07-08-19 Gull Lake HS MS AV SPECS Issued for Bid.pdf
PDF 3 MB Posted
- Attached to
- Gull Lake Community Schools AV Upgrades
- Solicitation number
- RFP-GLCS-190000002770-3
- Issued by
- Kalamazoo County, Michigan
About this file
This bid document package details specifications for an Audio/Video Upgrade project at Gull Lake Community Schools in Richland, Michigan for both the High School and Middle School facilities. The project includes installation of classroom AV systems including audio and video equipment, cabling infrastructure, projection systems, and integration services. Bids are due July 31, 2019 at 2:00 PM, with a mandatory pre-bid meeting scheduled for July 22, 2019 at 9:00 AM at Gull Lake High School. Questions are due by July 26, 2019 at 3:00 PM. Work must be completed by December 20, 2019, with regular school starting September 3, 2019. Installation work can be performed 7:30 AM to 5:00 PM Monday-Friday during summer and 3:30 PM to 11:30 PM during the school year.
The project requires contractors to provide all labor, materials, equipment, tools, transportation and other items necessary for completion. A 5% bid bond is required with proposals, and successful bidders for work valued at $50,000 or more must provide 100% performance and payment bonds. The contractor must carry specified insurance coverage including workers compensation, general liability, and umbrella coverage. The project is not subject to prevailing wage requirements. The owner will retain 10% of the total project cost until final system completion and acceptance. Proposals will be evaluated based on compliance with requirements, price, responsiveness, experience, manufacturer relationships, and ongoing maintenance costs.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Bid Documents For
AUDIO/VIDEO UPGRADE
Gull Lake Community Schools
District Offices 10100 E. D Ave
Richland, Mi 49083
#1297-01
Distributed by:
Contact Bret Emerson
616-863-8132 emersonb@commtechdesign.com mailto:emersonb@commtechdesign.com
Gull Lake Schools AV FRONT END 28 0500-1 1297-01
SECTION 28 0500 – FRONT END
PART 1 - GENERAL
1.01 INTRODUCTION
A. Gull Lake Community Schools invites qualified contractors to provide proposals for an Audio / Video Systems Upgrade at the High School and Middle School. This work includes:
1. The base bid is the cost for the installation of all the audio and video systems including classroom AV system and cabling, etc. All work shall include all equipment, labor, installation and testing.
B. The Contractor shall pay all costs of the Work including, but not limited to, labor, materials, equipment, tools, transportation, freight, taxes, royalties, patent fees, support facilities, construction equipment, water, heat, utilities, supervision, overhead, and all other items necessary for the proper execution and completion of the Work.
1.02 CONTACTS
A. The contact for all questions and any addendums during bidding shall be:
Commtech Design Bret Emerson 616-863-8132 emersonb@commtechdesign.com
B. The owner as referred to in this bid is:
Richland, MI 49083
1.03 DUE DATES
A. Bids are due at July 31, 2019 at 2:00PM at
B. A pre-bid meeting will be held on July 22, 2019 at 9:00 AM. Meet at:
Gull Lake High School 7753 N. 34th St.
C. All questions shall be submitted to the owner no later than July 26, 2019 at 3:00PM. All questions shall be sent via email to Bret Emerson of Commtech Design.
Bret Emerson Emersonb@Commtechdesign.com 616-863-8132
1.04 BUILDING SITES
A. Work to be completed as part of this bid will be done at the sites as detailed in the drawings and specifications:
B. Access to the sites shall be from 7:30 AM to 5:00 PM Monday thru Friday during the summer C. Work done during school dates shall be from 3:30 to 11:30 PM Monday thru Friday D. The first day of school in 2019 is September 3, 2019
1. Arrangements can be made for additional time on site during each day as scheduled with the owner.
mailto:emersonb@commtechdesign.com mailto:Emersonb@Commtechdesign.com
Gull Lake Schools AV FRONT END 28 0500-2
2. All work in the classrooms or hallway shall be completed during the summer or during non-school hours.
3. No work activity shall disrupt the regular school day schedule or in any way intrude upon the teaching and administration of students.
1.05 OWNERS RIGHTS
A. The owner reserves the right to waive any formalities to bid, to reject any or all bids and to accept the bid that is most favorable to the Owner.
B. The owner does not incur any responsibility for Bidder’s costs in preparing the bid proposal.
C. Bidder recognizes that the owner is subject to the Freedom of Information Act. Per formal request the owner will make bid documents available for public review following contract with a successful bidder.
1.06 BID RESPONSE FORMAT
A. The owner requires that all responses include the information listed below.
B. All bid responses shall be submitted in a three-ring binder or bound folder
1. Provide two copies of the bid response. One shall be marked as the ORIGINAL. The ORIGINAL shall be signed by a duly designated officer of the company.
C. Bid responses shall be provided in the following format with section dividers.
1. Bid Form –See Bid Documents
2. Description of the bidder’s company
3. Description of the bidder’s response and the services they will provide.
a. Include information about any manufacturer required on-going maintenance costs for software or hardware or upgrades.
4. Spreadsheet detailing all equipment being submitted per building.
5. Any information the bidder wishes to include that was not specifically required.
1.07 DOCUMENTS
A. The following drawings are part of the bid package.
1. Refer to the table below to determine which drawings are included in each bid category. Some drawings refer to multiple bid categories.
Gull Lake Schools AV FRONT END 28 0500-3
DWG.
Drawing Name
TC301 Audio/Video Legend, Schedules & Details
TC302 Audio/Video Classroom Connectivity Diagram
TC303 Audio/Video Classroom Connectivity Diagram
TC304 Audio/Video Classroom Connectivity Diagram
TC305 Audio/Video Classroom Connectivity Diagram
TC306 Audio/Video Classroom Connectivity Diagram
TC307 Audio/Video Classroom Connectivity Diagram
TC401AD Middle School Audio Video Deme Plan Unit 100
TC401BD Middle School Audio Video Deme Plan Unit 200
TC401DD Middle School Audio Video Deme Plan Unit 400
TC401ED Middle School Audio Video Deme Plan Unit 500
TC401FD Middle School Audio Video Deme Plan Unit 600
TC402AD High School First Floor Audio Video Demo Plan Unit 1A
TC402BD High School First Floor Audio Video Demo Plan Unit 1A
TC402CD High School First Floor Audio Video Demo Plan Unit 1A
TC402DD High School First Floor Audio Video Demo Plan Unit 1A
TC402ED High School First Floor Audio Video Demo Plan Unit 1A
TC403AD High School Second Floor Audio Video Demo Plan Unit 2A
TC403BD High School Second Floor Audio Video Demo Plan Unit 2B
TC403CD High School Second Floor Audio Video Demo Plan Unit 2C
TC403DD High School Second Floor Audio Video Demo Plan Unit 2D
TC401A Middle School Audio Video Plan Unit 100
TC401B Middle School Audio Video Plan Unit 200
TC401D Middle School Audio Video Plan Unit 400
TC401E Middle School Audio Video Plan Unit 500
TC401F Middle School Audio Video Plan Unit 600
TC402A High School First Floor Audio Video Plan Unit 1A
TC402B High School First Floor Audio Video Plan Unit 1B
TC402C High School First Floor Audio Video Plan Unit 1C
TC402D High School First Floor Audio Video Plan Unit 1D
TC402E High School First Floor Audio Video Plan Unit 1E
TC402J High School First Floor Audio Video Plan Unit 1J
TC402K High School First Floor Audio Video Plan Unit 1K
TC403A High School Second Floor Audio Video Plan Unit 2A
TC403B High School Second Floor Audio Video Plan Unit 2B
TC403C High School Second Floor Audio Video Plan Unit 2C
TC403D High School Second Floor Audio Video Plan Unit 2D
Gull Lake Schools AV FRONT END 28 0500-4
B. The following specifications are part of the bid package.
1. The following specifications are part of the bid package.
2. Refer to the table below to determine which specification sections are included in each bid category. Some sections refer to all bid categories
PART 2 - PERSONNEL
2.01 BIDDER
A. Minimum Bidder Qualifications:
1. Bidder must be fully licensed and insured.
2. Bidder must be fully authorized by the manufacturer being proposed to install and configure the equipment.
3. Shall have technicians that are fully certified to install and configure the equipment being provided as part of the bid.
B. Bidder shall address each item in this package as specified. All required labor and equipment must be quoted. Any exception must be noted and explained. All bids must include the entire section bid to be considered.
C. The Contractor can withdraw their bid at any time prior to opening the bids.
D. Work shall be coordinated with the owner’s technology coordinator, architect, construction manager and the technology designer
2.02 PERSONNEL
A. All personnel working on the project shall be certified by the manufacturer to install, configure and connect the equipment as per the owner’s requirements and the manufacturer’s specifications.
B. The contractor shall assign a Project Manager to the project who will have ultimate authority to make decisions, schedule work and fix or repair any non-conforming equipment.
1. Provide a list of the projects of similar size and scope to the work they will be doing as part of this project. Include examples of three projects with similar scope that the PM has worked on in the last three years.
2. The project manager will be the primary contact for this project
3. The project manager shall attend all project meetings and be fully aware of all work going on as part of the project.
2.03 BACKGROUND CHECKS
Specification
28 0000 Coversheet
28 0500 Front End
Bid Form
Familial Disclosure
Iran Form
28 1000 Communications Overview
28 1600 Cat-6 Cabling
28 5300 Classroom Video
28 5350 Classroom Audio
28 5450 Audio Equipment
28 5453 Audio Speakers
28 5470 AV Cabling
28 7200 Submittals
28 7600 Labeling
28 7700 Testing
28 7750 Training
28 7800 Warranty
Gull Lake Schools AV FRONT END 28 0500-5
A. Contractor’s staff may be required to pass a security clearance check conducted by the Owner.
B. The Contractor shall authorize the investigation of its personnel proposed to have access to facilities and systems on a case-by-case basis.
1. The scope of the background check is at the discretion of the owner and the results will be used to determine Contractor’s personnel eligibility for working within the facilities and systems.
2. Such investigations will include Michigan State Police Background checks (ICHAT) and may include the National Crime Information Center (NCIC) Finger Prints.
3. Proposed Contractor personnel may be required to complete and submit an RI-8 Fingerprint Card for the NCIC Finger Print Check.
4. Any request for background checks will be initiated by the owner or construction manager and will be reasonably related to the type of work requested.
PART 3 - WORK REQUIREMENTS
3.01 DOCUMENTS
A. The contractor shall review all bid documents including specifications and the drawings. The specifications and documents and any addenda detail the requirements of the chosen contractor.
B. It is mandatory that items of material and equipment conform to the Contract Documents and meet the quality standards in every respect.
C. Where any specifications or drawings are not in agreement the higher value or more stringent requirement shall apply, and shall be included in the bid pricing.
3.02 PRODUCTS
A. All products shall be of the latest manufacture. No remanufactured or used equipment shall be provided as part of the bid.
B. All equipment shall be provided in the manufacturers shipping container. Provide copy of the shipping lists as part of the project documentation.
3.03 PRODUCT DELIVERY AND LIABILITY
A. The contractor shall be responsible for the complete installation of new and un-damaged products.
B. The contractor shall be liable for all equipment until it is formally accepted by the owner in writing. This shall include the equipment when it is in the contractor’s facility and when it is in the owner’s facility until it is formally accepted.
3.04 DAMAGE
A. The contractor shall be responsible for all damage made to the building or any of the buildings contents during their work as part of this project.
B. The contractor shall not disturb any hazardous material or materials that they are not authorized to work with.
3.05 INCIDENTAL WORK AND PERMITS
A. The contractor shall be responsible for requesting, obtaining and paying for any and all permits required for their work by the local, county, state and federal authorities having jurisdiction (AHJ) over the work being performed.
B. Provide any and all work or equipment required by the Authority Having Jurisdiction (AHJ) that may or may not be specifically noted in these documents.
3.06 INSPECTION OF THE WORK
A. The contractor shall keep up to date as-builts on site for the duration of the project. The engineer may request to see the as-built documents at any time.
B. The Contractor shall promptly facilitate inspection and testing of the Work regardless of expense as necessary or as requested by the Owner, regardless of whether or not the Work in question is his own or that of a subcontractor.
Gull Lake Schools AV FRONT END 28 0500-6
C. If such tests or inspections reveal deficiencies as measured by Construction documents or an independent consultant/testing agency or the owner/engineer, the Contractor shall bear all costs incurred to correct such deficiencies, and the cost to reconstruct any work to meet the contract documents.
3.07 PROJECT MEETINGS
A. The contractor shall attend project meeting as designated by the owner or engineer.
Attendance is mandatory.
PART 4 - WORK SCHEDULES
4.01 PROJECT SCHEDULE
A. It is the intention of the owner to take possession of the Work by the established completion date or earlier, within the shortest time possible consistent with good construction practices.
B. The Completion Date Shall be December 20, 2019 C. Upon award of the contract the contractor shall provide a complete schedule for their work.
This shall reference dates in the document and be coordinated with the schedule of any other contractors.
1. Include start date
2. Products installed
3. Punch list work complete
4. Substantial Completion
5. Final Completion after system has been working for 30 days with no outages or failures
D. If the work is delayed through the fault of the owner (or of any separate contractor employed by the owner)
1. The Contractor shall notify the owner, in writing, of any condition or situation that in the
Contractor's opinion warrants an extension of Contract Time.
2. The Contractor shall not be entitled to additional compensation or damages due to delays, interference’s or interruptions to the Work or the Project, but shall be entitled only to an appropriate extension of time in accord with the General Conditions of the Contract for Construction.
PART 5 - DEFICIENT WORK
5.01 PRODUCT AND INSTALLATION DEFICIENCIES
A. The Contractor shall expediently correct all deficiencies brought to his attention in writing or verbally by the owner. If, in the opinion of the owner and the technology design or construction manager, the Contractor fails to correct deficiencies, or fails to act expeditiously to correct deficiencies, the owner may:
1. Accept the deficiencies in the Work, and reduce the Contract Sum of the Contractor at fault by a unilateral Change Order issued and signed by the ownert in an amount to be determined by the owner.
2. Have the deficiencies removed in any reasonable manner available to the Owner, and charge the Contractor at fault for the costs incurred, or reduce that Contractor's Contract Sum by a unilateral Change Order issued by the Owner for the costs incurred.
B. The Contractor shall pay all costs of the Work including, but not limited to, labor, materials, equipment, tools, transportation, freight, taxes, royalties, patent fees, support facilities, construction equipment, water, heat, utilities, supervision, overhead, and all other items necessary for the proper execution and completion of the Work.
PART 6 - GENERAL
6.01 LEGAL REQUIREMENTS
Gull Lake Schools AV FRONT END 28 0500-7
A. The Contractor shall comply fully with all laws, statutes, ordinances, rules, regulations, codes, and lawful orders applicable to their work, including employment regulations, unless specifically exempted from compliance by the Contract Documents. Where local codes differ from codes of broader jurisdictions, the more stringent code shall apply. The Contractor shall promptly notify the Owner in writing of items in the plans or specifications for this project that violate any applicable codes.
6.02 CLEAN SITE
A. The contractor shall clean the site daily.
B. The contractor shall be responsible for disposal and removal from the site any and all waste and debris generated from their work.
C. All dust or ceiling debris generated as part of the work shall be cleaned each day.
6.03 PREVAILING WAGE
A. This project is not subject to the Prevailing Wage Law; Michigan Public Act 166 of 1965.
6.04 TAXES
A. The bidder is responsible to apply all tax information within their proposal. Contractor is responsible for applying such tax with each request for payment and complying with Federal, State and local laws.
B. All tax costs shall be included in the base bid price.
6.05 PAYMENTS
A. The contractor shall submit an invoice on the AIA form G702/G703 each month. The invoice shall include only work completed at the time of submission.
B. The contractor can be paid for equipment in storage at the owner’s site as long as the owner is provided with proof of insurance for the equipment.
C. The owner will provide payment on the invoice within 21 days of a signed invoice by the engineer and contractor.
D. The owner will retain 10% of the total cost of the project until the system is considered finally complete as detailed in the project documents.
PART 7 - REVIEW OF BIDS
7.01 OWNER REVIEW
A. The Owner reserves the right to waive any formalities to bid, to reject any or all bids, or to accept the bid that is most favorable to the Owner. The Owner does not incur any responsibility for Bidder’s costs in preparing the bid proposal.
7.02 BID BOND
A. Provide with the bid response a 5% Bid Bond which is required for all proposals. The bond must be in the form of a certified check or a bond executed by a surety company authorized by the State of Michigan. The amount of the bond shall be forfeited if the Contractor, after being awarded the bid, fails to enter into an appropriate contract with the Owner within (30) days.
7.03 PERFORMANCE BOND
A. Successful bidders, for work valued at $50,000 or more, will be required to secure
Performance, Labor and Material Bonds issued for the full amount (100% value) of the contract by a company licensed to do business in the State of Michigan and having an A.M.
Best rating of A- or better. The cost of these bonds is to be included in the proposal amount.
7.04 INSURANCE
A. Contractors must have the proper insurance forms submitted prior to start of their Work. The required insurance shall be written for not less than the limits shown below, or greater if required by law. Contractors will require all subcontractors to maintain similar coverage limits.
The Contractor shall name the Owner as additional insured.
1. Standard Workers Compensation and Employers Liability Employers Liability
a. $500,000 Bodily Injury by Accident—each accident
Gull Lake Schools AV FRONT END 28 0500-8
b. $500,000 Bodily Injury by Disease—each employee
c. $500,000 Bodily Injury by Disease—policy limit
2. General Liability Combined Single Limit Liability
a. $1,000,000 each occurrence
b. Or Split Limit Liability
c. $500,000 Bodily Injury—each occurrence
d. $500,000 Property Damage—each occurrence
3. Aggregates
a. $1,000,000 General Aggregate
b. $1,000,000 Products-completed operations
c. Automobile Liability Combined Single Limit Liability
d. $500,000 each accident Or
e. Split Income Liability
f. $500,000 Bodily injury—each person
g. $500,000 Bodily injury—each accident
h. $500,000 Property Damage—each accident
4. Umbrella Insurance
a. $2,000,000 Limit over primary insurance
7.05 REVIEW OF BIDS
A. Bids will be reviewed based on the following criteria:
1. Compliance with bidding documents
2. Price
3. Responsiveness to owner’s requirements
4. Experience and references with similar projects
5. Manufacturers relationships and personnel that are certified in the manufacturer’s equipment.
6. Any on-going costs associated with the equipment or installation.
7. The owner reserves the right to make any decision which they deem to be in their best interest regardless of price or experience of the bidders.
END OF SECTION 28 0500
BID FORM
Gull Lake Schools
Audio / Video Upgrade
Audio/Video Upgrades
TO: Gull Lake Schools
10100 E D Ave
Richland, MI 49083
Company Name:
hereinafter called "Contractor", does agree to provide equipment and labor as described in the specifications and drawings.
Total Base Bid : $ (in numbers)
The base bid is the cost to provide and install the audio / video systems including all AV systems and data cabling as shown on the drawings and as detailed in the specs.
Work shall include all equipment, labor, installation, configuration, warranty and testing.
Authorized Signature:
Name (printed):
Date:
Email:
Telephone:
Addenda
The Contractor acknowledges receipt of the following addenda and has included their costs in the Total Base Bid price shown above.
Addendum # Dated: Addendum # Dated:
Contractor Address: Phone:
Fax:
E-mail:
Bid Form Page 1 of 2
BID FORM
Gull Lake Schools
Audio / Video Upgrade
Voluntary Alternates:
Voluntary alternates are allowed and may be considered at the discretion of the owner. For each voluntary alternate, provide a brief written description and attach additional information as requried to fully describe intent. All alternates shall be completely inclusive and shall not require any additional work by other trades.
1.
Descripton
Add / Deduct (circle one) $
2.
Descripton
Add / Deduct (circle one) $
Unit Costs:
Provide pricing for the described work or the described product as a single unit cost.
The unit cost shall include any travel, equipment labor, overhead and tax required for purchase and installation of the product or service.
1 Provide, install and test one (1) CAT-6 cable and modular jack. This shall be for a cable that is 225' long. Include one port modular plate and labels.
Unit Cost: $
Breakout Pricing:
Include pricing on a school by school basis.
clarification #1 clarification #1
1 High School Cost: $
2 Middle School Cost: $
Bid Form Page 2 of 2
STATEMENT REGARDING FAMILIAL RELATIONSHIP
AFFIDAVIT OF _______________________________
(name of affiant)
STATE OF MICHIGAN
COUNTY OF _______________
______________________________makes this Affidavit under oath and states as follows:
1. I am a/the President Vice-President Chief Executive Officer Member Partner Owner Other (please specify) __________________________________
Of ____________________________________, a bidder on a construction project for (insert name of contractor)
_______________________________________ that involves, at least in part, construction (insert name of school district) of a new school building or an addition to or repair or renovation of an existing school building.
2. I have personal knowledge and/or I have personally verified that the following are all of the familial relationships existing between the owner(s) and employees(s) of the aforementioned contractor and the school district’s superintendent and/or board members
3. I have authority to bind the aforementioned contractor with the representations contained herein, and I am fully aware that the school district will rely on my representations in evaluating bids for the construction project.
4. I declare the above information to be true to the best of my knowledge, information and belief. I could completely and accurately testify regarding the information contained in this affidavit if requested to do so.
(signature of affiant)
Dated ___________________
Subscribed and sworn before me in ________________County, Michigan, on the ______day of _________________, 200__
______________________________________(signature)
_______________________________________(printed)
Notary public, State of Michigan, County of _______________
My commission expires on _____________________________
Acting in the County of ________________________________
Iran Economic Sanctions Act Certification
I am the _______________________ of ______________________________________, (title) (Bidder Company) or I am bidding in my individual capacity ("Bidder"), with authority to submit a binding bid for the Audio/Video Upgrade at Gull Lake Community Schools. I have personal knowledge of the matters described in this Certification, and I am familiar with the Iran Economic Sanctions Act, MCL 129.311, et seq. ("Act"). I am fully aware that the school district will rely on my representations in evaluating bids.
I certify that Bidder is not an Iran-linked business, as that term is defined in the Act. I understand that submission of a false certification may result in contract termination, ineligibility to bid for three (3) years, and a civil penalty of $250,000 or twice the bid amount, whichever is greater, plus related investigation and legal costs.
(signature)
(printed)
(date)
Gull Lake Schools AV COMMUNICATIONS OVERVIEW 28 1000-1
SECTION 28 1000 – COMMUNICATIONS OVERVIEW
1.01 SECTION INCLUDES
A. This section provides a project overview and general project and Contractor requirements for technology work.
B. The “Contractor” as referred to in these specifications, shall be the bidder whose bid is eventually chosen as the winner.
C. The “Engineer” as referred to in these specifications, shall be Commtech Design and its representative on this project.
D. The “Owner” as referred to in these specifications, shall be Gull Lake Community Schools and its representatives.
E. In the detailed specifications and on the contract drawings, the phrases “or equivalent,”
“approved equivalent,” “approved equal,” “or equal” and “engineer approved equivalent” shall be used interchangeably and shall mean the same thing.
F. All equals, equivalents, or alternates shall be approved by the Engineer prior to ordering or installation. Without approval, deviation from the products listed in the specifications and on the drawings, shall be presumed to be nonconforming and shall be removed and replaced at the direction of the Engineer and at the Contractor’s expense.
1.02 DESCRIPTION OF PROJECT
A. . Cabling and communications infrastructure.
1. The communications portion of the project encompasses communications cabling and termination equipment. The work shall include but not be limited to:
a. Communications Cabling and Termination Equipment:
a. User UTP Plenum rated CAT-6 and CAT-6A cabling
2. All cables shall be labeled according to the drawings and the specifications.
3. All cables shall be terminated and tested as per the specifications.
4. Contractor shall provide personnel and equipment for full training and commissioning of the system.
2. All cables shall be supported by J-hooks or cable tray/ladder.
3. Label all cables
4. Test all cables.
5. The extent of the work shall be as shown on the drawing and detailed in these specifications B. Bid Category #2: Audio and Video Systems
1. The audio and video systems in the building shall consist of but not be limited to:
a. Classroom AV Systems
b. Large room AV systems
2. Test all AV systems
3. The extent of the work shall be as shown on the drawing and detailed in these specifications C. Post installation documentation
1. Each contractor shall provide post installation documentation as per the specifications.
Shall include but not be limited to:
a. Red-lined as-built drawings
b. As-built detailed connectivity of AV and Network Systems
c. As-built cable locations and cable labels at each location.
d. Mark all splice locations
e. Update of all access control locations and equipment at each door
f. Camera locations and camera numbers.
g. Spreadsheet (hard copy and Excel file) for all network, Wireless, telephones and cameras detailing:
Gull Lake Schools AV COMMUNICATIONS OVERVIEW 28 1000-2
A) Mfg. Part number B) IP Address C) MAC Address D) Device number (Camera #, Telephone # etc)
1.03 STORAGE OF MATERIALS
A. All materials shall be secured when not in use by the Contractor.
B. It shall be the Contractor’s responsibility to secure all equipment including all material to be installed as part of the contract. No changes shall be made to the contract due to loss or theft of equipment and materials not officially accepted by the Owner.
1.04 PERMITS
A. The State of Michigan requires that the Contractor apply for and obtain permits for data telecommunication installation.
B. This is required under State of Michigan Public Act 230. The inspector at the State of Michigan states that the code never exempted data telecommunications from permits and previous rules had overstepped their bounds. Only exemptions to the permit requirements are found in Public Act 230 MCL125.1528a.
1. There is not a license required to apply for a permit per Public Act 407
MCL339.5737(3)(o).
C. The Permit is required under Public Act 230. The permit is under 2017 Michigan Electrical
Code rules Part 8.
D. People who can obtain the permit include the Owner of the building or a company representing the owner. See Public Act 230 MCL125.1510.
1. Contractor shall be required to apply for and obtain the permit
2. Contractor shall be required to install the data telecommunications system to fully meet all code requirements and requirements of the Inspector and Authority Having Jurisdiction (AHJ)
E. State inspector has noted that the inspection process for data telecommunications is the same as any other inspection.
1. Do not cover or conceal any wiring without approval.
2. Electrical Inspectors will be conducting the inspections.
3. Contractor shall be responsible for scheduling the inspections and attending the inspections with the inspector F. State inspector has noted that the inspectors will be inspecting for code compliance including manufacture’s installation instructions for the cables and terminations.
G. An installation may not pass inspection if there is any Non-compliance with the code.
1.05 REFERENCE SPECIFICATIONS-CABLING
A. All work applicable shall conform to the following standards:
B. ANSI/TIA-568-C.0, “Generic Telecommunications Cabling for Customer Premises”, C. ANSI/TIA-568-C.1, “Commercial Building Telecommunications Cabling Standard”, D. ANSI/TIA-568-C.2, “Balanced Twisted-Pair Telecommunication Cabling and Components
Standard”, ANSI/TIA-568-C.3, “Optical Fiber Cabling Components Standard”, E. ANSI/TIA-568-C.4, “Broadband Coaxial Cabling and Components Standard”, F. ANSI/TIA/EIA-569-B Commercial Building Standard for Telecommunications Pathways and
Spaces G. IA-606-B: Administration Standard for the Telecommunications Infrastructure of Commercial
Buildings including all Updates and Addenda.
H. TIA-607-C: Generic Telecommunications Bonding and Grounding (Earthing) for Customer
Premises.
I. EIA-472 General Specification for Fiber Optic Cable J. EIA-472A Sectional Specification for Fiber Optic Communication Cables for Outside Aerial K. EIA-472B Sectional Specification for Fiber Optic Communication Cables for Underground and
Buried Use L. EIA-472C Sectional Specification for Fiber Optic Communication Cables for Indoor Use
Gull Lake Schools AV COMMUNICATIONS OVERVIEW 28 1000-3
M. EIA-472D Sectional Specification for Fiber Optic Communication Cables for Outside Telephone Plant Use
N. NEC, 2015, or latest edition available O. IEEE 802.3af PoE • Ratified in 2003 • 15.4W at the PSE, with min of 12.95W available to the
PD
P. IEEE 802.3at PoE+ • Ratified in 2009 • 34.2W at the PSE, with min of 25.5W available to the
PD
Q. Pending (higher power) PoE standards Projected to be Ratified by IEEE in 2017 powering all
4 pairs:
1. Proposed IEEE 802.3bt PoE Type 3 • 60W at PSE • with 49 watts at the PD
2. Proposed IEEE 802.3bt PoE Type 4 • 100W at PSE •with 96 watts at the PD
1.06 REERECNE STANDARDS NETWORKING
A. EE 802.3™: Ethernet B. IEEE 802.11™: Wireless Lans C. IEEE 802.22™: Wireless Regional Area Networks D. TIA/EIA-526-7 Measurement of Optical Power Loss of Installed Single-Mode Fiber Cable
Plant.
E. IEEE 802.3af PoE • Ratified in 2003 • 15.4W at the PSE, with min of 12.95W available to the
PD
F. IEEE 802.3at PoE+ • Ratified in 2009 • 34.2W at the PSE, with min of 25.5W available to the
PD
G. Pending (higher power) PoE standards Projected to be Ratified by IEEE in 2017 powering all
4 pairs:
1. Proposed IEEE 802.3bt PoE Type 3 • 60W at PSE • with 49 watts at the PD
2. Proposed IEEE 802.3bt PoE Type 4 • 100W at PSE •with 96 watts at the PD
1.07 CONTRACTOR-ALL
A. Each contractor shall be responsible for inspecting their own work and ensuring it meets the project requirements.
B. Contractor shall have a project manager who will be responsible for all work, workers, equipment, cabling and project management for their work. The project manager shall have the authority to make decisions for the contractor and schedule all workers.
C. Contractor shall attend all project meetings throughout the project.
D. All work on the project shall meet all applicable state, federal, local and industry codes and be installed according to the requirements of he Authority Having Jurisdiction (AHJ).
1.08 CONTRACTOR -CABLING
A. The Contractor shall show proof of an existing contractual relationship with the approved equipment manufacturer of the horizontal cabling system, and shall pass through the manufacturer's certification and warranty to purchaser.
B. All faceplates and termination hardware shall be sourced from the certifying manufacturer to assure quality control and validity of the manufacturer's warranty.
C. The Contractor shall accept complete responsibility for the installation, certification, and support of the cabling system. Contractor must show proof that he has the certifying manufacturer's support on all of these issues.
D. All work shall be performed and supervised by Telecommunications Technicians and Project Managers who are qualified to install voice, data, and image cabling systems, and to perform related tests as required by the manufacturer in accordance with the manufacturer's methods.
E. The Telecommunications Technicians employed shall be fully trained and qualified by the manufacturer on the installation and testing of the equipment to be installed. Evidence that the vendor is a current Certified Installer of the manufacturer must be provided in writing prior to work commencing on the structured cabling for the building.
F. The Contractor (including Subcontractor(s) if any) shall have a proven track record in cabling projects. This must be shown by the inclusion of details of at least 3 projects involving Category 6 or better cabling and optical fiber, which have been completed by the vendor in
Gull Lake Schools AV COMMUNICATIONS OVERVIEW 28 1000-4 the last 2 years. Names, addresses, and phone numbers of references for the 3 projects shall be included.
1.09 CONTRACTOR –AUDIO/VIDEO
A. The Contractor shall accept complete responsibility for the installation, certification, and support of the system. Contractor shall show proof that they have the certifying manufacturer's support on all of these issues.
B. All work shall be performed and supervised by Audio/Video Technicians and Project Managers who are qualified to install audio/video systems and cabling and to perform related tests as required by the manufacturer in accordance with the manufacturer's methods.
C. The Audio/Video Technicians employed shall be fully trained and qualified by the manufacturer on the installation and testing of the equipment to be installed.
D. The vendor (including Subcontractor(s) if any) shall have a proven track record in audio/video system configuration and installation. This must be shown by the inclusion of details of at least 3 projects involving the installation of like sized audio/video systems that have been completed by the vendor in the last 2 years. Names, addresses, and phone numbers of references for the three projects shall be included.
PART 2 - PRODUCTS
2.01 FIRESTOPPING
A. Each contractor shall be responsible for firestopping around their cables and the raceways.
B. Shall be completed inside and around all conduits after cable installation.
C. Firestop for the area between the cable and the edge of the conduit shall be Nelson No. FSP, CLK or LBS+. Contractor shall install the best firestop for each individual installation.
1. Firestop shall be installed with regard to local and national building codes.
2. The firestop shall be a putty like substance that expands under heat and will not allow flame to pass for a designated period of time.
3. Firestop shall conform to all NEC, NFPA, and UL requirements.
4. Some wall pass-thru’ s are shown on the drawings. The Contractor shall utilize these where possible.
5. Where the contractor must install cables through a wall where there is no pass-thru already provided, the Contractor shall be responsible for installing a fire-rated pass-thru and fire-stopping the conduit after cable installation.
D. Firestopping is required at all riser conduits and all pass thru’s.
1. Each cable tray penetration of a wall shall be firestopped after cable installation. Use pillow type firestop to allow additional cables to be installed in the future.
2. Where riser conduits pass through floors, the area between the concrete and the conduit shall be firestopped. This shall be completed with a putty or liquid firestop product. Fill in the space with mineral wool, and then install the firestop on top. All firestop shall be of sufficient thickness to secure the rating required by code.
3. After final cable installation, install a putty firestop around all cables where they enter and exit conduit pass thru’s and conduit risers.
4. All firestop shall be installed to provide the fire rating as described by local fire code.
5. It shall be the responsibility of the Contractor to verify that all conduits, walls, and raceways required to be firestopped have been firestopped.
PART 3 - EXECUTION
3.01 INSTALLATION
A. Contractor shall be familiar with the location(s) where the work will be done. No additional compensation will be made for items the Contractor claims he was not aware of during bidding.
B. Work Area:
1. All work areas shall be cleaned at the end of each day. All debris shall be cleaned and removed from the site and disposed of in the approved container for the site.
Gull Lake Schools AV COMMUNICATIONS OVERVIEW 28 1000-5
2. All equipment shall be moved out of common areas and stored in the Contractor’s lay down area, or in other approved storage locations on site.
3. Any work that is low hanging, or may otherwise impede the general use of the space, and cannot be removed, shall be flagged and cordoned off by the Contractor.
C. All equipment and parts shall be installed in a neat and workmanlike manner. Good installation principles shall be used throughout the project.
D. All cables routed above the drop ceiling or in the ceiling area shall be installed square to the building. Diagonal cable runs are not permissible.
E. All cut edges of conduits, boxes, raceway, etc., shall be trimmed and filed so that no burrs or rough edges will damage cable as it is installed.
F. All surface raceways, including conduits in exposed areas shall be painted to match the existing colors of the surrounding area.
G. If, in the course of the work, the Contractor damages, marks, or misplaces any ceiling tiles, the Contractor shall repair, and/or replace the ceiling tile to the original condition.
1. The Engineer shall decide if ceiling tiles have been damaged. Based on the
Contractors proposed fixes, the Engineer shall decide the best course of action to repair any damage done by the Contractor to the ceiling tiles.
H. It shall be the responsibility of the Contractor to repair any damage done to the structure or finishes in the building by the Contractor. The building shall be returned to its original condition prior to final sign off of the project.
I. Firestop shall be installed to meet national and local codes.
3.02 DOCUMENTS
A. The Contractor shall fully read the contract documents including the detailed specifications, and the detailed drawings.
B. No additional compensation shall be made for any portion of the project which the Contractor did not know of or understand prior to providing the bid response.
C. In the case of any discrepancies between the detailed drawings and the detailed specifications, the Contractor shall provide the higher quality or more stringent requirement.
3.03 WORK PLAN-POST BID (CHOSEN CONTRACTOR ONLY)
A. Along with the submittals the Contractor shall provide a work plan for the implementation of the telephone switch and data/wireless network. The plan shall include scheduled dates for major milestones, and all phases required for completion prior to final cutover.
B. The work plan shall list all items that must be completed by the Contractor or Owner to provide a smooth install of the telephone system and data network. The Contractor shall be responsible for all costs associated with the planning and cutover. The Owners only responsibility is to act as a liaison between the Contractor and the users.
C. The work plans shall include a time line and a cutover date for the systems within each building. Contractor shall be responsible for all aspects of scheduling the work, including notification of the users, the administration, and the telephone service provider.
D. The work shall commence within 10 days of award of the contract. The Contractor shall be responsible for attending weekly project meetings at the Owner’s site to report on progress and keep the project team informed of the work being done
E. The work plan will be reviewed at each weekly meeting for compliance and updates.
F. Work shall immediately begin on site surveys to determine the existing infrastructure and determining placement of new system electronics. The Contractor shall be responsible for moving, relocating, and reconnecting any and all existing equipment required for the installation of the new systems.
G. After work plan and system approval by the Engineer the Contractor can begin work on infrastructure work that does not impede users.
H. The Contractor shall be responsible for working with the Owner’s Information Technology staff and administrators.
END OF SECTION 28 1000
Gull Lake Schools AV CAT-6 CABLING 28 1600-1
SECTION 28 1600 – CAT-6 CABLING
A. This section includes parts and equipment required for installation, termination, and testing of user communications cables.
1.02 SYSTEM DESCRIPTION
A. The horizontal cabling consists of all systems from the user faceplate, to the patch panel in the communications room, and all connections in between.
B. Products and installation detailed in this section shall comply with all applicable requirements.
1. ANSI/TIA-568, “Generic Telecommunications Cabling for Customer Premises”,
2. ANSI/TIA-568-D-2015, “Commercial Building Telecommunications Cabling Standard”,
3. ANSI/TIA-568-C.2.1-2016, “Balanced Twisted-Pair Telecommunication Cabling and
Components Standard”, ANSI/TIA-568-C.3, “Optical Fiber Cabling Components Standard”,
4. ANSI/TIA-568-C.4, “Broadband Coaxial Cabling and Components Standard”,
5. ANSI/TIA/EIA-569-D-2015 Commercial Building Standard for Telecommunications
Pathways and Spaces
6. IA-606-B: Administration Standard for the Telecommunications Infrastructure of
Commercial Buildings including all Updates and Addenda.
7. TIA-607-C-1-2017: Generic Telecommunications Bonding and Grounding (Earthing) for Customer Premises.
8. Latest Edition of NEC (National Electric Code)
9. NFPA Requirements for low voltage cabling
10. IEEE 802.3af PoE • Ratified in 2003 • 15.4W at the PSE, with min of 12.95W available to the PD
11. IEEE 802.3at PoE+ • Ratified in 2009 • 34.2W at the PSE, with min of 25.5W available to the PD
12. IEEE 802.3bt -Amendment 2. Ratified in 2018 PoE standards powering all 4 pairs:
1.03 COORDINATION
A. All cables shall be coordinated with the installation of the telecommunications raceways.
B. Coordinate all user cables with the furniture to be installed in the building. Make any adjustments prior to cable being installed.
C. Contractor shall walk the site during construction and shall verify all raceways are being installed as required to install the user data cables. Walk the site prior to drywall being installed or floors being installed when Floor boxes are being installed.
1.04 STANDARDS
A. Cabling shall be installed in accordance with NEC code for grouping/bundling of cables in relation to Type 3 and Type 4 PoE B. Install as per NEC 840.160 in reference to bundling cables:
Gull Lake Schools AV CAT-6 CABLING 28 1600-2
C. Cables shall be installed with no more than 24 cables in a single J-hook. Install additional J-hooks as required.
D. If cables are to be bundled/grouped in larger bundles then the cable shall be LP listed per UL.
E. All cables shall be no smaller than 23 AWG.
PART 2 - PRODUCTS
2.01 MANUFACTURERS
A. Approved vendors for copper user cables are:
1. General Cable.
2. Belden.
3. Mohawk
B. Approved vendors for CAT-6 termination equipment are:
1. Hubbell.
2. Panduit (Net Key not allowed)
3. Belden
2.02 CAT-6 CABLING
A. All UTP user/cabling installed shall be CAT-6 rated or above.
1. Category 6 cabling shall consist of 4 pairs of unshielded twisted pair, 23 AWG cables.
2. All CAT-6 cables shall be installed in cable tray or supported by J-Hooks.
3. Individual pair shall be marked in the standard 4 pair color code of blue/blue-white, orange/orange-white, green/green-white, and brown/brown-white.
4. Each cable shall be marked sequentially with the footage of the cable. Each cable shall also be marked with the manufacturer of the cable and the type of cable installed or the cable part number.
5. Cable and all connectors and patch panels shall meet or exceed the following electrical and physical requirements:
DC RESISTANCE (max) 24 AWG
Ohms/100m @ 20C 8.9
DC RESISTANCE UNBALANCED (max)
Individual Pair % 3.0
CHARACTERISTIC IMPEDANCE
Frequency (f) Ohms
1-500 Mhz 100 15
DELAY SKEW (max) ns/100m 25
NOMINAL VELOCITY OF PROPAGATION (NVP)
% Speed of light 70
INPUT IMPEDANCE
Frequency (f) Ohms
1.0-100 Mhz 100 15
100-350 Mhz 100 22
350-500 Mhz 100 32
FREQ. ACR PS-ACR ELFEXT PS-ELFEXT
Gull Lake Schools AV CAT-6 CABLING 28 1600-3
DB@100
m (min)
DB@100
m (min) dB (min) m (min)
772 kHz 74.2 72.2 70.0 67.0
1 kHz 72.3 70.3 67.8 64.8
4 kHz 61.5 59.5 55.8 52.8
10 kHz 53.3 51.3 47.8 44.8
16 kHz 49.0 47.0 43.7 40.7
20 MHz 46.3 44.3 41.8 38.8
31.25 MHz 41.2 39.2 37.9 36.8
62.5 MHz 32.0 30.0 31.9 28.9
100 MHz 24.5 22.5 27.8 24.8
200 MHz 11.0 9.0 21.8 18.8
250 MHz 5.5 3.5 19.8 16.8
350 MHz - - - -
400 MHz - - - -
500 MHz - - - -
FREQ. NEXT
dB (min)
PS-NEXT
dB (min)
ATTEN.
DB/100m max
RETURN
LOSS
dB (min)
772 kHz 76.0 74.0 1.8 -
1 kHz 74.3 72.3 2.0 20.0
4 kHz 65.3 63.3 3.8 23.0
10 kHz 59.3 57.3 6.0 25.0
16 kHz 56.3 54.3 7.6 256.0
20 MHz 54.8 52.8 8.5 25.0
31.25 MHz 51.9 49.9 10.7 23.6
62.5 MHz 47.4 45.4 15.4 21.5
100 MHz 44.3 42.3 19.8 20.1
200 MHz 39.8 37.8 29.0 18.0
250 MHz 38.3 36.3 32.8 17.3
350 MHz 36.2 34.2 39.8 -
400 MHz 35.3 33.3 43.0 -
500 MHz 33.8 31.8 48.9 -
6. All cables installed above a drop ceiling or fixed ceiling shall be Plenum Rated
7. CAT-6, 4 pair cabling shall be plenum rated unless specifically noted.
Cable Use Manufacturer Color Part number
Data Cabling General Blue 7131800
Security Camera General Green 7131806
Wireless AP General Yellow 7131802
Video General Red 7131804
Backbone General Purple 7131809
USB General Orange 7131805
Underground General Black 7136100 l
8. Ensure that cable passes all CAT-6 tests after installation.
2.03 UTP JACKS
A. Voice and data modular jacks shall be CAT-6 rated, 8 position, unkeyed,
1. Each jack shall be an individually constructed unit and shall snap mount in an industry standard keystone opening (.760 inches x .580 inches).
2. Jack housings shall be high impact 94 V-0 rated thermoplastic.
3. Jack housings shall fully encase and protect printed circuit boards and IDC fields.
Gull Lake Schools AV CAT-6 CABLING 28 1600-4
4. Modular jack contacts shall accept a minimum of 1000 mating cycles with 5.0 milliohm (maximum) increase over initial with the use of an FCC compliant plug.
5. Modular jack contact wires shall be formed flat for increased surface contact with mated plugs.
6. Modular jack contacts shall be constructed of beryllium copper for maximum spring force and resilience.
7. Contact plating shall be a minimum of 50 micro inches of hard gold in the contact area over 50 micro inches of nickel.
8. Jack termination shall follow the industry standard 110 IDC.
9. Jacks shall have a designation indicating CAT-6.
10. Jacks shall utilize a paired punch down sequence. Cable pair twist shall be maintained up to the IDC, terminating all conductors adjacent to its pair mate to better maintain pair characteristics designed by the cable manufacturer.
11. Jacks shall terminate 22-26 AWG stranded or solid conductors.
12. Jacks shall terminate insulated conductors with outside diameters up to .050 inches.
13. Jacks shall be compatible with single conductor, 110 impact termination tools.
14. Jacks shall include translucent wire retention stuffer cap that holds terminated wires in place and allows the conductors to be visually inspected in the IDC housing.
15. Jacks shall be compatible with EIA/TIA 606A color code labeling.
16. Jacks shall accept snap on icons for identification or designation of applications.
17. Jacks shall be marked for T568A and T568B wiring schemes. TIA 568B wiring shall be used in all terminations throughout the communications system.
18. All CAT-6 modular jacks and panels shall meet or exceed the following transmission characteristics:
a. Jacks shall be designed for 100 Ohm UTP cable termination.
b. Jacks shall be UL verified for TIA/EIA Category 6 electrical performance.
c. Jacks shall be UL listed 1863 and CSA certified.
d. Jacks shall be manufactured by an ISO 9002 registered manufacturer.
19. CAT-6, 8-pin modular jacks shall be:
a. Data Jacks shall be Hubbell # HXJ6OW or equal. Office White.
b. Data Jacks for Security Cameras shall be Hubbell #HXJ6GN-Green
c. Data jacks for backbone connectivity shall be Hubbell #HXJ6P-Purple
d. Data Jacks for Audio and Video connections shall be:
A) Hubbell #HXJ6W-White B) Hubbell #HXJ6R-Red C) Hubbell #HXJ6BK-Black
e. Data Jacks for USB connections shall be Hubbell #HXJ6OR-Orange
2.04 FACEPLATES
A. In addition to flush faceplates and surface housings, some installations call for integrated furniture outlets, GFI style outlets, and standard 106 style frames. These may be required at some surface raceway location. Field verify prior to ordering.
1. The Contractors shall identify which type of outlet or frame is required at each location throughout the system.
2. Match the outlet with the faceplate required.
3. GFI, more commonly referred to as style line outlets, are rectangular and fit in a rectangular plate used for GFI receptacles.
4. Each type of modular furniture has certain requirements for its voice and data modules.
The Contractor shall coordinate with the furniture installer and provide the correct faceplate and outlets to match the color and style of the furniture.
5. The 106 style frame fits in a common duplex electrical receptacle faceplate. The frame holds 2 or 4 modular jacks.
6. For all connections that do not have a faceplate with a location for a laser printed paper label, the Contractor shall provide an engraved lamacoid label detailing the location number of each cable.
7. GFI/Style line Plates shall be:
Gull Lake Schools AV CAT-6 CABLING 28 1600-5
a. Two port, Hubbell # ISF2OW
b. Three port, Hubbell # ISF3OW,
c. Four port, Hubbell # ISF4OW
d. Six port, Hubbell #…