70Z08518PR4526700_Amendment_0002_page_2.docx

DOCX document 21 KB Posted

Attached to
USCGC BERTHOLF Dockside repair FQ2 FY18
Solicitation number
070Z08518RP4526700
Issued by

About this file

page 2 of the SF 30, has the Q & A and other changes

View the file

Other files

File Type Posted
SF30_(00005)_BERTHOLF_Q2_2018_DS_Amendment_5_to_70Z08518PR4526700_rev.docx DOCX document
70Z08518PR4526700_Amendment_0005_page_2.docx DOCX document
SF30_(00004)_BERTHOLF_Q2_2018_DS_Amendment_4_to_70Z08518PR4526700_rev.docx DOCX document
BERTHOLF_(WMSL_418)_DS_FQ2_GWW_18R3_Combined__doc_with_PRC_Addition_no_comment.pdf PDF
70Z08518PR4526700_Amendment_0004_page_2.docx DOCX document
ATTACHMENT_2_-_Schedule_of_Supplies-Services_revised_KO_Reviewed_amendment_4.docx DOCX document
SF30_(00003)_BERTHOLF_Q2_2018_DS_Amendment_3_to_70Z08518PR4526700_rev.docx DOCX document
70Z08518PR4526700_Amendment_0003_page_2.docx DOCX document
SF30_(00002)_BERTHOLF_Q2_2018_DS_Amendment_2_to_70Z08518PR4526700_rev.docx DOCX document
ATTACHMENT_1_BERTHOLF_(WMSL_418)_DS_FQ2_GWW_18R2_Combined__doc_rev_12_18_17.docx DOCX document
ATTACHMENT_2_-_Schedule_of_Supplies-Services_revised_KO_Reviewed_amendment_2.docx DOCX document
SF30_(00002)_BERTHOLF_Q2_2018_DS_Amendment__70Z08518RP4526700.docx DOCX document
ATTACHMENT_4-Request_for_Clarification_final.docx DOCX document
ATTACHMENT_5_-_Government_Property_Report_final.pdf PDF
ATTACHMENT_3_-_Continuation_of_Combined_Synopsis-Solicitation-BERTHOLF_Q2_KO_Reviewed_(Final_revision_).docx DOCX document
ATTACHMENT_1_-_BERTHOLF_(WMSL_418)_DS_FQ2_GWW_18R1_Combined__doc_(2)_final.docx DOCX document
ATTACHMENT_6_-_DHS_Form_11000-6-non_disclosure_agreement.pdf PDF
ATTACHMENT_2_-_Schedule_of_Supplies-Services_revised_KO_Reviewed_(Final).docx DOCX document
Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sol. 70Z08518PR4526700 Amendment 0002 Page of 2 Cont’d (information for Sister Ships, available for ship check).

The point of contact for a site survey of the CGC MUNRO is LT Accumanno. Additionally, the MUNRO Port Engineer is LTJG Surgent. She can be reached at (W) (510) 437-5872 or © (443) 624-6613, or by email at Elizabeth.R.Surgent@uscg.mil. Another Sister Cutter, CGC HAMILTON (WMSL 753), will be available in Charleston , SC. The point of contact for a site survey of the CGC HAMILTON is LTJG Patrick Beringer, HAMILTON Port Engineer. He can be reached at 843-740-7096 or by email at Patrick.A.Beringer@uscg.mil. An alternate point of contact for site surveys is CW02 Jason Stonehouse. He can be reached at 520-637-5896 or by email at Jason.P.Stonehouse@uscg.mil.

1) Delete the work of item D-11 Girder & Stiffener, Renew. The line itemed is deleted in the replaced ATTACHMENT 2 Schedule_of_Supplies-Services , as well as the replaced ATTACHMENT 1, Specification Rev-2 December 18,2017 attached to this amendment.

2) Answers to Questions received from interested offerors Question 1: Regarding D-6 of the ATTCHMENT 0001 Spec. Paragraph 3.3 instructs contractor to modify piping IAW “CG Dwg 750 WMSL 555_XXX” which paragraph 2 says was not available as of April 2017.

Is this drawing available for KTR to use to properly modify the system?

Answer to Question 1 : Delete from Attachment 0001 Spec. D-6 para 3.3, the drawing 750 WMSL 555_XXX Question 2: The following NAVSEA drawings were not included in the reference CD; can the government provide these drawings? 803-138566, 804-1385781, 804-5773931, 804-5959214, 803-5184129, 803-6397268

Answer to Q2: The Coast Guard cannot issue the NAVSEA drawings directly to interested offerors. They will be sent through the following website: https://safe.amrdec.army.mil/safe/ If you wish to receive copies of the drawings, please submit a completed Attachment 6 of the solicitation “the non disclosure form “ to Kathryn.rato@uscg.mil

Question 3: Regarding D-1 of the Spec Attchmt 00001, para. 3.2 Table 1 lists Relief Valves 1-DLOS-V-015 and 2-DLOS-V-015 as being integral to the pump. Please provide the pump/equipment tech manual to assist in overhaul of these relief valves.

Answer to Question 3: add Relief Valve part numbers to Table 1 –RELIEF VALVES D-1 para 3.2 Table 1, page 12 of ATTACHMENT 0001 Spec. rev 2 December 18, 2017.

Source for valves is James.young@mtu-online.com Also, in this table 1 the valve # ALPV-V-031 is not needed and it is removed.

Additionally, in this same work item D-1 para 3.3.2 add the sentence (which is already added to the rev 2 ATTCH 1 Spec) the sentence starts as: “ Disconnect any interferences…” .