This is a geohazard maintenance pricing page and bid submission template for Ohio Department of Transportation (ODOT) contract 059-26. The document provides pricing structure for seven primary service categories: Launched Soil Nails, Drilled Soil Nails, Self-Drilling Soil Nails, Plate Piles, Plug Piles/Drilled Shafts, Scaling, and Trim Blasting, with an additional Maintenance of Traffic (MOT) section. Each category allows for tiered pricing based on project scope ranges, such as quantity thresholds for nails (50 or fewer versus 51 or more) or linear footage requirements for drilled applications (750 linear feet or less versus 751 or more). Vendors must provide unit pricing for mobilization, traffic control, flaggers, excavation, grading, seeding, dumped rock fill, and hauling/wasting services. The document specifies that mobilization is within a single district, with additional compensation of $150 for travel within-county or $250 between counties for multi-site projects, plus $0.575 per mile per vehicle after the first five miles. Vendors may submit equivalent options with alternative units of measure and pricing ranges for qualified items. Equivalent option experience requirements include minimum three recent projects (2023-2025) for Item 6.1a and minimum four projects for Item 6.1d, documenting project timelines, MOT involvement, and political subdivision locations.
Bidders must complete vendor information including name, location, contact details, and are prohibited from providing conditional information that would alter contract terms or deleting rows, columns, or tabs from the bid document. The pricing document includes a separate Temporary Sediment and Erosion Control Best Management Practices (BMP) schedule with fixed unit prices for items such as construction seeding and mulching ($0.86–$1.21 per square yard depending on acreage), perimeter filter fabric fence ($2.78–$4.89 per foot), and construction entrance ($104.00 per cubic yard). All material costs are subject to reimbursement based on local invoices at time of installation, accounting for location, availability, and seasonal variations. Incidentals and unforeseen work items require predefined unit pricing and must be addressed with ODOT prior to project start.
View the file
Other files for this state and local contract opportunity
| File | Type | Posted |
|---|---|---|
| 059-26.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
VENDOR INFORMATION
| 059-26 Pricing Geohazard Maintenance 10/29/25 | |
| Vendor Name: | ENTER VENDOR NAME HERE |
Vendor Location:
Contact Person:
Telephone Number:
Fax Number:
Email Address:
Complete Vendor Information above
DO NOT PROVIDE CONDITIONAL INFORMATION THAT WILL CHANGE THE TERMS OF THE CONTRACT.
DOING SO MAY RESULT IN REJECTION OF YOUR BID.
SUBMIT ANY QUESTIONS, CLARIFICATIONS AND INQUIRIES REGARDING THIS INVITATION TO BID THROUGH INQUIRY LINK IN OHIO BUYS
DO NOT DELETE ROWS, COLUMNS, OR TABS FROM THIS BID DOCUMENT
Do not submit previous versions (pricing pages) of the same contract.
Launched Soil Nail
| 059-26 Pricing Geohazard Maintenance 10/29/25 | ITEM A - Launched Soil Nail | |
| Vendor Name | Enter Vendor Name on VENDOR INFORMATION TAB |
| NOTE | |
| (1) | The Launched soil nail shall meet the requirement of Section 6. |
| (2) | Bid shall be the final in-place position of a Launched Soil Nail or Approved Equivalent. Price shall include all labor, equipment and material. |
| (3) | Mobilization is to any location within a District. |
| (4) | One project may consist of up to three sites. ODOT will compensate the awarded vendor for travel between sites. |
Awarded vendor will be compensated $150.00 for travel within County ($250 between Counties) for each additional site, plus $0.575 per mile per vehicle after the first 5 miles, for travel between sites.
UNIT OF MEASURE 50 Nails or Less 51 or more Nails FOR EQUIVALENT OPTIONS, COMPLETE THE INFORMATION
| TO THE RIGHT. | EQUIVALENT OPTION | UNIT OF MEASURE | Range A | Range B | ||
| ITEM A | Launched Soil Nail | EACH | 0 |
| Vendor shall list the equivalent option, identify the unit of measure, and a range for pricing. | ||||||||
| Mobilization | Traffic Control (When Necessary) | |||||||
| Lump Sum | Lump Sum | $ / HR | Unit of Measure = | For Instance: LF | ||||
| District 1 | District 7 | Flagger | ||||||
| District 2 | District 8 | Range A = | For Instance: 500 LF or less | |||||
| District 3 | District 9 | Range B = | For Instance: Greater than 500 LF | |||||
| District 4 | District 10 | |||||||
| District 5 | District 11 | |||||||
| District 6 | District 12 |
In the event the following work is required for a given site, providing a unit cost for the various services to be performed.
The cost of Materials can vary by location, availability, and time of year. For materials purchased locally at the time of the installation, ODOT will reimburse the vendor for the cost of the material at the unit price with proper invoices.
| Unit Price | Unit of Measure | ||
| Excavation | HR | Excludes hauling and wasting |
Grading HR Restore site to stable grade
Seeding SY Seeding of restored (stable grade) site.
601 Dumped Rock Fill Type A-D Supplied to Site Invoice CY Type to be determined at site meeting.
| Placement of Dumped Rock Fill | HR | Time spent placing Fill. Dumped Rock material paid on line above. |
| Option ( U/M ) determined during site visit | ||
| Hauling and Wasting | HR | Removal of excess from site and wasting it. |
| Hauling and Wasting | TN | Removal of excess from site and wasting it. |
| INCIDENTALS |
| ITEMS BELOW ARE TO PROVIDE A COST FOR INCIDENTALS, GIVING THE ODOT A DEFINED COST IN THE EVENT ADDITIONAL UNFORESEEN WORK IS NEEDED ABOVE AND BEYOND THE REQUIREMENTS AND PRICING ABOVE. |
ANY ADDITION OF ITEMS BELOW WILL BE ADDRESSED PRIOR TO THE PROJECT START.
ITEM Price Unit of Measure Description
Drilled Soil Nail
| 059-26 Pricing Geohazard Maintenance 10/29/25 | ITEM B - Drilled Soil Nail | |
| Vendor Name | Enter Vendor Name on VENDOR INFORMATION TAB |
| NOTE | |
| (1) | The Drilled soil nail shall meet the requirement of Section 6 |
| (2) | Bid shall be the final in-place position of a Drilled Soil Nail or Approved Equivalent. Price shall include all labor, equipment and material. |
| (3) | Mobilization is to any location within a District. |
| (4) | One project may consist of up to three sites. ODOT will compensate the awarded vendor for travel between sites. |
Awarded vendor will be compensated $150.00 for travel within County ($250 between Counties) for each additional site, plus $0.575 per mile per vehicle after the first 5 miles, for travel between sites.
| 750 LF or Less | 751 LF or more | |||
| ITEM B | Drilled Soil Nail | Linear Feet |
| Mobilization | Traffic Control (When Necessary) | ||||
| Lump Sum | Lump Sum | $ / HR | |||
| District 1 | District 7 | Flagger(s) | |||
| District 2 | District 8 | ||||
| District 3 | District 9 | ||||
| District 4 | District 10 | ||||
| District 5 | District 11 | ||||
| District 6 | District 12 |
In the event the following work is required for a given site, providing a unit cost for the various services to be performed.
The cost of Materials can vary by location, availability, and time of year. For materials purchased locally at the time of the installation, ODOT will reimburse the vendor for the cost of the material at the unit price with proper invoices.
| Unit Price | Unit of Measure | ||
| Excavation | HR | Excludes hauling and wasting |
Grading HR Restore site to stable grade
Seeding SY Seeding of restored (stable grade) site.
601 Dumped Rock Fill Type A-D Supplied to Site Invoice CY Type to be determined at site meeting.
| Placement of Dumped Rock Fill | HR | Time spent placing Fill. Dumped Rock material paid on line above. |
| Option ( U/M ) determined during site visit | ||
| Hauling and Wasting | HR | Removal of excess from site and wasting it. |
| Hauling and Wasting | TN | Removal of excess from site and wasting it. |
| INCIDENTALS |
| ITEMS BELOW ARE TO PROVIDE A COST FOR INCIDENTALS, GIVING THE ODOT A DEFINED COST IN THE EVENT ADDITIONAL UNFORESEEN WORK IS NEEDED ABOVE AND BEYOND THE REQUIREMENTS AND PRICING ABOVE. |
ITEM Price Unit of Measure Description
SELF - Drilling Soil Nail
| 059-26 Pricing Geohazard Maintenance 10/29/25 | ITEM C - Self Drilling Soil Nail | |
| Vendor Name | Enter Vendor Name on VENDOR INFORMATION TAB |
| NOTE | |
| (1) | The Drilled soil nail shall meet the requirement of Section 6 |
| (2) | Bid shall be the final in-place position of a Self-Drilled Soil Nail or Approved Equivalent. Price shall include all labor, equipment and material. |
| (3) | Mobilization is to any location within a District. |
| (4) | One project may consist of up to three sites. ODOT will compensate the awarded vendor for travel between sites. |
Awarded vendor will be compensated $150.00 for travel within County ($250 between Counties) for each additional site, plus $0.575 per mile per vehicle after the first 5 miles, for travel between sites.
| 750 LF or Less | 751 LF or more | |||
| ITEM C | Self Drilling Soil Nail | Linear Feet |
| Mobilization | Traffic Control (When Necessary) | ||||
| Lump Sum | Lump Sum | $ / HR | |||
| District 1 | District 7 | Flagger(s) | |||
| District 2 | District 8 | ||||
| District 3 | District 9 | ||||
| District 4 | District 10 | ||||
| District 5 | District 11 | ||||
| District 6 | District 12 |
In the event the following work is required for a given site, providing a unit cost for the various services to be performed.
The cost of Materials can vary by location, availability, and time of year. For materials purchased locally at the time of the installation, ODOT will reimburse the vendor for the cost of the material at the unit price with proper invoices.
| Unit Price | Unit of Measure | ||
| Excavation | HR | Excludes hauling and wasting |
Grading HR Restore site to stable grade
Seeding SY Seeding of restored (stable grade) site.
601 Dumped Rock Fill Type A-D Supplied to Site Invoice CY Type to be determined at site meeting.
| Placement of Dumped Rock Fill | HR | Time spent placing Fill. Dumped Rock material paid on line above. |
| Option ( U/M ) determined during site visit | ||
| Hauling and Wasting | HR | Removal of excess from site and wasting it. |
| Hauling and Wasting | TN | Removal of excess from site and wasting it. |
| INCIDENTALS |
| ITEMS BELOW ARE TO PROVIDE A COST FOR INCIDENTALS, GIVING THE ODOT A DEFINED COST IN THE EVENT ADDITIONAL UNFORESEEN WORK IS NEEDED ABOVE AND BEYOND THE REQUIREMENTS AND PRICING ABOVE. |
ITEM Price Unit of Measure Description
Plate Piles
| 059-26 Pricing Geohazard Maintenance 10/29/25 | ITEM D - Plate Piles | |
| Vendor Name | Enter Vendor Name on VENDOR INFORMATION TAB |
| NOTE | |
| (1) | The Plate Piles shall meet the requirement of Section 6 |
| (2) | Bid shall be the final in-place position of a Plate Pile. Price shall include all labor, equipment and material. |
| (3) | Mobilization is to any location within a District. |
| (4) | One project may consist of up to three sites. ODOT will compensate the awarded vendor for travel between sites. |
Awarded vendor will be compensated $150.00 for travel within County ($250 between Counties) for each additional site, plus $0.575 per mile per vehicle after the first 5 miles, for travel between sites.
| 250 SQYD or Less | 251 SQYD or Greater | |||
| ITEM D | Plate Piles | SQYD | ||
| FOR EQUIVALENT OPTIONS, COMPLETE THE INFORMATION BELOW |
| EQUIVALENT OPTION | UNIT OF MEASURE | Range A | Range B | ||
| 0 | Unit of Measure = | For Instance: SQFT |
| Vendor shall list the equivalent option, identify the unit of measure, and a range for pricing. | Range A = | For Instance: 400 SQFT or less |
| Range B = | For Instance: Greater than 400 SQFT |
| Mobilization | Traffic Control (When Necessary) | ||||
| Lump Sum | Lump Sum | $ / HR | |||
| District 1 | District 7 | Flagger(s) | |||
| District 2 | District 8 | ||||
| District 3 | District 9 | ||||
| District 4 | District 10 | ||||
| District 5 | District 11 | ||||
| District 6 | District 12 |
In the event the following work is required for a given site, providing a unit cost for the various services to be performed.
The cost of Materials can vary by location, availability, and time of year. For materials purchased locally at the time of the installation, ODOT will reimburse the vendor for the cost of the material at the unit price with proper invoices.
| Unit Price | Unit of Measure | ||
| Excavation | HR | Excludes hauling and wasting |
Grading HR Restore site to stable grade
Seeding SY Seeding of restored (stable grade) site.
601 Dumped Rock Fill Type A-D Supplied to Site Invoice CY Type to be determined at site meeting.
| Placement of Dumped Rock Fill | HR | Time spent placing Fill. Dumped Rock material paid on line above. |
| Option ( U/M ) determined during site visit | ||
| Hauling and Wasting | HR | Removal of excess from site and wasting it. |
| Hauling and Wasting | TN | Removal of excess from site and wasting it. |
| INCIDENTALS |
| ITEMS BELOW ARE TO PROVIDE A COST FOR INCIDENTALS, GIVING THE ODOT A DEFINED COST IN THE EVENT ADDITIONAL UNFORESEEN WORK IS NEEDED ABOVE AND BEYOND THE REQUIREMENTS AND PRICING ABOVE. |
ITEM Price Unit of Measure Description
Plug Piles Drilled Shafts
| 059-26 Pricing Geohazard Maintenance 10/29/25 | ITEM E - Plug Piles/Drilled Shafts | |
| Vendor Name | Enter Vendor Name on VENDOR INFORMATION TAB |
| NOTE | |
| (1) | The Plug Piles/Drilled Shafts shall meet the requirement of Section 6 |
| (2) | Bid shall be the final in-place position of a Plug Piles/Drilled Shafts. Price shall include all labor, equipment and material. |
| (3) | Mobilization is to any location within a District. |
| (4) | One project may consist of up to three sites. ODOT will compensate the awarded vendor for travel between sites. |
Awarded vendor will be compensated $150.00 for travel within County ($250 between Counties) for each additional site, plus $0.575 per mile per vehicle after the first 5 miles, for travel between sites.
| WALL LENGTH | |||||
| Less than 60 FT | 61 FT or Greater * | * Upper Length of contract is approximately 100 FT | |||
| ITEM E | Plug Piles/Drilled Shafts | ||||
| Drilled Shafts, 24" Diameter, Above Bedroack, As per Plan | LNFT | ||||
| Drilled Shafts, 24" Diameter, Into Bedrock, As Per Plan | LNFT | ||||
| Drilled Shafts, Misc,: Plug Pile, 24” Diameter, Unreinforced | LNFT | ||||
| Steel Piles, Misc.: W16x31 Steel Beam | LNFT | ||||
| Steel Piles, Misc.: W10x42 Steel Beam | LNFT | ||||
| Steel Piles, Misc.: W12x53 Steel Beam | LNFT |
| Mobilization | Traffic Control (When Necessary) | ||||
| Lump Sum | Lump Sum | $ / HR | |||
| District 1 | District 7 | Flagger(s) | |||
| District 2 | District 8 | ||||
| District 3 | District 9 | ||||
| District 4 | District 10 | ||||
| District 5 | District 11 | ||||
| District 6 | District 12 |
In the event the following work is required for a given site, providing a unit cost for the various services to be performed.
The cost of Materials can vary by location, availability, and time of year. For materials purchased locally at the time of the installation, ODOT will reimburse the vendor for the cost of the material at the unit price with proper invoices.
| Unit Price | Unit of Measure | ||
| Excavation | HR | Excludes hauling and wasting |
Grading HR Restore site to stable grade
Seeding SY Seeding of restored (stable grade) site.
601 Dumped Rock Fill Type A-D Supplied to Site Invoice CY Type to be determined at site meeting.
| Placement of Dumped Rock Fill | HR | Time spent placing Fill. Dumped Rock material paid on line above. |
| Option ( U/M ) determined during site visit | ||
| Hauling and Wasting | HR | Removal of excess from site and wasting it. |
| Hauling and Wasting | TN | Removal of excess from site and wasting it. |
| INCIDENTALS |
| ITEMS BELOW ARE TO PROVIDE A COST FOR INCIDENTALS, GIVING THE ODOT A DEFINED COST IN THE EVENT ADDITIONAL UNFORESEEN WORK IS NEEDED ABOVE AND BEYOND THE REQUIREMENTS AND PRICING ABOVE. |
ITEM Price Unit of Measure Description
Scaling
| 059-26 Pricing Geohazard Maintenance 10/29/25 | ITEM F - Scaling | |
| Vendor Name | Enter Vendor Name on VENDOR INFORMATION TAB |
| NOTE | |
| (1) | The Scaling shall meet the requirements of Section 6 |
| (2) | Bid shall be provided for the time lines provided. |
| (3) | Hauling and removal of all materials. |
| (4) | Mobilization is to any location within a District. |
| (5) | One project may consist of up to three sites. ODOT will compensate the awarded vendor for travel between sites. |
Awarded vendor will be compensated $150.00 for travel within County ($250 between Counties) for each additional site, plus $0.575 per mile per vehicle after the first 5 miles, for travel between sites.
| Hourly | ||||||
| ITEM F | Scaling | Time | ||||
| Mobilization | Traffic Control (When Necessary) | |||||
| Lump Sum | Lump Sum | $ / HR | ||||
| District 1 | District 7 | Flagger(s) | ||||
| District 2 | District 8 | |||||
| District 3 | District 9 | |||||
| District 4 | District 10 | |||||
| District 5 | District 11 | |||||
| District 6 | District 12 |
In the event the following work is required for a given site, providing a unit cost for the various services to be performed.
The cost of Materials can vary by location, availability, and time of year. For materials purchased locally at the time of the installation, ODOT will reimburse the vendor for the cost of the material at the unit price with proper invoices.
| Unit Price | Unit of Measure | ||
| Excavation | HR | Excludes hauling and wasting |
Grading HR Restore site to stable grade
Seeding SY Seeding of restored (stable grade) site.
601 Dumped Rock Fill Type A-D Supplied to Site Invoice CY Type to be determined at site meeting.
| Placement of Dumped Rock Fill | HR | Time spent placing Fill. Dumped Rock material paid on line above. |
| Option ( U/M ) determined during site visit | ||
| Hauling and Wasting | HR | Removal of excess from site and wasting it. |
| Hauling and Wasting | TN | Removal of excess from site and wasting it. |
| INCIDENTALS |
| ITEMS BELOW ARE TO PROVIDE A COST FOR INCIDENTALS, GIVING THE ODOT A DEFINED COST IN THE EVENT ADDITIONAL UNFORESEEN WORK IS NEEDED ABOVE AND BEYOND THE REQUIREMENTS AND PRICING ABOVE. |
ITEM Price Unit of Measure Description
Trim Blasting
| 059-26 Pricing Geohazard Maintenance 10/29/25 | ITEM G - Trim Blasting | |
| Vendor Name | Enter Vendor Name on VENDOR INFORMATION TAB |
| NOTE | |
| (1) | The Scaling shall meet the requirements of Section 6 |
| (2) | Provide pricing for the time lines listed |
| (3) | Hauling and removal of all materials. |
| (4) | Mobilization is to any location within a District. |
| (5) | One project may consist of up to three sites. ODOT will compensate the awarded vendor for travel between sites. |
Awarded vendor will be compensated $150.00 for travel within County ($250 between Counties) for each additional site, plus $0.575 per mile per vehicle after the first 5 miles, for travel between sites.
| 250 SQFT or Less | 251 SQFT or Greater | ||||||
| ITEM G | Trim Blasting | SQFT | |||||
| Mobilization | Traffic Control (When Necessary) | ||||||
| Lump Sum | Lump Sum | $ / HR | |||||
| District 1 | District 7 | Flagger(s) | |||||
| District 2 | District 8 | ||||||
| District 3 | District 9 | ||||||
| District 4 | District 10 | ||||||
| District 5 | District 11 | ||||||
| District 6 | District 12 |
In the event the following work is required for a given site, providing a unit cost for the various services to be performed.
The cost of Materials can vary by location, availability, and time of year. For materials purchased locally at the time of the installation, ODOT will reimburse the vendor for the cost of the material at the unit price with proper invoices.
| Unit Price | Unit of Measure | ||
| Excavation | HR | Excludes hauling and wasting |
Grading HR Restore site to stable grade
601 Dumped Rock Fill Type A-D Supplied to Site Invoice CY Type to be determined at site meeting.
| Placement of Dumped Rock Fill | HR | Time spent placing Fill. Dumped Rock material paid on line above. |
| Option ( U/M ) determined during site visit | ||
| Hauling and Wasting | HR | Removal of excess from site and wasting it. |
| Hauling and Wasting | TN | Removal of excess from site and wasting it. |
| INCIDENTALS |
| ITEMS BELOW ARE TO PROVIDE A COST FOR INCIDENTALS, GIVING THE ODOT A DEFINED COST IN THE EVENT ADDITIONAL UNFORESEEN WORK IS NEEDED ABOVE AND BEYOND THE REQUIREMENTS AND PRICING ABOVE. |
ITEM Price Unit of Measure Description
MOT
| 059-26 Pricing Geohazard Maintenance 10/29/25 | MAINTENANCE OF TRAFFIC | |
| Vendor Name | Enter Vendor Name on VENDOR INFORMATION TAB |
MAINTENANCE OF TRAFFIC
| Price | Unit of Measure | |||
| M.O.T. / No Lane Closure | Lump Sum | (When requested) | Maintenance of Traffic for the project, including all incidentals(excluding Flaggers, PCB & End Treatment) to properly setup and maintain the work zone. | |
| M.O.T. w/Single Lane Closure | Lump Sum | (When requested) | Maintenance of Traffic for the project, including all incidentals(excluding Flaggers, PCB & End Treatment) to properly setup and maintain the work zone. |
| PCB (M.O.T.) | Linear Ft. | (When requested) | A separate charge for approved temporary portable concrete barrier has been provided. |
| End Treatment (M.O.T) | Each | (When requested) | A separate charge for an approved temporary portable concrete barrier end treatment for work zones has been provided. |
| Flagger | $ / hr / flagger | (When necessary) | The number of flaggers may vary from project to project. (This number should match the individual tabs if completed in both sections) |
SS832
| 059-26 Pricing Geohazard Maintenance 10/29/25 | SS832 Pricing |
| Temporary Sediment and Erosion Control Best Management Practices (BMP) |
Unit Price Schedule, July 2025
| Project Identified EDA (acres) | Fixed Price | Comment | ||||||||
| <5 | 5 to 10 | 10 to 15 | 15 to 20 | >20 | ($) | |||||
| Item | Unit | Description | Price ($) | |||||||
| 832 | Sq. Yd. | Construction Seeding and | ||||||||
| Mulching | $1.21 | $1.11 | $1.00 | $0.91 | $0.86 | Based on |
NOI acres
| 832 | Feet | Slope Drains | $14.50 | ||||||
| 832 | Cu. Yd. | Sediment Basins and Dams | $16.50 | [3] | |||||
| 832 | Cu. Yd. | Excavated Drop Inlet Protection | $16.50 | ||||||
| 832 | Feet | Perimeter Filter Fabric Fence | $4.89 | $3.75 | $3.44 | $3.08 | $2.78 | Based on |
NOI acres
| 832 | Feet | Filter Fabric Ditch Check | $13.50 | |||||||
| 832 | Feet | Inlet Protection | $13.75 | |||||||
| 832 | Cu. Yd. | Earthen Dike/Berm | $3.75 | |||||||
| 832 | Sq. Yd. | Temporary Stabilization Matting | $3.25 | |||||||
| 832 | Cu. Yd. | Rock Ditch Check, Type C or D | ||||||||
| without Filter | $87.00 | [1] | ||||||||
| 832 | Cu. Yd. | Rock Channel Protection, Type C | ||||||||
| or D with Filter | $92.00 | [1] | ||||||||
| 832 | Cu. Yd. | Rock Channel Protection, Type C | ||||||||
| or D without Filter | $87.00 | [1] | ||||||||
| 832 | Cu. Yd. | Basin Sediment Removal | $12.00 | |||||||
| 832 | Cu. Yd. | Miscellaneous Sediment Removal | $19.00 | |||||||
| 832 | Feet | Construction Fence | $3.25 | |||||||
| 832 | Sq. Yd. | Construction Mulching | $0.96 | $0.86 | $0.70 | $0.68 | $0.66 | Based on |
NOI acres 832 Sq. Yd. Winter Seeding and Mulching $1.30 $1.21 $1.11 $1.02 $0.98 Based on NOI acres
| 832 | Cu. Yd. | Construction Entrance | $104.00 |
| [1] | Add the following amount per cubic yard for the cost of Type C or D Rock materials. | ||
| [3] | Add the amount for the appropriately sized surface dewatering device for sediment basin outlet. |
EXPERIENCE
059-26 Pricing Geohazard Maintenance 10/29/25 VENDOR EXPERIENCE
PROVIDE EXPERIENCE AS DESCRIBED IN SPECIFICATIONS FOR EACH EQUIVALENT OPTION SUBMITTED
If you uare not providing an "equivalent option", you are not be required to complete this page.
EQUIVALENT OPTION to Item 6.1a
A minimum of three projects are requried, within the last three calendar years (2023-2025). Providing additional projects may be beneficial if any quesitons arise with the first three, but are not required
| Project Begin Date | |||
| (MM / YY) | Project Timeline | ||
| (Months and/or Weeks) | Project length | MOT / Traffic Control | |
| Yes or No | Political Subdivision | Project Location/Description | |
| 1 (Required) | |||
| 2 (Required) | |||
| 3 (Required) | |||
| 4 (Optional) | |||
| 5 (Optional) | |||
| 6 (Optional) |
EQUIVALENT OPTION to Item 6.1d
A minimum of four projects are requried. Providing additional projects may be beneficial if any quesitons arise with the first four, but are not required
| Project Begin Date | |||
| (MM / YY) | Project Timeline | ||
| (Months and/or Weeks) | Project length | MOT / Traffic Control | |
| Yes or No | Political Subdivision | Project Location/Description | |
| 1 (Required) | |||
| 2 (Required) | |||
| 3 (Required) | |||
| 4 (Optional) | |||
| 5 (Optional) | |||
| 6 (Optional) |
File details come from the government source that posted it. Updated .