06.A04.PWS_FARO_FY26-REV1.docx

DOCX document 24 KB Posted

Attached to
FARO 3DOF TRACKER VANTAGE SERVICE
Solicitation number
N32253-26-PHNS-930-0020
Issued by

About this file

This is a Performance Work Statement (PWS) for annual preventive maintenance, refurbishment, calibration, warranty, and certification services for FARO 3DOF Laser Tracker equipment at Pearl Harbor Naval Shipyard and Intermediate Maintenance Facility (PHNSY & IMF) in Hawaii. The requirement covers two stationary laser beam Vantage units (Model V2000, Serial Numbers 1706606 and 1706607) used for highly accurate measurements in naval vessel maintenance and repair operations.

The contractor must be an authorized, Original Equipment Manufacturer (OEM) trained and certified technician—not a subcontractor—to perform all required services at the contractor's facilities. Key performance requirements include: preventive maintenance with all labor, tools, materials, and transportation provided; comprehensive certification encompassing equipment cleaning, label replacement, interim and final testing, weather module compensation, cable and connection inspection, and upgrade to latest engineering specifications; completion of services within 10 working days of receipt; detailed reporting within 7 business days certifying equipment meets specified tolerances; and a one-year standard warranty guaranteeing calibration with free re-calibration and re-certification if equipment falls out of specification during the warranty period. The contractor must submit a Quality Control Plan prior to contract performance and maintain records of all reviews and remedial actions. All parts replaced must be new and meet manufacturer specifications, with additional repairs requiring written quotes and Contracting Officer authorization. The government will ship equipment to the contractor at government expense; the contractor is responsible for return shipping. This is a sources sought notice with responses due by 08:00 HST on 15 July 2026, submitted to fiona.c.lynch.civ@us.navy.mil, with the Department of the Navy Naval Sea Systems Command having sole discretion on whether to compete the requirement.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Performance Work Statement (PWS) Pearl Harbor Naval Shipyard And Intermediate Maintenance Facility

FARO 3DOF TRACKER VANTAGE SERVICE

1. BACKGROUND:

1.1. Pearl Harbor Naval Shipyard & Intermediate Maintenance Facility (PHNSY & IMF) is a US Navy regional industrial center that maintains, overhauls, and repairs various vessels of the US Navy. Its industrial operations provide the US Naval forces with a wide range of services and resources located on the island of Oahu, Hawaii, with direct and indirect support to SSN 688 and 774 class submarines, surface vessels, and shore based activities in the Pacific. To accomplish some of our work, equipment capable of obtaining highly accurate measurements are required.

2. OBJECTIVE & SCOPE:

2.1. The Contractor shall supply a Manufacturer Trained Certified Technician to provide annual preventive maintenance, refurbishment, calibration, warranty and certification to performance specification, for each of the following equipment:

FARO 3DOF Laser Tracker

Equipment Description
Model Number
Serial Number
Stationary Laser Beam
Vantage
V20001706606
Stationary Laser Beam
Vantage
V20001706607

3. PERFORMANCE REQUIREMENTS:

3.1. Preventive Maintenance: The Contractor shall provide all management, labor, tools, materials, supplies, equipment and transportation to repair and perform preventive maintenance services:

3.2. Certification to include the following:

3.2.1. Cleaning the equipment

3.2.2. Replace Labels

3.2.3. Perform final interim tests and compensations

3.2.4. Perform certification tests with processes developed by FARO to verify that equipment is measuring within specified tolerances.

3.2.5. Perform weather module compensations

3.2.6. Provide recertification paperwork

3.2.7. FARO’s 15 point check

3.2.8. Inspect all cables, connections, and boards

3.2.9. Upgrade to the latest engineering specifications

3.2.10. Repeated testing to demonstrate ability to consistently power up and initiate measurements properly

3.2.11. Parts that are replaced during preventive maintenance service are included at no additional cost to the government. Materials used shall be new and not refurbished or reconditioned materials. All parts shall meet manufacturer specifications

3.2.12. If additional repairs are required and are not covered by the PM service, the contractor shall provide a written quote detailing the as-found condition, necessary parts, labor costs, labor hours, parts, price, quantities, and estimated down time to completion. Prior to commencement of work on the repairs, work must be authorized by the Contracting Officer.

3.2.13. Services completed in 10 working

days for Lasers from the date of receipt

3.3. Workmanship: The Contractor shall ensure that all work performed is done by a qualified, Manufacturer Trained, Certified Technician, to industry standards and specifications.

3.4. Reports: The Contractor shall provide a detailed report within 7 business days to certify that the FARO Trackers (listed by serial numbers) have been tested and meet the specified tolerances for accurate measuring.

3.5. One Year Standard Warranty to include the following:

3.5.1. Contractor must guarantee calibration of one year upon completion.

3.5.2. Equipment which falls out of calibration specifications during the period of time for which the calibration certificate provides, shall be re-calibrated and re-certified by the contractor at no additional cost to the government. The contractor shall be responsible for any cost associated in returning the re-calibrated equipment to the government.

3.6. Service Delivery Summary:

Performance Requirement
PWS Paragraph
Performance Threshold
1. Perform Preventive Maintenance.
3.1.
100% delivery and compliance
2. Provide One Year Standard Warranty.
3.2.
100% delivery and compliance
3. Provide Certification.
3.3.
100% delivery and compliance
4. Repair Parts.
3.4.
100% delivery and compliance
5. Workmanship.
3.5.
100% delivery and compliance
6. Reports.
3.6.
100% delivery and compliance

4. QUALITY ASSURANCE:

4.1. The Contractor shall be responsible for maintaining and implementing a Quality Control Plan (QCP), to ensure that the work performed meets or exceeds the requirement of this PWS, identify any “out of tolerance” measurements, and results in the prevention of potential and correction of actual problems. The QCP shall address what will be reviewed and shall outline any remedial actions warranted by the review. The QCP shall be implemented upon contract performance.

4.2. The Contractor shall maintain records of reviews and actions taken per the QCP, and shall make such records available to the government upon request.

5. GOVERNMENT FURNISHED PROPERTY:

5.1. All equipment at (ATTACHMENT A) will be shipped to the contractor at the government’s expense. Once service is complete, all equipment will be shipped back to the PHNSY&IMF at the Contractor’s expense (Return shipping address below).

PEARL HARBOR NAVAL SHIPYARD and IMF (N32253)

ATTN: C930, IAN WATANABE

BLDG 167-1/DLA-RECEIVING

667 SAFEGUARD ST

JBPHH HI 96860-5033

5.2. Property Management Plan - - Contractor shall provide a Property Management Plan to Government prior to award which describes the contractor’s property management system, plan, and any customary commercial practices, voluntary consensus standards, or industry-leading practices and standards to be used by the offeror in managing Government property by addressing the FAR 52.245-1(f)(ii) and (iii).

1. CONTRACTOR QUALIFICATIONS:

1.1. The Contractor shall be an authorized, Original Equipment Manufacturer (OEM) trained, certified technician, not a sub-contract technician, to troubleshoot, repair, and perform preventive maintenance service on the FARO Tracker Vantage equipment.

2. PLACE OF PERFORMANCE:

2.1. Contractor’s facilities.

3. ATTACHMENTS:

3.1. ATTACHMENT A, Government Furnished Property

File details come from the government source that posted it. Updated .