This document is a construction submittal register for a federal contract to replace a fire pump at Eielson Air Force Base in Alaska. The contract number is FTQW 17-1017 and was awarded as a total small business set-aside. The contractor must provide all labor, materials, equipment, transportation, and supervision to demolish an existing inoperable fire pump and replace it with a new fire pump and associated components. The performance period is 228 calendar days. The submittal register lists 89 submittal items required from the contractor organized by specification section that will require government approval, including plans, schedules, permits, training records, as-built drawings, operation and maintenance manuals, and warranties. Key due dates for the contractor include submitting the names of personnel attending a mandatory site visit by May 30th, any questions about site conditions by June 8th, and proposals in PDF format by email by June 29th at 2:00PM Alaska Standard Time.
View the file
Other files for this federal contract opportunity
Show all 22
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(a) (b) (c) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
Line
Acti vity
Trans-mittal #
Specification Section
SD
# Submittal Description Item Submitted
Paragraph
Classificati on: GOVT or A/E Revwr Submit
Approval Needed
By
Material Needed
By Action Code
Date Of Action
Date FWD to APPR / Auth Date RCD From
CONTR
Date FWD To
Other Revwr
Date
RCD
From Other Revwr
Action Code
Date Of Action
Mailed To
CONTR/
Date RCD From
APPR
Authority Remarks
01 20 00 01 Preconstruction Submittals Schedule of Prices 1.3 G
1 01 30 00 01 Preconstruction Submittals View Location Map 1.4
2 01 30 00 01 Preconstruction Submittals Progress and Completion Pictures 1.5
3 01 30 00 04 Samples Color Boards 1.3
4 01 32 16.00 20 01 Preconstruction Submittals Baseline Construction Schedule 1.2 G
5 01 32 16.00 20 07 Certificates Monthly Updates 1.4 G
6 01 33 00 01 Preconstruction Submittals Submittal Register 1.7 G
7 01 35 13 01 Preconstruction Submittals Construction Operation Plan 3.1 G
8 01 35 26 01 Preconstruction Submittals Accident Prevention Plan (APP) 1.6 G
9 01 35 26 06 Test Reports Notifications and Reports 1.11
10 01 35 26 06 Test Reports Accident Reports 1.11.2 G
11 01 35 26 06 Test Reports LHE Inspection Reports 1.11.3
12 01 35 26 07 Certificates Crane Operators/Riggers 1.5.1.4
13 01 35 26 07 Certificates Standard Lift Plan 1.6.2.2
14 01 35 26 07 Certificates Critical Lift Plan 1.6.2.3 G
15 01 35 26 07 Certificates Activity Hazard Analysis (AHA) 1.7
16 01 35 26 07 Certificates Confined Space Entry Permit 1.8.1
17 01 35 26 07 Certificates Hot Work Permit 1.8.1 G
18 01 35 26 07 Certificates Certificate of Compliance 1.11.4
19 01 35 26 07 Certificates License Certificates 1.13
20 01 45 00.00 10 01 Preconstruction Submittals Contractor Quality Control (CQC) Plan 3.2 G
21 01 45 00.00 10 06 Test Reports Verification Statement 3.5.2
22 01 50 00 01 Preconstruction Submittals Construction Site Plan 1.3 G
23 01 50 00 01 Preconstruction Submittals Traffic Control Plan 2.2 G
24 01 57 19 01 Preconstruction Submittals Preconstruction Survey 1.6.1
25 01 57 19 01 Preconstruction Submittals Regulatory Notifications 1.6.2
26 01 57 19 01 Preconstruction Submittals Environmental Protection Plan (EPP)
27 01 57 19 01 Preconstruction Submittals Stormwater Notice of Intent and copy of ADEC approval
28 01 57 19 01 Preconstruction Submittals Dirt and Dust Control Plan 1.7.11.1
29 01 57 19 01 Preconstruction Submittals Employee Training Records 1.6.5
30 01 57 19 01 Preconstruction Submittals Environmental Manager Qualifications 1.6.4
31 01 57 19 01 Preconstruction Submittals Completed Checklist For Spruce Lake Disposal G
32 01 57 19 01 Preconstruction Submittals Notice of Intent For Asbestos Abatement
33 01 57 19 01 Preconstruction Submittals Notice Of Building Demolition
APPROVING AUTHORITY
(d)
CONTRACTOR SCHEDULE
DATES
CONTRACTOR
ACTION
TITLE: CONSTRUCTION DOCUMENT
SUBMITTAL REGISTER
JOB NAME: Replace Fire Pump, B2536
LOCATION: EIELSON AFB, ALASKA
CONTRACT NO: FTQW 17-1017
CONTRACTOR:
APPROVING AUTHORITY
(d)
CONTRACTOR SCHEDULE
DATES
CONTRACTOR
ACTION
TITLE: CONSTRUCTION DOCUMENT
SUBMITTAL REGISTER
JOB NAME: Replace Fire Pump, B2536
LOCATION: EIELSON AFB, ALASKA
CONTRACT NO: FTQW 17-1017
CONTRACTOR:
34 01 57 19 01 Preconstruction Submittals Stormwater Pollution Prevention Plan
(SWPPP)
35 01 57 19 01 Preconstruction Submittals Evidence Of Delivery Of SWPPP to
ADEC
36 01 57 19 01 Preconstruction Submittals Contaminated Soil Sampling And Analysis Plan (SAP)
37 01 57 19 01 Preconstruction Submittals Contaminated Soil Sampling And Analysis Field Report
38 01 57 19 01 Preconstruction Submittals Initial Contractor Hazardous Material Inventory G
38 01 57 19 01 Preconstruction Submittals EAFB Waste Disposal Disposal, Borrow pit Worksheet G
39 01 57 19 06 Test Reports Laboratory Analysis 3.7.1.1.2
40 01 57 19 06 Test Reports Inspection Reports 3.2.1.3
41 01 57 19 06 Test Reports Solid Waste Management Report 3.7.2.1
42 01 57 19 07 Certificates Employee Training Records 1.6.5
43 01 57 19 07 Certificates Erosion and Sediment Control Inspector 1.6.5
44 01 57 19 07 Certificates ADEC Transport, Treatment, & Disposal Approval Form For Contaminated Media (ATT)
G
45 01 57 19 11 Closeout Submittals Stormwater Pollution Prevention Plan Compliance Notebook 3.2.1.4
46 01 57 19 11 Closeout Submittals Stormwater Notice of Termination to
ADEC
47 01 57 19 11 Closeout Submittals Waste Determination Documentation 3.7.1
48 01 57 19 11 Closeout Submittals Disposal Documentation for Hazardous and Regulated Waste 3.7.3.6 G
49 01 57 19 11 Closeout Submittals Assembled Employee Training Records 1.6.5
50 01 57 19 11 Closeout Submittals Solid Waste Management Permit G
51 01 57 19 11 Closeout Submittals Solid Waste Management Report 3.7.2.1 G
52 01 57 19 11 Closeout Submittals Hazardous Waste/Debris Management 3.7.3.1 G
53 01 57 19 11 Closeout Submittals Regulatory Notifications 1.6.2
54 01 57 19 11 Closeout Submittals Sales Documentation 3.7.2.1
55 01 57 19 11 Closeout Submittals Contractor Certification
56 01 57 19 11 Closeout Submittals As-Built Topographic Survey
57 01 57 19 11 Closeout Submittals ADEC Approved Disposal Facility Weight and/or Acceptance Ticket for Contaminated Soil
G
58 01 57 19 11 Closeout Submittals
ADEC Approved Disposal Facility Certificate of Thermal Incineration or Disposal of Contaminated Soil along with Confirmatory Sample Results
G
59 01 74 19 01 Preconstruction Submittals Waste Management Plan 1.6 G
60 01 78 00 03 Product Data Manufacturer's Warranties G
61 01 78 00 03 Product Data Warranty Management Plan 1.6.1 G
62 01 78 00 03 Product Data Warranty Tags 1.6.3 G
63 01 78 00 03 Product Data Spare Parts Data 1.4
64 01 78 00 08 Manufacturer’s Instructions Posted Instructions 1.6.1 G
(d)
CONTRACTOR SCHEDULE
DATES
CONTRACTOR
ACTION
TITLE: CONSTRUCTION DOCUMENT
SUBMITTAL REGISTER
JOB NAME: Replace Fire Pump, B2536
LOCATION: EIELSON AFB, ALASKA
CONTRACT NO: FTQW 17-1017
CONTRACTOR:
65 01 78 00 10 Operation and Maintenance Data Operation and Maintenance Manuals 3.6 G
66 01 78 00 11 Closeout Submittals As-Built Drawings 2.1 G
67 01 78 00 11 Closeout Submittals As-Built Record of Equipment and Materials 2.1 G
68 01 78 00 11 Closeout Submittals Final Approved Shop Drawings 2.1 G 69 01 78 00 11 Closeout Submittals Interim DD Form 1354 3.8 G
70 01 78 00 11 Closeout Submittals Checklist For DD Form 1354 3.8 G
71 01 78 23 10 Operation and Maintenance Data O&M Database 1.3 G
72 01 78 23 10 Operation and Maintenance Data Training Plan 3.1.1
73 01 78 23 10 Operation and Maintenance Data Training Outline 3.1.3
74 01 78 23 10 Operation and Maintenance Data Training Content 3.1.2
75 01 78 23 11 Closeout Submittals Training Video Recording 3.1.4
76 01 78 23 11 Closeout Submittals Validation of Training Completion 3.1.6
77 02 41 00 01 Preconstruction Submittals Demolition/Deconstruction Plan 1.2.2 G
78 02 41 00 01 Preconstruction Submittals Existing Conditions 1.11
79 02 41 00 07 Certificates Notification 1.7 G
80 02 41 00 11 Closeout Submittals Receipts 3.3.4 G
81 21 30 00 01 Preconstruction Submittals Fire Protection Specialist G
82 21 30 00 02 Shop Drawings Installation Drawings G
83 21 30 00 02 Shop Drawings As-Built Drawings G
84 21 30 00 02 Shop Drawings Piping Layout G
85 21 30 00 02 Shop Drawings Pump Room G
86 21 30 00 03 Product Data Catalog Data G
87 21 30 00 03 Product Data Field Tests G
88 21 30 00 03 Product Data Manufacturer's Representative G
89 21 30 00 03 Product Data Field Training G
90 21 30 00 07 Certificates Fire Protection Specialist G
91 21 30 00 10 Flow Meter Operating and Maintenance Instructions
(d)
CONTRACTOR SCHEDULE
DATES
CONTRACTOR
ACTION
TITLE: CONSTRUCTION DOCUMENT
SUBMITTAL REGISTER
JOB NAME: Replace Fire Pump, B2536
LOCATION: EIELSON AFB, ALASKA
CONTRACT NO: FTQW 17-1017
CONTRACTOR:
File details come from the government source that posted it. Updated .