- 36C24423R0083_0001
About this file
This document contains specifications for asphalt shingle roofing work on a federal building renovation project. The specifications call for fiberglass asphalt shingles to match the existing roof in style, color, and texture. Underlayment is also specified if needed. Related flashing and sheet metal work is referenced. Product standards, warranty requirements, and installation instructions are provided.
The related federal contract opportunity is a 100% SDVOSB set-aside for renovations to Building 58 at a VA medical center, including first and second floor work. Amendment 0001 provides additional details for the roofing work specified in the technical specifications.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Site Visit BLDG.58 DOM_1.pdf | ||
| SOLICITATION-DESCRIPTION.docx | DOCX document | |
| 12_20_23_RFI_Answers_ Building_58_1_and_2_Floor.pdf | ||
| Window Film SECTION 08 87 00.pdf | ||
| SECTION 07 60 00 Flashing.pdf | ||
| Asbestos plan Bldg.58_1.pdf | ||
| 36C24423R0083 0001.docx | DOCX document | |
| 20200612 Connell-Greene Asbestos Report.pdf | ||
| SECTION 080671 DOOR HARDWARE.pdf | ||
| PRICING SHEET FOR TOTAL PROJECT AND DEDUCT ALTERNATES rev 1.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SECTION 07 31 13
ASPHALT SHINGLES
PART 1 - GENERAL
1.1 SUMMARY
A. Section Includes: Fiberglass asphalt shingles over underlayment nailed to roof sheathing. Shingle style and color to match the existing building roof shingle.
1.2 RELATED WORK
A. Section 07 60 00, FLASHING AND SHEET METAL: Counterflashing and
Flashing of Roof Projections.
B. Section 08 90 00, LOUVERS & VENTS: New Dormer Exhaust Louvers.
1.3 APPLICABLE PUBLICATIONS
A. Comply with references to extent specified in this section.
B. ASTM International (ASTM):
D226/D226M-17...........Asphalt-Saturated Organic Felt Used in Roofing and Waterproofing.
D1970/D1970M-19.........Self-Adhering Polymer Modified Bituminous Sheet
Materials Used as Steep Roofing Underlayment for Ice Dam Protection.
D3018/D3018M-11(2017)...Class A Asphalt Shingles Surfaced with Mineral
Granules.
D3161/D3161M-20.........Wind Resistance of Steep Slope Roofing Products
(Fan-Induced Method).
D3462/D3462M-19.........Asphalt Shingles Made from Glass Felt and
Surfaced with Mineral Granules.
F1667-18a...............Driven Fasteners: Nails, Spikes, and Staples.
C. UL LLC (UL):
790(Edition 8)..........Fire Tests of Roof Coverings.
1.4 SUBMITTALS
A. Submittal Procedures: Section 01 33 23, SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES.
B. Manufacturer's Literature and Data:
1. Description of each product.
2. Installation instructions.
3. Warranty.
C. Sustainable Construction Submittals:
1. Solar Reflectance Index (SRI) for asphalt shingles.
1.5 DELIVERY
A. Deliver products in manufacturer's original sealed packaging.
B. Mark packaging, legibly. Indicate manufacturer's name or brand, type, color, production run number, manufacture date, and the label of
Underwriters Laboratories.
C. Before installation, return or dispose of products within distorted, damaged, or opened packaging.
1.6 STORAGE AND HANDLING
A. Store shingles according to manufacturer's instructions. Store roll goods on end in upright position.
B. Protect products from damage during handling and construction operations.
C. Keep materials dry, covered completely and protected from weather.
1.7 WARRANTY
A. Construction Warranty: FAR clause 52.246-21, "Warranty of
Construction."
B. Manufacturer's Warranty: Warrant asphalt shingles against material and manufacturing defects.
1. Material Warranty Period: 30 years.
2. Wind-Speed Warranty Period: Resist wind speeds up to 160 km/h (100 mph) for 15 years.
3. Algae-Resistance Warranty Period: No discoloration for 20 years.
4.
PART 2 - PRODUCTS
2.1 PRODUCTS - GENERAL
A. Basis of Design: Mtatch existing shingle installed on the roof regarding size, texture and color to blend in with existing roof finish.
B. Provide each product from one manufacturer.
1. Provide each product exposed to view from one production run.
C. Sustainable Construction Requirements:
1. Asphalt Shingle Recycled Content: 50 percent post-consumer recycled content, minimum.
2. Solar Reflectance Index: 29, minimum.
2.2 ASPHALT SHINGLES
A. Asphalt Shingles: Fiberglass reinforced, laminated type, square butt.
1. ASTM D3462/D3462M and ASTM D3018/D3018M, Type I, self-sealing.
2. ASTM D3161/D3161M, Class D or F wind-resistant.
3. UL 790 Class A fire resistance.
4. Minimum Weight: 10.3 kg/square meter (210 lbs./100 square feet).
2.3 ROOFING NAILS
A. ASTM F1667, Type I, Style 20, galvanized steel, deformed shanks, heads
10 mm to 11 mm (3/8 inch to 7/16 inch) diameter.
1. Nails for Shingles: 32 mm (1-1/4 inches) long.
2. Nails for Felt: 19 mm (3/4 inch) long.
2.4 ROOFING UNDERLAYMENT
A. Organic Felt: ASTM D226/D226M, Type l.
B. Self-Adhering Modified Bituminous Underlayment: ASTMD1970/D1970M.
C. Replace underlayment if necessary, in areas indicated. Document exact area of replacement and quantities.
2.5 METAL FLASHING
A. Provide metal roof flashings, including apron flashings, step flashings, valley flashings, drip edges, and vent pipe flashings specified in Section 07 60 00, FLASHING AND SHEET METAL.
B.
PART 3 - EXECUTION
3.1 PREPARATION
A. Examine and verify substrate suitability for roofing installation.
1. Verify roof substrates are sound, within manufacturer's tolerances, and free from defects which would interfere with roofing installation.
2. Verify roof accessories, vent pipes and other projections through roof are in place and roof flashing is installed, or ready for installation, before installing shingles.
B. Protect existing construction and completed work from damage.
3.2 INSTALLATION - GENERAL
A. Install products according to manufacturer's instructions and approved submittal drawings.
1. When manufacturer's instructions deviate from specifications, submit proposed resolution for Contracting Officer's Representative consideration.
2. Ensure to match the existing shingle installed and the layout of the existing roof system and pattern.
3.3 METAL DRIP EDGE INSTALLATION
A. At eaves and rakes, install stainless steel drip edges specified in
Section 07 60 00, FLASHING AND SHEET METAL. Match existing flashing intstallation.
1. Eaves: Install metal drip edge before underlayment.
2. Rakes: Install metal drip edge after underlayment.
B. Secure metal drip edges with compatible nails spaced maximum 250 mm (10 inches) on center along inner edges.
3.4 FLASHING INSTALLATION
A. Install metal flashings specified in Section 07 60 00, FLASHING AND
SHEET METAL at intersections of roofs, adjoining walls, or projections through deck such as chimneys and vent stacks.
B. Install metal valley flashing shown and as specified under Section
07 60 00, FLASHING AND SHEET METAL.
1. Secure valley flashing according to shingle manufacturer's instructions.
2. Expose flashing in open portion of valley 125 mm (5 inches) minimum, and lap shingles over flashing 125 mm (5 inches) minimum.
3.5 UNDERLAYMENT INSTALLATION- IF REQUIRED
A. Install self-adhering sheet underlayment, working from low point to high point. Lap sides 90 mm (3-1/2 inches) minimum, and lap ends 150 mm
(6 inches) minimum. Install at the following locations:
1. Eaves and Rakes: From edge of eave and rake to 600 mm (24 inches) minimum beyond inside face of exterior wall.
a. Lap underlayment over eave metal drip edge.
2. Valleys, Hips and Roof Slope Transitions: Centered over change in slope, and extended 450 mm (18 inches) minimum on both sides.
3. Ridges: Centered on ridge, and extended 900 mm (36 inches) minimum on both sides.
4. Sidewalls and Projections through Roof: Extended 450 mm (18 inches) from projection, and extended up projection 100 mm (4 inches) minimum.
5. Firmly roll underlayment to ensure adhesion to roof deck and metal flashings.
B. Install organic felt underlayment on roof deck not covered by self-adhering sheet underlayment, with 100 mm (4 inches) minimum end laps, 50 mm (2 inches) minimum head laps, and 300 mm (12 inches) minimum ridge laps. Nail felt 125 mm (5 inches) on centers along laps.
3.6 ROOF ACCESSORY INSTALLATION
A. Lap underlayment and asphalt shingles over upslope base flanges of roof accessory flashings.
B. Install underlayment and asphalt shingles over side slope base flanges of roof accessory flashings.
C. Install downslope base flanges of roof accessories over asphalt shingles.
3.7 ASPHALT SHINGLE INSTALLATION
A. Install shingles aligned parallel to roof eave, nailed to roof sheathing.
1. Exposure: Match existing.
2. Head lap: Match existing.
B. Install asphalt-shingle starter strip with tabs removed, and overhanging lower edge of roof 13 mm (1/2 inch).
C. Valleys: Open.
3.8 HIP AND RIDGE SHINGLE INSTALLATION
A. Bend each shingle lengthwise down center to provide equal exposure on both sides of hip and ridge.
1. Begin ridge installation at leeward end of ridge. Cover ridge vents with shingles.
2. Begin hip installation at eave.
B. Install shingles with maximum 125 mm (5 inches) exposure.
C. Secure each shingle with one nail on both sides of hip and ridge, 215 mm (8-1/2 inches) back from exposed end and one inch up from edge.
- - E N D - -
---INTENTIONALLY BLANK---
| SECTION 07 31 13 ASPHALT SHINGLES |
| PART 1 - GENERAL |
| 1.1 SUMMARY |
| 1.2 RELATED WORK |
| 1.3 APPLICABLE PUBLICATIONS |
| 1.4 SUBMITTALS |
| 1.5 DELIVERY |
| 1.6 STORAGE AND HANDLING |
| 1.7 WARRANTY |
| PART 2 - PRODUCTS |
| 2.1 PRODUCTS - GENERAL |
| 2.2 ASPHALT SHINGLES |
| 2.3 ROOFING NAILS |
| 2.4 ROOFING UNDERLAYMENT |
| 2.5 METAL FLASHING |
| PART 3 - EXECUTION |
| 3.1 PREPARATION |
| 3.2 INSTALLATION - GENERAL |
| 3.3 METAL DRIP EDGE INSTALLATION |
| 3.4 FLASHING INSTALLATION |
| 3.5 UNDERLAYMENT INSTALLATION- IF REQUIRED |
| 3.6 ROOF ACCESSORY INSTALLATION |
| 3.7 ASPHALT SHINGLE INSTALLATION |
| 3.8 HIP AND RIDGE SHINGLE INSTALLATION |
File details come from the government source that posted it. Updated .