(04) BERTHOLF DS FQ3 FY26 - Blank SOSS.xls
XLS spreadsheet 40 KB Posted
- Attached to
- BERTHOLF DS FQ3 FY26
- Solicitation number
- BERTHOLF_DSFQ3_FY26
About this file
This document is a Statement of Specifications and Pricing Schedule (SOS&S) for the United States Coast Guard Cutter BERTHOLF (WMSL-750) Dockside Availability in Fiscal Year 2026. The procurement involves comprehensive ship maintenance and repair services at the vessel's homeport in Alameda, California, with a performance period from 21 April 2026 through 12 June 2026. The detailed pricing schedule includes 16 primary work items and 3 optional work items, covering critical maintenance tasks such as crane maintenance, HVAC system modifications, gear ventilation line installations, deck preservation, sewage system cleaning and renewal, fire prevention, equipment grooming, and deck covering replacement.
The solicitation is being conducted by the U.S. Coast Guard Surface Forces Logistics Center - Contracting & Procurement Division, targeting ship repair contractors under NAICS Code 336611 (Ship Building and Repairing). The pricing document shows a template with labor rate calculations, including composite labor rates, assumed G&A factor of 15%, and profit factor of 10%, with labor rates varying across different geographical locations. Notably, all line items in the current document are marked with $0.00 pricing, suggesting this is a preliminary or draft pricing schedule for market research and potential future solicitation purposes.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| dhs_form_11000-6.pdf | ||
| BERTHOLF (WMSL 418) DS FQ3 AJR 26R0.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOS&S
| PRICING SCHEDULE FOR: | |||||
| USCGC BERTHOLF (WMSL-750) DOCKSIDE AVAILABILITY FY2026 | |||||
| ITEM | DESCRIPTION | UNIT PRICE | UNIT | QTY | EXTENDED PRICE |
| D-001 | Folding Boom Cranes, Biennial Maintenance, Perform | JOB | $0.00 | ||
| D-002 | HVAC System (Port Aft Capstan), Modify | JOB | $0.00 | ||
| D-003 | Main Reduction Gear and Cross Connect Gear, Vent Lines Install | JOB | $0.00 | ||
| D-004 | Countermeasure Washdown Sprinkler Nozzle, Repair | JOB | $0.00 | ||
| D-005 | Decks, Preserve | JOB | $0.00 | ||
| D-006 | Temporary Services, Dockside | JOB | $0.00 | ||
| D-007 | Sewage Piping, Clean and Flush | JOB | $0.00 | ||
| D-008 | Tanks (Sewage Holding Tank), Preserve (Partial) | JOB | $0.00 | ||
| D-009 | Sewage Holding Tank(s), Clean and Inspect | JOB | $0.00 | ||
| D-010 | Sewage Piping, Renew | JOB | $0.00 | ||
| D-011 | AC Groom | JOB | $0.00 | ||
| D-012 | OWS, Groom | JOB | |||
| D-013 | Fire Prevention, Provide | JOB | |||
| D-014 | Reefer Groom | JOB | |||
| D-015 | Cracks (GT Collector and Exhaust), Repair | JOB | |||
| D-016 | Deck Covering (Polymeric), Renew | JOB | |||
| O-00A | Composite Labor Rate | Hour | 0 | 0 | |
| D-00B | GFP Report | NSP | EA | NSP | |
| D-00C | Travel and Perdiem | $0.00 | JOB | $0.00 | |
| O-00Z | Laydays | Day | 5 | $0.00 | |
| Total Price of Definite Items | $0.00 | ||||
| Total Price of Option Items | $0.00 | ||||
| Total Price of Definite and Optional Items | $0.00 |
&C(4/24/2025) Draft-00 - Page &P of &N
CostEstimateBreakdowns
| Composite Labor Rate | 55 | |||||||||||||||||||||||
| Assumed G&A Factor | 15% | |||||||||||||||||||||||
| Assumed Profit Factor | 10% | Direct Labor | Direct Material/Subs Cost | |||||||||||||||||||||
| ITEM | DESCRIPTION | UNIT PRICE | Sub-Contracted (put a "1" in the blank) | Total Labor Hours | Total Material & Subs (cost + G&A + profit) | Eng Tech | Machinest/Pipe Fitter | Electrician | Shipfitter | Welder | Firewatch | Insulator/Lagger | Painter | Gen Labor/Helper/Rigger | Supt/QA/NDT | Mat/Sub Cost 1 | Mat/Sub Cost 2 | Mat/Sub Cost 3 | Mat/Sub Cost 4 | Lab Rate | Area | WorkItemID | WIFileID | LoadData |
| 62 | Baltimore, MD | |||||||||||||||||||||||
| 52 | Biloxi, MS | |||||||||||||||||||||||
| 56 | Boston, MA | |||||||||||||||||||||||
| 50 | Charleston, SC | |||||||||||||||||||||||
| 60 | Corpus Christi, TX | |||||||||||||||||||||||
| 51 | Hampton Roads | |||||||||||||||||||||||
| 64 | Honolulu, HI | |||||||||||||||||||||||
| 55 | Houston, TX | |||||||||||||||||||||||
| 56 | Los Angeles, CA | |||||||||||||||||||||||
| 55 | Median Rate | |||||||||||||||||||||||
| 49 | Miami | |||||||||||||||||||||||
| 50 | Narragansett Bay, RI | |||||||||||||||||||||||
| 55 | New London, CN | |||||||||||||||||||||||
| 45 | New Orleans | |||||||||||||||||||||||
| 62 | NYNY | |||||||||||||||||||||||
| 49 | Panama City, FL | |||||||||||||||||||||||
| 60 | Philadelphia, PA | |||||||||||||||||||||||
| 51 | Portland, ME | |||||||||||||||||||||||
| 57 | Portland, OR | |||||||||||||||||||||||
| 55 | San Diego, CA | |||||||||||||||||||||||
| 67 | San Francisco, CA | |||||||||||||||||||||||
| 55 | Santa Barbara, CA | |||||||||||||||||||||||
| 55 | SE North Carolina | |||||||||||||||||||||||
| 65 | Seattle, WA | |||||||||||||||||||||||
| 48 | Tampa-St. Petersburg | |||||||||||||||||||||||
| 60 | Wilmington, DE |
&C(09/28/2009) Page &P of &N
CostEstimateTemplate
File details come from the government source that posted it. Updated .