05 - Appendix 02 - Acronyms and Definitions.pdf
PDF 153 KB Posted
- Attached to
- Maintenance Call Center RFI
- Solicitation number
- RFI8132025
- Issued by
-
Defense Commissary Agency
About this file
This document is an Acronyms & Definitions appendix for a Defense Commissary Agency (DeCA) contract. The file provides a comprehensive list of acronyms and key terms specific to the contract, covering areas such as contract management, quality assurance, operational conditions, and performance assessment. Notable acronyms include COR (Contracting Officer's Representative), PWS (Performance Work Statement), QASP (Quality Assurance Surveillance Plan), and QCP (Quality Control Plan).
The definitions section offers detailed explanations of critical terms like "Quality Control" (internal contractor management functions to ensure contract requirements are met), "Urgent Work" (work required during normal duty hours to correct emergencies threatening health, safety, or mission), and "Normal Operating Hours" (commissary operating hours excluding holidays like Thanksgiving, Christmas, and New Year's). The document serves as a reference guide to standardize understanding of contract-specific terminology and provides clear definitions to prevent potential misinterpretations during contract execution.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Acronyms & Definitions 1 | P a g e
Appendix 2
Acronyms & Definitions
For the resultant contract, the acronyms listed below shall apply.
DeCA Acronyms
Abbreviation Meaning APM Alternate Program Manager
AQL Acceptable Quality Level
ASA Average Speed to Answer
CCO Corporate Communications Office
CDR Contract Discrepancy Report
CDRL Contract Deliverable
COR Contracting Officer Representative
COTR Contracting Officer Technical Representative
CSAT Customer Satisfaction
DeCA Defense Commissary Agency
DoD Department of Defense
EMIS Electronic Management Information System
EPA Environmental Protection Agency
FCR First Call Resolution
GFP Government Furnish Property
HVAC Heating, Ventilation and Air Conditioning
HVAC Heating Ventilation and Air Conditioning
KO Contracting Officer
MFT Multi-Functional Team
OSHA Occupational Safety and Health Administration
PM Program Manager
PMR Program Management Review
POC Point of Contact
PRS Performance Requirement Summary
PWS Performance Work Statement
Acronyms & Definitions 2 | P a g e
QASP Quality Assurance Surveillance Plan
QAPC Quality Assurance Program Coordinator
QC Quality Control
QCM Quality Control Manager
QCP Quality Control Plan
RMCS Remote Monitoring Control System
SLA Service Level Agreement
SO Service Order
SOP Standing Operating Procedure
As used throughout this contract, the following terms shall have the meaning set forth below.
DeCA Terms and Definitions Acceptable Level of Control The amount of evidence and visible activity allowed after the treatment of various common pests listed.
Acceptable Quality Level Maximum percent defective (or maximum number of defects per hundred units) that can be considered as a satisfactory performance average.
As Directed, As Required, As Permitted, Approved, Acceptance
Where these words or words of similar import are used, it shall be understood that the direction, requirements, permission, approval, or acceptance of the KOs intended unless stated otherwise.
Attribute The property a unit has of being either bad or good. That is, the quality characteristic of a unit is either within the specified requirement, or it is not.
Contract Discrepancy Report
(CDR)
A formal, written documentation of Contractor’s poor performance or lack of performance for contracted work. The CDR is initiated by the COR, or an authorized representative, whenever the performance as determined by the COR is unsatisfactory. The Contractor completes and returns the report to the COR.
Contract employee Any prime or subcontractor employee assigned full time or regular part time to this contract.
Contractor The term Contractor as used herein refers to the prime Contractor. Contractor's subcontractor/s shall comply with the provisions of the contract.
Contracting Officer (KO) The individual with the authority to enter into, administer, and/or terminate contracts. The Contracting Officer (KO) is the exclusive Government official authorized to execute changes
Acronyms & Definitions 3 | P a g e and authorize deviations or variations from this contract.
Contracting Officer’s Representative (COR)
An authorized designee of the Contracting Officer.
Cost Estimate A preliminary cost estimate, using the most accurate figures readily available, of the labor and materials necessary to do a described piece of work.
Discrepancy A disagreement between the actual quantity or condition of property and that shown by the record of the property. A discrepancy usually is a disagreement between quantities or condition of property actually received in a shipment and that recorded on the shipping document. This type of discrepancy generally is referred to as a "discrepancy incident to shipment".
Another form of discrepancy occurs when there is a disagreement between a stock record balance and the results of a physical count or inventory.
Government The personnel and agencies that lawfully administer and control the affairs of the United States.
Normal operating characteristics and conditions
Appliance operating temperatures, pressures, fluid flows, speeds, and other characteristics, including full charge of the appliance, that would be expected for a given process load and ambient condition during normal operation.
Normal Operating Hours Commissary operating hours, except Thanksgiving, Christmas, or New Year's, as applicable to the specific supported commissary. Regular hourly labor rates apply during normal operating hours. Outside the Regular Hours rates apply outside of normal operating hours. Each commissary has its own hours of operation which the Contractor shall confirm at the following link: https://www.commissaries.com/shopping/store-locations.
Obligation 1) A legal reservation of funds recorded at the time a legal binding agreement has been reached between an agent for the United States Government and a second party. 2) An order placed, contract awarded, service received, or similar transaction during a given period that shall require payments during the same or a future period.
Operational Condition The condition of an item of equipment which allows it to function at its designed capacity and efficiency.
Off Duty Hours Hours outside the normal duty hours established in PWS Section 3.
Person Any individual or legal entity, including an individual, corporation, partnership, association, state, municipality, political subdivision of a state, Indian tribe, and any agency, department, or instrumentality of the United States, and any officer, agent, or employee thereof.
Performance Assessment Those actions taken by the Government to assure services meet the requirements of the performance work statement (PWS).
https://www.commissaries.com/shopping/store-locations
Acronyms & Definitions 4 | P a g e
Performance Work Statement
(PWS)
The PWS consists of the definitive or descriptive words identifying the subject matter of the contract referred to as the specifications or work statement.
Phase-in Period The period of time between contract award and contract full performance.
Quality Control The internal Contractor Management functions necessary to ensure that Contractor products and services conform to contract requirements, specifications, and standards. This includes, but not be limited to, documented procedures, inspections, tests (taken at the point of performance) and training.
Quality Assurance Those actions the COR takes to assure services meet the requirements of the PWS. The functions and associated actions performed by the Government to ensure that contract requirements are performed in accordance with specified standards and that an appropriate level of Contractor quality control activities is in place and operational.
Quality Assurance Surveillance Plan
A written plan of the details, methods, frequency of inspections, parameters, sampling guides, inspection checklists, and other information the COR or QAR uses to provide effective QA.
Quality Control Plan (QCP) The contractor's system for controlling quality of performance to ensure quality services are provided to the government in accordance with the contract’s terms and conditions.
Urgent Work Work required during normal duty hours to correct an emergency that threatens health, safety, property, or mission.
Urgent work includes, but is not limited to, utility failure, fire hazards, environmental hazards, or HVAC system failures.
Vandalism Damage to the facility or equipment due to mischief or tampering. Vandalism includes all damage not due to normal usage or deterioration not due to normal wear.
File details come from the government source that posted it. Updated .