06 FTQW 17-1017 Submittal Register.pdf

PDF 126 KB Posted

Attached to
FTQW 17-1017, REPAIR FIRE PUMP - Awarded Federal contract opportunity
Solicitation number
FA500422R0008
Issued by
Department of the Air Force Pacific Air Forces

About this file

This document is a construction submittal register for a federal contract to replace a fire pump at Eielson Air Force Base in Alaska. The contract number is FTQW 17-1017 and was awarded as a total small business set-aside. The contractor must provide all labor, materials, equipment, transportation, and supervision to demolish an existing inoperable fire pump and replace it with a new fire pump and associated components. The performance period is 228 calendar days. The submittal register lists 89 submittal items required from the contractor organized by specification section that will require government approval, including plans, schedules, permits, training records, as-built drawings, operation and maintenance manuals, and warranties. Key due dates for the contractor include submitting the names of personnel attending a mandatory site visit by May 30th, any questions about site conditions by June 8th, and proposals in PDF format by email by June 29th at 2:00PM Alaska Standard Time.

View the file

Other files for this federal contract opportunity

Other files attached to FTQW 17-1017, REPAIR FIRE PUMP - Awarded, newest first.
File Type Posted
FTQW 17-1017 Repair Fire Pump Notice of Award (1).pdf PDF
Solicitation Amendment FA500422R00080005 SF 30.pdf PDF
02 FTQW 17-1017 SOW Rpr Fire Pump B3426 5 Aug 22.pdf PDF
Solicitation Amendment FA500422R00080004 SF 30 (1).pdf PDF
Attachment 09 FTQW 17-1017 Fire Pump Solicitation QnA.xlsx XLSX spreadsheet
Attachment 09 FTQW 17-1017 Fire Pump Solicitation Q and A 7 July 2022.xlsx XLSX spreadsheet
Solicitation Amendment FA500422R00080003 SF 30.pdf PDF
20160609_092016.jpg JPG image
Attachment 09 FTQW 17-1017 Fire Pump Solicitation Q and A.pdf PDF
Solicitation Amendment FA500422R00080002 SF 30.pdf PDF
Solicitation Amendment FA500422R00080001 SF 30.pdf PDF
Solicitation Amendment - FA500422R00080001.pdf PDF
09 FTQW 17-1017 RPR Fire Pump B3426 Questions.xlsx XLSX spreadsheet
05 FTQW 17-1017 Fire Pump As-Builts PDF.pdf PDF
08 FTQW 17-1017 Wage Determination 15 April 2022.pdf PDF
07 FTQW 17-1017 Price Schedule.pdf PDF
01 FTQW 17-1017 RFP Replace Fire Pump Bldg 3426.pdf PDF
05 FTQW 17-1017 REPAIR FIRE PUMP As-Builts.zip ZIP file
04 FTQW 17-1017 Project Specifications 1 DEC 21.pdf PDF
03 FTQW 17-1017 Proposed Mezzanine plan B3426 1 DEC 21.pdf PDF
02 FTQW 17-1017 SOW Rpr Fire Pump B3426 5 April 22.pdf PDF
Solicitation - FA500422R0008.pdf PDF
Show all 22

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(a) (b) (c) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

Line

Acti vity

Trans-mittal #

Specification Section

SD

# Submittal Description Item Submitted

Paragraph

Classificati on: GOVT or A/E Revwr Submit

Approval Needed

By

Material Needed

By Action Code

Date Of Action

Date FWD to APPR / Auth Date RCD From

CONTR

Date FWD To

Other Revwr

Date

RCD

From Other Revwr

Action Code

Date Of Action

Mailed To

CONTR/

Date RCD From

APPR

Authority Remarks

01 20 00 01 Preconstruction Submittals Schedule of Prices 1.3 G

1 01 30 00 01 Preconstruction Submittals View Location Map 1.4

2 01 30 00 01 Preconstruction Submittals Progress and Completion Pictures 1.5

3 01 30 00 04 Samples Color Boards 1.3

4 01 32 16.00 20 01 Preconstruction Submittals Baseline Construction Schedule 1.2 G

5 01 32 16.00 20 07 Certificates Monthly Updates 1.4 G

6 01 33 00 01 Preconstruction Submittals Submittal Register 1.7 G

7 01 35 13 01 Preconstruction Submittals Construction Operation Plan 3.1 G

8 01 35 26 01 Preconstruction Submittals Accident Prevention Plan (APP) 1.6 G

9 01 35 26 06 Test Reports Notifications and Reports 1.11

10 01 35 26 06 Test Reports Accident Reports 1.11.2 G

11 01 35 26 06 Test Reports LHE Inspection Reports 1.11.3

12 01 35 26 07 Certificates Crane Operators/Riggers 1.5.1.4

13 01 35 26 07 Certificates Standard Lift Plan 1.6.2.2

14 01 35 26 07 Certificates Critical Lift Plan 1.6.2.3 G

15 01 35 26 07 Certificates Activity Hazard Analysis (AHA) 1.7

16 01 35 26 07 Certificates Confined Space Entry Permit 1.8.1

17 01 35 26 07 Certificates Hot Work Permit 1.8.1 G

18 01 35 26 07 Certificates Certificate of Compliance 1.11.4

19 01 35 26 07 Certificates License Certificates 1.13

20 01 45 00.00 10 01 Preconstruction Submittals Contractor Quality Control (CQC) Plan 3.2 G

21 01 45 00.00 10 06 Test Reports Verification Statement 3.5.2

22 01 50 00 01 Preconstruction Submittals Construction Site Plan 1.3 G

23 01 50 00 01 Preconstruction Submittals Traffic Control Plan 2.2 G

24 01 57 19 01 Preconstruction Submittals Preconstruction Survey 1.6.1

25 01 57 19 01 Preconstruction Submittals Regulatory Notifications 1.6.2

26 01 57 19 01 Preconstruction Submittals Environmental Protection Plan (EPP)

27 01 57 19 01 Preconstruction Submittals Stormwater Notice of Intent and copy of ADEC approval

28 01 57 19 01 Preconstruction Submittals Dirt and Dust Control Plan 1.7.11.1

29 01 57 19 01 Preconstruction Submittals Employee Training Records 1.6.5

30 01 57 19 01 Preconstruction Submittals Environmental Manager Qualifications 1.6.4

31 01 57 19 01 Preconstruction Submittals Completed Checklist For Spruce Lake Disposal G

32 01 57 19 01 Preconstruction Submittals Notice of Intent For Asbestos Abatement

33 01 57 19 01 Preconstruction Submittals Notice Of Building Demolition

APPROVING AUTHORITY

(d)

CONTRACTOR SCHEDULE

DATES

CONTRACTOR

ACTION

TITLE: CONSTRUCTION DOCUMENT

SUBMITTAL REGISTER

JOB NAME: Replace Fire Pump, B2536

LOCATION: EIELSON AFB, ALASKA

CONTRACT NO: FTQW 17-1017

CONTRACTOR:

APPROVING AUTHORITY

(d)

CONTRACTOR SCHEDULE

DATES

CONTRACTOR

ACTION

TITLE: CONSTRUCTION DOCUMENT

SUBMITTAL REGISTER

JOB NAME: Replace Fire Pump, B2536

LOCATION: EIELSON AFB, ALASKA

CONTRACT NO: FTQW 17-1017

CONTRACTOR:

34 01 57 19 01 Preconstruction Submittals Stormwater Pollution Prevention Plan

(SWPPP)

35 01 57 19 01 Preconstruction Submittals Evidence Of Delivery Of SWPPP to

ADEC

36 01 57 19 01 Preconstruction Submittals Contaminated Soil Sampling And Analysis Plan (SAP)

37 01 57 19 01 Preconstruction Submittals Contaminated Soil Sampling And Analysis Field Report

38 01 57 19 01 Preconstruction Submittals Initial Contractor Hazardous Material Inventory G

38 01 57 19 01 Preconstruction Submittals EAFB Waste Disposal Disposal, Borrow pit Worksheet G

39 01 57 19 06 Test Reports Laboratory Analysis 3.7.1.1.2

40 01 57 19 06 Test Reports Inspection Reports 3.2.1.3

41 01 57 19 06 Test Reports Solid Waste Management Report 3.7.2.1

42 01 57 19 07 Certificates Employee Training Records 1.6.5

43 01 57 19 07 Certificates Erosion and Sediment Control Inspector 1.6.5

44 01 57 19 07 Certificates ADEC Transport, Treatment, & Disposal Approval Form For Contaminated Media (ATT)

G

45 01 57 19 11 Closeout Submittals Stormwater Pollution Prevention Plan Compliance Notebook 3.2.1.4

46 01 57 19 11 Closeout Submittals Stormwater Notice of Termination to

ADEC

47 01 57 19 11 Closeout Submittals Waste Determination Documentation 3.7.1

48 01 57 19 11 Closeout Submittals Disposal Documentation for Hazardous and Regulated Waste 3.7.3.6 G

49 01 57 19 11 Closeout Submittals Assembled Employee Training Records 1.6.5

50 01 57 19 11 Closeout Submittals Solid Waste Management Permit G

51 01 57 19 11 Closeout Submittals Solid Waste Management Report 3.7.2.1 G

52 01 57 19 11 Closeout Submittals Hazardous Waste/Debris Management 3.7.3.1 G

53 01 57 19 11 Closeout Submittals Regulatory Notifications 1.6.2

54 01 57 19 11 Closeout Submittals Sales Documentation 3.7.2.1

55 01 57 19 11 Closeout Submittals Contractor Certification

56 01 57 19 11 Closeout Submittals As-Built Topographic Survey

57 01 57 19 11 Closeout Submittals ADEC Approved Disposal Facility Weight and/or Acceptance Ticket for Contaminated Soil

G

58 01 57 19 11 Closeout Submittals

ADEC Approved Disposal Facility Certificate of Thermal Incineration or Disposal of Contaminated Soil along with Confirmatory Sample Results

G

59 01 74 19 01 Preconstruction Submittals Waste Management Plan 1.6 G

60 01 78 00 03 Product Data Manufacturer's Warranties G

61 01 78 00 03 Product Data Warranty Management Plan 1.6.1 G

62 01 78 00 03 Product Data Warranty Tags 1.6.3 G

63 01 78 00 03 Product Data Spare Parts Data 1.4

64 01 78 00 08 Manufacturer’s Instructions Posted Instructions 1.6.1 G

(d)

CONTRACTOR SCHEDULE

DATES

CONTRACTOR

ACTION

TITLE: CONSTRUCTION DOCUMENT

SUBMITTAL REGISTER

JOB NAME: Replace Fire Pump, B2536

LOCATION: EIELSON AFB, ALASKA

CONTRACT NO: FTQW 17-1017

CONTRACTOR:

65 01 78 00 10 Operation and Maintenance Data Operation and Maintenance Manuals 3.6 G

66 01 78 00 11 Closeout Submittals As-Built Drawings 2.1 G

67 01 78 00 11 Closeout Submittals As-Built Record of Equipment and Materials 2.1 G

68 01 78 00 11 Closeout Submittals Final Approved Shop Drawings 2.1 G 69 01 78 00 11 Closeout Submittals Interim DD Form 1354 3.8 G

70 01 78 00 11 Closeout Submittals Checklist For DD Form 1354 3.8 G

71 01 78 23 10 Operation and Maintenance Data O&M Database 1.3 G

72 01 78 23 10 Operation and Maintenance Data Training Plan 3.1.1

73 01 78 23 10 Operation and Maintenance Data Training Outline 3.1.3

74 01 78 23 10 Operation and Maintenance Data Training Content 3.1.2

75 01 78 23 11 Closeout Submittals Training Video Recording 3.1.4

76 01 78 23 11 Closeout Submittals Validation of Training Completion 3.1.6

77 02 41 00 01 Preconstruction Submittals Demolition/Deconstruction Plan 1.2.2 G

78 02 41 00 01 Preconstruction Submittals Existing Conditions 1.11

79 02 41 00 07 Certificates Notification 1.7 G

80 02 41 00 11 Closeout Submittals Receipts 3.3.4 G

81 21 30 00 01 Preconstruction Submittals Fire Protection Specialist G

82 21 30 00 02 Shop Drawings Installation Drawings G

83 21 30 00 02 Shop Drawings As-Built Drawings G

84 21 30 00 02 Shop Drawings Piping Layout G

85 21 30 00 02 Shop Drawings Pump Room G

86 21 30 00 03 Product Data Catalog Data G

87 21 30 00 03 Product Data Field Tests G

88 21 30 00 03 Product Data Manufacturer's Representative G

89 21 30 00 03 Product Data Field Training G

90 21 30 00 07 Certificates Fire Protection Specialist G

91 21 30 00 10 Flow Meter Operating and Maintenance Instructions

(d)

CONTRACTOR SCHEDULE

DATES

CONTRACTOR

ACTION

TITLE: CONSTRUCTION DOCUMENT

SUBMITTAL REGISTER

JOB NAME: Replace Fire Pump, B2536

LOCATION: EIELSON AFB, ALASKA

CONTRACT NO: FTQW 17-1017

CONTRACTOR: