05. FR-SC Project Drawings.pdf
PDF 10 MB Posted
- Attached to
- FORT RANDALL-SIOUX CITY 230-KV TRANSMISSION LINE, STRUCTURE 103/4, ACCESS RAMP AND TOWER EROSION REPAIR, IA
- Solicitation number
- 89503421BWA000027
About this file
This document provides details on a federal solicitation opportunity for repair work on a transmission line structure and access ramp. The solicitation number is 89503421BWA000027 and is being issued by the Department of Energy Western Area Power Administration to complete repairs to Fort Randall-Sioux City 230-kV Transmission Line, Structure 103/4, including its access ramp and an area experiencing tower erosion. The opportunity type is listed as a solicitation. No further information is included on response due dates, award timing, pricing terms, or other requirements.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 05. FR-SC Project Specifications.pdf | ||
| 22. Sol_89503421BWA000027.pdf | ||
| 12. Wage Rates.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FORT RANDALL – SIOUX CITY 230-kV TRANSMISSION LINE
STRUCTURE 103/4 – ACCESS RAMPS AND TOWER EROSION REPAIR
SECTION C
DESCRIPTION/SPECIFICATIONS
Solicitation No. 89503421BWA000027 Spec. No. 21WC140745-790
IOWA
FORT RANDALL – SIOUX CITY 230-kV TRANSMISSION LINE
STRUCTURE 103/4 – ACCESS RAMPS AND TOWER EROSION REPAIR
PROJECT DRAWINGS
A. GENERAL:
CONSTRUCTION DRAWINGS: Construction drawings are the specification drawings and any additional drawings required for use in construction. The construction drawings will be issued after contract award and may include amendment changes and other details, which make the drawings suitable to use for construction purposes.
PROJECT DRAWINGS: Project drawings included herein are reduced reproductions and are not to scale. Some project drawings show details of fabrication and other information not a part of the work. Disregard information and details, which are not applicable.
STANDARD DRAWINGS: Where details shown on standard drawings included herein differ from construction or project drawings or text, the details of construction or project drawings or text shall govern. A complete set of standard drawings are available at https://www.wapa.gov/DoingBusiness/SellingToWestern/Pages/what-western-buys.aspx.
INFORMATIONAL DRAWINGS: Some project drawings have the words “FOR INFORMATION ONLY” appearing above the title block. These drawings show some information, which may be required for bidding purposes.
These drawings do not show items to be furnished or work to be performed.
EXISTING INSTALLATION DRAWINGS: Some project drawings have the words “EXISTING INSTALLATION” appearing above the title block. These drawings show the existing installations prior to modifications and may show some new work to be performed.
REFERENCE DRAWINGS: Reference drawings referred to on project drawings and not included herein, are not necessary for bidding purposes.
CONTRACTOR'S RESPONSIBILITY: Check all drawings and advise Western of any errors or omission.
B. LIST OF DRAWINGS:
LOCATION MAP:
1. FR-SC D 0005, Rev A – 230KV Transmission Line – Fort Randall to Sioux City – Key Map
2. FR-SC D T001 – Location Map – Structure 103/4
PHOTOGRAPHS:
3. FR-SC D T002 – Existing Photos (1 of 3) – Structure 103/4
4. FR-SC D T003 – Existing Photos (2 of 3) – Structure 103/4
5. FR-SC D T004 – Existing Photos (3 of 3) – Structure 103/4
6. FR-SC D T005 – Topo Map – Structure 103/4
7. FR-SC D T006 – Topo Map Overview – Structure 103/4
STRUCTURE FOOTINGS:
8. FR-SC-D 2008, Rev A FIO – Double Circuit Steel Towers - Type DSAH & DSAH-1 Towers - Concrete
Footing Special “PT” (14’-0”) (For Information Only)
EROSION REPAIR DRAWINGS:
9. FR-SC D 2028, Rev A FIO – Bank Stabilization – Iowa – Structure 103/4 (For Information Only)
10. FR-SC D 2033 – Access Ramp Over Existing Dike Near Structure 103/4
11. FR-SC D 2034 – Access Ramp Over Existing Dike Near Structure 103/4 – Details
12. FR-SC D 2035 – Access Ramp Over Existing Dike Near Structure 103/4 – Details
13. FR-SC D 2036 EI – Structure 103/4 – Riprap Plan View (Existing Installation)
14. FR-SC D 2036, Rev A – Structure 103/4 – Riprap Plan View
15. FR-SC D 2037 EI – Structure 103/4 – Sections A-A, B-B Existing Installation)
16. FR-SC D 2037, Rev A – Structure 103/4 – Sections A-A, B-B
17. FR-SC D T007 EI – Structure 103/4 – Sections A-A, B-B (Existing Installation)
18. FR-SC D T007, Rev A – Structure 103/4 – Sections A-A, B-B
PLAN AND PROFILE:
19. FR-SC D 4200 EI – Access Road Over Dike Near Structure 103/4 (Existing Installation)
20. FR-SC D 4200, Rev A – Access Road Over Dike Near Structure 103/4
GEOLOGIC INVESTIGATIONS:
21. FR-SC 8000, Rev A – Typical Foundation Conditions https://www.wapa.gov/DoingBusiness/SellingToWestern/Pages/what-western-buys.aspx https://www.wapa.gov/DoingBusiness/SellingToWestern/Pages/what-western-buys.aspx http://www.wapa.gov/business/buys.htm lowe Text Box Location of access ramps and tower erosion repair project. Structure is located in T91N, R49W, Section 10 approximately 3.5 miles south of Westfield, IA, then 1.0 mile west on a gravel/dirt road, and 0.5 mile northwest across field trail to tower.
Line
Rectangle lowe Rectangle lowe Rectangle lowe Typewritten Text
FOR INFORMATION ONLY
Line lowe Text Box
- ESTIMATED DIRECTION
OF FLOOD FLOWS
lowe Line lowe Line lowe Line lowe Typewritten Text
FOR INFORMATION ONLY
Line lowe Typewritten Text
EXISTING INSTALLATION
lowe Line lowe Typewritten Text
REFERENCE DRAWING
lowe Typewritten Text
STRUCTURE 103/4, SECTIONS A-A,
B-B..............................FR-SC D T007
Message from the Administrator
At Western Area Power Administration (WAPA), we show our commitment to safety every day through the actions we take, the training we offer and the work conditions we provide. We expect the same commitment to safety from each of our contractors who provide products or services to WAPA. In performing work for WAPA, all contractors must make the right decisions to ensure that the work environment is as safe as possible.
Our safety program is based on four points:
Safety procedures or common sense must be applied by each Federal and contract employee. Safety should not be set aside to meet a project schedule or for personal convenience.
Employees and contractors must believe that they have the right and the responsibility to identify and take action to reduce, if not eliminate, hazardous work environments and hazardous work practices.
Managers and supervisors must lead by example and execute their responsibility to ensure each job is accomplished in a safe and healthy way.
Safety is a personal responsibility. Each individual makes the decision on what action to take to accomplish a task.
By integrating these principles into every task we take, together we can ensure WAPA is a safe place to work.
Tracey A. LeBeau Administrator and CEO (Interim)
| fr_sc_d_8000a |
| DOE Symbol_11x17 |
| Mark Gabriel Safety Message_11x17 |
File details come from the government source that posted it. Updated .