SOUTH DAKOTA
Solicitation No. 89503421BWA000022 Spec. No. 21WC138924-1011
SECTION C
DESCRIPTION/SPECIFICATIONS
FLANDREAU SUBSTATION
STAGE 09
Section C
DESCRIPTION/SPECIFICATIONS
FLANDREAU SUBSTATION, STAGE 09
DIVISION 1 – GENERAL REQUIREMENTS
A. CONTRACT REQUIREMENT:
B. DESCRIPTION OF WORK:
1. The principal components of work includes:
C. DESCRIPTION OF BIDDING SCHEDULE ITEM:
1. Bidding Schedule item “Mobilization and preparatory work”
D. COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK:
1. SUBMITTAL APPROVAL TIME:
2. COMMENCEMENT OF CONTROL WORK:
3. OUTAGE RESTRICTIONS:
4. CONSTRUCTION SCHEDULE RESTRICTIONS AND SEQUENCE:
5. PROTECTIVE GROUND LEADS:
6. MAXIMUM AVAILABLE FAULT CURRENT:
7. SAFETY AND HEALTH PROGRAM:
E. CONSTRUCTION SCHEDULE:
1. SUBMITTAL TIME:
2. FORMAT AND DETAIL:
F. MATERIAL: F
1. POINTS-OF-DELIVERY:
G. RIGHTS-OF-WAY:
H. GEOLOGIC INVESTIGATIONS:
I. ELECTRIC POWER FOR CONSTRUCTION PURPOSES:
J. WATER FOR CONSTRUCTION PURPOSES:
K. EXPLOSIVES AND BLASTING:
L. BURIED UTILITIES:
M. EMPLOYEE REQUIREMENTS:
N. ELECTRICAL MINIMUM APPROACH DISTANCES:
O. SUBMITTALS AND CORRESPONDENCE:
1. GENERAL:
2. TRANSMITTAL:
3. PHYSICAL SAMPLE SUBMITTALS:
4. SUBMITTAL RESPONSE:
5. APPROVAL TIME:
6. PROJECT PROTOCOL:
DIVISION 2 – SITEWORK
A. DESCRIPTION OF BIDDING SCHEDULE ITEMS:
1. Bidding Schedule item “Miscellaneous sitework”
2. Bidding Schedule item “Demolition”
3. Bidding Schedule does not contain separate items for the following
DIVISION 3 – CONCRETE
A. GENERAL:
1. MATERIAL:
2. TEST FOR POTENTIAL REACTIVITY OF SAND AND COARSE AGGREGATE:
3. CURING:
4. REBAR DEVELOPMENT (LD) AND LAP LENGTH:
B. DESCRIPTION OF BIDDING SCHEDULE ITEM:
1. Bidding Schedule item “Concrete foundations”
DIVISION 4 – SUBSTATION METALWORK
A. GENERAL:
1. MEASUREMENT: Measurement for quantities for Bidding Schedule item “Install steel (Government-furnished)”
B. DESCRIPTION OF BIDDING SCHEDULE ITEM:
1. Bidding Schedule item “Install steel (Government-furnished” includes installing the following: ..11
DIVISION 9 – SUBSTATION - ELECTRICAL
A. GENERAL:
1. Bidding Schedule for Government-furnished items
2. Bidding Schedule for items (not furnished by the Government)
3. Unless otherwise specified, associated support structures
4. Installation and painting of electrical equipment and material
B. DESCRIPTION OF BIDDING SCHEDULE ITEMS:
1. Bidding Schedule items “Power circuit breaker, 69-kV, 2,000-amps (Government-furnished)”: .12
2. Bidding Schedule items “Disconnecting switch, three phase, 69-kV, 1,200-amps (Government-furnished)”:
3. Bidding Schedule item “Current transformer, 69-kV, single phase (Government-furnished)”:
4. Bidding Schedule items “Coupling capacitor voltage transformer, 69-kV, single-phase
(Government-furnished)”:
5. Bidding Schedule item “1/0 AWG, 25-kV, insulated copper cable”
6. Bidding Schedule item “Associated electrical equipment and material”
7. Bidding Schedule item “Existing outdoor electrical equipment and material”
8. Bidding Schedule items “Furnishing 5/c No. 10 AWG control cable” and “Furnishing 12/c No. 10
AWG control cable”
9. Bidding Schedule items “Installing 5/c No. 10 AWG control cable” and “Installing 12/c No. 10
AWG control cable”
DIVISION 1 – GENERAL REQUIREMENTS
A. CONTRACT REQUIREMENT:
Construct and complete Flandreau Substation, Stage 09, in accordance with the Construction Contract (Standard Form 1442); the Contract Clauses; Western Area Power Administration’s (WAPA) Construction Standards, including Standard 1 – General Requirements (September 2016), Standard 2 – Sitework (September 2016), Standard 3 – Concrete (September 2016), Standard 4 – Substation Metalwork and Transmission Line Lattice Structures (September 2016), Standard 5 – Transmission Line Steel Pole Structures (September 2016), Standard 6 – Light Duty Steel Pole Structures (September 2016), Standard 7 – Wood Poles (September 2016), Standard 8 – Glued Laminated Structures (September 2016), Standard 9 – Substation – Electrical (September 2016), Standard 10 – Transmission Line – Electrical (September 2016), Standard 11 – Service Building (September 2016), Standard 12 – Painting (September 2016), Standard 13 – Environmental Quality Protection (September 2016), Standard 14 – Communication Facilities (September 2016), Standard 15 – Drawings (September 2016); Standard Drawings; and these Project Specifications and Drawings.
If a conf lict occurs between the Project Specifications and the Construction Standards, the Project Specifications shall govern. The Project Specifications and the drawings are used to take exceptions or provide additions to the Construction Standards. Some paragraphs in the Construction Standards will not apply to this job.
WAPA’s Construction Standards, Standard Drawings, and Electrical Equipment Standards are available at https://www.wapa.gov/DoingBusiness/SellingToWestern/Pages/what-western-buys.aspx.
WAPA Project Specifications and Construction Standards are explained in Standard 1 – General Requirements, Section 1.1.1, “Standards and Project Specifications”.
B. DESCRIPTION OF WORK:
1. The principal components of work includes:
a. Miscellaneous sitework.
b. Providing new concrete foundations.
c. Demolition of existing foundations.
d. Providing grounding, bus, and conduit systems.
e. Installing Government-furnished steel structures.
f. Installing the following Government-furnished equipment (GFE): One (1) 69-kV Power circuit breaker, two (2) 69-kV disconnect switches, one (1) 69-kV coupling capacitor voltage transformer, three (3) 69-kV current transformers, and steel.
g. Providing insulated conductor and cables, terminal boxes, and substation signs.
Paragraphs “Description of Bidding Schedule Items” in Divisions – 1, 2, 3, 4, and 9 describe the work to be performed.
The work is located near Flandreau, South Dakota, as shown on Drawing FL 0016.
C. DESCRIPTION OF BIDDING SCHEDULE ITEM:
1. Bidding Schedule item “Mobilization and preparatory work” includes the following:
https://www.wapa.gov/DoingBusiness/SellingToWestern/Pages/what-western-buys.aspx
a. Performing mobilization and preparatory work in accordance with Sections H and M of the contract clauses.
b. Preparing and submitting a Construction Schedule and furnish a Safety and Health Program.
c. Complying with applicable Environmental Standards.
d. Complying with DOE order 442.2 “Dif fering Professional Opinions for Technical Issues
Involving Environment, Safety, and Health”.
D. COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK: See FAR 52.211-10 in
Section F of the solicitation/contract.
1. SUBMITTAL APPROVAL TIME: Except as otherwise provided for specific submittals, WAPA will require 20-calendar days for review of drawings or data submitted for approval.
2. COMMENCEMENT OF CONTROL WORK: Do not perform any control board or outdoor equipment wiring until receipt of Government-furnished wiring diagrams. WAPA will furnish outdoor wiring and schematic diagrams no sooner than February 25, 2021. Control board wiring and schematic diagrams will be furnished no sooner than March 16, 2021. Include these restrictions in the Construction Program.
3. OUTAGE RESTRICTIONS:
a. The electrical operation of the transmission lines are under the jurisdiction of WAPA’s
Watertown Operations Office. All outage requests by the Contractor shall be subject to the approval of the Contracting Of ficer’s Representative (COR). Approval or denial of an individual outage request will be based on transmission system electrical loads, system operating configurations and weather conditions at the time the outage is scheduled to begin. At any time because of transmission system electrical loads, system the transmission system operation or reliability, WAPA may deny an outage request or direct the Contractor to return facilities to operating conditions and release the applicable Special Work Permit.
b. Make all outage requests in writing to the COR a minimum of 3-weeks in advance.
c. Meeting the minimum advance notice requirement of 3-weeks does not guarantee an outage will be approved. To improve the chances of an outage being approved, all outages should be submitted with as much advance notice as practicable. Weather conditions and other system conditions such as other scheduled and nonscheduled (forced) outage must be evaluated against an outage request before approval can be granted.
4. CONSTRUCTION SCHEDULE RESTRICTIONS AND SEQUENCE: The following Construction
Schedule restrictions shall apply:
a. The Contractor shall not work more than 12-hours per day and no more than 60-hours in one (1) continuous period without approval from the COR.
b. The Contractor shall remove the lightning mast and foundation and construct the new equipment without interfering with the existing 69-kV terminal and SS transformer. After this is complete, WAPA will than install the tie-in to the existing 69-kV terminal and relocate the SS transformer, perform all commissioning activities, and place the 69-kV yard in-service.
At this time, the Contractor shall remobilize to the site and remove and dispose of the old SS foundations.
5. PROTECTIVE GROUND LEADS: See WAPA Construction Standards, Standard 1 “General
Requirements”, Section 1.4.14.3(1).
6. MAXIMUM AVAILABLE FAULT CURRENT: When protective ground leads are required, the protective ground leads shall be sized as defined below and shall meet the requirements of Standard 1 – General Requirements, Section 1.4 “Safety and Health” and the following:
a. The maximum available fault current in the 115-kV area is 4,590-amps and the X/R ratio is
3.6 prior to completing construction and 4,590-amps and the X/R ratio is 3.6 af ter completing construction.
b. A minimum of one (1) 1/0 grounds shall be used in the 115-kV area.
c. The maximum available fault current in the 69-kV area is 3,470-amps and the X/R ratio is 8 prior to completing construction and 3,470-amps and the X/R ratio is 8 af ter completing
d. A minimum of one (1) 1/0 grounds shall be used in the 69-kV area.
e. The maximum available fault current in the 12.47-kV area is 4,540-amps and the X/R ratio is 20.2 prior to completing construction and 4,540-amps and the X/R ratio is 20.2 af ter completing construction.
f. A minimum of one (1) 1/0 grounds shall be used in the 12.47-kV area.
7. SAFETY AND HEALTH PROGRAM: Prior to the start of f ield construction operations at the job site, submit a Safety and Health Program. Prior to beginning onsite construction, a preconstruction safety meeting will be conducted with the Contractor’s supervisory personnel, any major subcontractors, and WAPA.
E. CONSTRUCTION SCHEDULE:
1. SUBMITTAL TIME: Prepare and Submit a Construction Schedule to the CO within 10-calendar days after date of Notice to Proceed.
2. FORMAT AND DETAIL: Dates for each item of Government-furnished material shall be provided.
Do not program dates earlier than the estimated delivery dates shown in the “Material” paragraph.
F. MATERIAL: Furnish all material for completing the work, except material furnished by WAPA as listed below:
Item Estimated
Weight (pounds)
Estimated Delivery
Date Estimated
Cost
One (1) 3-phase, power circuit breaker, 69-kV, 2,000-amp 4,630 NST 02-04-2021
NLT 03-04-2021 $55,000
Disconnecting Switches:
a. Two (2) 3-phase, 69-kV, 1,600 amp 1,386 ea NST 02-04-2021
NLT 03-04-2021 $8,000 ea
One (1) single-phase coupling capacitor voltage transformer, 69-kV 444 NST 02-04-2021
NLT 03-04-2021 $6,000
Item Estimated
Weight (pounds)
Estimated Delivery
Date Estimated
Cost
Three (3) single-phase current transformers, 69-kV 533 ea NST 02-04-2021
NLT 03-04-2021 $6,700 ea
Steel 27,000 NST 04-01-2021
NLT 04-15-2021 $82,000
NST – No sooner than.
NLT – No later than.
1. POINTS-OF-DELIVERY: Material furnished by WAPA will be delivered to Flandreau Substation.
The Contractor is responsible for unloading of WAPA-furnished material. The Contractor shall inspect the equipment and report any damages to the COR.
G. RIGHTS-OF-WAY:
Orient construction methods and equipment to utilize Government-furnished rights-of-way and within Government property lines or obtain additional temporary access without additional cost to WAPA.
Any additional temporary access acquired by the Contractor shall have prior COR approval. WAPA reserves the right to use Contractor-obtained access.
H. GEOLOGIC INVESTIGATIONS:
The 8000-series geologic logs of subsurface explorations included in the “Drawings” Division constitute the information and records of geologic investigations for the work. Locations of subsurface investigations are shown on the Drawings.
Samples and cores of recovered material were not retained. Bidders shall obtain their own samples and perform tests on the material to evaluate properties, which they believe to be significant. WAPA does not guarantee that the geologic information and records show the conditions that will be encountered in performing the work, but only that the geologic information and records show conditions encountered at the particular point and time the information and records were obtained.
The geologic information may not indicate variations, such as those caused by seasonal fluctuations in rainfall and other factors, which may af fect the water level. The Contractor shall determine the nature of material to be excavated, the difficulties of making and maintaining required excavations, and doing other work affected by geology and ground water elevations at the worksite.
I. ELECTRIC POWER FOR CONSTRUCTION PURPOSES:
Electric power for construction purposes will be available without cost. Source of supply is located in the receptacles throughout the substation. Power made available by WAPA will be delivered as single-phase, 60 Hz, AC at approximately 120-240V.
The Contractor may furnish power for his operations by other means at no additional cost to WAPA.
If needed, make arrangements and provide all electric power for construction purposes. Provide necessary transmission lines, distribution circuits, transformers, and other electrical equipment for distributing the power to the places of use. At contract completion, remove temporary electrical equipment and distribution lines.
J. WATER FOR CONSTRUCTION PURPOSES:
Furnish water for construction purposes. Make arrangements for obtaining the water and provide for conveying the water to the points of use.
K. EXPLOSIVES AND BLASTING:
Explosives shall not be used.
L. BURIED UTILITIES:
Prior to excavation, examine the area and determine the location of buried utilities. Utilities shall be identified with a marker denoting the type of service.
M. EMPLOYEE REQUIREMENTS:
In addition to the requirements listed in WAPA Construction Standard 1.4.3 all employees are restricted f rom wearing a headset, headphone or other listening device, other than a hearing aid or instrument for the improvement of defective human hearing, hearing protection worn as the hazard exists or for communication purposes while on a WAPA jobsite.
N. ELECTRICAL MINIMUM APPROACH DISTANCES:
In addition to the requirements listed in WAPA Construction Standard 1.4.9 equipment other than cranes and derricks, conductive objects or personnel, shall not be brought closer to energized facilities than the electrical minimum approach distances established by OSHA 1926.958(b), “Materials, Handling, and Storage”. The less stringent equipment clearance distances established by OSHA 1926.960, “Working On or Near Exposed Energized Parts”, Table V-5 and Table V-6, may only be used af ter the Contractor has completed and submitted WAPA’s Electrical Clearance Variance form and has received the signed form in return from the COR.
O. SUBMITTALS AND CORRESPONDENCE:
1. GENERAL: The Contractor shall furnish submittals via email as specified in the Construction Standards and this Project Specification to the email address listed under the Transmittal section below and with the following requirements:
a. Submittals shall be in standard PDF, Microsoft Word (.doc/.docx), Microsoft Excel
(.xls/.xlsx), or Electronic CAD (.dwg) (AutoCAD 2010 or 2014) formats. All submittals in .dwg format shall also be submitted in .pdf format.
b. All submittals shall include the WAPA Contract number, Specification number, WAPA project title, Bidding Schedule Contract Line Item Number (CLIN) and applicable division number.
c. Multiple CLIN’s on a single submittal are not permitted.
d. A cover transmittal letter in Microsoft Word or PDF format shall be included with each email submittal.
2. TRANSMITTAL: The Contractor shall transmit all submittals to the Construction Office.
Email: UGP-CS-B5600@WAPA.GOV
3. PHYSICAL SAMPLE SUBMITTALS: When physical specimens or digital media are required to be submitted for approval, (i.e. brick samples, roofing material samples, carpeting, CDs, DVDs, etc.) the Contractor shall provide a digital cover letter outlining the physical sample submittal prior mailto:UGP-CS-B5600@WAPA.GOV to sending the sample (including tracking data when applicable) and shall deliver physical specimens to:
Western Area Power Administration Civil/Structural Design ATTN: 7920, Civil Engineering Manager 12155 W. Alameda Parkway Lakewood, CO 80228-2802
A courtesy copy of the submittal letter shall be emailed to the Construction office at the above address.
4. SUBMITTAL RESPONSE: WAPA will respond to submittals electronically with an “Accepted” or
“Not Accepted” status with comments as appropriate in accordance with the “Commencement, Prosecution, and Completion of Work” paragraph to the email address where the submittals originated.
5. APPROVAL TIME: Approval time for submittals shall be in accordance with the “Commencement, Prosecutions, and Completion of Work” paragraph.
6. PROJECT PROTOCOL:
a. Submittals – Electronic Correspondence:
SUBJECT LINE IN EMAIL -- SUBMITTAL FORMAT
CLIN + Submittal Name – Applicable Division Number or Drawing Number – Project Title – Specification Number – Contract Number Example: 0011 Concrete Mix Design – 3.A.1 – Flandreau Substation, Stage 09, SD –
21WC138924-1011 – 89503421CWA4000XX
b. Payment Requests:
SUBJECT LINE IN EMAIL -- PAYMENT REQUEST FORMAT
Invoice Number – Project Title – Specification Number – Contract Number Example: Invoice 01 – Flandreau Substation, Stage 09, SD – 21WC138924-1011 –
89503421CWA4000XX
c. Certif ied Payrolls – Prime and Sub-Contractors:
SUBJECT LINE IN EMAIL -- CERTIFIED PAYROLL FORMAT
Certif ied Payroll (CP) – Contractor Name – Week Ending (WE) – Project Title – Specification Number – Contract Number Example: CP – Bob’s Asphalt Repair – WE 08/13/16 & 08/20/16 – Flandreau Substation, Stage
09, SD – 21WC138924-1011 – 89503421CWA4000XX
d. Request for Information:
SUBJECT LINE IN EMAIL -- REQUEST FOR INFORMATION (RFI) FORMAT
RFI Number – Subject – Project Title – Specification Number – Contract Number Example: RFI 003 – Labeling Info – Flandreau Substation, Stage 09, SD – 21WC138924-1011 –
89503421CWA4000XX
DIVISION 2 – SITEWORK
A. DESCRIPTION OF BIDDING SCHEDULE ITEMS:
1. Bidding Schedule item “Miscellaneous sitework” includes the following:
a. Protecting, repairing, and replacing gravel surfacing disturbed during mobilization and
b. Providing new gravel surfacing as needed due to demolition and foundation work. New gravel surfacing shall be South Dakota Department of Transportation (SDDOT) standard road base.
2. Bidding Schedule item “Demolition” includes the following:
a. Completely removing and disposing of the concrete foundations encircled on Existing
Installation Drawings FL 2008 Rev. O, FL 2006 Rev. D, FL 2005 Rev. N, FL 2016 Rev. C, and FL 2017 Rev. B.
b. Removing the 45-foot Steel Ground Mast on top of foundation “7GM1”. The Steel Ground
Mast shall be placed at a location in the substation as directed by the COR. WAPA will take possession of the mast.
3. Bidding Schedule does not contain separate items for the following. Include these items in applicable Bidding Schedule items.
a. Excavations for foundations, structures, and trenches.
b. Placing and compacting earth material and backfill.
c. Providing gravel fill under concrete foundations as shown on the Drawings.
d. Disposing of excavated material. Material f rom excavations not suitable or required for earthwork shall be removed f rom the substation and access road right-of-way. The Contractor shall make arrangements required for disposal of waste material in an approved landf ill.
e. Expansion anchors and epoxy adhesive anchors.
DIVISION 3 – CONCRETE
A. GENERAL:
1. MATERIAL:
a. Cement: Type IIA cement Types are according to ASTM C 150.
b. Compressive Strength: 4500-psi minimum at 28-days
c. Water-Cement Ratio: Net water-cement ratio, exclusive of water absorbed by the aggregates, shall not exceed 0.45 by weight.
d. Type A and D water-reducing and retarding admixtures may be used if approved by the
COR.
e. Class F f ly ash is required to neutralize severe alkali or ASR reaction in accordance with ASTM C 311 (regarding test data), ASTM C 618 (regarding material) and Standard 3 – Concrete (regarding WAPA-specific requirements). Proposed concrete mix designs shall incorporate fly ash up to a maximum of 20-percent; minimum 28-day compressive strength shall be maintained in mix design.
2. TEST FOR POTENTIAL REACTIVITY OF SAND AND COARSE AGGREGATE: WAPA may perform tests for potential reactivity for the sand and coarse aggregate to be used by the Contractor. If the tests determine the aggregate(s) to be unsuitable as a concrete aggregate, a suitable source will be obtained by the Contractor.
3. CURING: Exposed, formed surfaces of concrete foundations shall be cured with water, resin-base curing compound without fugitive dye, or by covering with polyethylene film.
4. REBAR DEVELOPMENT (LD) AND LAP LENGTH:
a. Class B lap splices apply unless noted otherwise; refer to Table 3 on Standard
Drawing 01 2004-1 General Outline and Reinforcement Notes.
b. Typical closed circular tie lap splice lengths for drilled piers and columns, 4,000 – 4,500 psi normal weight concrete, unless noted otherwise, are 18-inches for No. 3 ties, 24-inches for No. 4 ties and 30-inches for No. 5 ties.
B. DESCRIPTION OF BIDDING SCHEDULE ITEM:
1. Bidding Schedule item “Concrete foundations” includes the following:
a. Earthwork, formwork, reinforcement, material used in concrete, galvanized anchor bolts, curing, f inishing, joints and other related work and material needed to complete the concrete
b. Concrete foundations for steel structures.
c. Concrete foundations for electrical equipment.
d. Concrete foundation for station service equipment including aluminum trench covers.
e. Unwatering foundation excavations, if required.
f. Casing auger excavations, if required.
g. Trial augering, if required.
Measurement for quantities for concrete foundations will be made on the basis of concrete quantities shown on Drawing FL 2008. Regardless of the concrete quantities actually placed, payment will be based on the quantities of concrete shown on the Drawing.
DIVISION 4 – SUBSTATION METALWORK
A. GENERAL:
1. MEASUREMENT: Measurement for quantities for Bidding Schedule item “Install steel (Government-furnished)” will be lump sum.
a. The Bidding Schedule item Lump Sum shall include of f-loading, temporary cribbing, storage, and erection of all steel structures listed in Section “B.1” below. Included in that lump sum bid shall be: All field-drilling required to mount electrical equipment for Take-Off Structure shown on Section J-J on Drawing FL 2603.
B. DESCRIPTION OF BIDDING SCHEDULE ITEM:
1. Bidding Schedule item “Install steel (Government-furnished” includes installing the following:
a. Three (3) – Bus Frames - Type V, shown on Drawing FL 2600.
b. Three (3) – Bus Frames - Type VI, shown on Drawing FL 2600.
c. One (1) – Bus Frames - Type VII, shown on Drawing FL 2601.
d. One (1) – 69kV Take-Off Structure, shown on Drawing FL 2602 and FL 2603.
e. One (1) – Equipment cabinet platforms including grating, Type V, shown on Drawing FL
2925.
f. Two (2) – Switch platforms including grating, Type III, shown on Drawing FL 2926.
DIVISION 9 – SUBSTATION - ELECTRICAL
A. GENERAL: Electrical equipment and material shall be as specified in WAPA’s “WAPA ES” standard equipment specifications, as shown on project drawings and in accordance with NEMA, ANSI, IEEE, ICEA, ASTM, NEC, NESC, UL and Federal specifications and standards as applicable. Applicable requirements shall be met under the following service conditions:
Ambient Temperatures:
Maximum ..................................................................+40°C Maximum 24-Hour Average .........................................+30°C Minimum....................................................................-50°C
Elevation:
Above Mean Sea Level ........................................ 1,630-Feet
*ASCE-7 Wind Load Minimum Basic Wind Speed ..................................... 90-MPH Importance Factor ........................................................ 1.15
*IEEE 693 Seismic Qualification................................................Low
*May include support structure in accordance with STANDARD 9.1.1.2. Wind and seismic loads are nonsimultaneous.
1. Bidding Schedule for Government-furnished items (including associated supporting structures when furnished) require the Contractor to provide:
a. Unless otherwise indicated, unloading and inspecting Government-furnished items.
b. Installing Government-furnished items as shown on drawings.
c. Furnishing equipment and material not furnished by WAPA.
2. Bidding Schedule for items (not furnished by the Government) shall be furnished by the
Contractor and shall include the following:
a. Providing (furnishing and installing) bidding schedule items.
b. Furnishing equipment and material not furnished by WAPA.
c. Installing bidding schedule items as shown on drawings.
3. Unless otherwise specified, associated support structures provided for each electrical equipment rated above 7-kV shall be 102-inches in height and hot-dip galvanized, if made of steel.
Instrument transformers that are seismically qualified shall be 96-inches in height. If tubular steel supports are furnished, they shall be galvanized internally and externally.
4. Installation and painting of electrical equipment and material shall be provided in accordance with
Construction Standards 9 and 12, respectively.
B. DESCRIPTION OF BIDDING SCHEDULE ITEMS:
1. Bidding Schedule items “Power circuit breaker, 69-kV, 2,000-amps (Government-furnished)”:
Designation JZ2A
Manufacturer Mitsubishi
Model Number 70-SFMT-32HE
Designation JZ2A
Type SF6 gas Nominal Voltage Rating (kV) 69
Maximum Voltage Rating (kV) 72.5 Continuous Current (Amps) 2,000 Short Circuit Fault Rating (KA) 31.5
Rated Interrupting Time (cycles) 3 Number CT’s per Bushing 3 Estimated Weight of 3-pole Breaker with Gas (LBS)
4,660
Approximate SF6 Gas Weight (LBS) 40
a. The Material shall be obtained in accordance with Division 1.
b. Any spare parts furnished with each voltage class of power circuit breaker shall be inspected for damage and turned over to the COR. Special tools and spare parts will be furnished with the power circuit breakers (a complete list will be included with the breaker instruction books). The Contractor shall deliver the spare parts furnished with the breakers to WAPA’s onsite representative.
2. Bidding Schedule items “Disconnecting switch, three phase, 69-kV, 1,200-amps
(Government-furnished)”:
Designation WZ2A (2253)
YZ2A (2251)
Type 3-pole, single throw, outdoor, group operated, vertical break, rotating insulator
System Nominal Voltage Rating (kV) 69
Rated Maximum Voltage (kV) 72
Basic Impulse Insulation Level (kV) 350
Continuous Current Rating (Amps) 1200
Short-Time (3 seconds) Symmetrical Current Rating (kA)
Peak Withstand Current (kA at 60Hz) 114
Grounding Blades None
Standard Arcing Horns N/A
Designation WZ2A (2253)
YZ2A (2251)
Switch Operator Type Manual Worm-Gear Operator
Phase Spacing (feet) 5-0
Height of Support Structure (feet) 19-3*
Mounting Position Vertical
Insulator Technical Reference No. 216
Key Interlock None
* Approximate mounting height.
3. Bidding Schedule item “Current transformer, 69-kV, single phase (Government-furnished)”:
Designation Per Phase
QZ22A1
QZ22A2
QZ22A3
Type Single-phase, outdoor, 60 Hz
Manufacturer Alstom
Nominal System Voltage (kV) 69
Maximum System Voltage (kV) 72.5
Basic Impulse Level (kV) 350
Rated Primary and Secondary Currents (Amps) 500:5
Construction Oil-f illed Type
ANSI Accuracy Class 0.15B 1.8 Extended range metering
Minimum Accuracy Range at 30°C Ambient Temperature 1% to 150%
Continuous Thermal Current Rating Factor at 30°C Ambient Temperature 1.5
Short time Thermal Rating (One Second kA) 60
Short time Mechanical Rating (kA) 60
Mounting Base
4. Bidding Schedule items “Coupling capacitor voltage transformer, 69-kV, single-phase (Government-furnished)”:
Designation (Single Phase) VZ22A1
Type Single-phase, outdoor, 60 Hz
Manufacturer GE
Nominal System Voltage (kV) 69 Maximum System Voltage (kV) 72.5
Basic Impulse Insulation Level (kV) 350
Primary to Secondary Ratios 350/600: 1
ANSI Accuracy Rating 1.2% M, W, X, Y, Z
Thermal Rating (VA) 1000
Carrier Accessories None Mounting Base
5. Bidding Schedule item “1/0 AWG, 25-kV, insulated copper cable” includes locating existing
15kV station service power cable if required. If path of existing power cable interferes with location of any new foundations, the cable must be replaced and relocated. Replacement cable shall be insulated copper power cable type MV-105, 100-percent insulation level. Southwire Simpull NL-EPR or equal. Cables run between FW1C to KW1D, FW1C to KW1C, and DW1C to KZ1A.
6. Bidding Schedule item “Associated electrical equipment and material” includes providing equipment, material, and services required to expand as necessary and complete the following substation installations as shown on the Drawings:
a. Electrical Testing: Includes providing electrical testing in accordance with Standard 9, paragraph 9.1.2 Acceptance Tests - Method A.
b. Substation Grounding System: Includes providing material and services required to complete and expand the substation grounding system. All new exposed ground wire shall be copper. Unless otherwise specified on the Drawings, splices, crosses, tees and other f ittings used on grounding system shall be swage type (DMC Power Swage system, AFL Swage system, or equal. It’s recommended to obtain the necessary tooling f rom the respective manufacturer.)
c. Electrical Conduit System: Including embedded and exposed conduit. All conduit shown on the Drawings shall be Schedule 40 PVC. Conduit entering the cable trench with a 90-degree bend is allowed to be Schedule 40 PVC as shown on Standard Drawing 31 1006.
All other 90-degree bends shall be rigid metal. A red or yellow polyethylene warning tape shall be installed directly above each conduit run and located 12-inches below f inished grade. Provide sand backfill around buried conduits and insulated electrical cables and 2-inch x 8-inch plastic lumber over the sand as shown on Standard Drawing 31 1006.
Conduit runs shall be clean and f ree f rom obstructions and sharp corners. Open ends of conduit shall be sealed with plugs or caps. Synthetic pull ropes shall be installed in all conduits Informational drawings and data are not required for this item.
d. Outdoor Bus System: Outdoor strain and jumper buses, rigid buses and overhead ground wire unless otherwise specified on the Drawings, splices, elbows, pad type terminal connectors and other fittings used on rigid or cable buses shall be compression type (DMC Power’s Bus and Cable Connectors and Swage System, AFL Swage system, or equal. If required, tools shall be obtained f rom respective manufacturers.). Post insulators for new structures shall use industry standard 3-, 5- or 7-inch base cap bolt circles in lieu of WAPA Standard 9.3.1.1.3.2 and Drawing 31 1081. Replacement insulators shall match existing bolt circles. Insulators shall be ANSI 70 gray. Informational drawings and data are required for the rigid bus, conductors, overhead ground wire and insulators only.
e. Insulated Conductors: Insulated conductors and cables except 5/c and12/c No. 10 AWG control cable and power cable with insulation greater than 15,000 V.
f. Terminal Boxes: Terminal boxes’ internal components arrangements shown on Standard Drawing 31 1085 is typical and the Contractor shall provide internal components for Type A and Type C terminal box configurations. Actual internal arrangements will be determined by the COR.
g. Junction Box: The Contractor shall determine size and provide waterproof junction box as shown on Drawing FL 1117.
h. Lighting Unit: Material for the lighting unit shall include lamp, ballast, fixture wire, f ittings, mounting devices and other accessories required to complete the installation. Material shall conform to UL standards and to the following:
(1) Up-Light: Holophane Petrolux LED series catalog No. PLED2-10L-5K-AS-UN-NA-
CRG-L5H, or equal. Light shall include single luminaire substation arm accessory catalog No. 07233-1 or equal. Up-light shall be mounted to structure leg approximately 8-feet-0-inches high as shown on the Drawings.
(2) Fixture Wire: Single conductor copper, No 14 AWG standard, Type SF-2 silicon rubber insulated, 600 V.
i. Phase Identification signs (Standard Drawing 31 1000):
(1) One (1) on each phase at both ends of main and transfer buses, at each high voltage circuit terminating structure and on each phase of an instrument transformer or single-phase transformer:
(a) Phase A - 4 required.
(b) Phase B - 3 required.
(c) Phase C - 3 required.
j. Equipment identification signs (Standard Drawing 31 1000): Lettering on the signs shall be as shown on Drawing FL 1101.
7. Bidding Schedule item “Existing outdoor electrical equipment and material” includes removal and disposal of existing electrical equipment and material.
a. Material to be removed and disposed of is as follows:
(1) Replaced equipment signs.
(2) Substation control, power cables and conduit as designated on the Drawings.
Portions of cables in conduit, trench, and/or trays shall be removed and disposed of.
Cabled direct buried underground may be abandoned in place.
b. The Contractor shall include any credit to the Government for salvage of the equipment and/or materials in this bid item.
8. Bidding Schedule items “Furnishing 5/c No. 10 AWG control cable” and “Furnishing 12/c No. 10 AWG control cable” include furnishing 5/c No. 10 and 12/c No. 10 AWG control cable, respectively.
9. Bidding Schedule items “Installing 5/c No. 10 AWG control cable” and “Installing 12/c
No. 10 AWG control cable” include installing 5/c No. 10 and 12/c No. 10 AWG control cable, respectively.
Message from the Administrator
At Western Area Power Administration (WAPA), we show our commitment to safety every day through the actions we take, the training we offer and the work conditions we provide. We expect the same commitment to safety from each of our contractors who provide products or services to WAPA. In performing work for WAPA, all contractors must make the right decisions to ensure that the work environment is as safe as possible.
Our safety program is based on four points:
Safety procedures or common sense must be applied by each Federal and contract employee. Safety should not be set aside to meet a project schedule or for personal convenience.
Employees and contractors must believe that they have the right and the responsibility to identify and take action to reduce, if not eliminate, hazardous work environments and hazardous work practices.
Managers and supervisors must lead by example and execute their responsibility to ensure each job is accomplished in a safe and healthy way.
Safety is a personal responsibility. Each individual makes the decision on what action to take to accomplish a task.
By integrating these principles into every task we take, together we can ensure WAPA is a safe place to work.
Mark A. Gabriel Administrator and CEO
| DIVISION 1 – GENERAL REQUIREMENTS |
| A. CONTRACT REQUIREMENT: |
| B. DESCRIPTION OF WORK: |
| 1. The principal components of work includes: |
| C. DESCRIPTION OF BIDDING SCHEDULE ITEM: |
| 1. Bidding Schedule item “Mobilization and preparatory work” includes the following: |
| D. COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK: See FAR 52.211-10 in Section F of the solicitation/contract. |
| 1. SUBMITTAL APPROVAL TIME: Except as otherwise provided for specific submittals, WAPA will require 20-calendar days for review of drawings or data submitted for approval. |
| 2. COMMENCEMENT OF CONTROL WORK: Do not perform any control board or outdoor equipment wiring until receipt of Government-furnished wiring diagrams. WAPA will furnish outdoor wiring and schematic diagrams no sooner than February 25, 2021. Control b... |
| 3. OUTAGE RESTRICTIONS: |
| 4. CONSTRUCTION SCHEDULE RESTRICTIONS AND SEQUENCE: The following Construction Schedule restrictions shall apply: |
| 5. PROTECTIVE GROUND LEADS: See WAPA Construction Standards, Standard 1 “General Requirements”, Section 1.4.14.3(1). |
| 6. MAXIMUM AVAILABLE FAULT CURRENT: When protective ground leads are required, the protective ground leads shall be sized as defined below and shall meet the requirements of Standard 1 – General Requirements, Section 1.4 “Safety and Health” and the f... |
| 7. SAFETY AND HEALTH PROGRAM: Prior to the start of field construction operations at the job site, submit a Safety and Health Program. Prior to beginning onsite construction, a preconstruction safety meeting will be conducted with the Contractor’s sup... |
| E. CONSTRUCTION SCHEDULE: |
| 1. SUBMITTAL TIME: Prepare and Submit a Construction Schedule to the CO within 10-calendar days after date of Notice to Proceed. |
| 2. FORMAT AND DETAIL: Dates for each item of Government-furnished material shall be provided. Do not program dates earlier than the estimated delivery dates shown in the “Material” paragraph. |
| F. MATERIAL: Furnish all material for completing the work, except material furnished by WAPA as listed below: |
| 1. POINTS-OF-DELIVERY: Material furnished by WAPA will be delivered to Flandreau Substation. The Contractor is responsible for unloading of WAPA-furnished material. The Contractor shall inspect the equipment and report any damages to the COR. |
| G. RIGHTS-OF-WAY: |
| Orient construction methods and equipment to utilize Government-furnished rights-of-way and within Government property lines or obtain additional temporary access without additional cost to WAPA. Any additional temporary access acquired by the Contrac... |
| H. GEOLOGIC INVESTIGATIONS: |
| I. ELECTRIC POWER FOR CONSTRUCTION PURPOSES: |
| J. WATER FOR CONSTRUCTION PURPOSES: |
| K. EXPLOSIVES AND BLASTING: |
| L. BURIED UTILITIES: |
| M. EMPLOYEE REQUIREMENTS: |
| N. ELECTRICAL MINIMUM APPROACH DISTANCES: |
| O. SUBMITTALS AND CORRESPONDENCE: |
| 1. GENERAL: The Contractor shall furnish submittals via email as specified in the Construction Standards and this Project Specification to the email address listed under the Transmittal section below and with the following requirements: |
| 2. TRANSMITTAL: The Contractor shall transmit all submittals to the Construction Office. |
| 3. PHYSICAL SAMPLE SUBMITTALS: When physical specimens or digital media are required to be submitted for approval, (i.e. brick samples, roofing material samples, carpeting, CDs, DVDs, etc.) the Contractor shall provide a digital cover letter outlinin... |
| A courtesy copy of the submittal letter shall be emailed to the Construction office at the above address. |
| 4. SUBMITTAL RESPONSE: WAPA will respond to submittals electronically with an “Accepted” or “Not Accepted” status with comments as appropriate in accordance with the “Commencement, Prosecution, and Completion of Work” paragraph to the email address w... |
| 5. APPROVAL TIME: Approval time for submittals shall be in accordance with the “Commencement, Prosecutions, and Completion of Work” paragraph. |
| 6. PROJECT PROTOCOL: |
| DIVISION 2 – SITEWORK |
| A. DESCRIPTION OF BIDDING SCHEDULE ITEMS: |
| 1. Bidding Schedule item “Miscellaneous sitework” includes the following: |
| 2. Bidding Schedule item “Demolition” includes the following: |
| 3. Bidding Schedule does not contain separate items for the following. Include these items in applicable Bidding Schedule items. |
| DIVISION 3 – CONCRETE |
| A. GENERAL: |
| 1. MATERIAL: |
| 2. TEST FOR POTENTIAL REACTIVITY OF SAND AND COARSE AGGREGATE: WAPA may perform tests for potential reactivity for the sand and coarse aggregate to be used by the Contractor. If the tests determine the aggregate(s) to be unsuitable as a concrete agg... |
| 3. CURING: Exposed, formed surfaces of concrete foundations shall be cured with water, resin-base curing compound without fugitive dye, or by covering with polyethylene film. |
| 4. REBAR DEVELOPMENT (LD) AND LAP LENGTH: |
| B. DESCRIPTION OF BIDDING SCHEDULE ITEM: |
| 1. Bidding Schedule item “Concrete foundations” includes the following: |
| DIVISION 4 – SUBSTATION METALWORK |
| A. GENERAL: |
| 1. MEASUREMENT: Measurement for quantities for Bidding Schedule item “Install steel (Government-furnished)” will be lump sum. |
| B. DESCRIPTION OF BIDDING SCHEDULE ITEM: |
| 1. Bidding Schedule item “Install steel (Government-furnished” includes installing the following: |
| DIVISION 9 – SUBSTATION - ELECTRICAL |
| A. GENERAL: Electrical equipment and material shall be as specified in WAPA’s “WAPA ES” standard equipment specifications, as shown on project drawings and in accordance with NEMA, ANSI, IEEE, ICEA, ASTM, NEC, NESC, UL and Federal specifications and ... |
| 1. Bidding Schedule for Government-furnished items (including associated supporting structures when furnished) require the Contractor to provide: |
| 2. Bidding Schedule for items (not furnished by the Government) shall be furnished by the Contractor and shall include the following: |
| 3. Unless otherwise specified, associated support structures provided for each electrical equipment rated above 7-kV shall be 102-inches in height and hot-dip galvanized, if made of steel. Instrument transformers that are seismically qualified shall ... |
| 4. Installation and painting of electrical equipment and material shall be provided in accordance with Construction Standards 9 and 12, respectively. |
| B. DESCRIPTION OF BIDDING SCHEDULE ITEMS: |
| 1. Bidding Schedule items “Power circuit breaker, 69-kV, 2,000-amps (Government-furnished)”: |
| 2. Bidding Schedule items “Disconnecting switch, three phase, 69-kV, 1,200-amps (Government-furnished)”: |
| 3. Bidding Schedule item “Current transformer, 69-kV, single phase (Government-furnished)”: |
| 4. Bidding Schedule items “Coupling capacitor voltage transformer, 69-kV, single-phase (Government-furnished)”: |
| 5. Bidding Schedule item “1/0 AWG, 25-kV, insulated copper cable” includes locating existing 15kV station service power cable if required. If path of existing power cable interferes with location of any new foundations, the cable must be replaced and... |
| 6. Bidding Schedule item “Associated electrical equipment and material” includes providing equipment, material, and services required to expand as necessary and complete the following substation installations as shown on the Drawings: |
| 7. Bidding Schedule item “Existing outdoor electrical equipment and material” includes removal and disposal of existing electrical equipment and material. |
| 8. Bidding Schedule items “Furnishing 5/c No. 10 AWG control cable” and “Furnishing 12/c No. 10 AWG control cable” include furnishing 5/c No. 10 and 12/c No. 10 AWG control cable, respectively. |
| 9. Bidding Schedule items “Installing 5/c No. 10 AWG control cable” and “Installing 12/c No. 10 AWG control cable” include installing 5/c No. 10 and 12/c No. 10 AWG control cable, respectively. |