

P

P

P

P

P E

R M

A N

E

C E

S E

M E

N T

CITY OF STANFORD

COOLEY

DEBORAH W.

CORNELIUS (WIFE)

DAVID & JESSICA

HTW PROPERTIES, LLC

MURPHY OIL USA INC.

REAL ESTATE TRUST

ERIC ZORN, TRUSTEE, WAL-MART

HENSON (WIFE)

JOHN M. & WILMA

ALFORD, LLC

LOIS L. OLIVER

ARC RASFDKY001, LLC

BLUEGRASS MOBILE HOME PARK, INC

P

OWENS CHEVROLET INC.

P

SUSAN ANN CHERRY

SUSAN B. CHERRY &

P

ENTERPRISES, LLC

TRIPLE

(W

IF

E

H E

N S

IL

M

J

H

WENDELL R. MORRIS

OWENS CHEVROLET INC.

P

24" PIPE

922.83

T/G

923.50

T/G 923.59

T/G

928.81 T/G 927.88

T/G

929.38

T/G 930.55

T/G

J.B.

M.H.

2' SPCL DIT

2' SPCL DIT

2' SPCL DIT

2' SPCL DIT 2' SPCL DIT

15"

P I P

E

930.11

T/G

P I P

E

2' DIT

2' DIT SWL DIT

2' DIT

REMOVE

P I P

E

P I P

E

{ 24" PIPE {

24" PIPE

18" PIPE

18" PIPE

I E

912.03

O.E.

911.51

O.E.

O E

921.86

T.R.

928.49

T/R

J.B.

930.83

T/R

933.54

T/RREMOVE REMOVE

REMOVE

REMOVE

REMOVE

REMOVE REMOVE

REMOVE

DIT

2' SPCL

P I P

E

24" PIPE

18" PIPE

18" PIPE}

923.52

O.E.

923.70

I.E.

15" PIPE

CONST. LIMIT

S

CONST. LIMITS

C O

N S

T

L I

M I T

S

C O

N S

T

L I

M I T

S

CONST. LI

MITS

E

E

E

E

E

E

E

SA

N

SA

N

SA

N

SA

N

SA

N

SA

N

SA

N

SA

N

SA

N

SA

N

SA

N

SA

N

SAN

SAN

SAN

SANSANSANSANSANSANSANSANSANSAN

SA

N

SA

N

SA

N

SA

N

SA

N

SA

N

SA

N

SA

N

SA

N

SA

N

SA

N

E

E

E

E

E

E

E

SA

N

SA

N

SA

N

SA

N

SA

N

SA

N

SA

N

SA

N

SA

N

SA

N

SA

N

SA

N

SAN

SAN

SAN

SANSANSANSANSANSANSANSANSANSAN

SA

N

SA

N

SA

N

SA

N

SA

N

SA

N

SA

N

SA

N

SA

N

SA

N

SA

N

TB JB

W V

W M

WM

G L

M TEL JB

S S

M H

TB JB

WM

S S

M H

GLM

S S

M H

GLM E

E

E

E

E L

J B

Y S

W V

WM

W V

W S

WV W

M

W V

W

M WM

WV

WM

W V

WM

SANMH

S A

N M

H S

A N

M H

8" PVC

" P

V C

" P

V C

W V

W M

WM

G L

M TEL JB

S S

M H

TB JB

WM

S S

M H

GLM

S S

M H

GLM E

E

E

E

E L

J B

Y S

W V

W M

W V

W S

W V

WM

W V

W S

WV W

M

W V

W

M WM

WV

WM

W V

WM

SANMH

S A

N M

H S

A N

M H

8" PVC

" P

V C

" P

V C

G L

M

G L

M

G L

M

G L

M

G L

M G L

M

TB JB

ELJB

TL JBTL JB

TB JB

SD

SD

SD

W M

W V

WM WV

WM

WM

W V

5" PVC MARKER

ATMOS ENERGY

GLM

G L

M

GLM

SANMH

SANMH

SANMH

SANMH

SANMHSANMH

SANMH

SANMH

ELJB

TV JB

TV JB

TV JB

TV JB

TV JBTV JB

TV JB

TV JB

TV JB

TV JB

TV JB

TV JBTV JB

TV JB

Y S

W V

1T V

1E

1E

FACE

SINGLE

(LF)

S I D

E

STA. TO

STA.

(EACH)

1RT 1205+00 1212+00

END TREATMENT

TYPE 4A

GUARDRAIL STEEL "W" BEAM US 27

REMOVE

S I D

E

STA. TO STA.

GUARDRAIL REMOVAL US 27

(LF)

RT 1205+96 1211+85 589

662.5

PIPE STA. 1213+76 SAFELOAD 5.3 CU YDS

PIPE STA. 1209+68 SAFELOAD 4.2 CU YDS

PIPE STA. 1206+15 SAFELOAD 3.9 CU YDS

WIDTH PIPE

STA.

S I D

E

SIZE (IN) LENGTH (FT)(LF) TYPE AREA (SQYD)

SURFACE

EACH

HDWLTYPE

LT ASPH

LT ASPH

N/A

N/AN/A N/A

ENTRANCES - US 27

1207+55

1209+19

1210+58 N/A N/A N/A

1212+35 N/A N/A N/A

LT

LT

LT 1213+20 N/A N/A N/A

ASPH

1213+90LT 36 ASPH 100 N/A N/A N/A

CONC

CONC

15 36

12 ASPH 171 N/A N/A N/AGOSHEN

HEADER CURB

CONSTRUCT 59 LF OF STANDARD

LT. STA. 1217+38 TO STA. 1217+97

EXISTING PAVEMENT

REMOVE 90 SQ YDS OF

LT. STA. 1217+39 TO STA. 1217+96

EXISTING CURB

REMOVE 115 LF OF

LT. STA. 1217+38 TO STA. 1217+97

LT 1205+08 36 ASPH N/A236 15 45

for Slope Construc tionTemp Eas ement for Slope Construction

Temp Easement

Temp Easement for Slope Const for Ent.Const

Temp Esmt

Const for Ent.

Esmt

Temp

Temp Drainage Esmt

Temp Drainage Esmt

Jason.baker Text Box Building 2

Jason.baker Polygon

Jason.Baker Callout P105 Cherokee

POST

POST

POST

POST

POST

POST

POST

POST

POST

POST

POST

POST

POST

POST

POST

POST

POST

POST

POST

POST

POST

POST

POST

POST

POST

POST

POST

POST

F

IL

L

W E

W E

S T E P S

S T E P S

S T E P S

S T E P S

S T E P S

DENSE VEGETATION

D E

N

G E T

A T

IO

N

D E

N

G E T

A T

IO

N

B A

N K

S T

B E L L

S T

L O

W E

L N

B E L L

S T

" R

C P

12" CP

12" CP

18" CP

" C

P

" R

C P

" R

C P

18" RCP

15" CMP

15" RCP

ELJB ELJB

ELJB

IP IP

IP IP

" C

P

IP

A S

P H

A L

T

A S P

H A L T

ASPHALT

ASPHALT

A S P

H A L T

G R

A V

E L

A S P H A L T

M A

T C

H L I N

E

S

T A

M A

T C

H L I N

E

S

T A

0' 100' 200'50'

U.S. 27 STA. 1230+18.08

BANK ST. STA. 60+00

PLANS

RIGHT OF WAY

GAS LINE

CAUTION

GAS LINE

CAUTION

GAS LINE

CAUTION

GAS LINE

CAUTION

GAS LINE

CAUTION

US 27

N o v e m b e r

D A

T E

P

L O

T T

E b iv a n c h a k

U S

E

S

H E

M r o

S t a t io n v

COUNTY OF ITEM NO. SHEET NO.

LINCOLN 8-196.00 R8

PLAN SHEET

STA. 1220+00 TO STA. 1235+00

P

P

P

P

P

P

P

P

PROPERTIES 19, LLC

REALTY INCOME

OWENS CHEVROLET INC.

PBK BANK INC.

ESTRIDGE

JEAN DAVIDSON

JODY WELLS (WIFE)

JAMES D. &

JOHN M. & WILMA HENSON (WIFE)

THERESA LONG (1/2)

PATRICK O. SANDERS II (1/2)

IRREVOCABLE TRUST

THE CAUDILL FAMILY

P

REAL ESTATE TRUST

ERIC ZORN, TRUSTEE, WAL-MART

P

LLC

ENTERPRISES,

TRIPLE

P

ANGIE SULLIVAN (WIFE)

DONNIE S. &

12'

12'

12'

12'

7'

7'

12'

10' PAVED SHLD

10' PAVED SHLD

10' PAVED SHLD

12'

12'

12'

12'

7' 7'

4' PAVED SHLD

P C

PC 60+57.68

PT 61+20.30

PI 60+89.52

1'

1.

1.

1'

180' @ 15:1 TAPER

OF EDGE KEY

CONST. 16 LF

OF EDGE KEY

CONST. 20 LF

S '1 "E

S '3

"E

N '4

"W

N49°36'39"E

PC

3+

.0

P T

P I

9 d d

C d d d d d d d

E=10.29'

R=40.00'

L=52.08'

T=30.47'

D

PI STA=3+32.49

BELL STREET

E=5.28'

R=100.00'

L=63.58'

T=32.91'

D

PI STA=6+59.79

BELL STREET

E=3.58'

R=140.00'

L=62.62'

T=31.84'

D

PI STA=60+89.52

BANK STREET

RUNOFF = 215'

RUNOUT = 134'

E = 222.38'

R = 5000.00'(1) R = 5000.00'(2)

L = 2445.13'(1) L = 483.64'(2)

T = 1507.74'

D

P.I. STA. 1238+83.27

US 27

4=R

'05 =R

=R

R

'52=

R

=R

Prop R/W Prop R/W

Prop R/W

Prop R/W

76.00

+00.00

89.00

+63.00 84.00

+55.00

93.00

+94.00

100.00

+46.00

122.00

+08.00

81.12

+55.00 64.22

+23.53 84.20

+22.61

71.79

+02.00

95.00

+46.00

93.92

+55.03

78.26

+73.00

78.61

+83.00

30.00

+45.00

19.77

+45.00

99.71

+47.00

99.99

+58.00

82.52

+92.17

72.42

+92.04 83.86

+72.80

81.00

+58.00

70.51

+72.64

92.00

+15.00

78.00

+78.69 86.47

+83.45

86.00

+99.00

95.00

+99.00

73.00

+99.00

73.62

+83.31

74.45

+75.25

83.43

+74.98

73.83

+72.92

74.00

+00.00

86.00

+00.00

73.00

+65.00

140.00

+82.00

119.57

+46.16

63.63

+00.36

119.00

+48.00

80.00

+81.00

59.45

+47.75

63.00

+71.00

71.92

+45.05

61.36

+53.21

72.00

+98.00

62.00

+99.00

86.00

+50.00

222.00

+36.00

224.00

+89.00

181.00

+72.00

71.57

+78.47

146.00

+30.00

92.00

+30.00

68.00

+78.35

91.40

+37.93

24" PIPE

936.08

T/G

18" PIPE

2' SPCL DIT

2' SPCL DIT

2' SPCL DIT

2' SPCL DIT

2' SPCL DIT

15"

15"

S P

I T

P I P

E

18"

937.48

I.E.

915.16

O.E.

934.27

O.E.

924.68

O.E.

915.40

F.L.

REMOVE

DIT

2' SPCL

937.49

I.E.936.94

O.E.

921.24

I.E.

919.80

O.E.

939.88

O.E.

940.07

I.E.

CONST. LIMITS

CONST. LIMITS

E

E

E E

E

E

E

E

E

E

E

E

E

E

E

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

E

E

E

E

E

E

E

E

E E

E

E

E

E

E

E

E

E

E

E

E

E

E

E E

E

E

E

E

E

E

E

E

E

E

E

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

E

E

E

E

E

E

E

E

TEL JB

WMW

M

T E

L

J

B

S S

M H

WV

G L

M

WM

S S

M H

TEL JB

T E L

J B

E

E

E

E

E L

J B

E

E

E

E

E L

J B

WV

W V

WM

W V

W M

WM

8" PVC

E

E

E

E

E le c t r ic

J c t

B x

T E L

J

BT

V

J x

TEL JB

WMW

M

T E

L

J

B

S S

M H

WV

G L

M

WM

S S

M H

TEL JB

T E L

J B

E

E

E

E

E L

J B

E

E

E

E

E L

J B

E

E

E

E

E L

J B

WV

W V

WM

W V

W M

WM

8" PVC

G L

M G L

M

T E L

J B

E L

J B

T E L

J B

E

E

E

E

E le c t r ic

J x

T V

J x

TELJB

TLJB

TLJB

TE JB

TV JB

TV JB

WV

WM

WV

GLM

SANMH

SANMH

SANMH

SANMH

ELJB ELJB

ELJB

TV JB

TV JB

TV JB

TV JB

TV JB

TV JB

TV JB

E

1T

1T

V

WIDTH PIPE

STA.

S I D

E

SIZE (IN) LENGTH (FT)(LF) TYPE AREA (SQYD)

SURFACE

EACH

HDWLTYPE

ASPH

LT ASPH

N/A

N/A

ENTRANCES - US 27

1221+12

1230+18

RT 15 36

15 36

WIDTH PIPE

STA.

S I D

E

SIZE (IN) LENGTH (FT)(LF) TYPE AREA (SQYD)

SURFACE

EACH

HDWLTYPE

ASPH N/A21RT

ENTRANCES - BELL ST

2+93 19 N/A N/A

DITCHES US 27

S I D

E

STA. TO STA. SIZE/TYPE

CHANNEL LINING

TYPE DEPTH QUANTITY

RT 1220+00 - 1220+75 2' FB SPCL ECB 1.0' 67 SQYD

RT 1228+50 - 1229+86 2' FB SPCL CL II 1.0' 76 TON

RT 1230+46 - 1235+00 NORM ECB 1.0' 404 SQYD

DITCHES US 27

S I D

E

STA. TO STA. SIZE/TYPE

CHANNEL LINING

TYPE DEPTH QUANTITY

LT 1220+00 - 1220+50 2' FB SPCL ECB 1.0' 45 SQYD

LT 1221+50 - 1226+00 2' FB SPCL ECB 1.0' 400 SQYD

LT 1226+00 - 1228+50 NORM ECB 1.0' 223 SQYD

LT 1228+50 - 1229+00 2' FB SPCL ECB 1.0' 45 SQYD

LT 1229+00 - 1229+50 2' FB SPCL TRM 1.0' 56 SQYD

LT 1229+50 - 1230+00 NORM ECB 1.0' 45 SQYD

LT 1230+35 - 1234+00 NORM ROCK N/A N/A

LT 1233+00 - 1234+00 NORM ECB 1.0' 89 SQYD

LT 1234+00 - 1234+50 2' FB SPCL ECB 1.0' 45 SQYD

LT 1234+50 - 1235+00 2' FB SPCL CL III 1.0' 45 TON

1220+38

STA.

S I D

E

RT

GUARDRAIL REMOVAL US 27

TO

- 1228+61

STA.

(LF)

REMOVE

RT 1234+13 - 1235+00 96

FACE

SINGLE

(LF)

S I D

E

STA. TO

(EACH)

RT 1221+20 6501228+00

LT 1234+50 - 1235+00 1

STA.

END TREATMENT

TYPE 4A

TERMINAL SECT.

(EACH)

N0. 1

62.5

FACE

SINGLE

(LF)

S I D

E

STA. TO

(EACH)

RT

GUARDRAIL STEEL "W" BEAM BELL ST

GUARDRAIL STEEL "W" BEAM US 27

3+12

TERMINAL SECT.

N0. 1STA.

4+28 112.5

SAFELOAD 1.2 CU YDS

PIPE STA. 1229+62

SCALE: 1"=50'

V

A C

T I V

E

T R

A N

S P

O R

T A

T I O

N

D E S I G

N

D R

A W I N

G

P L

A N S

H E

E T

S

P L

D G

N F I

M for Slope Construction Temp Easement

Temp Easement for Slope Construction

Entrance Construction

For

Temp Esmt

C on s tr u ct io n

T em p

E a s e f or E n t

26.00

+24.00

20.72

+24.00

20.71

+13.00

36.00

+13.00

19.30

+12.58

36.00

+13.00

38.00

+94.00

65.00

+06.00 57.77

+06.00

Temp Ease for Slope Const

Entrance Construction

Temp Easement for

23.97

+06.00 (Bell St)

(Bell St)

(Bell St)

(Bell St)

(Bell St)

(Bell St)

(Bell St)

(Bell St)

(Bell St)

(Bell St)

C on s t

S lo p e f or em p

E s m t

(Bank St)

(Bank St)

Jason.baker Callout Sign & Single Head Lot Light

Jason.Baker Callout P114 PBK Bank

993 US 27 N

POST

P O

S T

POST

POST

M A

T C

H L I N

E

S

T A

M A

T C

H L I N

E

S

T A

U.S. 27 STA. 1238+64.86

SENIOR WAY STA. 70+00

U.S. 27 STA. 1244+75.00

CLUBSIDE DR. STA. 80+00

SENIOR WAY STA. 71+17.45

BELL ST. STA. 8+00

d

RIDGEWAY RD. TIE STA. 10+00.00

RIDGEWAY RD. CONN. STA. 79+08.00

RIDGEWAY RD. CONNECTOR

RIDGEWAY RD. TIE

US 27

P O

B

P O

B

SAFELOAD 5.0 CU YDS

PIPE STA. 1247+73

SAFELOAD 4.9 CU YDS

PIPE STA. 1238+76

SAFELOAD 15.7 CU YDS

PIPE STA. 1236+33

SAFELOAD 14.2 CU YDS

PIPE STA. 1235+44

PLANS

RIGHT OF WAY

REVISED PLAN DATE: JANUARY 10, 2020

M-3 963.930

P-6967.826

923.1

W.E.

STEPS

STEPS

DENSE VEGETATION

DENSE VEGETATION

DENSE VEGETATION

DENSE VEGETATION DENSE VEGETATION

DENSE VEGETATION

DENSE VEGETATION

LANCASTER RD

H I G

H L

A

S E

N

IO

Y

W R

C L U B S

ID

E

D R

C L

U B S

ID

" R

C P

" R

C P

15" CMP

15" CMP

18" CMP

R C P

" R

C P

" R

C P

15" CMP

15" CMP

IP

IP

IP

IP

IP

IP IP

IP

IP

IP

IP

IP IP

IP

IP

IP

IP

S

P H

A L

T

ASPHALT

GRASS

EARTH

S I G

N

IP

IP

IP

IP

A S

P H

A L

T

A S

P H

A L

T

A S

P H

A L

T

L A

K E

V

IE

RWM

A S P

H A L T

A S P

H A L T

RIDGEWAY ROAD

RIDGEWAY ROAD

VEGETATION

DENSE

Prop R /W

Prop R/W

124.43

+53.60

97.58

+31.92

101.34

+42.44

110.69

+85.90 108.88

+92.81

209.00

+70.00

114.00

+35.00

189.00

+47.00

196.45

+31.47

202.00

+20.00

84.00

+98.00

89.00

+04.00

111.34

+42.51

127.58

+31.44

102.40

+63.97

2.83

+93.70

66.59

+92.67

0.36

+41.50

9.64

+41.45

102.32

+88.29

22.35

+37.77

2.35

+37.48

0.16

+06.65

8.69

+86.93 1.31

+86.87

101.61

+03.79

100.86

+34.72

26.71

+98.45

140.60

+79.55

138.70

+77.11

158.00

+00.00 155.00

+52.00 129.00

+00.00

92.00

+30.00

82.00

+00.00 76.63

+68.16

124.00

+10.00

210.00

+25.00

124.82

+87.55

156.05

+32.67

91.40

+37.93 89.96

+57.74

21.00

+82.00

42.00

+14.00

45.00

+55.00

14.69

+66.92

21.23

+20.56

80.11

+70.96

Rd Tie)

(Ridgeway

Rd Conn)

(Ridgeway

Rd Conn)

(Ridgeway

Rd Conn)

(Ridgeway

Rd Conn)

(Ridgeway

P rop

R

W

79.16

+16.87 103.33

+78.96

105.96

+20.27

10’ PAVED SHLD

10’ P

AVED SHLD

10’ PAVED SHLD

10’ PAVED SHLD

12’

12’

12’

12’

7’

7’

12’

12’

12’

12’

7’

7’

12’

4’ P

AVED S

HLD

4’ PAVED SHLD

P C

C

P I

1’

1.

96’ @ 8

:1 TAPER

1’

1.

96’ @ 8:1 TAPER

1.

1’

180’ @ 12:1 TAPER

385’ @ 55:1 TAPER

385’ @ 55:1 TAPER

1’

1.

OF EDGE KEY

CONST. 18 LF

OF EDGE KEY

CONST. 18 LF

OF EDGE KEY

CONST. 22 LF

OF EDGE KEY

CONST. 24 LF

OF EDGE KEY

CONST. 16 LF

S ’0

"E

N72°27’06"E

S ’0

"E

P C

P R

C

P T

P I

PI 7+43.31

PC 70

+89.

P T

1+

P C

P T

.0

P I 1+

.9

P I

PC 80+70.93

PT 81+50.44

PI 81+12.08

P C

PT 79+31.46

PI

9+ .6

P C

P T

P I

PC 6

+31.

PT 6+49.02

PI 6+40.31

d d d d dd d d d d

C d d d d d d d d

E=13.11’

R=100.00’

L=97.23’

T=52.85’

D

PI STA=7+43.31

BELL STREET

E=15.73’

R=75.00’

L=89.65’

T=51.06’

D

PI STA=71+40.91

SENIOR WAY

E=6.56’

R=100.00’

L=70.56’

T=36.82’

D

PI STA=72+86.28

SENIOR WAY

d

E=6.60’

R=125.00’

L=79.51’

T=41.15’

D

PI STA=81+12.08

CLUBSIDE DRIVE

d d

E=8.05’

R=50.00’

L=53.30’

T=29.50’

D

PI STA=79+07.66

RIDGEWAY ROAD CONN.

RUNOUT = 215’

RUNOFF = 134’

E = 222.38’

R = 5000.00’(1) R = 5000.00’(2)

L = 2445.13’(1) L = 483.64’(2)

T = 1507.74’

D

P.I. STA. 1238+83.27

US 27

E=7.96’

R=150.00’

L=95.63’

T=49.51’

D

PI STA=9+18.40

RIDGEWAY ROAD TIE

d

P

P 122

P

P

P

P d

124L

P

ACCESS EASEMENT

DONNIE S. & ANGIE SULLIVAN (WIFE)

DIANA C. YADEN

ENTERPRISES, LLC

BREWSTER AND NOE

UPCHURCH (WIFE)

JACK G. & ANN P.

SEAN PENMAN

LINCOLN COUNTY FISCAL COURT

THE TABERNACLE CHURCH

957.65

T/G

2’ SPCL DIT

2’ SP

CL DI

T

15" PIPE

2’ SPCL DIT

R E

M O

V E

P I P

E

P I P

E

928.59

T/G

918.53

O.E.

944.59

O.E.

REMOVE

REMOVE

REMOVE

ELEV.=958.83

BERM

2’ S

PCL

DI

T

2’ SPCL DIT

P I P

E

927.41

I.E.

18"

CONST. LIMI

TS

CONST. LIM

ITS

E E

E

E

E

E

E

E

SA

N

SA

N

SA

N

SA

N

SA

N

SA

N

SA

N

SA

N

SA

N

SA

N

SA

N

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SA

N

SA

N

SA

N

SA

N

SA

N

SA

N

SA

N

SA

N

SA

N

E E

E

E

E

E

E

E

SA

N

SA

N

SA

N

SA

N

SA

N

SA

N

SA

N

SA

N

SA

N

SA

N

SA

N

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SA

N

SA

N

SA

N

SA

N

SA

N

SA

N

SA

N

SA

N

SA

N

G L

M

G L

M

G L

M

WM

EL JB

TEL JB

TEL JB

T E L

J B

WV

S A

N M

H

WM

SANMH

W M

W V

SANMH

W V

" P

V C

8" P

VC

" P

V C

GLM

G L

M

G L

M

G L

M

WM

EL JB

TEL JB

TEL JB

T E L

J B

WV

S A

N M

H

WM

SANMH

W M

W V

SANMH

W V

" P

V C

8" P

VC

8" P

VC

" P

V C

GLM

GLM

GLM

GLM

GLM

GLM

GLM

GLM

SANMH

TELJB

ELJB

ELJB

TELJB

TELJB

SD

SIGN

T E L

J B

Metal Lid

WM

WV

G L

M

G L

M

G L

M S

A N

M H

TV J

B

TV J

B

TV J

B

TV J

B

TV J

B

TV J

B

TV J

B

E

E

E

E

EL JB

E

E

E

E

EL JB

US 27

J a n u a

D A

T E

P

L O

T T

E s e p h g o s s a g e

U S

E

S

H E

M r o

S t a t io n v

COUNTY OF ITEM NO. SHEET NO.

LINCOLN 8-196.00 R10

PLAN SHEET

STA. 1235+00 TO STA. 1250+00

FACE

SINGLE

(LF)

WIDTH PIPE

SIZE (IN) LENGTH (FT)(LF) TYPE AREA (SQYD)

SURFACE

EACH

HDWLTYPE

EX R

/W

EX R

/W

EX R/W

EX R/W

0’ 100’ 200’50’

S I D

E

STA. TO

(EACH)

LT 1235+00 1238+54

LT - 1250+00

STA.

(EACH)

NO. 1

FACE

SINGLE

(LF)

S I D

E

STA. TO

STA.

(EACH)

1RT 350

GUARDRAIL STEEL "W" BEAM BELL STREET

4+28 7+74

TERMINAL SECT.

TERMINAL SECT.

GUARDRAIL STEEL "W" BEAM US 27

END TREATMENT

NO. 1

TYPE 4A

1246+62.50

1235+00

STA.

GUARDRAIL REMOVAL US 27

TO

- 1239+48

STA.

(LF)

REMOVE

S I D

E

RT

STA.

S I D

E

ASPH N/A18 36

ENTRANCES - US 27

1238+65 43318LT

1245+02 - 1248+12 326RT

1248+40 - 1250+00 172RT

DITCHES US 27

S I D

E

STA. TO STA. SIZE/TYPE

CHANNEL LINING

TYPE DEPTH QUANTITY

RT 1235+00 - 1236+50 2’ FB SPCL ECB 1.0’ 134 SQYD

RT 1236+50 - 1238+00 2’ FB SPCL ECB 1.0’ 134 SQYD

RT 1243+50 - 1244+50 V’ SPCL ROCK N/A N/A

RT 1245+00 - 1247+00 2’ FB SPCL ECB 1.0’ 178 SQYD

RT 1246+00 - 1247+00 2’ FB SPCL CL II 1.0’ 42 TON

RT 1248+00 - 1248+50 V’ SPCL CL III 1.0’ 45 TON

RT 1248+50 - 1250+00 NORM ECB 1.0’ 134 SQYD

DITCHES US 27

S I D

E

STA. TO STA. SIZE/TYPE

CHANNEL LINING

TYPE DEPTH QUANTITY

LT 1235+00 - 1235+50 2’ FB SPCL CL III 24" 34 TON

LT 1235+50 - 1238+47 2’ FB SPCL CL III 24" 198 TON

LT 1238+83 - 1239+00 2’ FB SPCL ECB 1.0’ 16 SQYD

LT 1239+00 - 1241+50 NORM ECB 1.0’ 223 SQYD

LT 1241+50 - 1244+50 NORM ROCK N/A N/A

LT 1245+00 - 1246+50 NORM ROCK N/A N/A

LT 1246+50 - 1247+00 NORM ECB 1.0’ 45 SQYD

LT 1247+06 - 1248+00 NORM ECB 1.0’ 84 SQYD

LT 1248+00 - 1249+00 2’ FB SPCL ROCK N/A N/A

LT 1249+00 - 1250+00 V’ SPCL ROCK N/A N/A

DITCHES LAKEVIEW DRIVE

S I D

E

STA. TO STA. SIZE/TYPE

CHANNEL LINING

TYPE DEPTH QUANTITY

N/A 5+11 - 5+15 2’ FB SPCL* CONC 1’ 3 SQ YD *PVD DIT. TY 1

for B uildin g Rem ovalTemp

Eas ement

Entrance Cons truction

Temp Easeme nt for

Permanent Dr ainage Easem ent

80.61

+70.86

87.00

+89.00

78.00

+83.00

53.00

+64.00

59.00

+23.00

57.00

+70.00

17.30

+43.87

17.34

+85.00

31.00

+85.00

102.16

+16.58

58.00

+75.00

35.00

+40.00

40.00

+40.00

42.00

+97.00

43.00

+66.00

(Bell St)

(Bell St)

(Bell St)

(Bell St)

(Bell St) (Bell St)

(Senior Way)

(Senior Way)

(Senior Way)

(Senior Way)

(Senior Way)

(Lakeview)

(Lakeview)

(Clubside)

(Clubside)

(Clubside)

C o n s t f o r

E n t

E a s e m e n t

T e m p

Construction for Entrance

Temp Easement

SCALE: 1"=50’

U

P R

O J

E C

T S

V

1\

P L

D G

N F I

M

Jason.baker Polygon

Jason.Baker Callout P124 The Well Inc

1708 US 27 N

0’ 200’ 400’100’

M A

T C

H L I N

E

S

T A

G O

S H

T O

K Y

KY

W A

L M

A

I V

E

C O

T T

E

P

P

P

P

P

P

P

P

P

P

P

P

P

P

P

P

P

P

P

WENDELL R. MORRIS 20% INTEREST

OWENS CHEVROLET INC. 80% INTEREST

P

HENSON (WIFE)

JOHM M. & WILMA JOHM M. & WILMA HENSON (WIFE)

P

P

P

P

P

SHEILA GAIL MULLINS, ET AL

SUSAN ANN CHERRY

SUSAN B. CHERRY & LOIS L. OLIVER

ALFORD, LLC

BLUEGRASS MOBILE HOME PARK, INC

CORNELIUS (WIFE)

DAVID & JESSICA

COOLEY

DEBORAH W.

MURPHY OIL USA INC.

REAL ESTATE TRUST

ERIC ZORN, TRUSTEE, WAL-MART

TRIPLE ENTERPRISES, LLC

OWENS CHEVROLET INC.

ROBERT H. & ROSE C. NOE (WIFE) (1/2)

DAN L. & JANE N. BARNETT (WIFE) (1/2)

P

ARC RASFDKY001, LLC

P

CITY OF STANFORD

P

OWENS CHEVROLET INC.

P

ROSE MARIE NOE (WIFE)

ROBERT H. NOE AND

P

P for Landscape Removal

Temp Easement

Prop R/W

Prop R/W

Prop R/W Prop R/W Prop R/W

Prop R/W

Prop R/W

Pro p R /W

Prop R/W

P r o p

R

W

Prop R/W

P r o p

R

W

Prop R/W

Prop R/W

P

PROPERTIES 19, LLC

REALTY INCOME

P

P NINA ISON

HTW PROPERTIES, LLC

P

P

PROTECTION DISTRICT

LINCOLN COUNTY FIRE

P

NEWCOMB OIL CO., LLC

REVISED PLAN DATE: JANUARY 10, 2020

PLANS

RIGHT OF WAY

RIGHT OF WAY STRIP MAP

J a n u a

D A

T E

P

L O

T T

E s e p h g o s s a g e

U S

E

S

H E

M r o

S t a t io n v

COUNTY OF ITEM NO. SHEET NO.

LINCOLN 8-196.00 R22

SHEET 1 OF 2

100SCALE: 1"=

U

P R

O J

E C

T S

V

1\

R W

S

T R I P

M A

P 1.

D G

N F I

M

WALMART CENTER

STA 50+00 GOSHEN CUTOFF

STA 1215+83.60 US 27=

For Entr Const

Esmt

Temp

Temp Esmt For Building Removal for Slope Construc tionTemp Eas ement

Temp Easement for Slope Const

For Entr Const Esmt

Temp for Slope Construction

Temp Esmt

Temp Easement for Slope Construction

Entrance Construction

Temp Esmt For

Temp Esmt for Drainage

US 27 STA 1193+00

BEGIN CONSTRUCTION

US 27 STA 1196+76.86

BEGIN R/W PROJECT

Jason.Baker Polygon

Jason.Baker Callout P105 Cherokee

0’ 200’ 400’100’

A

T C

H L I N

E

S

T A

P

P

P

P

P

P

P

P

P

P

P

P

B A

N K

S T R E E T

B E L L

S T

R E E T

S E

N I

Y

C L

U B

S I

I V

E

L A

K E

V I

THERESA LONG (1/2)

PATRICK O. SANDERS II (1/2)

ESTRIDGE

JEAN DAVIDSON

LINCOLN COUNTY FISCAL COURT

SEAN PENMAN

UPCHURCH (WIFE)

JACK G. & ANN P.

ENTERPRISES, LLC

BREWSTER AND NOE

DIANA C. YADEN

CHURCH

THE TABERNACLE

PBK BANK INC.

IRREVOCABLE TRUST

THE CAUDILL FAMILY

P

P

P

P

124L

P

124L

P

DONNIE S. & ANGIE SULLIVAN (WIFE)

Prop R/W

P rop

R

W

Prop R/W

Prop R/W

P rop

R

W

P r o p

R

W

P

P

P

WILMA HENSON (WIFE)

JOHN M. HENSON &

JODY WELLS (WIFE)

JAMES D. &

OWENS CHEVROLET, INC.

R

ID

G E

W

Y

REVISED PLAN DATE: JANUARY 10, 2020

PLANS

RIGHT OF WAY

RIGHT OF WAY STRIP MAP

J a n u a

D A

T E

P

L O

T T

E b iv a n c h a k

U S

E

S

H E

M r o

S t a t io n v

COUNTY OF ITEM NO. SHEET NO.

LINCOLN 8-196.00 R23

SHEET 2 OF 2

100SCALE: 1"=

U

P R

O J

E C

T S

V

1\

R W

S

T R I P

M A

P

D G

N F I

M

US 27 STA 1260+00.00

END CONSTRUCTION

for Building Removal

Temp Easement

Temp Easement for Slope Construction for Slope Const

Temp Easement for Slope Const

Temp Easement

Construction for E ntrance

T em p E asem ent

Co ns tr uc tio n fo r

En tr an ce

Te mp E as em en t

Temp Ease for Ent Const

Ent Const

Temp Ease for

Permanent Easement For Drainage

US 27 STA 1247+62.94

END R/W PROJECT

Jason.Baker Polygon

Jason.Baker Polygon

Jason.Baker Callout P114 PBK Bank

993 US 27 N

Stanford, KY 40484

Jason.Baker Callout P124 The Well Inc

1708 US 27 N

08-0196.00 RW REV 1 Full 6
08-0196.00 RW REV 1 Full 9
strip map.pdf
08-0196.00 RW REV 1 Full 30
08-0196.00 RW REV 1 Full 31

File details come from the government source that posted it. Updated .