07-389104 Install High Friction Surface Treatment.pdf
PDF 1 MB Posted
- Solicitation number
- 07-389104, Fed #HSNH-P060(168)
- Issued by
- Los Angeles County, California
About this file
This is a Notice to Bidders and Special Provisions document from the California Department of Transportation (Caltrans) for Contract No. 07-389104, a highway construction project in Los Angeles County. The project involves installing high friction surface treatment (HFST) on State Route 60 from 0.1 mile west of Rosemead Boulevard Overcrossing to 0.1 mile east of Fullerton Road Undercrossing in and near the City of Industry. The primary work includes applying resin binder and calcined bauxite aggregate to asphalt and concrete surfaces, along with associated work such as crack treatment, asphalt concrete replacement, pavement marking removal and installation, and traffic stripe application. The project is identified as Federal-Aid Project HSNH-P060(168) with an estimated cost of $1,200,000 and must be completed within 140 working days. Bids are due electronically by 2:00 p.m. on Tuesday, August 4, 2026, submitted through the Bid Express website. The bid item list includes 29 line items covering mobilization, traffic control systems, HFST application (8,350 square yards), asphalt work, pavement markings, and related construction activities. Contractors must hold either a Class A license or a C-12 Class C license. Bidders must submit security equal to at least 10 percent of their bid.
Prevailing wages are required on this contract as determined by the California Department of Industrial Relations, with contractors obligated to pay the higher of state prevailing wage rates or federal minimum wage rates. The project has multiple traffic control requirements with specified lane closure restrictions on Route 60 eastbound and westbound, including designated holiday closures and restrictions during the 2028 LA Olympics (June 1 to September 1, 2028) and various special events throughout Los Angeles County. Buy America requirements apply to manufactured products, iron and steel products, and certain construction materials, with contractors required to submit certificates of compliance. Environmental requirements include submission of lead compliance plans, management of aerially deposited lead (ADL) in minimal disturbance areas, and disposal of hazardous waste residue from yellow thermoplastic and lead-based painted traffic stripes at Class 1 California facilities within specified timeframes. The project includes coordination with coincident contracts in the area and requires submission of quality control testing results for HFST materials within 24 hours of completion and environmental product declarations for hot mix asphalt within 30 days of initial placement.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Bids open Tuesday, August 4, 2026
Dated July 13, 2026
STATE OF CALIFORNIA
DEPARTMENT OF TRANSPORTATION
NOTICE TO BIDDERS
AND
SPECIAL PROVISIONS
FOR CONSTRUCTION ON STATE HIGHWAY IN LOS ANGELES COUNTY IN
AND NEAR CITY OF INDUSTRY AT VARIOUS LOCATIONS FROM 0.1 MILE
WEST OF ROSEMEAD BOULEVARD OVERCROSSING TO 0.1 MILE EAST OF
FULLERTON ROAD UNDERCROSSING
In District 07 On Route 60
Under
Bid book dated July 13, 2026 Standard Specifications dated 2025
Project plans approved March 18, 2026 Standard Plans dated 2025
Identified by
Contract No. 07-389104
07-LA-60-9.4/19.6
Project ID 0722000264
Federal-Aid Project
HSNH-P060(168)
SPECIAL NOTICES
See sections 2 and 3 for contractors' registration requirements.
The Department advises bidders that potential claim records must be submitted by the contractor using the Department's Internet potential claim system.
See section 2 for submittal requirements for DVBE quotes and Non–Small Business
Subcontractor Preference.
See section 6-1.01 and 6-1.04 of these Special Provisions for the requirements of Buy
America/Build America for manufactured products.
For work plan for local material from (1) a noncommercial source or (2) a source not regulated under California jurisdiction, see section 6-1.03B(2).
See section 7-1.02K(3) for the requirements for electronic submittal of certified payroll records using LCPtracker Pro.
The flagging and temporary traffic control requirements have been revised. See sections 7-
1.03, 7-1.04, and 12.
See sections 2-1.11 and 2-1.33B for in-use off-road diesel-fueled vehicle requirements regarding Certificate of Reported Compliance submittals.
See section 14-11.14 for changes to the management of treated wood waste.
Contract No. 07-389104 i
TABLE OF CONTENTS
NOTICE TO BIDDERS
BID ITEM LIST
SPECIAL PROVISIONS
ORGANIZATION
DIVISION I GENERAL PROVISIONS
1 GENERAL
2 BIDDING
5 CONTROL OF WORK
6 CONTROL OF MATERIALS
8 PROSECUTION AND PROGRESS
9 PAYMENT
DIVISION II GENERAL CONSTRUCTION
12 TEMPORARY TRAFFIC CONTROL
14 ENVIRONMENTAL STEWARDSHIP
DIVISION V SURFACINGS AND PAVEMENTS
36 GENERAL
37 SEAL COATS
39 ASPHALT CONCRETE
DIVISION IX TRAFFIC CONTROL DEVICES
84 MARKINGS
DIVISION X ELECTRICAL WORK
87 ELECTRICAL SYSTEMS
ii
STANDARD PLANS LIST
The standard plan sheets applicable to this Contract include those listed below. The applicable revised standard plans (RSPs) listed below are included in the project plans.
RSP A3A Abbreviations (Sheet 1 of 3)
RSP A3B Abbreviations (Sheet 2 of 3)
RSP A3C Abbreviations (Sheet 3 of 3)
A10A Legend - Lines and Symbols (Sheet 1 of 5)
A10B Legend - Lines and Symbols (Sheet 2 of 5)
A10C Legend - Lines and Symbols (Sheet 3 of 5)
A10D Legend - Lines and Symbols (Sheet 4 of 5)
A10E Legend - Lines and Symbols (Sheet 5 of 5)
A20A Pavement Markers and Traffic Lines - Typical Details
A20B Pavement Markers and Traffic Lines - Typical Details
A20C Pavement Markers and Traffic Lines - Typical Details
A20D Pavement Markers and Traffic Lines - Typical Details
A20E Traffic Lines - Typical Details for Contrast Striping
A20F Pavement Markers and Traffic Lines - Typical Details
A20G Exit Ramp with Enhanced Pavement Markers for Wrong Way Details
A24A Pavement Markings - Arrows
A24B Pavement Markings - Arrows and Symbols
A24C Pavement Markings - Symbols and Numerals
A24D Pavement Markings - Words
A24E Pavement Markings - Words
A24F Pavement Markings - Crosswalks
A24G Pavement Markings - Yield Lines, Limit Lines, and Wrong Way Details
A24H Pavement Markings - Arrows
A24J Pavement Markings - Speed Measurement
A24K Pavement Markings - Bicycle Obstruction Markings
A24L Pavement Markings - Speed Reduction
A73B Markers
A87A Curbs and Driveways
A87B Hot Mix Asphalt Dikes
P70 Hot Mix Asphalt Paving (Longitudinal Tapered Notched Wedge Joint)
T1A Temporary Crash Cushion - Sand Filled (Unidirectional) iii
T1A1 Temporary Crash Cushion - Sand Filled (Unidirectional)
T1B Temporary Crash Cushion - Sand Filled (Bidirectional)
T2 Temporary Crash Cushion - Sand Filled (Shoulder Installations)
T3C Temporary Barrier System (Cross Bolt)
T3D Temporary Barrier System (Cross Bolt)
T3E Temporary Barrier System (Cross Bolt)
T3F Temporary Barrier System (Cal F-23)
T3F2 Temporary Barrier System (Cal F-23)
T3G Temporary Barrier System (Staking or Anchoring)
T3G2 Temporary Barrier System (Staking or Anchoring)
T9 Traffic Control System Tables for Lane and Ramp Closures
T10 Traffic Control System for Lane Closure on Freeways and Expressways
T14 Traffic Control System for Ramp Closure
T30 Temporary Pedestrian Access Routes - Typical Sidewalk Closure and Pedestrian Detour
RS1 Roadside Signs - Typical Installation Details No. 1
RS2 Roadside Signs - Wood Post - Typical Installation Details No. 2
RS4 Roadside Signs - Typical Installation Details No. 4
ES-1A Electrical Systems (Legend)
ES-1B Electrical Systems (Legend)
ES-1C Electrical Systems (Legend)
ES-5A Electrical Systems (Loop Detectors)
ES-5B Electrical Systems (Detectors)
ES-5D Electrical Systems (Curb and Shoulder Termination, Trench, and Handhole Details)
ES-13A Electrical Systems (Splice Insulation Methods Details)
ES-13B Electrical Systems (Kinking and Banding Detail)
CANCELED STANDARD PLANS LIST
The 2025 standard plan sheets listed below are canceled and not applicable to this contract.
Plan No.
Date
Canceled Plan No.
Date Canceled
Plan No.
Date
Canceled
P8 04-20-26
NOTICE TO BIDDERS
Bids open Tuesday, August 4, 2026
Dated July 13, 2026
General work description: Install high friction surface treatment.
The Department will receive electronically sealed bids for the following work: CONSTRUCTION ON
STATE HIGHWAY IN LOS ANGELES COUNTY IN AND NEAR CITY OF INDUSTRY AT VARIOUS
LOCATIONS FROM 0.1 MILE WEST OF ROSEMEAD BOULEVARD OVERCROSSING TO 0.1 MILE
EAST OF FULLERTON ROAD UNDERCROSSING.
District-County-Route-Post Mile: 07-LA-60-9.4/19.6
Contract No. 07-389104
The Contractor must have either a Class A license or the following Class C license which constitutes a majority of the work: C-12.
Federal-aid project no.:
HSNH-P060(168)
Bids must be on a unit price basis.
Complete the work within 140 working days.
The estimated cost of the project is $1,200,000.
The Department will receive bids until 2:00 p.m. on the bid open date via Bid Express website. Bids received after this time will not be accepted. For more information refer to the Electronic Bidding Guide at the Office Engineer's website.
The Department will open and publicly read the bids through webcast/teleconference services immediately after the specified closing time.
For bid results go to:
https://ppmoe.dot.ca.gov/cc
Select Electronic Bidding under the Bidding tab.
District office addresses are provided in the Standard Specifications.
Present bidders' inquiries to the Department and view the Department's responses at:
https://ppmoe.dot.ca.gov/cc?id=cc_bidinquiries
Questions about alleged patent ambiguity of the plans, specifications, or estimate must be asked before bid opening. After bid opening, the Department does not consider these questions as bid protests.
Submit your bid with bidder's security equal to at least 10 percent of the bid.
Prevailing wages are required on this Contract. The Director of the California Department of Industrial Relations determines the general prevailing wage rates. Obtain the wage rates at the DIR website, http://www.dir.ca.gov, or from the Department's Labor Compliance Office of the district in which the work is located.
The federal minimum wage rates for this Contract as determined by the United States Secretary of Labor are available at https://sam.gov/content/home.
If the minimum wage rates as determined by the United States Secretary of Labor differs from the general prevailing wage rates determined by the Director of the California Department of Industrial Relations for similar classifications of labor, the Contractor and subcontractors must not pay less than the higher wage rate. The Department does not accept lower State wage rates not specifically included in the federal minimum wage determinations. This includes helper, or other classifications based on hours of experience, or any other classification not appearing in the federal wage determinations. Where federal wage determinations do not contain the State wage rate determination otherwise available for use by the Contractor and subcontractors, the Contractor and subcontractors must not pay less than the federal minimum wage rate that most closely approximates the duties of the employees in question.
The Department has made available Notices of Suspension and Proposed Debarment from the Federal Highway Administration. For a copy of the notices, go to https://www.dir.ca.gov/dlse/debar.html.
Additional information is provided in the Excluded Parties List System at https://sam.gov/content/home.
Caltrans and the Construction Industry are committed to making partnering the way we do business. For more information, go to https://dot.ca.gov/programs/construction/partnering.
Department of Transportation
BID ITEM LIST
Item No.
Item Code Item Description Unit of Measure Estimated Quantity
0001 070030 LEAD COMPLIANCE PLAN LS LUMP SUM
0002 090100 TIME-RELATED OVERHEAD (WDAY) WDAY 140
0003 120090 CONSTRUCTION AREA SIGNS LS LUMP SUM
0004 120100 TRAFFIC CONTROL SYSTEM LS LUMP SUM
0005 124000 TEMPORARY PEDESTRIAN ACCESS ROUTE LS LUMP SUM
0006 130100 JOB SITE MANAGEMENT LS LUMP SUM
0007 130201 WATER POLLUTION CONTROL PROGRAM LS LUMP SUM
0008 141103 REMOVE YELLOW THERMOPLASTIC TRAFFIC
STRIPE (HAZARDOUS WASTE)
LF 2,030
0009 037164 HIGH FRICTION SURFACE TREATMENT SQYD 8,350
0010 374207 CRACK TREATMENT LNMI 1.2
0011 390095 REPLACE ASPHALT CONCRETE SURFACING CY 25
0012 390132 HOT MIX ASPHALT (TYPE A) TON 560
0013 394076 PLACE HOT MIX ASPHALT DIKE (TYPE E) LF 520
0014 397005 TACK COAT TON 2.5
0015 398100 REMOVE ASPHALT CONCRETE DIKE LF 520
0016 398200 COLD PLANE ASPHALT CONCRETE PAVEMENT SQYD 5,340
0017 810120 REMOVE PAVEMENT MARKER EA 73
0018 810230 PAVEMENT MARKER (RETROREFLECTIVE) EA 210
0019 820750 FURNISH SINGLE SHEET ALUMINUM SIGN
(0.063"-UNFRAMED)
SQFT 33
0020 820840 ROADSIDE SIGN - ONE POST EA 2
Item No.
Item Code Item Description Unit of Measure Estimated Quantity
0021 820860 INSTALL SIGN (STRAP AND SADDLE BRACKET
METHOD)
EA 4
0022 840502 THERMOPLASTIC TRAFFIC STRIPE (ENHANCED
WET NIGHT VISIBILITY)
LF 5,560
0023 840517 PREFORMED THERMOPLASTIC PAVEMENT
MARKING
SQFT 670
0024 846030 REMOVE THERMOPLASTIC TRAFFIC STRIPE LF 2,440
0025 846035 REMOVE THERMOPLASTIC PAVEMENT
MARKING
SQFT 25
0026 847221 6" TRAFFIC STRIPE TAPE WITH CONTRAST
(WARRANTY) (BROKEN 17-7)
LF 920
0027 870009 MAINTAINING EXISTING TRAFFIC MANAGEMENT
SYSTEM ELEMENTS DURING CONSTRUCTION
LS LUMP SUM
0028 872134 MODIFYING RAMP METERING SYSTEMS LS LUMP SUM
0029 999990 MOBILIZATION LS LUMP SUM
SPECIAL PROVISIONS
ORGANIZATION
Special provisions are under headings that correspond with the main-section headings of the Standard Specifications. A main-section heading is a heading shown in the table of contents of the Standard Specifications.
Each special provision begins with a revision clause that describes or introduces a revision to the Standard Specifications.
Any paragraph added or deleted by a revision clause does not change the paragraph numbering of the Standard Specifications for any other reference to a paragraph of the Standard Specifications.
DIVISION I GENERAL PROVISIONS
1 GENERAL
Add to section 1-1.01:
Bid Items and Applicable Sections
Item code
Item description Applicable section
037164 HIGH FRICTION SURFACE TREATMENT 37
2 BIDDING
Add between the 1st and 2nd paragraphs of section 2-1.06B:
The Department makes the following supplemental project information available:
Supplemental Project Information
Means Description Included in the Information Handout -Pavement Smoothness Data
-Preconstruction Operational Checklist
Delete section 2-1.20.
Delete section 2-1.33B(2)(b).
5 CONTROL OF WORK
Delete section 5-1.13B.
Replace section 5-1.13E with:
5-1.13E Prompt Payment
Section 5-1.13E applies to all contracts.
Pay your subcontractors within 7 days of receipt of each progress payment under Pub Cont Code §§ 10262 and 10262.5. Pay duly authorized motor carriers of property in dump trucks for transportation charges under Bus & Prof Code § 7108.6. Pay other entities, such as material suppliers, within 30 days of receipt of each progress payment.
Each month, after the 15th and prior to 20th, submit the following payment information through the Department’s prompt payment monitoring system at https://caltrans.dbesystem.com:
1. Subcontractor’s or entity’s business name
2. Description of work performed
2.1. Bid item numbers or change order numbers
2.2. Written narrative of work performed
3. Value of work performed
4. Amount paid to subcontractor or entity
5. Withhold amount, if applicable
6. Explanation of withhold reasoning, if applicable
Your subcontractors and other entities may validate payments received using the prompt payment monitoring system.
If a subcontractor’s or other entity’s work is in dispute, provide a written withhold notification to the subcontractor or entity and the Engineer no later than 7 days after receipt of the corresponding progress payment that includes the following:
1. Value of the disputed work
2. Amount of the withhold being taken
3. Bid item numbers or change order numbers associated with the disputed work
4. Explanation of the deficiencies of the disputed work and how the corresponding value was calculated
5. Corrective actions to be taken for release of withheld amount
The Department may request additional documentation from you to evaluate whether you applied the withhold in good faith. Submit requested documents within 10 days of receipt of request.
The Department may withhold the same amount of your withhold from a future progress pay estimate if the Department determines any of the following has occurred:
1. Withhold was not applied in good faith
2. Requested additional withhold documentation records were not provided
3. Payment information was not submitted through the prompt payment monitoring system
4. Required withhold notification was not provided
The Department may also apply a 2 percent penalty on the withhold amount for every month payment is not made.
Add to the end of section 5-1.20A:
During the progress of the work under this Contract, work under the following contracts may be in progress at or near the job site of this Contract:
Coincident or Adjacent Contracts
Contract no. County–Route–Post Mile Location Type of work 07-1Q0604 LA-60-PM 19.5/20.4 and
LA-5-PM-2.5
Rowland Heights Norwalk
Restore bioswales and repair Austin Vault Sand Filter
Coordinate lane closures and traffic handling with the Engineer and with contractors of coincident or adjacent projects. Potential conflicts may not be limited to the contracts listed above.
6 CONTROL OF MATERIALS
Add to end of section 6-1.01:
If you fail to submit the form for materials subject to Buy America, the Department may:
1. Withhold from the next progress payment
2. Reject your request for a De Minimis Costs waiver for non-compliant construction materials or manufactured products
Replace section 6-1.03B with:
6-1.03B Submittals
6-1.03B(1) General
Not Used
6-1.03B(2) Work Plan
For local material, such as rock, gravel, earth, structure backfill, pervious backfill, imported borrow, and culvert bedding, obtained from a (1) noncommercial source, or (2) source not regulated under California jurisdiction, submit a local material plan for each material at least 60 days before placing the material. The local material plan must include:
1. Certification signed by you and an engineer who is registered as a civil engineer in the State or a professional geologist licensed as a professional geologist by the State stating:
I am aware local material from a noncommercial source or a source not regulated under CA jurisdiction must be sampled and analyzed for pH and lead and may require sampling and analysis under section 6-1.03B(3) for other constituents of concern based on the land use history. I am aware that local material sources must not contain ADL at concentrations greater than 80 mg/kg total lead or equal to or greater than 5 mg/L soluble lead as determined by the Waste Extraction Test (WET) Procedures, 22 CA Code of Regs § 66261.24(a)(2) App II. I am aware that a maximum quantity of material may be excavated at the site based on the minimum number of samples taken before excavating at the site under section 6-1.03B(3).
2. Land use history of the local material location and surrounding property
3. Sampling protocol
4. Number of samples per volume of local material
5. QA and QC requirements and procedures
6. Qualifications of sampling personnel
7. Stockpile history
8. Name and address of the analytical laboratory that will perform the chemical analyses
9. Analyses that will be performed for lead and pH
10. Other analyses that will be performed for possible hazardous constituents based on:
10.1. Source property history
10.2. Land use adjacent to source property
10.3. Constituents of concern in the ground water basin where the job site is located
The plan must be sealed and signed by an engineer who is registered as a civil engineer in the State or a professional geologist licensed as a professional geologist by the State.
If the plan requires revisions, the Engineer provides comments. Submit a revised plan within 7 days of receiving comments. Allow 7 days for the review.
6-1.03B(3) Analytical Test Results
At least 15 days before placing local material, submit analytical test results for each local material obtained from a noncommercial source or a source not regulated under CA jurisdiction. The analytical test results must include:
1. Certification signed by an engineer who is registered as a civil engineer in the State or a professional geologist licensed as a professional geologist by the State stating:
The analytical testing described in the local material plan has been performed. I performed a statistical analysis of the test results using the US EPA's ProUCL software with the applicable 95 percent upper confidence limit. I certify that the material from the local material source is suitable for unrestricted use at the job site, it has a pH above 5.0, does not contain soluble lead in concentrations equal to or greater than 5mg/l as determined by the Waste Extraction Test (WET) Procedures, 22 CA Code of Regs § 66261.24(a)(2) App II, does not contain lead in concentrations above 80 mg/kg total lead, is free from all other contaminants identified in the local material plan, and will comply with the job site's basin plan and water quality objectives of the RWQCB.
2. Chain of custody of samples
3. Analytical results no older than 1 year
4. Statistical analysis of the data using US EPA’s ProUCL software with a 95 percent upper confidence limit
5. Comparison of sample results to hazardous waste concentration thresholds and the RWQCB's basin plan requirements and water quality objectives for the job site location
6-1.03B(4) Sample and Analysis
Sample and analyze local material from a (1) noncommercial source or (2) a source not regulated under CA jurisdiction:
1. Before bringing the local material to the job site
2. As described in the local material plan
3. Under US EPA Test Methods for Evaluating Solid Waste, Physical/Chemical Methods (SW-846)
The sample collection must be designed to generate a data set representative of the entire volume of proposed local material.
Before excavating at the (1) noncommercial material source or (2) a source not regulated under CA jurisdiction, collect the minimum number of samples and perform the minimum number of analytical tests for the corresponding maximum volume of local material as shown in the following table:
Minimum Number of Samples and Analytical Tests for Local Material
Maximum volume of imported borrow (cu yd)
Minimum number of samples and analytical tests
< 5,000 8
5,000–10,000 12 for the first 5,000 cu yd plus 1 for each additional 1,000 cu yd or portion thereof
10,000–20,000 17 for the first 10,000 cu yd plus 1 for each additional 2,500 cu yd or portion thereof
20,000-40,000 21 for the first 20,000 cu yd plus 1 for each additional 5,000 cu yd or portion thereof
40,000–80,000 25 for the first 40,000 cu yd plus 1 for each additional 10,000 cu yd or portion thereof
> 80,000 29 for the first 80,000 cu yd plus 1 for each additional 20,000 cu yd or portion thereof
Do not collect composite samples or mix individual samples to form a composite sample.
Analyze the samples using the US EPA's ProUCL software with a 95 percent upper confidence limit. All chemical analysis must be performed by a laboratory certified by the SWRCB's Environmental Laboratory Accreditation Program (ELAP).
The analytical test results must demonstrate that the local material:
1. Is not a hazardous waste
2. Has a pH above 5.0
3. Has an average total lead concentration, based upon the 95 percent upper confidence limit, at or below 80 mg/kg
4. Is free of possible contaminants identified in the local material plan
5. Complies with the RWQCB's basin plan for the job site location 6 Complies with the RWQCB's water quality objectives for the job site location
6-1.03C Local Material Management
Do not place local material until authorized.
If the Engineer determines the appearance, odor, or texture of any delivered local material suggests possible contamination, sample and analyze the material. The sampling and analysis is change order work unless (1) hazardous waste is discovered or (2) the analytical test results indicate the material does not comply with section 6-1.03B(3).
Dispose of noncompliant local material at an appropriately permitted CA Class I, CA Class II or CA Class III facility. You are the generator of noncompliant local materials.
Replace section 6-1.04 with:
6-1.04 BUY AMERICA
6-1.04A General
Buy America requirements do not apply to the following:
1. Tools and construction equipment used in performing the work.
2. Temporary work that is not incorporated into the finished project.
An article, material, or supply to be permanently incorporated in the project should only be classified into one of the following categories:
1. Iron or steel products
2. Manufactured products
3. Construction materials
4. Excluded materials
Excluded materials means cement and cementitious materials; aggregates such as stone, sand, or gravel; or aggregate binding agents or additives.
6-1.04B Crumb Rubber (Pub Res Code § 42703(d))
Furnish crumb rubber with a certificate of compliance. Crumb rubber must be:
1. Produced in the United States
2. Derived from waste tires taken from vehicles owned and operated in the United States
6-1.04C Iron or Steel Products
Iron or steel products must be melted and manufactured in the United States except:
1. Foreign pig iron and processed, pelletized, and reduced iron ore may be used in the domestic production of the steel and iron materials
2. If the total combined cost of the materials produced outside the United States does not exceed the greater of 0.1 percent of the total bid or $2,500, the material may be used if authorized
Furnish iron or steel products to be incorporated into the work with certificates of compliance and certified mill test reports. Mill test reports must indicate where the steel and iron were melted and manufactured.
All melting and manufacturing processes for these materials, including an application of a coating, must occur in the United States. Coating includes all processes that protect or enhance the value of the material to which the coating is applied.
6-1.04D Manufactured Products
Manufactured products mean articles, materials, or supplies that have been:
1. Processed into a specific form and shape; or
2. Combined with other articles, materials, or supplies to create a product with different properties than the individual articles, materials, or supplies
Per 23 CFR 635.410, these products must be manufactured in the United States.
Manufacturer, in the case of manufactured products, means the entity that performs the final manufacturing process by bringing individual elements together that produces a manufactured product.
If an item is classified as an iron or steel product, a construction material, or an excluded material under the definitions set forth under this Buy America section, then it is not a manufactured product. However, an article, material, or supply classified as a manufactured product under this Buy America section may include components that are construction materials, iron or steel products, or excluded materials.
Iron or steel used in precast concrete manufactured products or enclosures for Intelligent Transportation Systems (ITS) must meet the requirements of section 6-1.04C regardless of the amount used.
Iron or steel used in other manufactured products must meet the requirements of section 6-1.04C if the cost of steel and iron components is 50 percent or more of the total cost of the manufactured product.
Furnish manufactured products to be incorporated into the work with certificates of compliance with each project delivery. The manufacturer's certificate of compliance must identify where the manufacturing occurred and attest specifically to compliance with the 23 CFR 635.410 standard.
6-1.04E Construction Materials
The following construction materials must be produced in the United States under standards in 2 CFR 184.6:
1. Non-ferrous metals
2. Plastic and polymer-based products such as:
2.1. Polyvinylchloride
2.2. Composite building materials
3. Glass
4. Fiber optic cable including drop cable
5. Optical fiber
6. Lumber
7. Engineered wood
8. Drywall
All manufacturing processes for these materials as defined in 2 CFR 184.6 must occur in the United States.
Furnish construction materials to be incorporated into the work with certificates of compliance with each project delivery. Manufacturer’s certificate of compliance must identify where the construction material was manufactured and attest specifically to compliance with the 2 CFR 184.6 standard.
Minor additions of articles, materials, supplies, or binding agents to these construction materials do not change the categorization of the construction material.
6-1.04F Buy America Waiver for the De Minimis Costs for Manufactured Products and Construction Materials
A De Minimis Costs waiver can waive the application of FHWA's Buy America requirements for manufactured products and construction materials under a single project when the total cost of non-compliant manufactured products and construction materials is no more than the lesser of $1,000,000 or 5 percent of the total applicable costs for the project.
The percentage threshold is calculated based on the following formula:
X = NC / TA
where:
X = percent threshold NC = total cost of non-compliant construction materials and manufactured products TA = total applicable project costs (steel, iron, construction materials and manufactured products;
does not include excluded materials)
This threshold is based on the actual cost of the steel, iron, construction materials, and manufactured products, not the anticipated cost of those materials. The contractor must account for compliant and non-compliant Department-Furnished Materials for the project in the De Minimis Costs Waiver Worksheet calculation if provided by the Department as supplemental project information.
See further instructions for the De Minimis Costs waiver request in the Notice of Materials to be Used form.
Add to section 6-1:
6-1.08 ENVIRONMENTAL PRODUCT DECLARATIONS FOR HOT MIX ASPHALT AND CONCRETE
Section 6-1.08 includes specifications for environmental product declarations for hot mix asphalt and concrete materials and products.
See section 6-1.06B for definitions.
For projects with bid opening dates after February 1, 2025, with a total bid over $1 million and 175 or more original working days, materials or products specified in the following table require facility-specific, product stage, environmental product declarations as informational submittals:
Material or product Material specifications
Hot mix asphalta Section 39-2, "Hot Mix Asphalt" Excludes RHMA, OGFC, and BWC materials.
Concreteb Section 28-2, "Lean Concrete Bases," Section 28-3, "Rapid Strength Concrete Base," Section 28-4, "Lean Concrete Base Rapid Setting," Section 28-5, "Concrete Base," Section 40, "Concrete Pavement," Section 47-5, "Type 6 Retaining Walls," Section 49-3, "Cast-In-Place Concrete Piling," Section 49-4, "Steel Soldier Piling," Section 51, "Concrete Structures," Section 58-2, "Masonry Block," Section 73, "Concrete Curbs and Sidewalks," Section 83, "Railings and Barriers," and Section 99, "Building Construction."
Excludes volumetric-proportioned rapid strength concrete and Section 90-4 PC concrete members.
aFor each hot mix asphalt plant providing 2,250 tons or more on the project by job mix formula.
bFor each concrete plant providing 250 cubic yards or more on the project by mix design.
The requirements in section 6-1.08 do not apply to seasonal plants operating fewer than 6 months per year.
The requirements in section 6-1.08 do not apply to informal-bid contracts.
For product category rules for hot mix asphalt or concrete, go to the METS website. Use the product category rule in effect on the date of bid opening unless otherwise authorized. An environmental product declaration for hot mix asphalt or concrete is not required for either of the following conditions:
1. Applicable product category rule has expired without replacement as of the bid opening date.
2. Applicable product category rule was issued less than 50 days before the bid opening date.
Immediately notify the Engineer if a program operator has determined their product category rule does not allow for development of a facility-specific environmental product declaration. Include written correspondence from the program operator with your notification to the Engineer. If the Engineer determines the development of a facility-specific environmental product declaration cannot be achieved, an environmental product declaration will not be required for that material or product.
You must register on the Department’s Data Interchange for Materials Engineering (DIME) at least 15 days before submitting environmental product declarations. Follow the registration process at:
https://dime.dot.ca.gov/
Within 30 days of initial placement of each applicable material or product, submit a facility-specific, product stage, environmental product declaration informational submittal to DIME and provide proof of submission in PDF file format to the Engineer. The DIME entry information must include intended use of materials and estimated quantities of materials to be used as represented by the environmental product declaration.
Failure to provide a required environmental product declaration informational submittal will result in a $6,000 performance failure withhold for each missing declaration. The Department returns the withhold within 30 days after receipt of the compliant declaration if submitted prior to Contract acceptance.
Withholds become permanent deductions if the declaration is not submitted before Contract acceptance.
8 PROSECUTION AND PROGRESS
Replace the row for DBE and DVBE in the table in the 2nd paragraph of section 8-1.03 with:
DVBE Final utilization reports
Replace the row for Schedule in the table in the 2nd paragraph of section 8-1.03 with:
Schedule Baseline schedule and weekly statement of working days report
Replace the 4th and 5th paragraphs of section 8-1.05 with:
The Engineer issues a weekly statement of working days report by the end of the following week. If you disagree with a weekly statement of working days report, submit an RFI within 5 business days of receipt of the report.
The weekly statement of working days report shows:
1. Working days and non–working days during the reporting week
2. Time adjustments
3. Calculations of work completion dates, including working days remaining
4. Controlling activities
Delete the 6th paragraph of section 8-1.05.
9 PAYMENT
Replace the 1st paragraph of section 9-1.11D with:
For progress payments, the total work completed for the TRO bid item is the number of working days shown for the pay period on the weekly statement of working days report.
Replace item 2 in the list in the paragraph of section 9-1.16C with:
2. Material cost exceeds either of the following:
2.1. $50,000
2.2. $25,000 if the requestor is certified as one or more of the following:
2.2.1. DVBE
2.2.2. Small business as certified by Department of General Services, Office of Small
Business and Disabled Veteran Business Enterprise Services
DIVISION II GENERAL CONSTRUCTION
12 TEMPORARY TRAFFIC CONTROL
Add to section 12-3.11B(5)(b):
Provide two C50D(CA) construction project funding identification signs.
Legend for the type of project must read as follows:
HIGHWAY IMPROVEMENT
Legend for the year of completion on project funding sign must read as follows:
YEAR OF COMPLETION: 2028
Add to section 12-4.02A(2):
special days: Martin Luther King Jr and Columbus Day
Add between the 1st and 2nd paragraphs of section 12-4.02A(3)(c):
Submit a contingency plan for each of the following activities:
1. High friction surface treatment application
2. Cold plane asphalt concrete pavement
3. Hot mix asphalt type A pavement overlay
4. Striping
Add between the 4th and 5th paragraphs of section 12-4.02C(1):
Not more than 1 stationary closure is allowed per direction of travel at one time.
Add to the end of section 12-4.02C(1):
Keep the full width of the ramp traveled way open for use by traffic on designated holidays and special days.
For each 10-minute interval or fraction thereof past the time specified to open the closure, the amount for liquidated damages per interval shown in the table below is deducted. Liquidated damages are limited to 5 percent of the total bid per occurrence. Liquidated damages are not assessed if the Engineer orders the closure to remain in place beyond the scheduled pickup time.
Type of facility Route Direction or segment Period Liquidated damages/interval
Mainline 60 EB 1st half hour 2nd half hour
2nd hour and beyond
$1,800/10 minutes $2,800/10 minutes $3,700/10 minutes
Mainline 60 WB 1st half hour 2nd half hour
2nd hour and beyond
$3,000/10 minutes $4,500/10 minutes $6,000/10 minutes
Add to the end of section 12-4.02C(3)(a):
If work vehicles or equipment is parked on the shoulder within 6 feet of a traffic lane of a freeway or expressway, close the shoulder area as shown.
Personal vehicles of your employees must not be parked within the highway.
Replace section 12-4.02C(3)(d) with:
12-4.02C(3)(d) City Street Closure Requirements
Keep the full width of the city traveled way open for use by traffic on designated holidays.
Replace section 12-4.02C(3)(e) with:
12-4.02C(3)(e) Closure Restrictions for Special Events and Venues
Do not work from 1800 on Halloween to 0600 the following day.
No work or highway closures are allowed along the Games Route Network from June 1, 2028 to September 1, 2028. Plan all work shown on the stage construction and traffic handling plans to comply with this requirement. The Games Route Network is shown in the following table:
Olympic and Paralympic Games Route Network
Affected routes Route limits
1 Orange County Line to 7th St 2 Route 101 to Route 134 5 Stadium Way to Route 2
10 Route 405 to Route 110 10 Route 101 to White Ave 47 Route 110 to Harbor Blvd 57 Routes 10/57/71 interchange to Via Verde 91 Vermont Ave to Orange County Line
101 Route 10 to Alvarado St 101 Campo De Cahuenga to Hayvenhurst Ave 105 Route 405 to Route 110 110 Route 47 to Stadium Way 134 Route 101 to Route 210 164 Route 60 to Route 10 210 Mountain St to Baldwin Ave 405 Orange County Line to Victory Blvd
No work or highway closures within the traveled way are allowed along non-Games Route Network routes from July 11, 2028 to July 31, 2028 and from August 14, 2028 to August 28, 2028. Plan all work shown on the stage construction and traffic handling plans to comply with this requirement. Work outside of the traveled way may be allowed if authorized by the Engineer.
From 3 hours before to 2 hours after special events or events at the venues shown in the table titled "Special Events and Venues," do not perform work that encroaches onto the freeway or connector traveled way or the following ramps:
1. EB Route 60 on-ramp from SB Rosemead Blvd
2. WB Route 60 on-ramp from NB Hacienda Blvd
3. WB Route 60 on-ramp from NB Fullerton Rd
At the LA28 venues shown in the table titled "Special Events and Venues," do not perform work from June 1, 2028 to September 1, 2028 that encroaches onto the freeway or connector traveled way or the following ramps:
1. EB Route 60 on-ramp from SB Rosemead Blvd
2. WB Route 60 on-ramp from NB Hacienda Blvd
3. WB Route 60 on-ramp from NB Fullerton Rd
The special events and venues that could impact closures are shown in the following table:
Special Events and Venues
Special event or venue Affected routes
Route limits
Academy Awards ceremony 101 Route 110 to Routes 101/134/170 interchange Antelope Valley Fair 14 Avenue S to Avenue D
Auto Club/California Speedway
EB 10 Route 605 to San Bernardino County line
NB 57
Orange County line to Routes 10/57/71 interchange EB 60 Route 605 to San Bernardino County line 210 Route 605 to San Bernardino County Line
California State University, Long Beach, graduation ceremonies
22 Routes 22/405/605 interchange to Route 1
California State University, Los Angeles, graduation ceremonies
10 Route 5 to Rosemead Blvd
710 Route 60 to Valley Blvd
California State University, Pomona, graduation ceremonies
10 Route 605 to San Bernardino County line
57 Route 60 to Route 210 Cinco De Mayo at Whittier Narrows
Recreation Area 60 Paramount Blvd to Route 605
Cinco De Mayo parades or festivals in downtown Los Angeles
Routes 5/10/60/101 interchange to
Broadway
NB 101
Routes 5/10/60/101 interchange to Route
SB 101 Vermont Ave to Broadway
110 Route 10 to Route 101
Crypto.com Arena/Los Angeles Convention Center
Routes 5/10/60/101 interchange to
Crenshaw Blvd 110 Route 105 to Route 101
Crypto.com Arena/Los Angeles Convention Center/Peacock
Theater/LA28
Routes 5/10/60/101 interchange to
Crenshaw Blvd 110 Route 105 to Route 5
Dignity Health Sports Park 91 Route 110 to Central Ave
Dignity Health Sports Park/LA28
91 Route 110 to Route 710 110 Route 1 to Route 105 405 Route 710 to Route 105 710 Route 1 to Route 105
Dodger Stadium
2 Glendale Blvd to Route 5 5 Route 10 to Route 134
Routes 5/10/60/101 interchange to Vermont
Ave 110 Route 10 to Route 5
Dodger Stadium/LA28
2 Glendale Blvd to Route 5 5 Route 10 to Route 134
Routes 5/10/60/101 interchange to Vermont
Ave 110 Route 10 to Route 5
Grand Park & LA City Hall/LA28
Routes 5/10/60/101 interchange to
Broadway
NB 101
Routes 5/10/60/101 interchange to Route
SB 101 Vermont Ave to Broadway
110 Route 10 to Route 101
Fairplex/LA28
10 Route 605 to San Bernardino County line 57 Route 60 to Route 210 71 Route 60 to Routes 10/57/71 interchange
210 Grand Ave to San Bernardino County line
Frank G. Bonelli Park/LA28 10 Azusa Ave to Central Ave 57 Route 60 to Route 210 71 Route 60 to Routes 10/57/71 interchange
Griffith Park Light Show 5 Route 2 to Route 134
134 Forest Lawn Dr to San Fernando Rd
Hollywood Bowl 101 Vermont Ave to Route 170 Hollywood Christmas Parade 101 Route 10 to Route 170
Industry Hills Expo Center/LA28 10 Route 605 to Route 57 60 Route 605 to Route 57
Kaleidoscope Festival 22 Routes 22/405/605 interchange to Route 1 LA Clays Shooting Sports
Park/Whittier Narrows Recreation Area/LA28
60 Paramount Blvd to Route 605
164 Route 60 to Route 10
Long Beach Grand Prix 47 Route 110 to Route 710
405 Route 605 to Route 110 710 Route 47 to Route 91
Long Beach Arena/Long Beach Convention Center/Long Beach
Waterfront/Belmont Shore/Alamitos Beach/Marine Stadium/Port of Los
Angeles/LA28
1 Orange County Line to Route 110 47 Route 110 to Route 710
110 Route 47 to Route 91 405 Route 605 to Route 110 710 Route 47 to Route 91
Los Angeles Coliseum/BMO Stadium
Crenshaw Blvd to Routes 5/10/60/101 interchange
110 Route 105 to Route 101 Los Angeles Coliseum/BMO
Stadium/University of Southern California/LA28
Crenshaw Blvd to Routes 5/10/60/101 interchange 110 Route 105 to Route 5
Los Angeles County Fair
10 Route 605 to San Bernardino County line 57 Route 60 to Route 210
Mission Blvd to Routes 57/60/71 interchange 210 Grand Ave to San Bernardino County line
Los Angeles Marathon
5 Route 10 to Route 134 NB 101 Route 10 to Highland Ave
SB 101
Routes 101/134/170 interchange to Route
NB 110 Route 10 to Route 5 NB 405 Route 90 to Santa Monica Blvd SB 405 Sunset Blvd to Santa Monica Blvd
Los Angeles Music Center 101 Route 10 to Glendale Blvd 110 Route 10 to Route 5
Mexican independence celebration at Whittier Narrows Recreation Area
60 Paramount Blvd to Route 605
Olvera Street festivals 101 Route 10 to Vermont Ave
Rose Bowl Stadium events
2 Colorado Blvd to Route 210 110 Route 101 to Glenarm St 134 Route 5 to Route 210 210 Route 2 to Route 605 710 Del Mar Blvd to Route 210
Rose Bowl Stadium/LA28
2 Colorado Blvd to Route 210 110 Route 101 to Glenarm St 134 Route 5 to Route 210 210 Route 2 to Route 605 710 Del Mar Blvd to Route 210
Rose Parade float viewing EB 210 Route 134 to Rosemead Blvd WB 210 Route 605 to Allen Ave
Santa Anita Race Track EB 210 Lake Ave to Huntington Dr WB 210 Route 605 to Baldwin Ave
Santa Anita Park/LA28 EB 210 Lake Ave to Huntington Dr WB 210 Route 605 to Baldwin Ave
Sepulveda Basin Recreation Area/LA28
101 Route 27 to Route 134 405 Route 10 to Route 118
SoFi Stadium/Kia Forum/Intuit Dome 105 Route 1 to Route 110 110 Route 105 to Slauson Ave 405 El Segundo Blvd to Route 90
SoFi Stadium/Kia Forum/Intuit Dome/LA28
105 Route 1 to Route 110 110 Route 91 to Route 10 405 Route 110 to Route 10
South Gate Holiday Christmas Parade 710 Imperial Hwy to Route 5
Point Mugu Air Show 1 Las Posas Rd to Rose Ave
101 Route 23 to Route 126
Universal Studios/International Broadcast Center (IBC)/LA28
101 Route 2 to Route 405 134 Routes 101/134/170 interchange to Route 5
Routes 101/134/170 interchange to Victory
Blvd
University of California, Los Angeles/Riviera Country Club/Venice
Beach/LA28
1 Route 90 to Route 27 10 Route 1 to Venice Blvd 90 Route 1 to Route 405
405 Route 90 to Route 101
Ventura County Fair 33 Ventura Ave to Route 101
101 Route 1 to Route 33
Ventura Strawberry Festival 1 Las Posas Rd to Rose Ave
101 Route 23 to Route 126
Replace section 12-4.02C(3)(f) with:
12-4.02C(3)(f) Closure Restrictions for Designated Holidays and Special Days
Closure restrictions for designated holidays and special days are shown in the following table:
Freeway or Connector Lane Closure Restrictions for Designated Holidays and Special Days Thu Fri Sat Sun Mon Tues Wed Thu Fri Sat Sun Mon x
H xx
SD
TH
Legend:
Refer to chart nos. G1 – G3.
x The full width of the traveled way must be open for use by traffic by 0600.
xx The full width of the traveled way must be open for use by traffic.
H Designated holiday
TH Thanksgiving Day SD Special day
Replace section 12-4.02C(3)(g) with:
12-4.02C(3)(g) Freeway or Expressway Lane Requirement Charts
Freeway lane closures must comply with the requirements shown in the following charts:
Chart No. G1 Freeway Lane Requirements and Hours of Work
County: LA Route/Direction:60/EB Post Mile:9.059
Closure limits: Rosemead Blvd off-ramp to (SB) Rosemead Blvd on-ramp
Hour 00 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Mon– Thu
3 3 3 3 3 3 N N N N N N N N N N N N N N N 3 3 3
Fri 3 3 3 3 3 3 N N N N N N N N N N N N N N N N 3 3
Sat 3 3 3 3 3 3 3 3 N N N N N N N N N N N N N N 3 3
Sun 3 3 3 3 3 3 3 3 3 N N N N N N N N N N N N 3 3 3
3 Provide at least 3 adjacent through freeway lanes open in the direction of travel.
N No work is allowed.
REMARKS: The number of through traffic lanes is 4.
The full width of the traveled way must be open for use by traffic when construction activities are not actively in progress.
iChart No. G2 Freeway Lane Requirements and Hours of Work
County: LA Route/Direction:60/WB Post Mile:15.785
Closure limits: Hacienda Blvd off-ramp to (SB) Hacienda Blvd on-ramp
Hour 00 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Mon– Thu
3 3 3 3 3 N N N N N N N N N N N N N N N 3 3 3 3
Fri 3 3 3 3 3 N N N N N N N N N N N N N N N 3 3 3 3
Sat 3 3 3 3 3 3 3 3 N N N N N N N N N N N N N N 3 3
Sun 3 3 3 3 3 3 3 3 3 N N N N N N N N N N N N N 3 3
REMARKS: The number of through traffic lanes excluding HOV lanes is 4.
The full width of the traveled way must be open for use by traffic when construction activities are not
Chart No. G3
Freeway Lane Requirements and Hours of Work County: LA Route/Direction:60/WB Post Mile:19.316
Closure limits: Fullerton Rd off-ramp to (SB) Fullerton Rd on-ramp
Hour 00 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Mon– Thu
3 3 3 3 N N N N N N N N N N N N N N N 3 3 3 3 3
Fri 3 3 3 3 3 N N N N N N N N N N N N N N N 3 3 3 3
Sat 3 3 3 3 3 3 3 N N N N N N N N N N N N N N 3 3 3
Sun 3 3 3 3 3 3 3 3 N N N N N N N N N N N N N 3 3 3
REMARKS: The number of through traffic lanes excluding HOV lanes is 4.
The full width of the traveled way must be open for use by traffic when construction activities are not
Replace section 12-4.02C(3)(j) with:
12-4.02C(3)(j) Complete Ramp Closure Hour Charts and Ramp Lane Requirement Charts
Comply with the requirements and hours for the complete ramp closure shown in the following charts:
Chart No. J1 Complete Ramp Closure Hours
County: LA Route/Direction: 60/EB Post Mile:9.465
Closure limits: (SB) Rosemead Blvd on-ramp
Hour 00 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Mon– Thu
C C C C C C N N N N N N N N N N N N N N C C C C
Fri C C C C C C N N N N N N N N N N N N N N C C C C
Sat C C C C C C C C N N N N N N N N N N N N C C C C
Sun C C C C C C C C C N N N N N N N N N N N C C C C
C Ramp may be closed completely.
REMARKS:
Detour traffic to continue south on Rosemead Blvd; west on San Gabriel Blvd to the on-ramp to eastbound Route 60. Post at least 8 special portable freeway detour signs, SP-2, along the detour route and remove the signs at the end of each closure.
The full width of the traveled way must be open for use by traffic when construction activities are not
Chart No. J2 Complete Ramp Closure Hours
County: LA Route/Direction: 60/WB Post Mile:15.985
Closure limits: (NB) Hacienda Blvd on-ramp
Hour 00 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Mon– Thu
C C C C C N N N N N N N N N N N N N N N N C C C
Fri C C C C C N N N N N N N N N N N N N N N N C C C
Sat C C C C C C N N N N N N N N N N N N N N N C C C
Sun C C C C C C C C N N N N N N N N N N N N N N C C
Detour traffic to continue north on S Hacienda Blvd; west on Gale Ave to the on-ramp to westbound Route 60. Post at least 5 special portable freeway detour signs, SP-2, along the detour route and remove the signs at the end of each closure.
The full width of the traveled way must be open for use by traffic when construction activities are not
Chart No. J3
Complete Ramp Closure Hours County: LA Route/Direction: 60/WB Post Mile:19.316
Closure limits: Fullerton Rd on-ramp
Hour 00 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Mon– Thu
C C C C C N N N N N N N N N N N N N N C C C C C
Fri C C C C C N N N N N N N N N N N N N N C C C C C
Sat C C C C C C C N N N N N N N N N N N N C C C C C
Sun C C C C C C C C N N N N N N N N N N N N N N C C
Detour traffic to continue north on Fullerton Blvd; west on Gale Ave; south on S Azusa Ave to the on-ramp to westbound Route 60. Post at least 6 special portable freeway detour signs, SP-2, along the detour route and remove the signs at the end of each closure.
The full width of the traveled way must be open for use by traffic when construction activities are not
Replace section 12-4.02C(3)(m) with:
12-4.02C(3)(m) City Street Closure Hour Charts and City Street Lane Requirement Charts
Comply with the requirements for a city street lane closure shown in the following charts:
Chart No. M1 City Street Lane Requirements and Hours of Work
Location: Rosemead Blvd Direction: SB
Closure limits: At Route 164/60 Separation
Hour 00 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Mon– Thu
1 1 1 1 1 1 N N N N N N N N N N N N N N N 1 1 1
Fri 1 1 1 1 1 1 N N N N N N N N N N N N N N N N 1 1
Sat 1 1 1 1 1 1 1 1 N N N N N N N N N N N N N N 1 1
Sun 1 1 1 1 1 1 1 1 1 N N N N N N N N N N N N 1 1 1
1 Provide at least 1 city street lane open in the direction of travel.
REMARKS: The number of through traffic lanes in each direction of travel is 3.
Chart No. M2 City Street Lane Requirements and Hours of Work
Location: Hacienda Blvd Direction: NB
Closure limits: From EB Route 60 on-ramp to WB Route 60 off-ramp
Hour 00 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Mon– Thu
1 1 1 1 1 N N N N N N N N N N N N N N N 1 1 1 1
Fri 1 1 1 1 1 N N N N N N N N N N N N N N N 1 1 1 1
Sat 1 1 1 1 1 1 1 1 N N N N N N N N N N N N N N 1 1
Sun 1 1 1 1 1 1 1 1 1 N N N N N N N N N N N N N 1 1
Chart No. M3 City Street Lane Requirements and Hours of Work
Location: Fullerton Rd Direction: NB
Closure limits: From EB Route 60 on-ramp to WB Route 60 off-ramp
Hour 00 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Mon– Thu
1 1 1 1 N N N N N N N N N N N N N N N 1 1 1 1 1
Fri 1 1 1 1 1 N N N N N N N N N N N N N N N 1 1 1 1
Sat 1 1 1 1 1 1 1 N N N N N N N N N N N N N N 1 1 1
Sun 1 1 1 1 1 1 1 1 N N N N N N N N N N N N N 1 1 1
Replace the paragraphs of section 12-4.02C(8)(b) with:
If a ramp or connector closure is allowed, post a special advance notice publicity sign, SP-1, at an authorized location at least 7 days before the ramp or connector closure.
Add between the 1st and 2nd paragraphs of section 12-4.04C:
A pedestrian facility closure on the same side of the highway is limited to no more than 1 block. When working on one side of the highway, the pedestrian facility on opposite side of the highway within the same block must be open.
Schedule operations such that all pedestrian facility closures do not exceed 1 work shift. At the end of each work shift, you must provide the walkway surface complying with the requirements of a temporary pedestrian access route specified in section 12-4.04. For all activities requiring construction of a pedestrian facility, you must complete the work within 10 working days.
14 ENVIRONMENTAL STEWARDSHIP
Replace Reserved in Section 14-9.05 with:
14-9.05 AIR QUALITY CONTROL DISTRICT JURISDICTIONS
The…