05__Attachment_B_-_Technical_Specification_Siemens_550kV_Bushing_Replacement.pdf
PDF 203 KB Posted
- Attached to
- 550kV EHV Bushing Replacement
- Solicitation number
- 89503325QWA000317
- Issued by
-
Department of Energy
About this file
This technical specification details a 550-kV Extra High Voltage (EHV) composite bushing replacement for a power circuit breaker at Tracy Substation, issued by the Western Area Power Administration (WAPA). The specification requires a single Siemens-manufactured composite bushing with specific technical parameters, including IEEE 693 High Seismic Qualification Level, designed to withstand temperatures from -30°C to +50°C, wind loads of 100-MPH, and agricultural pollution/contamination levels.
The document outlines comprehensive requirements for the bushing, including detailed testing protocols, drawing and data submission guidelines, and optional on-site removal and installation services. The contractor must provide two sets of bushing drawings, parts identification lists, manufacturer's operation manuals, and test reports prior to shipment. The delivery location is the Tracy Substation in Alameda County, California, with specific contact persons for coordination. The government reserves the right to conduct a post-award factory meeting within one month of the contract award date.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Western Area Power Administration (WAPA)
550-kV Extra High Voltage
(EHV)
Technical Specification for
Tracy Substation Dead-Tank Power Circuit Breaker
Single Bushing Replacement
IEEE 693 High Seismic Qualification Level
Headquarters Office of Engineering and Design
February 10, 2025
Attachment B
WAPA BUSHING SPECIFICATIONS
SECTION 1 - WESTERN AREA POWER ADMINISTRATION (WAPA) BUSHING SPECIFICATION
1.1 GENERAL:
1.2 SERVICE CONDITIONS:
1.3 DESCRIPTION OF BIDDING SCHEDULE ITEM CLIN 00001:
1. Bidding Schedule item 550-kV Power Circuit Breaker Composite Bushing
1.4 TERMINAL CONNECTORS:
1.5 TESTING:
1.6 DRAWING AND DATA:
1.7 SUBMITTALS AND CORRESPONDENCE:
SECTION 1 - WESTERN AREA POWER ADMINISTRATION (WAPA) BUSHING SPECIFICATION
1.1 GENERAL:
A single bushing for a 550-kV power circuit breaker located at Tracy Substation sustained damage. The replacement bushing shall be composite, shall be manufactured/provided by Siemens and shall conform to the latest IEEE C37.017-2020 Bushings for High-Voltage (Over 1000 Vac) Circuit Breakers and Gas- Insulated Switchgear. The bushing and adapters shall be direct replacement for Tracy Substation 550-kV power circuit breaker SPS2-550kV-63-1. If the Government exercises the Optional Contract Line Item as described below in Section 3, the contractor shall have Siemens perform the work to replace the existing bushing with the new bushing and make all connections and preform all tests required to place the unit back into service. The Government intends to exercise this Optional Line Item if at time of bushing delivery construction is complete and no construction crew is available on site to install the bushing.
Bushing shall be composite. Composite type bushing shall consist of a core, housing, top mounting plate, bottom mounting plate, end fittings, flange cover assembly, guide pins, and all accessories as required to install the bushing on the existing Siemens power circuit breaker. The outer material shall resist formation of electrical tracking on the surface of the insulating material, resist cracking, prevent hydrolysis (chemical process leading to electrical or mechanical degradation), have electrical and mechanical characteristics as required for the application, provide the necessary creep distance, shall have a life comparable to what a porcelain bushing provides and withstand sunlight for the entire life of the equipment (resist ultra-violet radiation and pollution).
1.2 SERVICE CONDITIONS:
The Bushings shall be suitable for operation under the conditions as listed below in the following subsequent stated requirements:
a. Ambient Temperatures:
Maximum +50 oC Maximum 24-Hour Average +35 oC Minimum -30 oC
b. Minimum Elevation Rating:
Above Mean Sea Level 3,300 ft
c. ASCE-7 Wind Load:
Minimum Basic Wind Speed 100-MPH Importance Factor 1.15
d. IEEE 693:
Seismic Qualification High
e. Agricultural Pollution/Contamination:
IEEE level Medium Minimum 245-kV Creep Distance 433-inches
1.3 DESCRIPTION OF BIDDING SCHEDULE ITEM CLIN 00001:
1. Bidding Schedule item 550-kV Power Circuit Breaker Composite Bushing
Contract Line Item Number (CLIN) 00001 (Tracy)
2392 (JT8C)
Siemens Power Circuit Breaker Serial No. 30080708291 Siemens Composite Bushing Drawing Number (Attachment C) 72-281-810-401 Issue 02
Rated Maximum Voltage (kV) 550 Rated Short-Circuit Current and Short-time Current at Rated Maximum Voltage (kA, rms)
Rated peak withstand current (kA, peak) 164 Power Frequency Withstand, one-minute dry at Installed Elevation (kV, rms)
Minimum Basic Impulse Insulation Level Lightning Impulse Full Wave Withstand (kV, peak)
Chopped Wave 2µs minimum time to sparkover withstand (kV, peak) 2320
Rated Continuous Current of PCB SPS2 at +50°C (amps, rms) 4000
Rated Continuous Current of Composite Bushing at +50°C (amps, rms) 5000
1.4 TERMINAL CONNECTORS:
a. Terminal connectors shall be furnished on each bushing.
b. Bushing shall be furnished with NEMA Standard CC 1, 2 x 4, 8-hole type terminal pad. The current ratings of the terminal connectors shall match or exceed the current ratings of the associated bushing.
1.5 TESTING:
Routine tests shall be made in accordance with the latest version of Industry Standards and shall include the following:
a. Design Tests: The Contractor shall furnish certification that the bushing furnished has passed the test requirements of IEEE C37.017 and any other applicable standard.
b. Routine Tests (production): Routine testing of bushings shall be governed by the routine tests required for the equipment for which they will be applied. The routine tests shall be made wherever reasonably practical at the manufacturer’s facility assembled to the apparatus in the same manner as the equipment on which the type tests have been passed.
Routine tests shall meet IEEE C37.017 and any other applicable standard. A routine test report shall be provided by the manufacturer.
1.6 DRAWING AND DATA:
The Contractor shall furnish two sets of the offered bushing drawing and data as part of their bid submission.
This documentation is required to verify compliance with respect to the specifications. Such documentation shall be clearly annotated to indicate the specific equipment proposed:
a. Bushing outline drawing, including detailed installation dimensions, warranty terms and conditions.
1.7 SUBMITTALS AND CORRESPONDENCE:
a. General: The Contractor shall furnish submittals via email. Submittals via email shall be in standard PDF or Electronic CAD “*.dwg” (AutoCAD 2021) formats. All submittals shall include the WAPA award number (895033RWA××××), WAPA project title, and Bidding Schedule Contract Line Item Number (CLIN) and applicable division number. Multiple CLIN’s on a single submittal are not permitted. A cover transmittal letter in Microsoft Word or PDF format shall be included with each email submittal. All project correspondence and submittals shall be delivered to:
1. Primary Contacts by Regions:
a. Western Area Power Administration Joseph Hartman Phone: 72.962.7353 Email: jhartman@wapa.gov
2. Secondary Contact (required carbon copy on all correspondence):
a. Wayne Icenhower
Phone: 916.353.4529 Email: icenhower@wapa.gov
b. Submittal Response: WAPA will return all submittals electronically with a “Reviewed
Acceptable” or “Reviewed Requiring Revisions” status with comments as appropriate to the email address where the submittal originated:
c. Review Time: WAPA will require 30 calendar days to answer correspondence pertaining to each submittal of data or drawings.
d. Transmittal: The Contractor shall email submittals to WAPA’s Headquarters Office:
1. The COR: GFE specialist, Headquarters Office.
Western Area Power Administration, Headquarters Office ATTN: Tracy 550-kV Bushing
Email: jhartman@wapa.gov
e. The Government shall have the right to require the Contractor, at no additional cost, to make any changes in the equipment design that may be necessary to make the Contractor-furnished equipment conform to the requirements of this contract. The design and coordination of this electrical equipment shall be the responsibility of the Contractor, and the Government assumes no responsibility to approve or review drawings and data that are submitted. Review by the Government of the Contractor's drawings shall not relieve the Contractor of any part of the responsibility to meet all of the requirements of these specifications or for the correctness of the drawings. Revised drawings shall show revision dates, and all changes and revisions shall be circled on the drawing.
f. The following Table A summarizes the Post-award submittals of drawings and data required of electrical equipment:
mailto:jhartman@wapa.gov mailto:icenhower@wapa.gov
TABLE A – DRAWINGS AND DATA SCHEDULE
Type of Drawings and
Data Paragraph Delivery Time
Submittal Type in addition to electronic
(paragraph 1.6.h)
Quantity For Each Item
Informational drawings and data including seismic qualification report
1.7.g.1
Within 90 calendar days after date of contract award
Final drawings 1.7.g.2 21 days prior to shipment - -
Parts identification lists or bills of materials 1.7.g.2 21 days prior to shipment hard copy 1 to Address 1 w/equipment
Manufacturer’s operation and maintenance manual
1.7.g.2 21 days prior to shipment books with final drawings
1 to Address 1 w/equipment
Equipment test reports 1.7.g.2 prior to shipment of equipment hard copy 1 to Address 1 w/equipment
1. Informational and Installation Drawings and Data:
a. Equipment outlines, nameplates, dimensions, and weights for Bushings and support structures. This information is needed as soon as possible to enable the Government to design the foundations.
b. Base type, dimensions, and mounting details.
c. Location, types, sizes, and projections of required embedded anchor bolts or material. The Government will furnish the foundations, anchor bolts, and embedded material based on the information shown on these Contractors drawings.
2. Final Drawings and Data: At least 21 days before the date the Contractor begins to ship any equipment, furnish to the Government the drawings and data required in the following subparagraphs.
a. Final drawings shall be furnished for all the informational and installation drawings supplied paragraph 2.g.1 above for the outlines and assembly of the Bushings and support structures. Final drawings shall show all changes, and revision dates therefore, made up to the time the drawings and data are furnished.
b. Sets of parts identification lists or bills of materials shall be furnished for the equipment. Each part shall be assigned an identifying number which can be used for ordering replacements and a reference number that locates the part on the appropriate outline drawing. A copy of the identification or bills of materials shall accompany each shipment of material to the substation. The identification list or bills of materials shall identify which material is included in each shipment of material to the substation.
c. Sets of manufacturer's instruction books or pamphlets covering installation, operation, and maintenance repair for electrical equipment and for each device appurtenant to the equipment. A print of each final drawing shall be included in the instruction books along with the parts identification list and the test report.
d. Test reports required for electrical equipment shall be furnished prior to shipment of the equipment. The Contractor shall furnish certified copies of all test reports, performance curves, data, etc. Any equipment that does not successfully pass the testing requirements will be rejected.
3. On-Site Removal/Installation of Bushing (Optional Contract Line Item):
If Option Contract Line Item (CLIN) is exercised by the Government in accordance with contract terms, the breaker supply contractor shall provide a Siemens on-site working crew and all equipment to uninstall the existing bushing and re-install the new bushing, make pole interconnection, reclaim SF6, apply vacuum, add SF6 and perform recommended testing. The quoted costs are to include all labor and material (including new desiccant bag), and equipment costs associated with this work, including travel, lodging and per diem. The Government will evaluate offers for award purposes by adding the total price for the Option to the total price for the basic requirement. Evaluation of the Option will not obligate the Government to exercise the Option.
The work shall include any work associated with external high voltage connections, low voltage connections, current transformer, and controls connections associated with replacing the existing bushing with the new bushing. The Siemens personnel shall be responsible for any testing, erecting, starting, and operation of the equipment until the equipment is ready for normal commercial operation.
4. Right to Use Contractor's Drawings: The Government expressly reserves the right to use, to reproduce in whole or in part, to distribute, and to reuse any and all such drawings, whether copyrighted or not, in connection with the following:
a. Installation, maintenance, replacement, and repair of the articles furnished under this contract.
b. Making any and all such drawings and reproductions thereof available to subsequent offerors and Contractors, where necessary, for installation, fabricating and furnishing articles connected with or dependent upon information shown on the drawings and duplicating the drawings to be furnished hereunder.
c. The depositing of all such drawings with the Government shall constitute a license to the Government to use said drawings in the manner hereinabove stated.
5. Cost of Drawings: The cost of all drawings and data required under these specifications shall be included in applicable items
g. Delivery Contacts And Location:
Items shall be delivered and unloaded with all transportation and unloading costs prepaid by the contractor, F.O.B. Destination Within Consignee’s Premises. See Contract Clauses WES-F-2002 REQUIREMENT TO UNLOAD EQUIPMENT AT THE DESTINATION and 52.247-35 F.O.B.
DESTINATION, WITHIN CONSIGNEE’S PREMISES (This is not the same as ‘F.O.B. Factory - Prepaid and Added”) and WES-H-2015 – SAFETY AND HEALTH – HIGH RISK. As used in this contract, "F.O.B. Destination Within Consignee's Premises” means any specific location within the substation yard or other location as directed by WAPA's on-site representative.
a. Contacts:
Advance shipping notification is required as stated in contract clause
WES-F-2001 ADVANCE SHIPPING NOTIFICATION REQUIRED.
Additionally, the contractor shall contact and coordinate the delivery location access, unloading process, and the safety requirements with the Contracting Officer's Field Point of Contact (POC) again 24 hours prior to delivery. If the required arrangements/ notifications are not made, the Government may not be able to provide access and receive the equipment
Persons to be contacted for this requirement are:
Tracy Substation Field Delivery Contact Person:
Braian Marsteller Tracy Maintenance Facility Mailing Address:
16800 Kelso Road Byron, CA 94514-1932
Office Phone: (209) 833.3043 Mobile Phone (916) 413.1157 E-mail address: Marsteller@wapa.gov
Alternate/Backup Field Delivery Contact Person:
Jim Higgins Tracy Maintenance Facility Mailing Address:
112 Parkshore Drive Folsom, CA 95630-4710 Office Phone: (279) 221.0788 Mobile Phone (916) 769.2360 E-mail address: higgins@wapa.gov
b. Equipment/Services Delivery Locations:
CLINs 0001-0003:
Western Area Power Administration Tracy Substation
Tracy Substation is located in Alameda County, California, near Tracy, California.
Directions:
• From intersection of I-205 and West Grant Line Road (I-205 exit 6.)
• Head West on Grant Line Road for approximately 1.25 miles.
• Turn Right (North-West) on Bryon road and travel approximately 4.50 miles.
• Turn Left (South-West) on Great Valley Parkway and travel approximately 0.10 miles.
• Turn Right (North-West) on Kelso road and travel approximately 1.75 miles.
• Tracy Substation is on your Right (North).
Latitude (DMS NAD83): 37° 47' 55.799" N Longitude (DMS NAD83): 121° 34' 46.466" W
h. Mailing Address: In addition to electronic submittals, the data identified in Table A shall be sent to the following addresses:
1. WAPA Area Power Administration
ATTN: A7910, GFE-TRACY BUSHING
Joseph Hartman 12155 W Alameda Pkwy Lakewood, CO 80228 mailto:higgins@wapa.gov
2. WAPA Area Power Administration ATTN: Brian Marsteller 16800 Kelso Road Byron, CA 94514-1932
i. Post Award Factory Meeting: The Government reserves the right to conduct a post award meeting to be held with the equipment manufacturer at the factory site or at the buyer’s office, within 1 month after contract award date. Contractor personnel qualified to discuss both contractual and technical issues shall attend
******** Last page of the Technical Specifications ********
| SECTION 1 - WESTERN AREA POWER ADMINISTRATION (WAPA) BUSHING SPECIFICATION |
| 1.1 GENERAL: |
| Bushing shall be composite. Composite type bushing shall consist of a core, housing, top mounting plate, bottom mounting plate, end fittings, flange cover assembly, guide pins, and all accessories as required to install the bushing on the existing Si... |
| 1.2 SERVICE CONDITIONS: |
| 1.3 DESCRIPTION OF BIDDING SCHEDULE ITEM CLIN 00001: |
| 1. Bidding Schedule item 550-kV Power Circuit Breaker Composite Bushing |
| 1.4 TERMINAL CONNECTORS: |
| 1.5 TESTING: |
| 1.6 DRAWING AND DATA: |
| 1.7 SUBMITTALS AND CORRESPONDENCE: |