042518-Schedule B - Pricing - (I-94-Sawyer).docx
DOCX document 39 KB Posted
- Attached to
- Concrete patch Supplies-Sawyer-I-94
- Solicitation number
- RFP 591 180000002359 1
- Issued by
- Michigan
About this file
This is a Schedule B Pricing form for Request for Proposal No. 071I issued by the State of Michigan Department of Transportation (MDOT) for concrete patch supplies along I-94 eastbound between mile markers 23 and 27 in Sawyer. The proposal solicits pricing for four primary supply items: curing compound (20 five-gallon pails), epoxy coated smooth dowels (600 units at 1¼" x 18"), dowel caps of metal crimp type (200 units at 1"), and two-part epoxy with nozzles (25 53-ounce tubes). The first three items are not brand-specific and must comply with MDOT 2012 Standard Specifications for Construction, with references provided to specific sections covering curing compound (Section 903.06), epoxy coated dowels (Section 914.07, part A), and dowel caps (Section 914.07, part C). The two-part epoxy is brand-specific, requiring Adhesive Technologies Ultrabond product.
Contractors must submit pricing schedules in modifiable format (Microsoft Word or Excel) with all-inclusive cost pricing covering any one-time charges, setup fees, shipping, handling, and per-piece pricing. The proposal encourages submission of quick payment discount terms expressed as a percentage discount off invoice if paid within a specified number of days after receipt of invoice. Contractors must certify that prices were developed independently without consultation or agreement with competing contractors. Failure to complete the pricing schedule as requested may result in proposal disqualification.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 042518-Proposal Instructions and Vendor Questions Worksheet (I-94-Sawyer).docx | DOCX document | |
| 042418--Schedule A - Commodities and Non-Prof Services (I-94-Sawyer).docx | DOCX document | |
| 042518-Standard Contract Terms-(I-94-Sawyer).docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Enter company name here.
STATE OF MICHIGAN
Request For Proposal No. 071I (proposal title/description)
SCHEDULE B
PRICING
Concrete Patch Supplies I-94 East bound from mile marker 23 to the 27 mile marker
1. The Contractor must provide a pricing schedule for the proposed Contract Activities using _Word/Excel____. The pricing schedule should be submitted in a modifiable format (e.g.. Microsoft Word or Excel); however, you may also submit an additional pricing schedule in a non-modifiable format (e.g., PDF). Failure to complete the pricing schedule as requested may result in disqualification of your proposal.
2. Price proposals must include all costs, including but not limited to, any one-time or set-up charges, fees, and potential costs that Contractor may charge the State (e.g., shipping and handling, per piece pricing, and palletizing).
3. The Contractor is encouraged to offer quick payment terms. The number of days must not include processing time for payment to be received by the Contractor's financial institution.
Quick payment terms: ________ % discount off invoice if paid within ________ days after receipt of invoice.
4. By submitting its proposal, the Contractor certifies that the prices were arrived at independently, and without consultation, communication, or agreement with any other Contractor.
| ITEM |
| QUANTITY |
| SIZE |
| BRAND SPECIFIC Yes/No |
| BRAND / PRODUCT |
PRICE
Curing Compound (commonly known as “White Topping) see MDOT 2012 Standard Specifications for Construction: Section 903.06 located at https://www.michigan.gov/mdot/0,4616,7-151-9622---,00.html
| 20 ea |
| 5 gallon pail |
| NO |
Epoxy coated smooth dowel see MDOT 2012 Standard Specifications for Construction: Section 914.07, part A located at https://www.michigan.gov/mdot/0,4616,7-151-9622---,00.html
| 600 ea |
| 1/1/4” x 18” ea |
| NO |
Dowel Cap, metal crimp type see MDOT 2012 Standard Specifications for Construction: Section 914.07, part C. located at https://www.michigan.gov/mdot/0,4616,7-151-9622---,00.html
| 200 |
| 1 ¼” ea |
| NO |
Two Part Epoxy with nozzles
| 25 ea |
| 53 ozs tube |
| YES |
| Brand: Adhesive Technologies |
Product: Ultrabond
Version 1 Revised Date: 7/28/2017
File details come from the government source that posted it. Updated .