04_JPP Arc Flash Mitigation Scope Work.pdf
PDF 264 KB Posted
- Attached to
- J. Percy Priest Arc Flash Mitigation Federal contract opportunity
- Solicitation number
- W912P520B0011
About this file
This document provides details on a federal contract opportunity for arc flash mitigation work at the J. Percy Priest Powerplant. The U.S. Army Corps of Engineers Nashville District intends to issue a solicitation for a firm fixed price construction contract between $250,000 to $500,000 to replace two 480 Volt motor control centers, replace associated cabling, and provide temporary power. The contractor shall field verify equipment, remove and install new motor control centers, add optional relay and communication components, and replace cabling to the first termination point outside the centers. The period of performance is 365 days after notice to proceed. The solicitation is anticipated for release on August 10, 2020 with a site visit scheduled for August 18, 2020. The NAICS code is 238210 and it is set aside as a total small business opportunity. Interested parties should monitor the beta.SAM website for solicitation documents and direct any questions to the listed points of contact.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Foreign National Site Visit Request Form .pdf | ||
| FINAL TSpecs JPP Arc Flash Mitigation.pdf | ||
| W912P520B0011 Solicitation.pdf | ||
| FINAL TPlansJPP Arc Flash Mitigation.pdf | ||
| US Citizen Site Visit Request Form.pdf | ||
| Draft TPlans_JPP Arc Flash Mitigation_BCOES_23JUL2020.pdf | ||
| Draft TSpecs_JPP Arc Flash Mitigation_BCOES_24JUL2020.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
J Percy Priest Motor Control Center Replacement Scope of Work
Scope of Work
The scope of work for this contract consists of the Contractor furnishing all supervision, engineering, labor, materials, and equipment to perform the following required work in strict accordance with the detailed requirements of this contract:
a. Field verify all the equipment connections, wiring, and all other features of the existing 480 Volt Equipment and 480 Volt Unit Auxiliary motor control centers.
b. Remove existing and provide a new 480 Volt Equipment motor control center.
c. Remove existing and provide a new 480 Volt Unit Auxiliary motor control center.
d. Provide optional Solid-state overload relays, communications, and draw-out unit test provisions for each motor control center.
e. All cabling associated with the motor control centers shall be replaced to the first point of termination outside of the motor control centers.
f. Provide temporary power for the critical loads fed by equipment being replaced.