This document is an Exhibit B-1 Rate Sheet related to a Master Agreement for Concrete Pumping Services issued by the California Department of Corrections and Rehabilitation (CDCR) Inmate/Ward Labor Program. The Master Agreement covers concrete pumping services on an as-needed basis at multiple CDCR facilities across the state. The Rate Sheet outlines the scope of work, including various boom sizes, pump types, and estimated quantities for each facility group. Bidders may bid on one or more facility groups, but must bid on all locations within each group. The contract term and renewal options are not specified.

The Rate Sheet requires bidders to provide unit prices for the specified services and equipment. The State estimates a total contract value of $3,250,000, with the ability to augment the contract by 25-100% of the bid amount. Bidders must offer a minimum 1% discount for invoices paid within 30 days. The award will be made to the lowest responsible bidder with the highest discount.

View the file

Other files

File Type Posted
00_IFB_C5611982-D.pdf PDF
Addendum_1_Letter.pdf PDF
Exhibit_B-1_Rate_Sheet.xlsx XLSX spreadsheet

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1-ASP-PVSP

CONCRETE PUMPING SERVICES
INMATE/WARD LABOR PROGRAM
AVENAL STATE PRISON (ASP)

PLEASANT VALLEY STATE PRISON (PVSP)

Electronic bid packages include an Excel version of this Exhibit B-1, Rate Sheet in addition to the PDF file in order to assist bidders in computing bid totals. Bidders are encouraged to download the Excel version and complete all highlighted cells.
NOTE: Bidders may bid on one (1) or more Institution groups. Bidders are not required to bid on all groups. However, if bidding on a group, your bid shall be for all locations within each group. Each item within the selected group you are bidding, must be completed. Failure to indicate a dollar amount (BLANK CELL) in any item may be grounds for rejection. A zero dollar ($0.00 or $-) listed for any and/or all items shall be interpreted and understood by the State to mean that the bidder shall perform any such services at NO COST to the State. Rates must include all fees and taxes.
Any quantities listed in Exhibit B-1, Rate Sheet are CDCR's estimates only. The State does not expressly or by implication agree that the actual amount of work will correspond therewith and reserves the right to omit portions of the work as may be deemed necessary or advisable by the State.
All prices and notations must be printed in ink or typewritten. All prices must be in U. S. currency.
The "Basis of Award" for each Group is strictly used for bidding purposes only to determine the lowest responsive bidder. The CDCR reserves the right to augment this Master Agreement dollar amount by 25 - 100% of the total bid amount.
NOTE: The State makes no guarantee that any Institution which is included in this bid package will request services.
GROUP 1: ASP, PVSP
A. 85' Boom (or equivalent)RatexEstimated Quantity=Total
1. Rate per hour for Equipment & Operator$ - 0x1,312Hours=$ - 0
2. Rate per yard$ - 0x2,100Yards=$ - 0
3. Total Fee for Setup/Cleanup & Round Trip Travel$ - 0x164Trips=$ - 0
Item A Subtotal (Sum of 1 + 2 + 3)=$ - 0
B. 100' Boom (or equivalent)RatexEstimated Quantity=Total
1. Rate per hour for Equipment & Operator$ - 0x1,312Hours=$ - 0
2. Rate per yard$ - 0x2,100Yards=$ - 0
3. Total Fee for Setup/Cleanup & Round Trip Travel$ - 0x164Trips=$ - 0
Item B Subtotal (Sum of 1 + 2 + 3)=$ - 0
C. 120' Boom (or equivalent)RatexEstimated Quantity=Total
1. Rate per hour for Equipment & Operator$ - 0x1,344Hours=$ - 0
2. Rate per yard$ - 0x2,300Yards=$ - 0
3. Total Fee for each trip Setup/Cleanup & Round Trip Travel$ - 0x168Trips=$ - 0
Item C Subtotal (Sum of 1 + 2 + 3)=$ - 0
D. Maximum 1" aggregate hose pumpRatexEstimated Quantity=Total
1. Rate per hour for Equipment & Operator$ - 0x1,344Hours=$ - 0
2. Rate per yard$ - 0x2,300Yards=$ - 0
3. Total Fee for Setup/Cleanup & Round Trip Travel$ - 0x168Trips=$ - 0
Item D Subtotal (Sum of 1 + 2 + 3)=$ - 0
E. 3/8" Pea gravel line hose pumpRatexEstimated Quantity=Total
1. Rate per hour for Equipment & Operator$ - 0x1,312Hours=$ - 0
2. Rate per yard$ - 0x2,100Yards=$ - 0
3. Total Fee for Setup/Cleanup & Round Trip Travel$ - 0x164Trips=$ - 0
Item E Subtotal (Sum of 1 + 2 + 3)=$ - 0
F. Grout pumpRatexEstimated Quantity=Total
1. Rate per hour for Equipment & Operator$ - 0x1,296Hours=$ - 0
2. Rate per yard$ - 0x2,000Yards=$ - 0
3. Total Fee for Setup/Cleanup & Round Trip Travel$ - 0x162Trips=$ - 0
Item F Subtotal (Sum of 1 + 2 + 3)=$ - 0
GRAND TOTAL (SUM OF ITEMS A, B, C, D, E, AND F)=$ - 0
BASIS OF AWARD

The Agreement shall be written for the State's Estimate of $3,250,000.00

Contractor may offer a discount on invoices in order for the invoices to be paid within 30 days of receipt Discount offered must be at least one (1) percent of the amount and a minimum of $50.00.

Discount offered on invoices to be paid within 30 days of receipt=%
In the event of a tie absent other determining factors, the lowest responsible bid with the highest discount shall prevail.

&"Arial,Regular"TBB California Department of Corrections and Rehabilitation (CDCR) Rate Sheet &"Arial,Regular"Bid Number C5611982-D Exhibit B-1

&"Arial,Regular"Page &P of &N

2-CAL-CEN

CONCRETE PUMPING SERVICES
INMATE/WARD LABOR PROGRAM
CALIPATRIA STATE PRISON (CAL)

CENTINELA STATE PRISON (CEN)

Electronic bid packages include an Excel version of this Exhibit B-1, Rate Sheet in addition to the PDF file in order to assist bidders in computing bid totals. Bidders are encouraged to download the Excel version and complete all highlighted cells.
NOTE: Bidders may bid on one (1) or more Institution groups. Bidders are not required to bid on all groups. However, if bidding on a group, your bid shall be for all locations within each group. Each item within the selected group you are bidding, must be completed. Failure to indicate a dollar amount (BLANK CELL) in any item may be grounds for rejection. A zero dollar ($0.00 or $-) listed for any and/or all items shall be interpreted and understood by the State to mean that the bidder shall perform any such services at NO COST to the State. Rates must include all fees and taxes.
Any quantities listed in Exhibit B-1, Rate Sheet are CDCR's estimates only. The State does not expressly or by implication agree that the actual amount of work will correspond therewith and reserves the right to omit portions of the work as may be deemed necessary or advisable by the State.
All prices and notations must be printed in ink or typewritten. All prices must be in U. S. currency.
The "Basis of Award" for each Group is strictly used for bidding purposes only to determine the lowest responsive bidder. The CDCR reserves the right to augment this Master Agreement dollar amount by 25 - 100% of the total bid amount.
NOTE: The State makes no guarantee that any Institution which is included in this bid package will request services.
GROUP 2: CAL, CEN
A. 85' Boom (or equivalent)RatexEstimated Quantity=Total
1. Rate per hour for Equipment & Operator$ - 0x104Hours=$ - 0
2. Rate per yard$ - 0x200Yards=$ - 0
3. Total Fee for Setup/Cleanup & Round Trip Travel$ - 0x13Trips=$ - 0
Item A Subtotal (Sum of 1 + 2 + 3)=$ - 0
B. 100' Boom (or equivalent)RatexEstimated Quantity=Total
1. Rate per hour for Equipment & Operator$ - 0x104Hours=$ - 0
2. Rate per yard$ - 0x200Yards=$ - 0
3. Total Fee for Setup/Cleanup & Round Trip Travel$ - 0x13Trips=$ - 0
Item B Subtotal (Sum of 1 + 2 + 3)=$ - 0
C. 120' Boom (or equivalent)RatexEstimated Quantity=Total
1. Rate per hour for Equipment & Operator$ - 0x104Hours=$ - 0
2. Rate per yard$ - 0x200Yards=$ - 0
3. Total Fee for each trip Setup/Cleanup & Round Trip Travel$ - 0x13Trips=$ - 0
Item C Subtotal (Sum of 1 + 2 + 3)=$ - 0
D. Maximum 1" aggregate hose pumpRatexEstimated Quantity=Total
1. Rate per hour for Equipment & Operator$ - 0x104Hours=$ - 0
2. Rate per yard$ - 0x200Yards=$ - 0
3. Total Fee for Setup/Cleanup & Round Trip Travel$ - 0x13Trips=$ - 0
Item D Subtotal (Sum of 1 + 2 + 3)=$ - 0
E. 3/8" Pea gravel line hose pumpRatexEstimated Quantity=Total
1. Rate per hour for Equipment & Operator$ - 0x104Hours=$ - 0
2. Rate per yard$ - 0x200Yards=$ - 0
3. Total Fee for Setup/Cleanup & Round Trip Travel$ - 0x13Trips=$ - 0
Item E Subtotal (Sum of 1 + 2 + 3)=$ - 0
F. Grout pumpRatexEstimated Quantity=Total
1. Rate per hour for Equipment & Operator$ - 0x104Hours=$ - 0
2. Rate per yard$ - 0x200Yards=$ - 0
3. Total Fee for Setup/Cleanup & Round Trip Travel$ - 0x13Trips=$ - 0
Item F Subtotal (Sum of 1 + 2 + 3)=$ - 0
GRAND TOTAL (SUM OF ITEMS A, B, C, D, E, AND F)=$ - 0
BASIS OF AWARD

The Agreement shall be written for the State's Estimate of $350,000.00

Contractor may offer a discount on invoices in order for the invoices to be paid within 30 days of receipt Discount offered must be at least one (1) percent of the amount and a minimum of $50.00.

Discount offered on invoices to be paid within 30 days of receipt=%
In the event of a tie absent other determining factors, the lowest responsible bid with the highest discount shall prevail.

&"Arial,Regular"TBB California Department of Corrections and Rehabilitation (CDCR) Rate Sheet &"Arial,Regular"Bid Number C5611982-D

&"Arial,Regular"Page &P of &N

3-CCC-HDSP

CONCRETE PUMPING SERVICES
INMATE/WARD LABOR PROGRAM
HIGH DESERT STATE PRISON (HDSP)

CALIFORNIA CORRECTIONAL CENTER (CCC)

Electronic bid packages include an Excel version of this Exhibit B-1, Rate Sheet in addition to the PDF file in order to assist bidders in computing bid totals. Bidders are encouraged to download the Excel version and complete all highlighted cells.
NOTE: Bidders may bid on one (1) or more Institution groups. Bidders are not required to bid on all groups. However, if bidding on a group, your bid shall be for all locations within each group. Each item within the selected group you are bidding, must be completed. Failure to indicate a dollar amount (BLANK CELL) in any item may be grounds for rejection. A zero dollar ($0.00 or $-) listed for any and/or all items shall be interpreted and understood by the State to mean that the bidder shall perform any such services at NO COST to the State. Rates must include all fees and taxes.
Any quantities listed in Exhibit B-1, Rate Sheet are CDCR's estimates only. The State does not expressly or by implication agree that the actual amount of work will correspond therewith and reserves the right to omit portions of the work as may be deemed necessary or advisable by the State.
All prices and notations must be printed in ink or typewritten. All prices must be in U. S. currency.
The "Basis of Award" for each Group is strictly used for bidding purposes only to determine the lowest responsive bidder. The CDCR reserves the right to augment this Master Agreement dollar amount by 25 - 100% of the total bid amount.
NOTE: The State makes no guarantee that any Institution which is included in this bid package will request services.
GROUP 3: HDSP, CCC
A. 85' Boom (or equivalent)RatexEstimated Quantity=Total
1. Rate per hour for Equipment & Operator$ - 0x48Hours=$ - 0
2. Rate per yard$ - 0x300Yards=$ - 0
3. Total Fee for Setup/Cleanup & Round Trip Travel$ - 0x6Trips=$ - 0
Item A Subtotal (Sum of 1 + 2 + 3)=$ - 0
B. 100' Boom (or equivalent)RatexEstimated Quantity=Total
1. Rate per hour for Equipment & Operator$ - 0x32Hours=$ - 0
2. Rate per yard$ - 0x130Yards=$ - 0
3. Total Fee for Setup/Cleanup & Round Trip Travel$ - 0x4Trips=$ - 0
Item B Subtotal (Sum of 1 + 2 + 3)=$ - 0
C. 120' Boom (or equivalent)RatexEstimated Quantity=Total
1. Rate per hour for Equipment & Operator$ - 0x32Hours=$ - 0
2. Rate per yard$ - 0x130Yards=$ - 0
3. Total Fee for each trip Setup/Cleanup & Round Trip Travel$ - 0x4Trips=$ - 0
Item C Subtotal (Sum of 1 + 2 + 3)=$ - 0
D. Maximum 1" aggregate hose pumpRatexEstimated Quantity=Total
1. Rate per hour for Equipment & Operator$ - 0x32Hours=$ - 0
2. Rate per yard$ - 0x140Yards=$ - 0
3. Total Fee for Setup/Cleanup & Round Trip Travel$ - 0x4Trips=$ - 0
Item D Subtotal (Sum of 1 + 2 + 3)=$ - 0
E. 3/8" Pea gravel line hose pumpRatexEstimated Quantity=Total
1. Rate per hour for Equipment & Operator$ - 0x40Hours=$ - 0
2. Rate per yard$ - 0x240Yards=$ - 0
3. Total Fee for Setup/Cleanup & Round Trip Travel$ - 0x5Trips=$ - 0
Item E Subtotal (Sum of 1 + 2 + 3)=$ - 0
F. Grout pumpRatexEstimated Quantity=Total
1. Rate per hour for Equipment & Operator$ - 0x32Hours=$ - 0
2. Rate per yard$ - 0x240Yards=$ - 0
3. Total Fee for Setup/Cleanup & Round Trip Travel$ - 0x4Trips=$ - 0
Item F Subtotal (Sum of 1 + 2 + 3)=$ - 0
GRAND TOTAL (SUM OF ITEMS A, B, C, D, E, AND F)=$ - 0
BASIS OF AWARD

The Agreement shall be written for the State's Estimate of $100,000.00

Contractor may offer a discount on invoices in order for the invoices to be paid within 30 days of receipt Discount offered must be at least one (1) percent of the amount and a minimum of $50.00.

Discount offered on invoices to be paid within 30 days of receipt=%
In the event of a tie absent other determining factors, the lowest responsible bid with the highest discount shall prevail.

&"Arial,Regular"TBB California Department of Corrections and Rehabilitation (CDCR) Rate Sheet &"Arial,Regular"Bid Number C5611982-D

&"Arial,Regular"Page &P of &N

4-CCI

CONCRETE PUMPING SERVICES
INMATE/WARD LABOR PROGRAM
CALIFORNIA CORRECTIONAL INSTITUTION (CCI)
Electronic bid packages include an Excel version of this Exhibit B-1, Rate Sheet in addition to the PDF file in order to assist bidders in computing bid totals. Bidders are encouraged to download the Excel version and complete all highlighted cells.
NOTE: Bidders may bid on one (1) or more Institution groups. Bidders are not required to bid on all groups. However, if bidding on a group, your bid shall be for all locations within each group. Each item within the selected group you are bidding, must be completed. Failure to indicate a dollar amount (BLANK CELL) in any item may be grounds for rejection. A zero dollar ($0.00 or $-) listed for any and/or all items shall be interpreted and understood by the State to mean that the bidder shall perform any such services at NO COST to the State. Rates must include all fees and taxes.
Any quantities listed in Exhibit B-1, Rate Sheet are CDCR's estimates only. The State does not expressly or by implication agree that the actual amount of work will correspond therewith and reserves the right to omit portions of the work as may be deemed necessary or advisable by the State.
All prices and notations must be printed in ink or typewritten. All prices must be in U. S. currency.
The "Basis of Award" for each Group is strictly used for bidding purposes only to determine the lowest responsive bidder. The CDCR reserves the right to augment this Master Agreement dollar amount by 25 - 100% of the total bid amount.
NOTE: The State makes no guarantee that any Institution which is included in this bid package will request services.
GROUP 4: CCI
A. 85' Boom (or equivalent)RatexEstimated Quantity=Total
1. Rate per hour for Equipment & Operator$ - 0x40Hours=$ - 0
2. Rate per yard$ - 0x200Yards=$ - 0
3. Total Fee for Setup/Cleanup & Round Trip Travel$ - 0x5Trips=$ - 0
Item A Subtotal (Sum of 1 + 2 + 3)=$ - 0
B. 100' Boom (or equivalent)RatexEstimated Quantity=Total
1. Rate per hour for Equipment & Operator$ - 0x40Hours=$ - 0
2. Rate per yard$ - 0x200Yards=$ - 0
3. Total Fee for Setup/Cleanup & Round Trip Travel$ - 0x5Trips=$ - 0
Item B Subtotal (Sum of 1 + 2 + 3)=$ - 0
C. 120' Boom (or equivalent)RatexEstimated Quantity=Total
1. Rate per hour for Equipment & Operator$ - 0x40Hours=$ - 0
2. Rate per yard$ - 0x200Yards=$ - 0
3. Total Fee for each trip Setup/Cleanup & Round Trip Travel$ - 0x5Trips=$ - 0
Item C Subtotal (Sum of 1 + 2 + 3)=$ - 0
D. Maximum 1" aggregate hose pumpRatexEstimated Quantity=Total
1. Rate per hour for Equipment & Operator$ - 0x40Hours=$ - 0
2. Rate per yard$ - 0x200Yards=$ - 0
3. Total Fee for Setup/Cleanup & Round Trip Travel$ - 0x5Trips=$ - 0
Item D Subtotal (Sum of 1 + 2 + 3)=$ - 0
E. 3/8" Pea gravel line hose pumpRatexEstimated Quantity=Total
1. Rate per hour for Equipment & Operator$ - 0x40Hours=$ - 0
2. Rate per yard$ - 0x200Yards=$ - 0
3. Total Fee for Setup/Cleanup & Round Trip Travel$ - 0x5Trips=$ - 0
Item E Subtotal (Sum of 1 + 2 + 3)=$ - 0
F. Grout pumpRatexEstimated Quantity=Total
1. Rate per hour for Equipment & Operator$ - 0x40Hours=$ - 0
2. Rate per yard$ - 0x200Yards=$ - 0
3. Total Fee for Setup/Cleanup & Round Trip Travel$ - 0x5Trips=$ - 0
Item F Subtotal (Sum of 1 + 2 + 3)=$ - 0
GRAND TOTAL (SUM OF ITEMS A, B, C, D, E, AND F)=$ - 0
BASIS OF AWARD

The Agreement shall be written for the State's Estimate of $120,000.00

Contractor may offer a discount on invoices in order for the invoices to be paid within 30 days of receipt Discount offered must be at least one (1) percent of the amount and a minimum of $50.00.

Discount offered on invoices to be paid within 30 days of receipt=%
In the event of a tie absent other determining factors, the lowest responsible bid with the highest discount shall prevail.

&"Arial,Regular"TBB California Department of Corrections and Rehabilitation (CDCR) Rate Sheet &"Arial,Regular"Bid Number C5611982-D

&"Arial,Regular"Page &P of &N

5-CCWF-VSP

CONCRETE PUMPING SERVICES
INMATE/WARD LABOR PROGRAM
CENTRAL CALIFORNIA WOMEN'S FACILITY (CCWF)

VALLEY STATE PRISON (VSP)

Electronic bid packages include an Excel version of this Exhibit B-1, Rate Sheet in addition to the PDF file in order to assist bidders in computing bid totals. Bidders are encouraged to download the Excel version and complete all highlighted cells.
NOTE: Bidders may bid on one (1) or more Institution groups. Bidders are not required to bid on all groups. However, if bidding on a group, your bid shall be for all locations within each group. Each item within the selected group you are bidding, must be completed. Failure to indicate a dollar amount (BLANK CELL) in any item may be grounds for rejection. A zero dollar ($0.00 or $-) listed for any and/or all items shall be interpreted and understood by the State to mean that the bidder shall perform any such services at NO COST to the State. Rates must include all fees and taxes.
Any quantities listed in Exhibit B-1, Rate Sheet are CDCR's estimates only. The State does not expressly or by implication agree that the actual amount of work will correspond therewith and reserves the right to omit portions of the work as may be deemed necessary or advisable by the State.
All prices and notations must be printed in ink or typewritten. All prices must be in U. S. currency.
The "Basis of Award" for each Group is strictly used for bidding purposes only to determine the lowest responsive bidder. The CDCR reserves the right to augment this Master Agreement dollar amount by 25 - 100% of the total bid amount.
NOTE: The State makes no guarantee that any Institution which is included in this bid package will request services.
GROUP 5: CCWF, VSP
A. 85' Boom (or equivalent)RatexEstimated Quantity=Total
1. Rate per hour for Equipment & Operator$ - 0x336Hours=$ - 0
2. Rate per yard$ - 0x700Yards=$ - 0
3. Total Fee for Setup/Cleanup & Round Trip Travel$ - 0x42Trips=$ - 0
Item A Subtotal (Sum of 1 + 2 + 3)=$ - 0
B. 100' Boom (or equivalent)RatexEstimated Quantity=Total
1. Rate per hour for Equipment & Operator$ - 0x336Hours=$ - 0
2. Rate per yard$ - 0x700Yards=$ - 0
3. Total Fee for Setup/Cleanup & Round Trip Travel$ - 0x42Trips=$ - 0
Item B Subtotal (Sum of 1 + 2 + 3)=$ - 0
C. 120' Boom (or equivalent)RatexEstimated Quantity=Total
1. Rate per hour for Equipment & Operator$ - 0x320Hours=$ - 0
2. Rate per yard$ - 0x600Yards=$ - 0
3. Total Fee for each trip Setup/Cleanup & Round Trip Travel$ - 0x40Trips=$ - 0
Item C Subtotal (Sum of 1 + 2 + 3)=$ - 0
D. Maximum 1" aggregate hose pumpRatexEstimated Quantity=Total
1. Rate per hour for Equipment & Operator$ - 0x320Hours=$ - 0
2. Rate per yard$ - 0x600Yards=$ - 0
3. Total Fee for Setup/Cleanup & Round Trip Travel$ - 0x40Trips=$ - 0
Item D Subtotal (Sum of 1 + 2 + 3)=$ - 0
E. 3/8" Pea gravel line hose pumpRatexEstimated Quantity=Total
1. Rate per hour for Equipment & Operator$ - 0x320Hours=$ - 0
2. Rate per yard$ - 0x600Yards=$ - 0
3. Total Fee for Setup/Cleanup & Round Trip Travel$ - 0x40Trips=$ - 0
Item E Subtotal (Sum of 1 + 2 + 3)=$ - 0
F. Grout pumpRatexEstimated Quantity=Total
1. Rate per hour for Equipment & Operator$ - 0x320Hours=$ - 0
2. Rate per yard$ - 0x600Yards=$ - 0
3. Total Fee for Setup/Cleanup & Round Trip Travel$ - 0x40Trips=$ - 0
Item F Subtotal (Sum of 1 + 2 + 3)=$ - 0
GRAND TOTAL (SUM OF ITEMS A, B, C, D, E, AND F)=$ - 0
BASIS OF AWARD

The Agreement shall be written for the State's Estimate of $750,000.00

Contractor may offer a discount on invoices in order for the invoices to be paid within 30 days of receipt Discount offered must be at least one (1) percent of the amount and a minimum of $50.00.

Discount offered on invoices to be paid within 30 days of receipt=%
In the event of a tie absent other determining factors, the lowest responsible bid with the highest discount shall prevail.

&"Arial,Regular"TBB California Department of Corrections and Rehabilitation (CDCR) Rate Sheet &"Arial,Regular"Bid Number C5611982-D

&"Arial,Regular"Page &P of &N

6-CHCF

CONCRETE PUMPING SERVICES
INMATE/WARD LABOR PROGRAM
CALIFORNIA HEALTH CARE FACILITY (CHCF)
Electronic bid packages include an Excel version of this Exhibit B-1, Rate Sheet in addition to the PDF file in order to assist bidders in computing bid totals. Bidders are encouraged to download the Excel version and complete all highlighted cells.
NOTE: Bidders may bid on one (1) or more Institution groups. Bidders are not required to bid on all groups. However, if bidding on a group, your bid shall be for all locations within each group. Each item within the selected group you are bidding, must be completed. Failure to indicate a dollar amount (BLANK CELL) in any item may be grounds for rejection. A zero dollar ($0.00 or $-) listed for any and/or all items shall be interpreted and understood by the State to mean that the bidder shall perform any such services at NO COST to the State. Rates must include all fees and taxes.
Any quantities listed in Exhibit B-1, Rate Sheet are CDCR's estimates only. The State does not expressly or by implication agree that the actual amount of work will correspond therewith and reserves the right to omit portions of the work as may be deemed necessary or advisable by the State.
All prices and notations must be printed in ink or typewritten. All prices must be in U. S. currency.
The "Basis of Award" for each Group is strictly used for bidding purposes only to determine the lowest responsive bidder. The CDCR reserves the right to augment this Master Agreement dollar amount by 25 - 100% of the total bid amount.
NOTE: The State makes no guarantee that any Institution which is included in this bid package will request services.
GROUP 6: CHCF
A. 85' Boom (or equivalent)RatexEstimated Quantity=Total
1. Rate per hour for Equipment & Operator$ - 0x56Hours=$ - 0
2. Rate per yard$ - 0x1,500Yards=$ - 0
3. Total Fee for Setup/Cleanup & Round Trip Travel$ - 0x7Trips=$ - 0
Item A Subtotal (Sum of 1 + 2 + 3)=$ - 0
B. 100' Boom (or equivalent)RatexEstimated Quantity=Total
1. Rate per hour for Equipment & Operator$ - 0x56Hours=$ - 0
2. Rate per yard$ - 0x1,000Yards=$ - 0
3. Total Fee for Setup/Cleanup & Round Trip Travel$ - 0x7Trips=$ - 0
Item B Subtotal (Sum of 1 + 2 + 3)=$ - 0
C. 120' Boom (or equivalent)RatexEstimated Quantity=Total
1. Rate per hour for Equipment & Operator$ - 0x56Hours=$ - 0
2. Rate per yard$ - 0x1,000Yards=$ - 0
3. Total Fee for each trip Setup/Cleanup & Round Trip Travel$ - 0x7Trips=$ - 0
Item C Subtotal (Sum of 1 + 2 + 3)=$ - 0
D. Maximum 1" aggregate hose pumpRatexEstimated Quantity=Total
1. Rate per hour for Equipment & Operator$ - 0x56Hours=$ - 0
2. Rate per yard$ - 0x1,000Yards=$ - 0
3. Total Fee for Setup/Cleanup & Round Trip Travel$ - 0x7Trips=$ - 0
Item D Subtotal (Sum of 1 + 2 + 3)=$ - 0
E. 3/8" Pea gravel line hose pumpRatexEstimated Quantity=Total
1. Rate per hour for Equipment & Operator$ - 0x56Hours=$ - 0
2. Rate per yard$ - 0x1,000Yards=$ - 0
3. Total Fee for Setup/Cleanup & Round Trip Travel$ - 0x7Trips=$ - 0
Item E Subtotal (Sum of 1 + 2 + 3)=$ - 0
F. Grout pumpRatexEstimated Quantity=Total
1. Rate per hour for Equipment & Operator$ - 0x56Hours=$ - 0
2. Rate per yard$ - 0x1,000Yards=$ - 0
3. Total Fee for Setup/Cleanup & Round Trip Travel$ - 0x7Trips=$ - 0
Item F Subtotal (Sum of 1 + 2 + 3)=$ - 0
GRAND TOTAL (SUM OF ITEMS A, B, C, D, E, AND F)=$ - 0
BASIS OF AWARD

The Agreement shall be written for the State's Estimate of $125,000.00

Contractor may offer a discount on invoices in order for the invoices to be paid within 30 days of receipt Discount offered must be at least one (1) percent of the amount and a minimum of $50.00.

Discount offered on invoices to be paid within 30 days of receipt=%
In the event of a tie absent other determining factors, the lowest responsible bid with the highest discount shall prevail.

&"Arial,Regular"TBB California Department of Corrections and Rehabilitation (CDCR) Rate Sheet &"Arial,Regular"Bid Number C5611982-D

&"Arial,Regular"Page &P of &N

7-CIM-CIW-CRC

CONCRETE PUMPING SERVICES
INMATE/WARD LABOR PROGRAM
CALIFORNIA INSTITUTION FOR MEN (CIM)

CALIFORNIA INSTITUTION FOR WOMEN (CIW)

CALIFORNIA REHABILITATION CENTER (CRC)

Electronic bid packages include an Excel version of this Exhibit B-1, Rate Sheet in addition to the PDF file in order to assist bidders in computing bid totals. Bidders are encouraged to download the Excel version and complete all highlighted cells.
NOTE: Bidders may bid on one (1) or more Institution groups. Bidders are not required to bid on all groups. However, if bidding on a group, your bid shall be for all locations within each group. Each item within the selected group you are bidding, must be completed. Failure to indicate a dollar amount (BLANK CELL) in any item may be grounds for rejection. A zero dollar ($0.00 or $-) listed for any and/or all items shall be interpreted and understood by the State to mean that the bidder shall perform any such services at NO COST to the State. Rates must include all fees and taxes.
Any quantities listed in Exhibit B-1, Rate Sheet are CDCR's estimates only. The State does not expressly or by implication agree that the actual amount of work will correspond therewith and reserves the right to omit portions of the work as may be deemed necessary or advisable by the State.
All prices and notations must be printed in ink or typewritten. All prices must be in U. S. currency.
The "Basis of Award" for each Group is strictly used for bidding purposes only to determine the lowest responsive bidder. The CDCR reserves the right to augment this Master Agreement dollar amount by 25 - 100% of the total bid amount.
NOTE: The State makes no guarantee that any Institution which is included in this bid package will request services.
GROUP 7: CIM, CIW, CRC
A. 85' Boom (or equivalent)RatexEstimated Quantity=Total
1. Rate per hour for Equipment & Operator$ - 0x72Hours=$ - 0
2. Rate per yard$ - 0x200Yards=$ - 0
3. Total Fee for Setup/Cleanup & Round Trip Travel$ - 0x9Trips=$ - 0
Item A Subtotal (Sum of 1 + 2 + 3)=$ - 0
B. 100' Boom (or equivalent)RatexEstimated Quantity=Total
1. Rate per hour for Equipment & Operator$ - 0x72Hours=$ - 0
2. Rate per yard$ - 0x200Yards=$ - 0
3. Total Fee for Setup/Cleanup & Round Trip Travel$ - 0x9Trips=$ - 0
Item B Subtotal (Sum of 1 + 2 + 3)=$ - 0
C. 120' Boom (or equivalent)RatexEstimated Quantity=Total
1. Rate per hour for Equipment & Operator$ - 0x72Hours=$ - 0
2. Rate per yard$ - 0x200Yards=$ - 0
3. Total Fee for each trip Setup/Cleanup & Round Trip Travel$ - 0x9Trips=$ - 0
Item C Subtotal (Sum of 1 + 2 + 3)=$ - 0
D. Maximum 1" aggregate hose pumpRatexEstimated Quantity=Total
1. Rate per hour for Equipment & Operator$ - 0x72Hours=$ - 0
2. Rate per yard$ - 0x200Yards=$ - 0
3. Total Fee for Setup/Cleanup & Round Trip Travel$ - 0x9Trips=$ - 0
Item D Subtotal (Sum of 1 + 2 + 3)=$ - 0
E. 3/8" Pea gravel line hose pumpRatexEstimated Quantity=Total
1. Rate per hour for Equipment & Operator$ - 0x72Hours=$ - 0
2. Rate per yard$ - 0x200Yards=$ - 0
3. Total Fee for Setup/Cleanup & Round Trip Travel$ - 0x9Trips=$ - 0
Item E Subtotal (Sum of 1 + 2 + 3)=$ - 0
F. Grout pumpRatexEstimated Quantity=Total
1. Rate per hour for Equipment & Operator$ - 0x72Hours=$ - 0
2. Rate per yard$ - 0x200Yards=$ - 0
3. Total Fee for Setup/Cleanup & Round Trip Travel$ - 0x9Trips=$ - 0
Item F Subtotal (Sum of 1 + 2 + 3)=$ - 0
GRAND TOTAL (SUM OF ITEMS A, B, C, D, E, AND F)=$ - 0
BASIS OF AWARD

The Agreement shall be written for the State's Estimate of $150,000.00

Contractor may offer a discount on invoices in order for the invoices to be paid within 30 days of receipt Discount offered must be at least one (1) percent of the amount and a minimum of $50.00.

Discount offered on invoices to be paid within 30 days of receipt=%
In the event of a tie absent other determining factors, the lowest responsible bid with the highest discount shall prevail.

&"Arial,Regular"TBB California Department of Corrections and Rehabilitation (CDCR) Rate Sheet &"Arial,Regular"Bid Number C5611982-D

&"Arial,Regular"Page &P of &N

8-CMC

CONCRETE PUMPING SERVICES
INMATE/WARD LABOR PROGRAM
CALIFORNIA MEN'S COLONY (CMC)
Electronic bid packages include an Excel version of this Exhibit B-1, Rate Sheet in addition to the PDF file in order to assist bidders in computing bid totals. Bidders are encouraged to download the Excel version and complete all highlighted cells.
NOTE: Bidders may bid on one (1) or more Institution groups. Bidders are not required to bid on all groups. However, if bidding on a group, your bid shall be for all locations within each group. Each item within the selected group you are bidding, must be completed. Failure to indicate a dollar amount (BLANK CELL) in any item may be grounds for rejection. A zero dollar ($0.00 or $-) listed for any and/or all items shall be interpreted and understood by the State to mean that the bidder shall perform any such services at NO COST to the State. Rates must include all fees and taxes.
Any quantities listed in Exhibit B-1, Rate Sheet are CDCR's estimates only. The State does not expressly or by implication agree that the actual amount of work will correspond therewith and reserves the right to omit portions of the work as may be deemed necessary or advisable by the State.
All prices and notations must be printed in ink or typewritten. All prices must be in U. S. currency.
The "Basis of Award" for each Group is strictly used for bidding purposes only to determine the lowest responsive bidder. The CDCR reserves the right to augment this Master Agreement dollar amount by 25 - 100% of the total bid amount.
NOTE: The State makes no guarantee that any Institution which is included in this bid package will request services.
GROUP 8: CMC
A. 85' Boom (or equivalent)RatexEstimated Quantity=Total
1. Rate per hour for Equipment & Operator$ - 0x1,104Hours=$ - 0
2. Rate per yard$ - 0x1,500Yards=$ - 0
3. Total Fee for Setup/Cleanup & Round Trip Travel$ - 0x138Trips=$ - 0
Item A Subtotal (Sum of 1 + 2 + 3)=$ - 0
B. 100' Boom (or equivalent)RatexEstimated Quantity=Total
1. Rate per hour for Equipment & Operator$ - 0x1,104Hours=$ - 0
2. Rate per yard$ - 0x1,500Yards=$ - 0
3. Total Fee for Setup/Cleanup & Round Trip Travel$ - 0x138Trips=$ - 0
Item B Subtotal (Sum of 1 + 2 + 3)=$ - 0
C. 120' Boom (or equivalent)RatexEstimated Quantity=Total
1. Rate per hour for Equipment & Operator$ - 0x1,056Hours=$ - 0
2. Rate per yard$ - 0x1,200Yards=$ - 0
3. Total Fee for each trip Setup/Cleanup & Round Trip Travel$ - 0x132Trips=$ - 0
Item C Subtotal (Sum of 1 + 2 + 3)=$ - 0
D. Maximum 1" aggregate hose pumpRatexEstimated Quantity=Total
1. Rate per hour for Equipment & Operator$ - 0x1,056Hours=$ - 0
2. Rate per yard$ - 0x1,200Yards=$ - 0
3. Total Fee for Setup/Cleanup & Round Trip Travel$ - 0x132Trips=$ - 0
Item D Subtotal (Sum of 1 + 2 + 3)=$ - 0
E. 3/8" Pea gravel line hose pumpRatexEstimated Quantity=Total
1. Rate per hour for Equipment & Operator$ - 0x1,056Hours=$ - 0
2. Rate per yard$ - 0x1,200Yards=$ - 0
3. Total Fee for Setup/Cleanup & Round Trip Travel$ - 0x132Trips=$ - 0
Item E Subtotal (Sum of 1 + 2 + 3)=$ - 0
F. Grout pumpRatexEstimated Quantity=Total
1. Rate per hour for Equipment & Operator$ - 0x1,056Hours=$ - 0
2. Rate per yard$ - 0x1,200Yards=$ - 0
3. Total Fee for Setup/Cleanup & Round Trip Travel$ - 0x132Trips=$ - 0
Item F Subtotal (Sum of 1 + 2 + 3)=$ - 0
GRAND TOTAL (SUM OF ITEMS A, B, C, D, E, AND F)=$ - 0
BASIS OF AWARD

The Agreement shall be written for the State's Estimate of $3,000,000.00

Contractor may offer a discount on invoices in order for the invoices to be paid within 30 days of receipt Discount offered must be at least one (1) percent of the amount and a minimum of $50.00.

Discount offered on invoices to be paid within 30 days of receipt=%
In the event of a tie absent other determining factors, the lowest responsible bid with the highest discount shall prevail.

&"Arial,Regular"TBB California Department of Corrections and Rehabilitation (CDCR) Rate Sheet &"Arial,Regular"Bid Number C5611982-D

&"Arial,Regular"Page &P of &N

9-CMF-SOL

CONCRETE PUMPING SERVICES
INMATE/WARD LABOR PROGRAM
CALIFORNIA MEDICAL FACILITY (CMF)

CALIFORNIA STATE PRISON, SOLANO (SOL)

Electronic bid packages include an Excel version of this Exhibit B-1, Rate Sheet in addition to the PDF file in order to assist bidders in computing bid totals. Bidders are encouraged to download the Excel version and complete all highlighted cells.
NOTE: Bidders may bid on one (1) or more Institution groups. Bidders are not required to bid on all groups. However, if bidding on a group, your bid shall be for all locations within each group. Each item within the selected group you are bidding, must be completed. Failure to indicate a dollar amount (BLANK CELL) in any item may be grounds for rejection. A zero dollar ($0.00 or $-) listed for any and/or all items shall be interpreted and understood by the State to mean that the bidder shall perform any such services at NO COST to the State. Rates must include all fees and taxes.
Any quantities listed in Exhibit B-1, Rate Sheet are CDCR's estimates only. The State does not expressly or by implication agree that the actual amount of work will correspond therewith and reserves the right to omit portions of the work as may be deemed necessary or advisable by the State.
All prices and notations must be printed in ink or typewritten. All prices must be in U. S. currency.
The "Basis of Award" for each Group is strictly used for bidding purposes only to determine the lowest responsive bidder. The CDCR reserves the right to augment this Master Agreement dollar amount by 25 - 100% of the total bid amount.
NOTE: The State makes no guarantee that any Institution which is included in this bid package will request services.
GROUP 9: CMF, SOL
A. 85' Boom (or equivalent)RatexEstimated Quantity=Total
1. Rate per hour for Equipment & Operator$ - 0x200Hours=$ - 0
2. Rate per yard$ - 0x1,500Yards=$ - 0
3. Total Fee for Setup/Cleanup & Round Trip Travel$ - 0x25Trips=$ - 0
Item A Subtotal (Sum of 1 + 2 + 3)=$ - 0
B. 100' Boom (or equivalent)RatexEstimated Quantity=Total
1. Rate per hour for Equipment & Operator$ - 0x200Hours=$ - 0
2. Rate per yard$ - 0x1,500Yards=$ - 0
3. Total Fee for Setup/Cleanup & Round Trip Travel$ - 0x25Trips=$ - 0
Item B Subtotal (Sum of 1 + 2 + 3)=$ - 0
C. 120' Boom (or equivalent)RatexEstimated Quantity=Total
1. Rate per hour for Equipment & Operator$ - 0x200Hours=$ - 0
2. Rate per yard$ - 0x1,500Yards=$ - 0
3. Total Fee for each trip Setup/Cleanup & Round Trip Travel$ - 0x25Trips=$ - 0
Item C Subtotal (Sum of 1 + 2 + 3)=$ - 0
D. Maximum 1" aggregate hose pumpRatexEstimated Quantity=Total
1. Rate per hour for Equipment & Operator$ - 0x240Hours=$ - 0
2. Rate per yard$ - 0x1,500Yards=$ - 0
3. Total Fee for Setup/Cleanup & Round Trip Travel$ - 0x30Trips=$ - 0
Item D Subtotal (Sum of 1 + 2 + 3)=$ - 0
E. 3/8" Pea gravel line hose pumpRatexEstimated Quantity=Total
1. Rate per hour for Equipment & Operator$ - 0x200Hours=$ - 0
2. Rate per yard$ - 0x1,500Yards=$ - 0
3. Total Fee for Setup/Cleanup & Round Trip Travel$ - 0x25Trips=$ - 0
Item E Subtotal (Sum of 1 + 2 + 3)=$ - 0
F. Grout pumpRatexEstimated Quantity=Total
1. Rate per hour for Equipment & Operator$ - 0x240Hours=$ - 0
2. Rate per yard$ - 0x3,000Yards=$ - 0
3. Total Fee for Setup/Cleanup & Round Trip Travel$ - 0x30Trips=$ - 0
Item F Subtotal (Sum of 1 + 2 + 3)=$ - 0
GRAND TOTAL (SUM OF ITEMS A, B, C, D, E, AND F)=$ - 0
BASIS OF AWARD

The Agreement shall be written for the State's Estimate of $450,000.00

Contractor may offer a discount on invoices in order for the invoices to be paid within 30 days of receipt Discount offered must be at least one (1) percent of the amount and a minimum of $50.00.

Discount offered on invoices to be paid within 30 days of receipt=%
In the event of a tie absent other determining factors, the lowest responsible bid with the highest discount shall prevail.

&"Arial,Regular"TBB California Department of Corrections and Rehabilitation (CDCR) Rate Sheet &"Arial,Regular"Bid Number C5611982-D

&"Arial,Regular"Page &P of &N

10-COR-SATF

CONCRETE PUMPING SERVICES
INMATE/WARD LABOR PROGRAM
CORCORAN STATE PRISON (COR)

SUBSTANCE ABUSE TREATMENT FACILITY (SATF)

Electronic bid packages include an Excel version of this Exhibit B-1, Rate Sheet in addition to the PDF file in order to assist bidders in computing bid totals. Bidders are encouraged to download the Excel version and complete all highlighted cells.
NOTE: Bidders may bid on one (1) or more Institution groups. Bidders are not required to bid on all groups. However, if bidding on a group, your bid shall be for all locations within each group. Each item within the selected group you are bidding, must be completed. Failure to indicate a dollar amount (BLANK CELL) in any item may be grounds for rejection. A zero dollar ($0.00 or $-) listed for any and/or all items shall be interpreted and understood by the State to mean that the bidder shall perform any such services at NO COST to the State. Rates must include all fees and taxes.
Any quantities listed in Exhibit B-1, Rate Sheet are CDCR's estimates only. The State does not expressly or by implication agree that the actual amount of work will correspond therewith and reserves the right to omit portions of the work as may be deemed necessary or advisable by the State.
All prices and notations must be printed in ink or typewritten. All prices must be in U. S. currency.
The "Basis of Award" for each Group is strictly used for bidding purposes only to determine the lowest responsive bidder. The CDCR reserves the right to augment this Master Agreement dollar amount by 25 - 100% of the total bid amount.
NOTE: The State makes no guarantee that any Institution which is included in this bid package will request services.
GROUP 10: COR, SATF
A. 85' Boom (or equivalent)RatexEstimated Quantity=Total
1. Rate per hour for Equipment & Operator$ - 0x1,280Hours=$ - 0
2. Rate per yard$ - 0x1,800Yards=$ - 0
3. Total Fee for Setup/Cleanup & Round Trip Travel$ - 0x160Trips=$ - 0
Item A Subtotal (Sum of 1 + 2 + 3)=$ - 0
B. 100' Boom (or equivalent)RatexEstimated Quantity=Total
1. Rate per hour for Equipment & Operator$ - 0x1,280Hours=$ - 0
2. Rate per yard$ - 0x1,800Yards=$ - 0
3. Total Fee for Setup/Cleanup & Round Trip Travel$ - 0x160Trips=$ - 0
Item B Subtotal (Sum of 1 + 2 + 3)=$ - 0
C. 120' Boom (or equivalent)RatexEstimated Quantity=Total
1. Rate per hour for Equipment & Operator$ - 0x1,280Hours=$ - 0
2. Rate per yard$ - 0x1,800Yards=$ - 0
3. Total Fee for each trip Setup/Cleanup & Round Trip Travel$ - 0x160Trips=$ - 0
Item C Subtotal (Sum of 1 + 2 + 3)=$ - 0
D. Maximum 1" aggregate hose pumpRatexEstimated Quantity=Total
1. Rate per hour for Equipment & Operator$ - 0x1,280Hours=$ - 0
2. Rate per yard$ - 0x1,800Yards=$ - 0
3. Total Fee for Setup/Cleanup & Round Trip Travel$ - 0x160Trips=$ - 0
Item D Subtotal (Sum of 1 + 2 + 3)=$ - 0
E. 3/8" Pea gravel line hose pumpRatexEstimated Quantity=Total
1. Rate per hour for Equipment & Operator$ - 0x1,248Hours=$ - 0
2. Rate per yard$ - 0x1,500Yards=$ - 0
3. Total Fee for Setup/Cleanup & Round Trip Travel$ - 0x156Trips=$ - 0
Item E Subtotal (Sum of 1 + 2 + 3)=$ - 0
F. Grout pumpRatexEstimated Quantity=Total
1. Rate per hour for Equipment & Operator$ - 0x1,120Hours=$ - 0
2. Rate per yard$ - 0x1,100Yards=$ - 0
3. Total Fee for Setup/Cleanup & Round Trip Travel$ - 0x140Trips=$ - 0
Item F Subtotal (Sum of 1 + 2 + 3)=$ - 0
GRAND TOTAL (SUM OF ITEMS A, B, C, D, E, AND F)=$ - 0
BASIS OF AWARD

The Agreement shall be written for the State's Estimate of $3,000,000.00

Contractor may offer a discount on invoices in order for the invoices to be paid within 30 days of receipt Discount offered must be at least one (1) percent of the amount and a minimum of $50.00.

Discount offered on invoices to be paid within 30 days of receipt=%
In the event of a tie absent other determining factors, the lowest responsible bid with the highest discount shall prevail.

&"Arial,Regular"TBB California Department of Corrections and Rehabilitation (CDCR) Rate Sheet &"Arial,Regular"Bid Number C5611982-D

&"Arial,Regular"Page &P of &N

11-FSP-SAC

CONCRETE PUMPING SERVICES
INMATE/WARD LABOR PROGRAM
FOLSOM STATE PRISON (FSP)

CALIFORNIA STATE PRISON - SACRAMENTO (SAC)

Electronic bid packages include an Excel version of this Exhibit B-1, Rate Sheet in addition to the PDF file in order to assist bidders in computing bid totals. Bidders are encouraged to download the Excel version and complete all highlighted cells.
NOTE: Bidders may bid on one (1) or more Institution groups. Bidders are not required to bid on all groups. However, if bidding on a group, your bid shall be for all locations within each group. Each item within the selected group you are bidding, must be completed. Failure to indicate a dollar amount (BLANK CELL) in any item may be grounds for rejection. A zero dollar ($0.00 or $-) listed for any and/or all items shall be interpreted and understood by the State to mean that the bidder shall perform any such services at NO COST to the State. Rates must include all fees and taxes.
Any quantities listed in Exhibit B-1, Rate Sheet are CDCR's estimates only. The State does not expressly or by implication agree that the actual amount of work will correspond therewith and reserves the right to omit portions of the work as may be deemed necessary or advisable by the State.
All prices and notations must be printed in ink or typewritten. All prices must be in U. S. currency.
The "Basis of Award" for each Group is strictly used for bidding purposes only to determine the lowest responsive bidder. The CDCR reserves the right to augment this Master Agreement dollar amount by 25 - 100% of the total bid amount.
NOTE: The State makes no guarantee that any Institution which is included in this bid package will request services.
GROUP 11: FSP, SAC
A. 85' Boom (or equivalent)RatexEstimated Quantity=Total
1. Rate per hour for Equipment & Operator$ - 0x96Hours=$ - 0
2. Rate per yard$ - 0x700Yards=$ - 0
3. Total Fee for Setup/Cleanup & Round Trip Travel$ - 0x12Trips=$ - 0
Item A Subtotal (Sum of 1 + 2 + 3)=$ - 0
B. 100' Boom (or equivalent)RatexEstimated Quantity=Total
1. Rate per hour for Equipment & Operator$ - 0x112Hours=$ - 0
2. Rate per yard$ - 0x3,000Yards=$ - 0
3. Total Fee for Setup/Cleanup & Round Trip Travel$ - 0x14Trips=$ - 0
Item B Subtotal (Sum of 1 + 2 + 3)=$ - 0
C. 120' Boom (or equivalent)RatexEstimated Quantity=Total
1. Rate per hour for Equipment & Operator$ - 0x96Hours=$ - 0
2. Rate per yard$ - 0x700Yards=$ - 0
3. Total Fee for each trip Setup/Cleanup & Round Trip Travel$ - 0x12Trips=$ - 0
Item C Subtotal (Sum of 1 + 2 + 3)=$ - 0
D. Maximum 1" aggregate hose pumpRatexEstimated Quantity=Total
1. Rate per hour for Equipment & Operator$ - 0x104Hours=$ - 0
2. Rate per yard$ - 0x700Yards=$ - 0
3. Total Fee for Setup/Cleanup & Round Trip Travel$ - 0x13Trips=$ - 0
Item D Subtotal (Sum of 1 + 2 + 3)=$ - 0
E. 3/8" Pea gravel line hose pumpRatexEstimated Quantity=Total
1. Rate per hour for Equipment & Operator$ - 0x104Hours=$ - 0
2. Rate per yard$ - 0x700Yards=$ - 0
3. Total Fee for Setup/Cleanup & Round Trip Travel$ - 0x13Trips=$ - 0
Item E Subtotal (Sum of 1 + 2 + 3)=$ - 0
F. Grout pumpRatexEstimated Quantity=Total
1. Rate per hour for Equipment & Operator$ - 0x160Hours=$ - 0
2. Rate per yard$ - 0x5,000Yards=$ - 0
3. Total Fee for Setup/Cleanup & Round Trip Travel$ - 0x20Trips=$ - 0
Item F Subtotal (Sum of 1 + 2 + 3)=$ - 0
GRAND TOTAL (SUM OF ITEMS A, B, C, D, E, AND F)=$ - 0
BASIS OF AWARD

The Agreement shall be written for the State's Estimate of $250,000.00

Contractor may offer a discount on invoices in order for the invoices to be paid within 30 days of receipt Discount offered must be at least one (1) percent of the amount and a minimum of $50.00.

Discount offered on invoices to be paid within 30 days of receipt=%
In the event of a tie absent other determining factors, the lowest responsible bid with the highest discount shall prevail.

&"Arial,Regular"TBB California Department of Corrections and Rehabilitation (CDCR) Rate Sheet &"Arial,Regular"Bid Number C5611982-D

&"Arial,Regular"Page &P of &N

12-ISP

CONCRETE PUMPING SERVICES
INMATE/WARD LABOR PROGRAM
IRONWOOD STATE PRISON (ISP)
Electronic bid packages include an Excel version of this Exhibit B-1, Rate Sheet in addition to the PDF file in order to assist bidders in computing bid totals. Bidders are encouraged to download the Excel version and complete all highlighted cells.
NOTE: Bidders may bid on one (1) or more Institution groups. Bidders are not required to bid on all groups. However, if bidding on a group, your bid shall be for all locations within each group. Each item within the selected group you are bidding, must be completed. Failure to indicate a dollar amount (BLANK CELL) in any item may be grounds for rejection. A zero dollar ($0.00 or $-) listed for any and/or all items shall be interpreted and understood by the State to mean that the bidder shall perform any such services at NO COST to the State. Rates must include all fees and taxes.
Any quantities listed in Exhibit B-1, Rate Sheet are CDCR's estimates only. The State does not expressly or by implication agree that the actual amount of work will correspond therewith and reserves the right to omit portions of the work as may be deemed necessary or advisable by the State.
All prices and notations must be printed in ink or typewritten. All prices must be in U. S. currency.
The "Basis of Award" for each Group is strictly used for bidding purposes only to determine the lowest responsive bidder. The CDCR reserves the right to augment this Master Agreement dollar amount by 25 - 100% of the total bid amount.
NOTE: The State makes no guarantee that any Institution which is included in this bid package will request services.
GROUP 12: ISP
A. 85' Boom (or equivalent)RatexEstimated Quantity=Total
1. Rate per hour for Equipment & Operator$ - 0x40Hours=$ - 0
2. Rate per yard$ - 0x400Yards=$ - 0
3. Total Fee for Setup/Cleanup & Round Trip Travel$ - 0x5Trips=$ - 0
Item A Subtotal (Sum of 1 + 2 + 3)=$ - 0
B. 100' Boom (or equivalent)RatexEstimated Quantity=Total
1. Rate per hour for Equipment & Operator$ - 0x40Hours=$ - 0
2. Rate per yard$ - 0x400Yards=$ - 0
3. Total Fee for Setup/Cleanup & Round Trip Travel$ - 0x5Trips=$ - 0
Item B Subtotal (Sum of 1 + 2 + 3)=$ - 0
C. 120' Boom (or equivalent)RatexEstimated Quantity=Total
1. Rate per hour for Equipment & Operator$ - 0x40Hours=$ - 0
2. Rate per yard$ - 0x400Yards=$ - 0
3. Total Fee for each trip Setup/Cleanup & Round Trip Travel$ - 0x5Trips=$ - 0
Item C Subtotal (Sum of 1 + 2 + 3)=$ - 0
D. Maximum 1" aggregate hose pumpRatexEstimated Quantity=Total
1. Rate per hour for Equipment & Operator$ - 0x40Hours=$ - 0
2. Rate per yard$ - 0x400Yards=$ - 0
3. Total Fee for Setup/Cleanup & Round Trip Travel$ - 0x5Trips=$ - 0
Item D Subtotal (Sum of 1 + 2 + 3)=$ - 0
E. 3/8" Pea gravel line hose pumpRatexEstimated Quantity=Total
1. Rate per hour for Equipment & Operator$ - 0x40Hours=$ - 0
2. Rate per yard$ - 0x400Yards=$ - 0
3. Total Fee for Setup/Cleanup & Round Trip Travel$ - 0x5Trips=$ - 0
Item E Subtotal (Sum of 1 + 2 + 3)=$ - 0
F. Grout pumpRatexEstimated Quantity=Total
1. Rate per hour for Equipment & Operator$ - 0x40Hours=$ - 0
2. Rate per yard$ - 0x400Yards=$ - 0
3. Total Fee for Setup/Cleanup & Round Trip Travel$ - 0x5Trips=$ - 0
Item F Subtotal (Sum of 1 + 2 + 3)=$ - 0
GRAND TOTAL (SUM OF ITEMS A, B, C, D, E, AND F)=$ - 0
BASIS OF AWARD

The Agreement shall be written for the State's Estimate of $150,000.00

Contractor may offer a discount on invoices…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .