0688-03-031.pdf
PDF 5 MB Posted
- Solicitation number
- 0688-03-031
- Issued by
- Kleberg County, Texas
About this file
This is a proposal solicitation document issued by the Texas Department of Transportation (TxDOT) for a Hazard Elimination & Safety (HES) construction project on FM 1497 in Lamar County, Texas. The project, designated STP 2026(784)HES, involves safety improvements and hazard elimination work spanning 6.091 miles from State Loop 286 to FM 1184. The scope of work includes preparing right-of-way, removing concrete, excavation, embankment work, seeding and erosion control, concrete and riprap work, reinforced concrete pipe installation, culvert and headwall work, safety end treatment installation, structure removal, mobilization, traffic control, temporary erosion and sedimentation controls, driveway and turnout work, guardrail installation and removal, mailbox assembly installation, and delineator assembly work. The contract specifies 96 working days for project completion. The project includes 63 distinct pay items with varying quantities, ranging from preparing right-of-way at 86 stations to concrete crack repair at 12 linear feet. The bidding process requires submission of an audited financial statement and experience questionnaire at least ten days prior to the letting date, with questions submitted through TxDOT's Letting Pre-Bid Q&A web page.
Bidders must submit a proposal guaranty of $16,000.00 in the form of a cashier's check, teller's check, official check, bank money order, or bid bond. Unit prices must be submitted for each pay item in accordance with Item 2 of the standard specifications. This is a federally funded project requiring compliance with Davis-Bacon wage rates, nondiscrimination requirements, and Form FHWA-1273 provisions. The project requires a Notarized Buy America Certification Form for all items classified as construction materials. Various special provisions apply, including requirements for e-verify system registration, conflict of interest certifications, foreign adversaries compliance, and prohibitions on certain telecommunications equipment. Contractor responsibilities include submitting a construction operations plan and bar chart progress schedule before work begins, incorporating erosion control measures per the Stormwater Pollution Prevention Plan, and ensuring 70 percent perennial vegetative cover establishment prior to final estimate release. Monthly estimate cutoff occurs on the 25th of each month, with material on hand cutoffs on the 20th of each month.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Control 0688-03-031 Project STP 2026(784)HES Highway FM 1497 County LAMAR
ADDENDUM ACKNOWLEDGMENT
Each bidder is required to acknowledge receipt of an addendum issued for a specific project. This page is provided for the purpose of acknowledging an addendum.
FAILURE TO ACKNOWLEDGE RECEIPT OF AN ADDENDUM WILL RESULT IN THE BID NOT
BEING READ.
In order to properly acknowledge an addendum, place a mark in the box next to the respective addendum.
ADDENDUM NO. 1
ADDENDUM NO. 2
ADDENDUM NO. 3
ADDENDUM NO. 4
ADDENDUM NO. 5
In addition, the bidder by affixing their signature to the signature page of the proposal is acknowledging that they have taken the addendum(s) into consideration when preparing their bid and that the information contained in the addendum will be included in the contract, if awarded by the Commission or other designees.
1-1
This page intentionally left blank.
Highway FM 1497 County LAMAR
PROPOSAL TO THE TEXAS
TRANSPORTATION COMMISSION
2024 SPECIFICATIONS
Work Consisting of Hazard Elimination & Safety
LAMAR COUNTY, TEXAS
The quantities in the proposal are approximate. The quantities of work and materials may be increased or decreased as considered necessary to complete the work as planned and contemplated.
This project is to be completed in 96 working days and will be accepted when fully completed and finished to the satisfaction of the Executive Director or designee.
Provide a proposal guaranty in the form of a Cashier’s Check, Teller’s Check (including an Official Check) or Bank Money Order on a State or National Bank or Savings and Loan Association, or State or Federally chartered Credit Union made payable to the Texas Transportation Commission in the following amount:
SIXTEEN THOUSAND AND 00/100 (Dollars) ( $16,000.00)
A bid bond may be used as the required proposal guaranty. The bond form may be detached from the proposal for completion. The proposal may not be disassembled to remove the bond form. The bond must be in accordance with Item 2 of the specifications.
Any addenda issued amending this proposal and/or the plans that have been acknowledged by the bidder, become part of this proposal.
By signing the proposal the bidder certifies:
1. the only persons or parties interested in this proposal are those named and the bidder has not directly or indirectly participated in collusion, entered into an agreement or otherwise taken any action in restraint of free competitive bidding in connection with the above captioned project.
2. in the event of the award of a contract, the organization represented will secure bonds for the full amount of the contract.
3. the signatory represents and warrants that they are an authorized signatory for the organization for which the bid is submitted and they have full and complete authority to submit this bid on behalf of their firm.
4. that the certifications and representations contained in the proposal are true and accurate and the bidder intends the proposal to be taken as a genuine government record.
• Signed: **
(1) (2) (3) Print Name:
(1) (2) (3) Title:
(1) (2) (3) Company:
(1) (2) (3)
• Signatures to comply with Item 2 of the specifications.
**Note: Complete (1) for single venture, through (2) for joint venture and through (3) for triple venture.
* When the working days field contains an asterisk (*) refer to the Special Provisions and General Notes.
NOTICE TO CONTRACTORS
ANY CONTRACTORS INTENDING TO BID ON ANY WORK TO BE AWARDED
BY THIS DEPARTMENT MUST SUBMIT A SATISFACTORY “AUDITED FINANCIAL
STATEMENT” AND “EXPERIENCE QUESTIONNAIRE” AT LEAST TEN DAYS
PRIOR TO THE LETTING DATE.
UNIT PRICES MUST BE SUBMITTED IN ACCORDANCE WITH ITEM 2 OF
THE STANDARD SPECIFICATIONS OR SPECIAL PROVISION TO ITEM 2 FOR
EACH ITEM LISTED IN THIS PROPOSAL.
TEXAS DEPARTMENT OF TRANSPORTATION
BID BOND
KNOW ALL PERSONS BY THESE PRESENTS,
That we, (Contractor Name)
Hereinafter called the Principal, and (Surety Name) a corporation or firm duly authorized to transact surety business in the State of Texas, hereinafter called the Surety, are held and firmly bound unto the Texas Department of Transportation, hereinafter called the Obligee, in the sum of not less than two percent (2%) of the department’s engineer’s estimate, rounded to the nearest one thousand dollars, not to exceed one hundred thousand dollars ($100,000) as a proposal guaranty (amount displayed on the cover of the proposal), the payment of which sum will and truly be made, the said Principal and the said Surety, bind ourselves, our heirs, executors, administrators, successors and assigns, jointly and severally, firmly by these presents.
WHEREAS, the principal has submitted a bid for the following project identified as:
Control 0688-03-031
Project STP 2026(784)HES
Highway FM 1497
County LAMAR
NOW, THEREFORE, if the Obligee shall award the Contract to the Principal and the Principal shall enter into the Contract in writing with the Obligee in accordance with the terms of such bid, then this bond shall be null and void. If in the event of failure of the Principal to execute such Contract in accordance with the terms of such bid, this bond shall become the property of the Obligee, without recourse of the Principal and/or Surety, not as a penalty but as liquidated damages.
Signed this Day of 20
By:
(Contractor/Principal Name)
(Signature and Title of Authorized Signatory for Contractor/Principal)
*By:
(Surety Name)
(Signature of Attorney-in-Fact) Impressed
*Attach Power of attorney (Surety) for Attorney-in-Fact Surety Seal Only
This form may be removed from the proposal
BIDDER’S CHECK RETURN
IMPORTANT
The space provided for the return address must be completed to facilitate the return of your bidder’s check. Care must be taken to provide a legible, accurate, and complete return address, including zip code. A copy of this sheet should be used for each different return address.
NOTE
Successful bidders will receive their guaranty checks with the executed contract.
RETURN BIDDERS CHECK TO (PLEASE PRINT):
Control 0688-03-031 Project STP 2026(784)HES Highway FM 1497 County LAMAR
IMPORTANT
PLEASE RETURN THIS SHEET IN ITS ENTIRETY
Please acknowledge receipt of this check(s) at your earliest convenience by signing below in longhand, in ink, and returning this acknowledgement in the enclosed self-addressed envelope.
Check Received By: Date:
Title:
For (Contractor's Name):
Project: County:
NOTICE TO THE BIDDER
In the space provided below, please enter your total bid amount for this project. Only this figure will be read publicly by the Department at the public bid opening.
It is understood and agreed by the bidder in signing this proposal that the total bid amount entered below is not binding on either the bidder or the Department. It is further agreed that the official total bid amount for this proposal will be determined by multiplying the unit bid prices for each pay item by the respective estimated quantities shown in this proposal and then totaling all of the extended amounts.
Total Bid Amount
Control Project Highway County
ALT ITEM DESC SP Bid Item Description Unit Quantity Bid Price Amount Seq
Signed ____________________________________________ Title ____________________________________________ Date ____________________________________________
Additional Signature for Joint Venture:
Signed ____________________________________________ Title ____________________________________________ Date ____________________________________________
Total Bid Amount _______$2,664.00________
EXAMPLE OF BID PRICES SUBMITTED BY COMPUTER PRINTOUT
0001-03-030
STP 2000(938)HES
SH 20
EL PASO
104 509 REMOV CONC (SDWLK) SY 266.400 $10.000 $2,664.00 1
EXAMPLE EXAMPLE EXAMPLE EXAMPLE
EXAMPLES
BID PRICES SUBMITTED BY HAND WRITTEN FORMAT
Unit price for each plant in place
249 014 FLEX BASE(DEL)(DENSCOT)(TY A GR4 CL2) TON 56,787.00 14
ALT
ITEM-CODE
ITEM
NO
DESC
NO
S.P.
NO.
UNIT BID PRICE ONLY
WRITTEN IN WORDS UNIT
APPROX
QUANTITIES
DEPT
USE
ONLY
190 026 RED OAK 1 1/2” - 1 3/4” GAL BB EA 9.000 1
DLRS
CENTS
DLRS
CENTS
Unit price for each ton of Flexible Base
430 001 001 CL A CONC FOR EXT STR (CULV) CY 45.000 27
Unit price for each cubic yard of Concrete
DLRS
CENTS
610 007 001 RDWY ILL ASSEM(TY ST 50T-8-8)(.4 KW)S EA 13.000 7
Unit price of each Roadway Illumination Assembly
DLRS
CENTS
EXAMPLE EXAMPLE EXAMPLE EXAMPLE
STP 2026(784)HES
Proposal Sheet
LAMAR FORM 234-B I-61-5M
TxDOT PROJECT
COUNTY
ALT
ITEM-CODE
UNIT BID PRICE ONLY.
WRITTEN IN WORDS UNIT APPROX
QUANTITIES
DEPT
USE
ONLY
ITEM
NO.
DESC
CODE
S.P.
No.
100 7002
PREPARING ROW
STA 86.000 1 DOLLARS
and CENTS
104 7006
REMOV CONC (RIPRAP)
SY 58.000 2 DOLLARS
and CENTS
104 7020
REMOV CONC (SAWCUT)
LF 30.000 3 DOLLARS
and CENTS
104 7046
REMOV CONC (MISC)
SY 11.000 4 DOLLARS
and CENTS
110 7002
EXCAV (CHANNEL)
CY 45.000 5 DOLLARS
and CENTS
132 7015
EMBANK (VEH)(OC)(TY B)
CY 4,865.000 6 DOLLARS
and CENTS
158 7002
SPEC EXCAV WORK (HYD EXCAVATOR)
HR 150.000 7 DOLLARS
and CENTS
164 7007
BROADCAST SEED (TEMP_WARM_COOL)
SY 39,353.000 8 DOLLARS
and CENTS
164 7018
HYDRO MULCH SEED
(PERM_RURAL_CLAY)
SY 19,678.000 9 DOLLARS
and CENTS
168 7001
VEGETATIVE WATERING
TGL 122.000 10 DOLLARS
and CENTS
400 7007
CUT & RESTORE CONC PAVING
SY 24.000 11 DOLLARS
and CENTS
400 7008
CUT & RESTORE ASPH PAVING
SY 56.000 12 DOLLARS
and CENTS
400 7009
CUT AND RESTORE PAV (FLEX BASE)
SY 51.000 13 DOLLARS
and CENTS
1-5
LAMAR FORM 234-B I-61-5M
TxDOT PROJECT
COUNTY
ALT
ITEM-CODE
UNIT BID PRICE ONLY.
WRITTEN IN WORDS UNIT APPROX
QUANTITIES
DEPT
USE
ONLY
ITEM
NO.
DESC
CODE
S.P.
No.
401 7001
FLOWABLE BACKFILL
CY 32.000 14 DOLLARS
and CENTS
402 7001
TRENCH EXCAVATION PROTECTION
LF 15.000 15 DOLLARS
and CENTS
403 7001
TEMPORARY SPL SHORING
SF 540.000 16 DOLLARS
and CENTS
420 7061
CL C CONC (COLLAR)
EA 7.000 17 DOLLARS
and CENTS
429 7002
CONC STR REPAIR (EPOXY MORTAR)
SF 20.000 18 DOLLARS
and CENTS
432 7002
RIPRAP (CONC)(5 IN)
CY 5.000 19 DOLLARS
and CENTS
432 7013
RIPRAP (MOW STRIP)(4 IN)
CY 43.000 20 DOLLARS
and CENTS
432 7041
RIPRAP (STONE PROTECTION)(12 IN)
CY 39.000 21 DOLLARS
and CENTS
432 7043
RIPRAP (STONE PROTECTION)(18 IN)
CY 321.000 22 DOLLARS
and CENTS
464 7003
RC PIPE (CL III)(18 IN)
LF 378.000 23 DOLLARS
and CENTS
464 7005
RC PIPE (CL III)(24 IN)
LF 70.000 24 DOLLARS
and CENTS
464 7009
RC PIPE (CL III)(36 IN)
LF 224.000 25 DOLLARS
and CENTS
464 7010
RC PIPE (CL III)(42 IN)
LF 50.000 26 DOLLARS
2-5
LAMAR FORM 234-B I-61-5M
TxDOT PROJECT
COUNTY
ALT
ITEM-CODE
UNIT BID PRICE ONLY.
WRITTEN IN WORDS UNIT APPROX
QUANTITIES
DEPT
USE
ONLY
ITEM
NO.
DESC
CODE
S.P.
No.
464 7011
RC PIPE (CL III)(48 IN)
LF 24.000 27 DOLLARS
and CENTS
466 7107
HEADWALL (CH - PW - 0) (DIA= 48 IN)
EA 1.000 28 DOLLARS
and CENTS
467 7043
SET (TY I)(S= 3 FT)(HW= 3 FT)(6:1)(P)
EA 2.000 29 DOLLARS
and CENTS
467 7304
SET (TY II) (18 IN) (CMP) (6: 1) (P)
EA 8.000 30 DOLLARS
and CENTS
467 7308
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 27.000 31 DOLLARS
and CENTS
467 7328
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 4.000 32 DOLLARS
and CENTS
467 7368
SET (TY II) (36 IN) (RCP) (6: 1) (P)
EA 3.000 33 DOLLARS
and CENTS
467 7380
SET (TY II) (42 IN) (RCP) (6: 1) (P)
EA 4.000 34 DOLLARS
and CENTS
467 7472
SET (REMOV & REINSTALL)
EA 4.000 35 DOLLARS
and CENTS
472 7004
REMOV & RE - LAY PIPE (18 IN)
LF 52.000 36 DOLLARS
and CENTS
472 7011
REMOV & RE - LAY PIPE (36 IN)
LF 120.000 37 DOLLARS
and CENTS
480 7001
CLEAN EXIST CULVERTS
EA 3.000 38 DOLLARS
and CENTS
496 7004
REMOV STR (SET)
EA 23.000 39 DOLLARS
3-5
LAMAR FORM 234-B I-61-5M
TxDOT PROJECT
COUNTY
ALT
ITEM-CODE
UNIT BID PRICE ONLY.
WRITTEN IN WORDS UNIT APPROX
QUANTITIES
DEPT
USE
ONLY
ITEM
NO.
DESC
CODE
S.P.
No.
496 7006
REMOV STR (HEADWALL)
EA 1.000 40 DOLLARS
and CENTS
496 7007
REMOV STR (PIPE)
LF 490.000 41 DOLLARS
and CENTS
500 7001
MOBILIZATION
LS 1.000 42 DOLLARS
and CENTS
502 7001
BARRICADES, SIGNS AND TRAFFIC
HANDLING
MO 6.000 43 DOLLARS
and CENTS
503 7002
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 44 DOLLARS
and CENTS
505 7001
TMA (STATIONARY)
DAY 40.000 45 DOLLARS
and CENTS
506 7002
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 60.000 46 DOLLARS
and CENTS
506 7011
ROCK FILTER DAMS (REMOVE)
LF 60.000 47 DOLLARS
and CENTS
506 7039
TEMP SEDMT CONT FENCE (INSTALL)
LF 525.000 48 DOLLARS
and CENTS
506 7041
TEMP SEDMT CONT FENCE (REMOVE)
LF 525.000 49 DOLLARS
and CENTS
530 7015
DRIVEWAYS (BASE)
SY 55.000 50 DOLLARS
and CENTS
530 7018
TURNOUTS (ACP)
SY 704.000 51 DOLLARS
and CENTS
540 7002
MTL W-BEAM GD FEN (STEEL POST)
LF 325.000 52 DOLLARS
4-5
LAMAR FORM 234-B I-61-5M
TxDOT PROJECT
COUNTY
ALT
ITEM-CODE
UNIT BID PRICE ONLY.
WRITTEN IN WORDS UNIT APPROX
QUANTITIES
DEPT
USE
ONLY
ITEM
NO.
DESC
CODE
S.P.
No.
542 7001
REMOVE METAL BEAM GUARD FENCE
LF 625.000 53 DOLLARS
and CENTS
542 7002
REMOVE TERMINAL ANCHOR SECTION
EA 5.000 54 DOLLARS
and CENTS
544 7001
GUARDRAIL END TREATMENT (INSTALL)
EA 4.000 55 DOLLARS
and CENTS
544 7003
GUARDRAIL END TREATMENT (REMOVE)
EA 1.000 56 DOLLARS
and CENTS
560 7001
MAILBOX INSTALL-M (TWG-POST) TY 1
EA 2.000 57 DOLLARS
and CENTS
560 7002
MAILBOX INSTALL-S (TWG-POST) TY 2
EA 52.000 58 DOLLARS
and CENTS
560 7003
MAILBOX INSTALL-D (TWG-POST) TY 2
EA 8.000 59 DOLLARS
and CENTS
644 7065
RELOCATE SM RD SN SUP&AM TY 10BWG
EA 1.000 60 DOLLARS
and CENTS
658 7003
INSTL DEL ASSM (D-SW)SZ 1(WFLX)GND
EA 68.000 61 DOLLARS
and CENTS
780 7002
CNC CRACK REPAIR (DISCRETE)(INJECT)
LF 12.000 62 DOLLARS
and CENTS
780 7005
CNC CRACK REPAIR (FLOOD)(GRAVITY)
SF 14.000 63 DOLLARS
5-5
CERTIFICATION OF INTEREST IN OTHER BID
PROPOSALS FOR THIS WORK
By signing this proposal, the bidding firm and the signer certify that the following information, as indicated by checking “Yes” or “No” below, is true, accurate, and complete.
A. Quotation(s) have been issued in this firm's name to other firm(s) interested in this work for consideration for performing a portion of this work.
________ YES
________ NO
B. If this proposal is the low bid, the bidder agrees to provide the following information prior to award of the contract.
1. Identify firms which bid as a prime contractor and from which the bidder received quotations for work on this project.
2. Identify all the firms which bid as a prime contractor to which the bidder gave quotations for work on this project.
DISCLOSURE OF LOBBYING ACTIVITIES
Complete this form to disclose lobbying activities pursuant to 31 U.S.C. 1352 (See reverse for public burden disclosure.)
1. Type of Federal Action:
a. contract
b. grant
c. cooperative agreement
d. loan
e. loan guarantee
f. loan insurance
2. Status of Federal Action:
a. bid/offer/application
b. initial award
c. post-award
3. Report Type:
a. initial filing
b. grant
For material change only:
year _______ quarter _____ date of last report ___________
4. Name and Address of Reporting Entity:
Prime Subawardee Tier __________, if known:
Congressional District, if known:
5. If Reporting Entity in No. 4 is Subawardee, Enter Name and Address of Prime:
Congressional District, if known:
6. Federal Department/Agency: 7. Federal Program Name/Description:
CFDA Number, if applicable: _____________________________
8. Federal Action Number, if known: 9. Award Amount, if known:
10. a. Name and Address of Lobbying Entity (if individual, last name, first name, MI):
b. Individuals Performing Services (including address if different from No. 10a) (last name, first name, MI):
(attach Continuation Sheet(s) SF-LLL-A, if necessary)
11. Amount of Payment (check all that apply):
$ ___________________________ actual planned
13. Type of Payment (check all that apply):
a. retainer
b. one-time fee
c. commission
d. contingent fee
e. deferred
f. other; specify: _______________________________
12. Form of Payment (check all that apply)
a. cash
b. in-kind; specify: nature ____________________ value ____________________
14. Brief Description of Services Performed or to be Performed and Date(s) of Service, including officer(s), employee(s), or Member(s) contacted, for Payment Indicated in Item 11:
(attach Continuation Sheet(s) SF-LLL-A, if necessary)
15. Continuation Sheet(s) SF-LLL-A attached: Yes No
16. Information requested through this form is authorized by title 31 U.S.C. section 1352. This disclosure of lobbying activities is a material representation of fact upon which reliance was placed by the tier above when this transaction was made or entered into. This disclosure is required pursuant to 31 U.S.C. 1352. This information will be reported to the Congress semi-annually and will be available for public inspection. Any person who fails to file the required dis-closure shall be subject to a civil penalty of not less than $10,000 and not more than $100,000 for each such failure.
Signature: __________________________________________
Print Name: _________________________________________
Title: ______________________________________________
Telephone No: _____________________ Date: ___________
FEDERAL USE ONLY Authorized for Local Reproduction Standard Form - LLL
INSTRUCTIONS FOR COMPLETION OF SF-LLL, DISCLOSURE OF LOBBYING ACTIVITIES
This disclosure form shall be completed by the reporting entity, whether subawardee or prime Federal recipient, at the initiation or receipt of a covered Federal action, or a material change to a previous filing, pursuant to title 31 U.S.C section 1352. The filing of a form is required for each payment or agreement to make payment to any lobbying entity for influencing or attempting to influence an officer or employee of any agency, a Member of Congress, an officer or employee of Congress, or an employee of a Member of Congress in connection with a covered Federal action. Use the SF-LLL-A Continuation Sheet for additional information if the space on the form is inadequate. Com-plete all items that apply for both the initial filing and material change report. Refer to the implementing guidance pub-lished by the Office of Management and Budget for additional information.
1. Identify the type of covered Federal action for which lobbying activity is and/or has been secured to influence the outcome of a covered Federal action.
2. Identify the status of the covered Federal action.
3. Identify the appropriate classification of this report. If this is a follow-up report caused by a material change to the information previously reported, enter the year and quarter in which the change occurred. Enter the date of the last previously submitted report by this reporting entity or this covered Federal action.
4. Enter the full name, address, city, state and zip code of the reporting entity. Include Congressional District, if known. Check the appropriate classification of the reporting entity that designates if it is, or expects to be, a prime or subaward recipient. Identify the tier of the subawardee, e.g., the first subawardee of the prime is the 1st tier. Subawards include but are not limited to subcontracts, subgrants and contract awards under grants.
5. If the organization filing the report in item 4 checks "Subawardee", then enter the full name, address, city, state and zip code of the prime Federal recipient. Include Congressional District, if known.
6. Enter the name of the Federal agency making the award or loan commitment. Include at least one organizational level below agency name, if known. For example, Department of Transportation, United States Coast Guard.
7. Enter the Federal program name or description for the covered Federal action (item 1). If known, enter the full Catalog of Federal Domestic Assistance (CFDA) number for grants, cooperative agreements, loans, and loan commitments.
8. Enter the most appropriate Federal identifying number available for the Federal action identified in item 1 (e.g., Request for Proposal (RFP) number; Invitation for Bid (IFB) number; grant announcement number, the contract, grant, or loan award number; the application/proposal control number assigned by the Federal agency). Include prefixes, e.g., "RFP-DE-90-001."
9. For a covered Federal action where there has been an award or loan commitment by the Federal agency, enter the Federal amount of the award/loan commitment for the prime entity identified in item 4 or 5.
10. (a) Enter the full name, address, city, state and zip code of the lobbying entity engaged by the reporting entity identified in item 4 to influence the covered Federal action.
(b) Enter the full names of the individual(s) performing services, and include full address if different from 10(a).
Enter Last Name, First Name, and Middle Initial (MI).
11. Enter the amount of compensation paid or reasonably expected to be paid by the reporting entity (item 4) to the lobbying entity (item 10). Indicate whether the payment has been made (actual) or will be made (planned).
Check all boxes that apply. If this is a material change report, enter the cumulative amount of payment made or planned to be made.
12. Check the appropriate box(es). Check all boxes that apply. If payment is made through an in-kind contribution, specify the nature and value of the in-kind payment.
13. Check the appropriate box(es). Check all boxes that apply. If other, specify nature.
14. Provide a specific and detailed description of the services that the lobbyist has performed, or will be expected to perform, and the date(s) of any services rendered. Include all preparatory and related activity, not just time spent in actual contact with Federal officials. Identify the Federal official(s) or employee(s) contacted or the officer(s), employee(s), or Member(s) of Congress that were contacted.
15. Check whether or not a SF-LLL-A Continuation Sheet(s) is attached.
16. The certifying official shall sign and date the form, print his/her name, title, and telephone number.
Public reporting burdon for this collection of infromation is estimated to average 30 minutes per response, including time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments reguarding the burden estimate or any other aspect of this collection of information, including suggestions for reducing this burdon, to the Office of Management and Budget, Paperwork Reduction Project (0348-0046), Washington, D.C. 20503.
DISCLOSURE OF LOBBYING ACTIVITIES Approved by OMB 0348-0046
CONTINUATION SHEET
Authorized for Local Reproduction
Standard Form - LLL-A
Reporting Entity: ____________________________________ Page ______ of ______
CONTRACTOR’S ASSURANCE
(Subcontracts-Federal Aid Projects)
By signing this proposal, the contractor is giving assurances that each subcontract and further all lower tier subcontracts will incorporate the Standard Specification to Article 9.9, Payment
Provisions for Subcontractors and will also physically attach the following:
Form FHWA 1273
Wage Rates
Special Provision 000-001
Special Provision 000-002
Special Provision 000-007
Required Contract Provisions Federal-Aid Construction
Contracts
All Construction Projects
Nondiscrimination, Sections 3.1-3.6 (include materials and leases of equipment)
Certificate of Nondiscrimination in Employment
Cargo Preference Act Requirements in Federal-Aid
11-25
ENGINEER SEAL
Project STP 2026(784)HES
Highway FM 1497 County LAMAR
The enclosed Texas Department of Transportation Specifications, Special Specifications, Special Provisions, General Notes and Specification Data in this document have been selected by me, or under my responsible supervision as being applicable to this project.
Alteration of a sealed document without proper notification to the responsible engineer is an offense under the Texas Engineering Practice Act.
The seal appearing on this document was authorized by:
Corey Hartwell P.E.
March 23, 2026
Seal Applies to CSJ(s):
All CSJs within the Contract
157736
Corey Hartwell
County: LAMAR Control: 0688-03-031
Highway: FM 1497 Sheet:
General Notes Sheet A
GENERAL NOTES
Contractor questions on this project are to be addressed to the following individual(s):
Paris Area Office
Daniel Taylor P.E. – Daniel.Taylor@txdot.gov
Zachary Smith P.E. – Zachary.Smith@txdot.gov
Questions may be submitted via the Letting Pre-Bid Q&A web page. This webpage can be accessed from the Notice to Contractors dashboard located at the following Address:
https://tableau.txdot.gov/views/ProjectInformationDashboard/NoticetoContractors
All contractor questions will be reviewed by the Engineer. All questions and any corresponding responses that are generated will be posted through the same Letting Pre-Bid Q&A web page.
The Letting Pre-Bid Q&A web page for each project can be accessed by using the dashboard to navigate to the project you are interested in by scrolling or filtering the dashboard using the controls on the left. Hover over the blue hyperlink for the project you want to view the Q&A for and click on the link in the window that pops up.
On Contractor request, construction timelines will be posted to TxDOT’s Public FTP at the following Address:
https://ftp.dot.state.tx.us/pub/txdot-info/Pre-Letting%20Responses/
The site is organized by District, Project Type (Construction or Maintenance), Letting Date, CCSJ/Project Name.
Dispose of waste materials at an approved site. Furnish written approval from the property owner before disposal of waste materials.
Locate equipment a minimum of 30 feet from roadway when possible. Place signs and barricades as approved.
Stockpile sites for construction materials must be approved. Give at least 48 hours notification prior to stockpiling material.
Item 5 Control of the Work:
The responsibility for the construction surveying on this contract will be in accordance with
Section 5.9.3, Method C.
Working days will be computed and charged in accordance with Article 8.3.1.4 Standard Work
Week.
mailto:Daniel.Taylor@txdot.gov mailto:Zachary.Smith@txdot.gov https://tableau.txdot.gov/views/ProjectInformationDashboard/NoticetoContractors https://tableau.txdot.gov/views/ProjectInformationDashboard/NoticetoContractors https://ftp.dot.state.tx.us/pub/txdot-info/Pre-Letting%20Responses/
County: LAMAR Control: 0688-03-031
Highway: FM 1497 Sheet:
General Notes Sheet B
Right and left are determined based upon the forward direction of stationing in the specific control section.
FINAL CLEANUP, prior to requesting final inspection the Contractor shall leave the work locations in a neat and presentable condition. This may include but is not limited to mowing, trimming and removal litter, debris, objectionable material, temporary structures, excess materials, and equipment from the work locations.
A precast concrete alternate may be submitted in accordance with the latest version of the Bridge
Design Manual – LRFD. The Contractor must submit the alternate design for review and approval. Acceptance or denial of an alternate is at the sole discretion of the Engineer. All alternate designs must be signed and sealed by a Professional Engineer. Impacts to the project schedule and any additional costs resulting from the use of alternates are the sole responsibility of the Contractor.
Item 7 Legal Relations and Responsibilities:
No significant traffic generator events identified.
Item 8 Prosecution and Progress:
Before beginning work on this project submit in writing, for approval, a plan of construction operations outlining in detail a sequence of work to be followed.
Provide a Bar Chart progress schedule for this project.
Item 9 Measurement and Payment:
Items of work for the Monthly Estimate will be cut off on the 25th of each month. Items of work performed after the 25th will be processed and paid on the following month’s estimate. Material
On Hand (MOH) will cut off on the 20th of each month. Special circumstances will be considered on a case-by-case basis.
Item 100 Preparing Right of Way:
Remove all trees 40 foot from centerline on both sides of roadway. At cross structures, remove trees to ROW line and within 100’ of the structure, parallel to the roadway. Remove underbrush and neatly trim trees and overhanging branches to produce a 60’ vertical clear area within the limits of Prep ROW. Remove any trees or underbrush that interferes with any construction operation, including relocation of ditches or other drainage elements. Receive approval of equipment used to trim limbs. A boom axe will not be allowed. Remove all trimmed debris from the ROW or mulch all debris and incorporate into the topsoil on State ROW to the satisfaction of the Engineer.
County: LAMAR Control: 0688-03-031
Highway: FM 1497 Sheet:
General Notes Sheet C
Item 110 Excavation:
Material below finished subgrade elevation suspected of containing sulfates will be tested in accordance with Tex-145-E by the Department. Treat subgrade material to the required depth and width in accordance with the Soil Sulfates Mitigation General Notes.
Before excavation operations the existing topsoil shall be salvaged in a manner to preserve the vigor of the existing Bermuda grass sod per Item 160.3 Construction.
Item 132 Embankment:
Test potential embankment sources using Tex-145-E to determine the presence and concentration of sulfates. Do not bring soil with greater than 3000 ppm sulfates into project.
Embankment sources containing sulfates that meet specification requirements may be used as fill material provided it is placed with at least one foot of separation from materials to be treated with lime, cement, or other calcium-based stabilizers. When soils are to be placed with less than one foot of separation from material to be treated with lime, cement, or other calcium-based stabilizers, process and treat such soils according to the Soil Sulfates Mitigation General Notes.
Excavation pits for project embankment made within 250 feet of State Right of Way must be approved.
Before embankment operations the existing topsoil shall be salvaged in a manner to preserve the vigor of the existing Bermuda grass sod per Item 160.3 Construction.
Item 158 Specialized Excavation Work:
The purpose of this item is to serve as compensation for cleaning and reshaping ditches to facilitate drainage throughout the project as needed. This work will be performed once toward the end of the project. The locations for this work will be determined by the department. A hydraulic excavator and two dump trucks with a capacity of 12 cubic yards each will be required to perform the work.
Item 164 Seeding for Erosion Control, 166 Fertilizer:
Apply fertilizer with a ratio of 3-1-2 (N-P-K) over the areas to be seeded. This work will not be paid for directly, but will be considered subsidiary.
Item 168 Vegetative Watering:
Use water trucks equipped with a sprinkler system adequate to permit coverage of the entire seeded area from the roadbed. This equipment must be available to perform watering throughout the duration of vegetative establishment.
Water all seeded areas the day seed is applied. Thereafter, maintain the seeded areas in a well-watered condition throughout the duration of vegetative establishment.
County: LAMAR Control: 0688-03-031
Highway: FM 1497 Sheet:
General Notes Sheet D
Item 400 Excavation and Backfill for Structures:
Excavation and backfill for bridge, culvert and Safety End Treatment construction/installation will be subsidiary to Item 464, 466, 467 and 472.
Pavement markings and RPM replacement will be subsidiary to “Cut and Restore Pavement”.
Cut and Restore Pavement: Backfill to top of pipe using HES flowable fill. Use an accelerator that produces a minimum strength of 250 psi in 4 hours. Provide rheofill or equivalent to ensure flowability. Anchor pipes to ensure no movement or displacement by the flowable fill. Furnish paper type cylinder test molds. Place flowable fill from the top of the pipe to within 10” of the existing pavement surface. Place Type B or C HMAC from the top of the flowable fill to the existing roadway surface. These items will be subsidiary to this item and will not be paid for directly.
Any materials necessary to complete the restoration of concrete, asphalt, or flex base driveways shall be subsidiary to this item.
Item 401 Flowable Fill:
Any forms required for placing flowable fill shall be subsidiary to this item.
Item 402 Trench Excavation Protection
Submit a Trench Excavation Protection Plan to the Engineer a minimum of three weeks prior to use. The excavation support plan shall address excavation/protection methods, work sequencing, traffic control, backfill operations, etc.
Item 403 Temporary Special Shoring
Submit a Temporary Special Shoring Plan to the Engineer a minimum of three weeks prior to use. The excavation support plan shall address excavation/protection methods, work sequencing, traffic control, backfill operations, etc.
Item 432 Riprap:
Concrete material salvaged from other areas on the project may be used for stone riprap. Cut protruding rebar within 2” of concrete. Maximum waste concrete cobble size shall match proposed stone riprap Dmax size.
The Engineer may adjust placement of riprap in the field.
Filter fabric is required for stone riprap.
County: LAMAR Control: 0688-03-031
Highway: FM 1497 Sheet:
General Notes Sheet E
Item 464 Reinforced Concrete Pipe:
Required excavation and embankment will be subsidiary to this Item.
Item 466 Headwalls and Wingwalls:
Culvert wingwall construction quantity shall be counted by culvert end, i.e. both wings attached to one culvert end shall be counted as one complete wingwall.
Unless shown in plans to obtain from offsite source, obtain headwall and wingwall backfill from
ROW and perform grading to shape ditch to headwall/wingwall, per Engineers directions. This work will be subsidiary to this Item.
Required excavation, backfill and pipe saw cutting will be subsidiary to this Item.
Removed headwalls and wingwalls may be broken into riprap size pieces (12” average diameter) for use as stone riprap on the project. Broken concrete and riprap must be stored according to the requirements for material stockpiles indicated on the BC standards.
Item 467 Safety End Treatment:
Parallel pipe culverts ~ 30" diameter and smaller require precast SET unless directed by the
Engineer to use cast-in-place SETs when precast SETs would project over 3" above surrounding ground surface or when otherwise indicated in the plans. Additional work to install cast in place
SETs will be subsidiary to this Item.
Cross pipe culverts ~ 30" diameter and smaller require precast SET unless indicated otherwise in the plans.
Repair damage culvert ends prior to SET installation. Straighten CMP ends by straightening or cutting off damaged ends. Paint cut off ends with zinc paint. Repair minor damaged RCP ends with epoxy mortar. This work will be subsidiary to this Item.
When necessary to close connection gaps, grout precast SETs to culvert ends. Materials, labor and equipment will be subsidiary to this item.
On existing CMP parallel culverts with mitered metal ends, construct concrete cast in place SETs or remove the mitered ends and install precast or cast-in-place SETs. Replace/remove existing mitered metal ends that are not 6:1 or flatter.
Required excavation, backfill and pipe saw cutting will be subsidiary to this Item.
County: LAMAR Control: 0688-03-031
Highway: FM 1497 Sheet:
General Notes Sheet F
Unless shown in the plans to obtain backfill from offsite source, obtain SET backfill from the
Right-of-Way. This work will be subsidiary to this Item.
Placement of concrete Riprap between multiple SETs on multiple barrel culverts will be subsidiary to this Item.
During SET installation, unless indicated otherwise in the plans, match SET flow line grade with the culvert flow line grade.
Removal and disposal of existing headwalls and wingwalls for parallel culverts will be subsidiary to this Item.
Removed concrete headwalls and wingwalls may be broken into riprap size pieces (12” average diameter) for use as stone riprap. Cut protruding steel reinforcement flush with surface of concrete. Broken concrete and riprap must be stored according to the requirements for material stockpiles indicated on BC(10)-21.
Prior to SET installation, ensure the slope from the driveway surface to the top of the SET matches the slope of the SET. In addition, also ensure any proposed mailbox turnouts can be constructed without the need for additional pipe. If additional pipe is needed to obtain the desired
SET slope or to construct the mailbox turnout, this will be compensated using the items in the contract. When establishing the proposed parallel pipe / SET flow line elevations, ensure the front slope grade is not steeper than 3:1.
Item 472 Removing and Re-Laying Culvert:
Seal reinforced concrete pipe joints with either the original manufacturers seal or cementitious mortar per DMS-4675.
Required excavation and backfilling will be subsidiary to this Item. Obtain backfill from Right-of-way unless indicated otherwise in the plans.
Item 496 Removing Structures:
Culvert wingwall removal quantity shall be counted by culvert end, i.e. both wings attached to a culvert end shall be counted as one wingwall removal.
County: LAMAR Control: 0688-03-031
Highway: FM 1497 Sheet:
General Notes Sheet G
Item 502 Barricades, Signs and Traffic Handling:
The Contractor Force Account “Safety Contingency” that has been established for this project is intended to be utilized for work zone enhancements, to improve the effectiveness of the Traffic
Control Plan, that could not be foreseen in the project planning and design stage. These enhancements will be mutually agreed upon by the Engineer and the Contractor’s Responsible
Person based on weekly or more frequent traffic management reviews on the project. The
Engineer may choose to use existing bid items if it does not slow the implementation of enhancement.
The following items will be required for flagger on this project:
1. Flaggers are required to wear a white hard hat while performing flagging operations.
2. Flaggers will be required at the intersection of all State maintained roadways.
3. Flaggers may be required at other high traffic generating intersections as deemed necessary by the Area Engineer.
The traffic control plan for this contract consists of the installation and maintenance of warning signs and other traffic control devices shown in the plans, specification data which may be included in the general notes, applicable provisions of the Texas Manual on Uniform Traffic
Control Devices (TMUTCD), traffic control plan sheets included in the plans, standard BC sheets and Item 502 of the Standard Specifications.
Do not begin Item 502, Barricades, Signs, and Traffic Handling, on the roadway until both of the following conditions are met:
1. The work schedule is approved.
2. No more than 5 workdays will pass between the beginning of Item 502 and the actual commencement of roadway work bid items.
The final estimate will be withheld until all disturbed areas are covered with at least 70% perennial vegetative cover.
Correct all deficiencies within the time frame noted on the Traffic Control Device Inspection
Form 599. Failure to make corrections within time frame specified may result in no payment for this Item for the month of the noted deficiency.
Provide shadow vehicles equipped with Truck Mounted Attenuators (TMA) as shown on Traffic
Control Plan (TCP) standards.
Ensure that all travel lanes are open at night.
Road closures must be approved by the Engineer. Provide a two-week advance notice to the
Engineer prior to desired roadway closure period. Begin display of closure information on
PCMBs ten days prior to roadway closure.
County: LAMAR Control: 0688-03-031
Highway: FM 1497 Sheet:
General Notes Sheet H
The traffic control plan for this contract consists of the proper installation and maintenance of warning signs and other traffic control devices shown in the plans, also including the 2024
Standard Specifications, Texas Manual on Uniform Traffic Control Devices (TMUTCD), Traffic
Control plan sheets included in the plans, Traffic Control Standard Sheets and General Notes.
Item 503 Portable Changeable Message Sign:
Two (2) portable changeable message boards are required for advance warning.
Item 505 Truck-Mounted Attenuator (TMA) and Trailer Attenuator (TA):
Shadow vehicles with truck mounted attenuator (TMA) are required on the traffic control plan and TCP standards for this project. The contractor will be responsible for determining if one or more of these traffic control operations will be ongoing at the same time to determine the total number of TMAs needed for the project.
Item 506 Temporary Erosion, Sedimentation & Environmental Controls:
The Temporary Erosion Control measures for this project will consist of using the following items, as directed:
1. Temporary Silt Fence
2. Rock Filter Dams: All rock filter dams shall be installed with 6:1 slopes regardless of their location on the project. Failure to do so will result in no payment for the dam.
Silt fences will remain the property of the Contractor upon completion of the project. The final estimate will not be released until all silt fences have been properly removed, or as directed and 70% establishment of vegetative cover is obtained.
Acquire approval for any change to the location of temporary sediment fence, as shown in the plans, prior to installation. Placement of erosion protection devices may be altered, as directed, to satisfy the requirements of the SWP3.
The pay item to remove rock filter dams will require only a partial removal after 70 percent perennial vegetation has been established and approved. When removing the rock filter dams, leave the lower layer of rock adjacent to the ground in place so as not to disturb the soil.
Refer to the SWP3 sheet for the total disturbed area for the project.
The disturbed area in this project, all project locations in the Contract, and Contractor project specific locations (PSLs) within one mile of the project limits will further establish the authorization requirements for storm water discharges. The Department will obtain an authorization to discharge storm water from the Texas Commission on Environmental Quality (TCEQ) for the construction activities shown on the plans. Obtain any required authorization from the TCEQ for any Contractor PSLs for construction support activities on or off ROW.
When the total area disturbed for all projects in the Contract and PSLs within one mile of the project limits exceeds five acres, provide a copy of the Contractors NOI for PSLs on the ROW (to the appropriate MS4 operator when on an off-system route).
County: LAMAR Control: 0688-03-031
Highway: FM 1497 Sheet:
General Notes Sheet I
Item 540 Metal Beam Guard Fence:
Reinstall removed MBGF and SGT’s on the same day.
MBGF delineation shall be installed within ten (10) working days of the completion of each
MBGF section. Concrete mow strip is not considered to be a part of this work.
Item 542 Removing Metal Beam Guard Fence:
Removed MBGF rail shall be retained by the Contractor.
Removed re-usable MBGF rail shall be stockpiled at the TXDOT Area Office located at
3600 SW Loop 286, Paris TX.
Item 560 Mailbox Assemblies:
Install new mailboxes unless the property owner chooses to have an existing, compliant mailbox reinstalled. Return all custom non-compliant mailboxes to the property owner.
All new mailboxes furnished and installed by the contractor will display the address number using one inch (1”) adhesive back numbering. The color, type, and style of numbering shall be consistent throughout the project.
Install Type 2 Mailbox foundations. Set the mailbox foundations in 12” diameter by 30” deep concrete (Class B) foundations.
Item 644 Small Roadside Sign Assemblies:
Use the Southern Plains style triangular slip base for all post types.
Remove the existing city street and county road topper from city and county signs and install on the new city street and county road stop sign assemblies. This work will be subsidiary to Item
644.
Stake proposed sign locations and obtain Engineer’s approval of locations prior to placing foundations.
Control : 0688-03-031 Project : STP 2026(784)HES
LAMAR
FM 1497Highway :
County :
TEXAS DEPARTMENT OF TRANSPORTATION
GOVERNING SPECIFICATIONS AND SPECIAL PROVISIONS
ALL SPECIFICATIONS AND SPECIAL PROVISIONS APPLICABLE TO THIS PROJECT ARE
IDENTIFIED AS FOLLOWS:
STANDARD SPECIFICATIONS:
PREPARING RIGHT OF WAY(103) (752) ITEM 100
REMOVING CONCRETEITEM 104
EXCAVATION(132) ITEM 110
EMBANKMENT(100) (110) (160) (204) (210) (216) (400) ITEM 132
SPECIALIZED EXCAVATION WORK(132) ITEM 158
SEEDING FOR EROSION CONTROL(162) (166) (168) ITEM 164
VEGETATIVE WATERINGITEM 168
EXCAVATION AND BACKFILL FOR STRUCTURES(110) (132) (401) (402) (403)
(416) (420) (421) (423)
ITEM 400
FLOWABLE BACKFILL(421) ITEM 401
TRENCH EXCAVATION PROTECTIONITEM 402
TEMPORARY SPECIAL SHORING(410) (411) ITEM 403
CONCRETE SUBSTRUCTURES(400) (404) (421) (422) (426) (427) (440) (441)
(448)
ITEM 420
CONCRETE STRUCTURE REPAIR(421) (431) (440) (780) ITEM 429
RIPRAP(247) (420) (421) (431) (440) ITEM 432
REINFORCED CONCRETE PIPE(400) (402) (403) (420) (421) (424) (440) (462)
(465) (467) (471) (476)
ITEM 464
HEADWALLS AND WINGWALLS(400) (420) (421) (432) (440) (464) ITEM 466
SAFETY END TREATMENT(400) (420) (421) (432) (440) (442) (445) (460) (464) ITEM 467
REMOVING AND RE-LAYING CULVERT(400) (402) (403) (460) (462) (464) (476) ITEM 472
CLEANING EXISTING CULVERTSITEM 480
REMOVING STRUCTURESITEM 496
MOBILIZATIONITEM 500
BARRICADES, SIGNS, AND TRAFFIC HANDLING(503) (505) (510) ITEM 502
PORTABLE CHANGEABLE MESSAGE SIGNITEM 503
TRUCK-MOUNTED ATTENUATOR (TMA) AND TRAILER ATTENUATOR (TA)ITEM 505
TEMPORARY EROSION, SEDIMENTATION, AND ENVIRONMENTAL CONTROLS
(161) (432) (556)
ITEM 506
INTERSECTIONS, DRIVEWAYS, AND TURNOUTS(247) (260) (275) (276) (292)
(316) (330) (334) (360) (421) (440)
ITEM 530
METAL BEAM GUARD FENCE(421) (441) (445) (492) (529) ITEM 540
REMOVING METAL BEAM GUARD FENCEITEM 542
GUARDRAIL END TREATMENTSITEM 544
ITEMS 1-9 INCL., GENERAL REQUIREMENTS AND COVENANTS
ADOPTED BY THE TEXAS DEPARTMENT OF TRANSPORTATION
SEPTEMBER 1, 2024.
STANDARD SPECIFICATIONS ARE INCORPORATED INTO THE
CONTRACT BY REFERENCE.
1-2
GENERAL :
THE ABOVE-LISTED SPECIFICATIONS ITEMS ARE THOSE UNDER WHICH
PAYMENT IS TO BE MADE. THESE, TOGETHER WITH SUCH OTHER PERTINENT
ITEMS, IF ANY, AS MAY BE REFERRED TO IN THE ABOVE-LISTED
SPECIFICATION ITEMS, AND INCLUDING THE SPECIAL PROVISIONS LISTED
ABOVE, CONSTITUTE THE COMPLETE SPECIFICATIONS FOR THIS PROJECT.
SPECIAL PROVISIONS :
SPECIAL PROVISIONS WILL GOVERN AND TAKE PRECEDENCE OVER
THE SPECIFICATIONS ENUMERATED HEREON WHEREVER IN
CONFLICT THEREWITH.
SPECIAL SPECIFICATIONS :
MAILBOX ASSEMBLIESITEM 560
SMALL ROADSIDE SIGN ASSEMBLIES(421) (440) (441) (442) (445) (636) (656) ITEM 644
DELINEATOR AND OBJECT MARKER ASSEMBLIES(445) ITEM 658
CONCRETE CRACK REPAIRITEM 780
"NONDISCRIMINATION" (000---001) SPECIAL PROVISION
"CERTIFICATION OF NONDISCRIMINATION IN EMPLOYMENT" (000---
002)
SPECIAL PROVISION
"ON-THE-JOB TRAINING PROGRAM" (000---004) SPECIAL PROVISION
"CARGO PREFERENCE ACT REQUIREMENTS IN FEDERAL AID
CONTRACTS" (000---007)
SPECIAL PROVISION
"CERTIFICATE OF INTERESTED PARTIES (FORM 1295)" (000---017) SPECIAL PROVISION
"SCHEDULE OF LIQUIDATED DAMAGES" (000---031) SPECIAL PROVISION
"NOTICE OF CONTRACTOR PERFORMANCE EVALUATIONS" (000---
125)
SPECIAL PROVISION
(002---003) SPECIAL PROVISION TO ITEM 002
(003---006) SPECIAL PROVISION TO ITEM 003
(006---009) SPECIAL PROVISION TO ITEM 006
(007---001) SPECIAL PROVISION TO ITEM 007
(009---002) SPECIAL PROVISION TO ITEM 009
(292---001) SPECIAL PROVISION TO ITEM 292
(540---001) SPECIAL PROVISION TO ITEM 540
REQUIRED CONTRACT PROVISIONS. ALL FEDERAL-AID PROJECTS (REV. 10-23) (FORM
FHWA 1273)
WAGE RATES
2-2
Highway FM 1497 County LAMAR
DISADVANTAGED BUSINESS ENTERPRISES
REQUIREMENTS
The following goal for disadvantaged business enterprises is established:
DBE
0%
CHILD SUPPORT STATEMENT
Under section 231.006, Family Code, the vendor or applicant certifies that the individual or business entity named in this contract, bid, or application is not ineligible to receive the specified grant, loan, or payment and acknowledges that this contract may be terminated and payment may be withheld if this certification is inaccurate.
CONFLICT OF INTEREST CERTIFICATION
Pursuant to Texas Government Code Section 2261.252(b), the Department is prohibited from entering into contracts in which Department officers and employees have a financial interest.
By signing the Contract, the Contractor certifies that it is not prohibited from entering into a Contract with the Department as a result of a financial interest as defined under Texas Government Code Section 2261.252(b), and that it will exercise reasonable care and diligence to prevent any actions or conditions that could result in a conflict of interest with the Department.
The Contractor also certifies that none of the following individuals, nor any of their family members within the second degree of affinity or consanguinity, owns 1% or more interest or has a financial interest as defined under Texas Government Code Section 2261.252(b) in the Contractor:
Any member of the Texas Transportation Commission; and The Department’s Executive Director, General Counsel, Chief of Procurement and Field Support
Operations, Director of Procurement, and Director of Contract Services.
Violation of this certification may result in action by the Department.
E-VERIFY CERTIFICATION
Pursuant to Texas Transportation Code §223.051, all TxDOT contracts for construction, maintenance, or improvement of a highway must include a provision requiring Contractors and subcontractors to use the U.S. Department of Homeland Security’s E-Verify system to determine employment eligibility. By signing the contract, the Contractor certifies that prior to the award of the Contract:
the Contractor has registered with and will, to the extent permitted by law, utilize the United States Department of Homeland Security’s E-Verify system during the term of the Contract to determine the eligibility of all persons hired to perform duties within Texas during the term of the agreement; and the Contractor will require that all subcontractors also register with and, to the extent permitted by law, utilize the United States Department of Homeland Security’s E-Verify system during the term of the subcontract to determine the eligibility of all persons hired to perform duties within Texas during the term of the agreement.
Violation of this requirement constitutes a material breach of the Contract, subjects a subcontractor to removal from the Contract, and subjects the Contractor or subcontractors to possible sanctions in accordance with Title 43, Texas Administrative Code, Chapter 10, Subchapter F, “Sanctions and Suspension for Ethical Violations by Entities Doing Business with the Department.”
_BPSDocName 1-1
Certification Regarding Disclosure of Public Information Pursuant to Subchapter J, Chapter 552, Texas Government Code,…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .