05 - Attachment A - Functional Specification for Bituminous.pdf
PDF 48 KB Posted
- Attached to
- 2023 Bituminous Coal Bid
- Solicitation number
- 6100058503
- Issued by
- Washington County, Pittsburgh City, Pennsylvania
About this file
This document is an Attachment A Functional Coal Specification for a Bituminous Coal contract opportunity. The contract is for the state of Pennsylvania, specifically the jurisdiction of Mercer County. The specification outlines the functional requirements for bituminous coal supplied to the facility, including proper combustion, minimal smoke and clinker formation, compliance with environmental regulations, and complete combustion. The supplier will have five business days to correct any issues with the coal's functionality. Failure to correct the problems may result in contract termination.
The contract opportunity is for the 2023 Bituminous Coal Bid. The specification does not provide details on pricing terms, set asides, incumbent suppliers, funding requirements, or other salient information.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 01. Cover Letter.pdf | ||
| 06 - 2023 - 2024 Coal Tonnage Estimates.xlsx | XLSX spreadsheet | |
| 02 - 2023 - 2024 Coal Statement of Work.pdf | ||
| 04 - PCID 1069 Coal_4-5-2022.pdf | ||
| 03 - Terms & Conditions.pdf | ||
| Addendum 1 - IFB 6100058503.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment A
Functional Coal Specification for Bituminous Coal
In addition to meeting the requirements in PCID 1069 coal supplied to bituminous coal fired plants must meet the functional specification shown below.
Coal delivered to the facility must function in the boilers as currently configured and conform to all environmental regulations applicable to the site. Specific boiler functionality:
1. Proper combustion is achieved and maintained with the current boiler(s) settings. Significant alterations (± 10%) to current boiler combustion setups will not be made to burn supplier provided material.
2. Boilers generating smoke in the boiler house during coal combustion is not acceptable.
3. Clinker formation should be minimal, and in no case should clinker size exceed 8 (eight) inches in size. Any clinkers formed should be extremely friable (easily broken up).
4. Opacity levels and other air emissions must meet environmental regulations.
5. The coal must combust completely so that hot coals are not discharged into the ash pits. This requirement is suspended during abnormal or upset conditions.
If supplier provided coal fails to meet one or a multiple of the functional specifications, the Bureau of
Procurement will notify the supplier that the coal is not functioning properly at the facility. The supplier will then have five (5) business days after notification by the Bureau of Procurement to correct the problem. Failure to the correct the problem(s) within the allotted time may result in contract termination.