This document is a Proposal and Schedule of Prices for the Buc871015D Nutrient Reduction Wetland Project, Bid No. 24-06, issued by the Iowa Department of Agriculture and Land Stewardship, Division of Soil Conservation and Water Quality. The project involves the construction of a traditional breakpoint nutrient reduction wetland, including steel sheet pile weir construction, tile installation, water control structures, and seeding. The bid submissions are due at 3:00 PM on October 9, 2024, and the bid opening is scheduled for 3:10 PM on the same date at the Wallace State Office Building in Des Moines, Iowa. The project must be completed by June 1, 2025, with seeding work to be finished by June 30, 2025. Liquidated damages of $175 per day and $125 per day apply for late completion of the main work and seeding, respectively.
The Schedule of Prices lists 29 bid items with estimated quantities, including site preparation, earthwork, pipe installation, water control structures, and erosion control. Bidders must submit a 10% proposal guarantee with their bids. The contract will be awarded to the lowest responsive and responsible bidder.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Buc871015D Nutrient Reduction Wetland Project DOCUMENT CC Bid No. 24-06 PROPOSAL AND SCHEDULE OF PRICES
CC-1
Time and Date for Bid Submissions: 3:00 PM, 10/9/2024
Wallace State Office Building
502 East 9th Street
Iowa Department of Agriculture and Land Stewardship
Division of Soil Conservation and Water Quality-Water Resources Bureau
Des Moines, Iowa 50319-0050
Time and Date of Bid Opening: 3:10 PM, October 9, 2024
Bid Opening Location: Wallace State Office Building
502 East 9th Street
Des Moines, IA 50319-0050
Bid Opening Teleconference: Call-in number: 1-877-304-9269
Access code: 519321
Project Description and Location: Buc871015D Nutrient Reduction Wetland Project
Section 15, Township 87 North, Range 10 West
Buchanan County, Iowa
PROPOSAL AND SCHEDULE OF PRICES
Proposal of ___________________________________________________________________________________
(Name of Bidder)
Located at ( )
(Address) (Telephone Number)
Amount of
Proposal Guarantee
Description of Work Specified Completion Date Liquidated Damages
10% of Base Bid
All Work Except Seeding
June 1, 2025
$175.00 Per Day
Seeding-Structure
Seeding-Buffer
May 15, 2025
June 30, 2025
$125.00 Per Day
The undersigned hereby agrees, if awarded the contract, to execute the proposed contract and to furnish satisfactory
Performance Bond in an amount not less than one hundred percent (100%) of the contract award within fourteen (14) days from the date when Notice-of-Award is received, and to provide all supervision, labor, materials, and equipment required to complete the project designated above, for the prices hereinafter set forth, in strict compliance with the Contract Documents prepared by the Division.
Further, the parties agree and acknowledge as follows:
• The amount of loss or damages likely to be incurred by Division are uncertain and said loss is incapable or very difficult to quantify and estimate;
• The amount specified for liquidated damages herein bear a reasonable relationship to, and are not plainly or grossly disproportionate to, the probable loss likely to be incurred by Division in connection with any delay on part of the Contractor;
CC-2
• The amount of liquidated damages fixed herein bears a reasonable relationship to Division’s anticipated losses and/or actual losses;
• The amount of liquidated damages herein fairly approximates Division’s loss at the time of making of this
Agreement;
• The amount of liquidated damages fixed herein are fair and reasonable and it approximates to the extent possible the actual loss to Division as a result of any delay on the part of Contractor; and
• Division and Contractor are sophisticated parties and negotiated this Agreement at arm’s length.
Now therefore, in consideration of the mutual obligations set forth herein, the receipt and sufficiency of which is hereby acknowledged, the parties agree as follows:
• Contractor will commence the work after the Preconstruction Conference and by the Construction Start Date approved by Division in the Construction Progress Schedule.
• Contractor will complete the work within the specified time period identified in the contract, or as amended, or be responsible for liquidated damages per day as set forth in the above table.
• The liquidated damages may be withheld from payments made to the Contractor by the Division upon written notice that liquidated damages have begun to accrue, and such damages are in addition to other remedies available as provided for in this contract and applicable law.
A Proposal Guarantee in the amount stipulated herein is included with this proposal, to be forfeited to the Division, if the undersigned fails or refuses to execute the contract and furnish satisfactory Performance Bond, if awarded the contract.
By _______________________________________________
(Signed)
(Title) (Date)
In executing this proposal, Bidder acknowledges receipt of Addendum Number _____ dated ____________________
In executing this proposal, Bidder acknowledges receipt of Addendum Number _____ dated ____________________
In executing this proposal, Bidder acknowledges receipt of Addendum Number _____ dated ____________________
CC-3
SCHEDULE OF PRICES
Buc871015D Project
Contract No. 24-06
Section 15, Township 87 North, Range 10 West, Buchanan County, Iowa
Name of Bidder: _______________________________
Item No. Work or Material Spec No.
Estimated
Quantity Unit
Unit
Price Total
1 SITE STRIPPING & PREPARATION
IA CS-
LS
2 CROP DAMAGE
IA CS-
place holder
AC
3 STRUCTURE & CHANNEL SEEDING
4.1 AC
4 BUFFER SEEDING
11 AC
5 MOBILIZATION AND DEMOBILIZATION
1 LS
DRAIN TILE INVESTIGATION AND
REMOVAL
IA CS-
7,860 LF
7 STEEL SHEET PILING
1,094 SF
8 EARTHFILL (GENERAL (P))
2,431 CY
9 EARTHFILL (GENERAL DAM (P))
9,885 CY
10 EARTHFILL (DAM CORE (P))
3,026 CY
EARTHFILL (SCARIFY AND RECOMPACT 18"
LAYER OF WETLAND BOTTOM, TWO 9"
LIFTS (P))
IA CS-
9,494 CY
EARTHFILL (SCARIFY AND RECOMPACT 9"
LAYER OF WETLAND BOTTOM (P))
IA CS-
7,513 CY
13 TOPSOIL PLACEMENT, 12 INCH
3,078 CY
14 TOPSOIL PLACEMENT, 6 INCH
5,492 CY
4" CORRUGATED PROFILE WALL (DUAL
WALL, PERFORATED) POLYETHYLENE PIPE
IA CS-
1,194 LF
6" CORRUGATED PROFILE WALL (DUAL
WALL, PERFORATED) POLYETHYLENE PIPE
IA CS-
1,096 LF
6" CORRUGATED PROFILE WALL (DUAL
WALL, PERFORATED) POLYETHYLENE PIPE
WITH POROUS BACKFILL
IA CS-
1,819 LF
CC-4
6" CORRUGATED PROFILE WALL (DUAL
WALL, NON-PERFORATED) POLYETHYLENE
PIPE
IA CS-
1,357 LF
24" ALUMINIZED CMP DRAWDOWN RISER,
12 GA
IA CS-
1 EA
20 48" CMP WATER CONTROL STRUCTURE
18" ALUMINIZED CMP WETLAND
DRAWDOWN PIPE, 14GA
IA CS-
156 LF
18" ALUMINIZED CMP FLARED END
SECITON
IA CS-
23 8" CMP TILE OUTLETS (20 LF EACH)
5 EA
24 RIP RAP
1,850 TON
25 2" CLEAN STONE
110 TON
26 EROSION STONE
220 TON
27 CONCRETE GROUT
198 CY
28 POLLUTION CONTROL, SILT FENCE
3,160 LF
POLLUTION CONTROL, TURF
REINFORCEMENT MAT, TYPE II
IA CS-
1,430 SY
TOTAL BASE BID………………………………………………………………………………………$________________
CC-5
THE FOLLOWING AFFIDAVIT MUST BE COMPLETED AND NOTARIZED, OR THIS BID WILL BE REJECTED
AFFIDAVIT
The signatory, being duly sworn, does depose and say that the undersigned is an authorized representative of:
(Name of Firm)
Located at ____________________________________________________________________________________ hereinafter referred to as “Bidder” and does hereby affirm to have personal knowledge that said Bidder has thoroughly examined the Contract Documents, carefully prepared the Proposal and Schedule of Prices form, and has checked the same in detail before submitting; and that said Bidder, or the agents, officers, or employees thereof, have not, either directly or indirectly, entered into any agreement, participated in any collusion or fraud, or otherwise taken any action in restraint of free competitive bidding in connection with this bid.
(Signed)
Subscribed and sworn to before me this _________ day of ________________________________, 2024
(Signed, Notary)
My Commission Expires _______________, 20______
END OF DOCUMENT CC
Buc871015D Nutrient Reduction Wetland Project DOCUMENT EE Bid No. 24-06 PROPOSAL GUARANTEE (BID BOND)
EE-1
State of Iowa Iowa Department of Agriculture and Land Stewardship
DIVISION OF SOIL CONSERVATION AND WATER QUALITY
KNOW ALL PERSONS BY THESE PRESENTS:
That we, of as PRINCIPAL, and of as SURETY(S), are hereby held and firmly bound unto the State of Iowa in the penal sum of
____ /100 Dollars ($ ) for the payment, whereof, the said PRINCIPAL and SURETY(S) bind themselves, their heirs, executors, administrators, successors and assigns, jointly and severally, firmly by these presents.
The conditions of this obligation are such that whereas the PRINCIPAL is herewith submitting to the Iowa Department of
Agriculture and Land Stewardship, Division of Soil Conservation and Water Quality, hereinafter called the DIVISION its sealed contract for the following:
Nutrient Reduction Wetland Project
Section 15, Township 87 North, Range 10 West, Buchanan County, Iowa
Project ID: Buc871015D
Bid No. 24-06
NOW THEREFORE,
the conditions of this obligation are such that, if said proposal is rejected by the DIVISION, or if said proposal is accepted by the DIVISION and the PRINCIPAL shall enter into a contract in the form specified by the DIVISION in accordance with the terms of the Proposal and Schedule of Prices (Document CC) and shall furnish a bond for the faithful performance of said contract in the form specified by the DIVISION, this obligation shall be null and void. Otherwise, it shall remain in full force and effect.
In the event that the said proposal is accepted by the DIVISION and the PRINCIPAL fails to enter into the contract as defined herein or fails to furnish the performance bond as noted above, within fourteen (14) days of the approval of the award, the
PRINCIPAL and SURETY(S) agree to forfeit to the DIVISION the penal sum herein mentioned, it being understood that the liability of the SURETY(S) shall in no event exceed the penal sum or this obligation.
IN WITNESS WHEREOF,
the above bounden parties have executed this instrument under their several seals this day of , 2024, the name and corporate seal of each party being hereto affixed and these presents duly signed by its undersigned representative pursuant to authority of its governing body.
PRINCIPAL SURETY
By By
Print Name:
If a partnership, all partners must sign.
END OF DOCUMENT EE