04 Att C - Technical Specifications.pdf

PDF 771 KB Posted

Attached to
24-33-SD Route 1 Sewer Replacement
Solicitation number
56854
Issued by
Spotsylvania County, Virginia

About this file

This document is an Invitation to Bid (IFB) issued by the Spotsylvania County, Virginia Department of Utilities for the Route 1 Sewer Replacement project. The project involves furnishing and installing approximately 5,600 feet of 36-inch Sanitary Sewer Main pipe and all necessary appurtenances to complete the replacement of the existing sewer infrastructure along Route 1. Bids will be received for the construction services and materials required for this project. The IFB provides detailed technical specifications, measurement and payment terms, and a table of contents for the various work divisions.

The pricing for this project will be based on unit prices for the various pipe sizes, manholes, stream crossings, site clearing and grubbing, and other related items. The IFB does not mention any set-asides, incumbents, or specific funding sources. Payment will be made based on the actual quantities installed per the unit prices provided in the contractor's bid.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

INVITATION TO BID # 24-33-SD

FOR

SPOTSYLVANIA COUNTY, VIRGINIA

DEPARTMENT OF UTILITIES

ROUTE 1 SEWER REPLACEMENT

SEPTEMBER 2023

Prepared By:

4840 Cox Road

Glen Allen, Virginia 23060 804-515-8300

IFB #24-33-SD

Table of Contents Route 1 Sewer Replacement TOC-1

ATTACHMENT X

TECHNICAL SPECIFICATIONS

ROUTE 1 SEWER REPLACEMENT

TABLE OF CONTENTS (TOC)

DIVISION 01 - GENERAL REQUIREMENTS

01 29 01 MEASUREMENT AND PAYMENT

01 32 33 CONSTRUCTION PHOTOGRAPHS

01 35 43 PROTECTION OF ENVIRONMENT

01 66 10 DELIVERY, STORAGE AND HANDLING

01 74 23 CLEANING UP

DIVISION 02 - EXISTING CONDITIONS

02 41 00 DEMOLITION

DIVISION 03 - CONCRETE

03 30 00 CAST-IN-PLACE CONCRETE

DIVISION 31 - EARTHWORK

31 10 00 SITE CLEARING

31 20 00 EARTH MOVING

31 23 19 DEWATERING

31 23 33 TRENCHING BACKFILLING AND COMPACTION

31 50 00 EXCAVATION SUPPORT SYSTEMS

DIVISION 33 – UTILITIES

33 01 48 FLOW CONTROL OF SEWER LINES

33 24 42 GUIDED BORING

33 30 00 SANITARY SEWERAGE UTILITIES

END OF TABLE OF CONTENTS

Measurement and Payment Route 1 Sewer Replacement Section No. 01 29 01-1

SECTION 01 29 01

MEASUREMENT AND PAYMENT

PART 1 - GENERAL

1.01 GENERAL

A. The Contractor shall receive and accept the compensation provided in the Bid and the Contract as full payment for furnishing all labor, materials, tools, equipment and services for performing all operations necessary to complete the Work under the Contract, and also in full payment for all loss or damages arising from the nature of the Work, or from any discrepancy between the actual quantities of Work and the quantities herein estimated by the Engineer, or from action of the elements or from any unforeseen difficulties which may be encountered during the prosecution of the Work until the final acceptance by the Owner.

B. The lump sum price stated in the Bid includes all costs and expenses for taxes, labor, equipment, materials, commissions, transportation, patent fees and royalties, labor for handling materials during inspection, together with any and all other costs and expenses for performing and completing the Work as shown on the Contract Drawings and as spec-ified herein. The basis of progress payments of said lump shall be broken down and de-tailed in the Schedule of Values in accordance with the description of the representative items in this section.

C. The Contractor’s attention is called to the fact that the quotations for the various items of the work are intended to establish a total price for completing the Work in its entirety.

Should the Contractor feel that the cost for any item of work has not been defined by a Bid Form, he must bring this to the attention of the Owner during the bid question period.

If the Owner finds the request to be valid, it may be added to the bid form. If the request is found to be incidental to the project, the contractor shall include the cost for that work in some other applicable bid item, so that his proposal for the work reflects his total price for completing the work in its entirely.

D. Items listed as “CONTINGENT ITEM” in the Bid Form are to be used and will be paid for only at the written direction and authorization of the Owner. Payment under this section will be made for materials furnished and placed in addition to those shown or beyond the limits indicated or reasonably inferred by the Contract Documents. Measure-ment and payment will be in accordance with the Schedule of Values and will include, but not necessarily be limited to, furnishing, hauling, placing and installing of materials and the furnishing of such manpower and equipment as required to accomplish the Work as directed in writing by the Owner.

E. Changes and Modifications in the Work by the Owner

Route 1 Sewer Replacement Section No. 01 29 01-2

1. The Owner reserves the right to change the alignment, grade, form, length, dimen-sions, or material of the Work under the Contract, whenever conditions or obstruc-tions are met that render the changes desirable or necessary. All such alterations shall be paid for under the total lump sum bid or at a unit price bid for these items of Work, except as follows:

a. In the cases where such alterations reduce the total Contract amount, a Change Order shall be executed to reduce the total Contract amount, and the Contractor shall have no claim on this account for damages or for anticipated profits on the Work that may be dispensed with.

b. In the cases where such alterations increase the total Contract amount, a Change Order shall be executed to increase the total Contract amount.

c. Any additions or subtractions to the contract prices shall be proposed by the Contractor and then reviewed and approved by the Owner.

d. In case the quantity of work in individual unit price items of work increases or decreases greater than 20 percent of the bid quantity, unit prices may be renegotiated.

F. Owner May Increase or Decrease Quantities

1. The Owner reserves the right to increase or decrease the quantity of material to be furnished or work to be done under the Contract whenever he deems it advisable or necessary. Such increase or decrease shall in no way violate or invalidate the Con-tract.

2. For the unit price items included in the bid, the Contractor will be paid for the actual amount of the authorized work done or material furnished under each item of the proposal, at the unit price bid for that item. In case the quantity of any item is increased, the Contractor shall not be entitled to compensation over and above the unit bid for each item. In case the quantity is decreased, the Contractor shall have no claim for damages on account of loss of anticipated profits because of such de-crease.

3. For the contingency items, the Contractor shall be paid for actual quantities in-stalled or services provided, on written order of the Engineer.

1.02 MEASUREMENT

A. The quantities for payment under this Contract shall be determined by actual measurement of the completed items, in place and accepted by the Owner, in accordance with Section D - General Conditions. A representative of the Contractor shall witness all field measurements.

Route 1 Sewer Replacement Section No. 01 29 01-3

1.03 PAYMENT

A. Please see Section D – General Terms and Conditions, Article 10 - Payments and Com-pletion.

1.04 BID ITEMS

A. Item 1: Mobilization

1. Payment for mobilization shall be made at the lump sum provided in the Schedule of Values for mobilization, upon completion.

2. No measurement shall be made for this item.

3. Lump sum cost for mobilization shall include such items as bonds, insurance, stake-out, equipment and labor mobilization, field office, progress photographs, project sign, permits, shop drawings, Contractor’s test pits, and other incidental items, in-cluding the safe relocation and protection of personal property located within the easement required prior to commencement of construction. Mobilization shall not exceed 5.0 percent of the total price bid. Application for maximum 50 percent pay-ment of mobilization may be made on the first Request for Payment, maximum 40 percent payment on the second Request for Payment, and 10 percent on the final Request for Payment.

B. Item 2: Traffic Control

1. Payment for furnishing, installing, operating, maintaining, and removing all tem-porary traffic control measures shall be made based on the lump sum price provided in the Schedule of Values.

2. No measurement shall be made for this item. Payment shall not be made until the traffic control measures are in place.

3. The lump sum price shall include all labor, materials, tools, equipment, and services for furnishing, installing, operating, maintaining, and removal of the traffic control measures including all signage, barrels, barricades, and other incidental items re-quired for its proper operation.

C. Super Silt Fence:

1. Payment for furnishing, installing, maintaining and removing super silt fence shall be made at the linear feet unit price bid provided in the Schedule of Values, as directed by the Owner, actually installed, complete in place and removed.

2. Measurement for payment for super silt fence shall be the actual linear feet of silt fence installed per VESCH Plate 3.05-1. The actual length of fence installed will be paid at 90 percent (90%) of the unit price provided; the remainder 10 percent

Route 1 Sewer Replacement Section No. 01 29 01-4

(10%) of the unit price will be paid upon final E&S inspection, removal and proper disposal of the fence. The cost of reinstallation of damaged silt fence is incidental.

3. The unit price provided per linear foot of super silt fence shall include installation, maintenance, and removal of super silt fence, including all labor, materials, equip-ment, and other incidentals necessary to complete the item, as shown on the Draw-ings or as required by the Owner.

D. Check Dam:

1. Payment for furnishing and installing rock check dam entrance shall consist of fur-nishing, installing, maintaining, rock check dams.

2. No measurement shall be made for this item.

3. The unit price for Check Dam shall include all labor, materials, tools, equipment and services for furnishing, installing, and maintaining Check Dams as specified on the plans.

E. Stream Crossing:

1. Payment for Utility Stream Crossing(s) and Temporary Vehicle Stream Crossing(s) meeting County standards shall be made at the respective unit price provided in the Schedule of Values for each type of the stream crossings maintained, complete in place, and removed upon the completion of work.

2. No measurement shall be made for this item.

3. The unit price provided for stream crossings shall include all labor, materials, tools, equipment, and services for furnishing, installing and removing the crossings in-cluding, but not limited to, maintenance and other incidental items required for proper operation of each stream crossing, actually placed and removed.

F. Construction Entrance:

1. Payment for construction entrances meeting County standards shall be made at the unit price provided in the Schedule of Values for each of the construction entrances, complete in place.

2. No measurement shall be made for this item.

3. The unit price provided for construction entrances shall include all labor, materials, tools, equipment, and services for furnishing and installing the construction en-trances including, but not limited to, maintenance and other incidental items re-quired for proper operation of the construction entrance, including removal upon completion of the project.

G. Clearing and Grubbing:

Route 1 Sewer Replacement Section No. 01 29 01-5

1. Payment for clearing and grubbing shall be made at the unit price provided per square yard of clearing and grubbing within the easement or limits of construction, complete in place.

2. Measurement for square yards of clearing and grubbing shall be made in the field.

3. The unit price shall include all labor, materials, equipment and services for the re-moval of trees, stumps, shrubs undergrowth and debris including removal and dis-posal of all items required to install the pipeline as shown on the plans and within the easement or limits of construction that is not to be protected and including other incidental items necessary to complete this element of the Work. This item will be used for areas identified that contain dense vegetation and many trees of a large diameter.

H. 42-inch PS-115 PVC Sanitary Sewer:

1. Payment for furnishing and installing sanitary sewer pipe of the various sizes, ma-terials, and pressure rating called for on the Construction Drawing meeting County standards shall be made at the unit price provided in the Schedule of Values per linear foot measured in the horizontal (not slope) actually installed, complete in place.

2. Measurement of length will be made for these items in the field with a representa-tive of the Owner present. No deductions will be made in the measured length in the manholes.

3. The unit price provided per linear foot shall include all labor, materials, tools, equipment and services for connection to the existing sanitary sewer system includ-ing, but not limited to; traffic control, excavation, pavement removal, excavation including rock if required, dewatering, sheeting and shoring, tracer wire, testing, appurtenance at depth indicated, cleanup, removal and disposal of all unsuitable and excess material, replacement of grass, sod, shrubs, backfill and surface materi-als, including the replacement of gravel, asphalt, and concrete driveways, and other incidental items required for the proper operation of the sanitary sewer.

I. 36-inch PS-115 PVC Sanitary Sewer:

1. Payment for furnishing and installing sanitary sewer pipe of the various sizes, ma-terials, and pressure rating called for on the Construction Drawing meeting County standards shall be made at the unit price provided in the Schedule of Values per linear foot measured in the horizontal (not slope) actually installed, complete in place.

2. Measurement of length will be made for these items in the field with a representa-tive of the Owner present. No deductions will be made in the measured length in the manholes.

Route 1 Sewer Replacement Section No. 01 29 01-6

3. The unit price provided per linear foot shall include all labor, materials, tools, equipment and services for connection to the existing sanitary sewer system includ-ing, but not limited to; traffic control, excavation, pavement removal, excavation including rock if required, dewatering, sheeting and shoring, tracer wire, testing, appurtenance at depth indicated, cleanup, removal and disposal of all unsuitable and excess material, replacement of grass, sod, shrubs, backfill and surface materi-als, including the replacement of gravel, asphalt, and concrete driveways, and other incidental items required for the proper operation of the sanitary sewer.

J. 36-inch CL 52 DIP Sanitary Sewer:

1. Payment for furnishing and installing sanitary sewer pipe of the various sizes, ma-terials, and pressure rating called for on the Construction Drawing meeting County standards shall be made at the unit price provided in the Schedule of Values per linear foot measured in the horizontal (not slope) actually installed, complete in place.

2. Measurement of length will be made for these items in the field with a representa-tive of the Owner present. No deductions will be made in the measured length in the manholes.

3. The unit price provided per linear foot shall include all labor, materials, tools, equipment and services for connection to the existing sanitary sewer system includ-ing, but not limited to; traffic control, excavation, pavement removal, excavation including rock if required, dewatering, sheeting and shoring, tracer wire, testing, appurtenance at depth indicated, cleanup, removal and disposal of all unsuitable and excess material, replacement of grass, sod, shrubs, backfill and surface materi-als, including the replacement of gravel, asphalt, and concrete driveways, and other incidental items required for the proper operation of the sanitary sewer.

K. 18-inch PS-115 PVC Sanitary Sewer:

1. Payment for furnishing and installing sanitary sewer pipe of the various sizes, ma-terials, and pressure rating called for on the Construction Drawing meeting County standards shall be made at the unit price provided in the Schedule of Values per linear foot measured in the horizontal (not slope) actually installed, complete in place.

2. Measurement of length will be made for these items in the field with a representa-tive of the Owner present. No deductions will be made in the measured length in the manholes.

3. The unit price provided per linear foot shall include all labor, materials, tools, equipment and services for connection to the existing sanitary sewer system includ-ing, but not limited to; traffic control, excavation, pavement removal, excavation including rock if required, dewatering, sheeting and shoring, tracer wire, testing, appurtenance at depth indicated, cleanup, removal and disposal of all unsuitable

Route 1 Sewer Replacement Section No. 01 29 01-7 and excess material, replacement of grass, sod, shrubs, backfill and surface materi-als, including the replacement of gravel, asphalt, and concrete driveways, and other incidental items required for the proper operation of the sanitary sewer.

L. 12-inch SDR-35 PVC Sanitary Sewer:

1. Payment for furnishing and installing sanitary sewer pipe of the various sizes, ma-terials, and pressure rating called for on the Construction Drawing meeting County standards shall be made at the unit price provided in the Schedule of Values per linear foot measured in the horizontal (not slope) actually installed, complete in place.

2. Measurement of length will be made for these items in the field with a representa-tive of the Owner present. No deductions will be made in the measured length in the manholes.

3. The unit price provided per linear foot shall include all labor, materials, tools, equipment and services for connection to the existing sanitary sewer system includ-ing, but not limited to; traffic control, excavation, pavement removal, excavation including rock if required, dewatering, sheeting and shoring, tracer wire, testing, appurtenance at depth indicated, cleanup, removal and disposal of all unsuitable and excess material, replacement of grass, sod, shrubs, backfill and surface materi-als, including the replacement of gravel, asphalt, and concrete driveways, and other incidental items required for the proper operation of the sanitary sewer.

M. 8-inch SDR-35 PVC Sanitary Sewer:

1. Payment for furnishing and installing sanitary sewer pipe of the various sizes, ma-terials, and pressure rating called for on the Construction Drawing meeting County standards shall be made at the unit price provided in the Schedule of Values per linear foot measured in the horizontal (not slope) actually installed, complete in place.

2. Measurement of length will be made for these items in the field with a representa-tive of the Owner present. No deductions will be made in the measured length in the manholes.

3. The unit price provided per linear foot shall include all labor, materials, tools, equipment and services for connection to the existing sanitary sewer system includ-ing, but not limited to; traffic control, excavation, pavement removal, excavation including rock if required, dewatering, sheeting and shoring, tracer wire, testing, appurtenance at depth indicated, cleanup, removal and disposal of all unsuitable and excess material, replacement of grass, sod, shrubs, backfill and surface materi-als, including the replacement of gravel, asphalt, and concrete driveways, and other incidental items required for the proper operation of the sanitary sewer.

N. 6-inch SDR-26 PVC Sewer Lateral:

Route 1 Sewer Replacement Section No. 01 29 01-8

1. Payment for furnishing and installing sanitary sewer pipe of the various sizes, ma-terials, and pressure rating called for on the Construction Drawing meeting County standards shall be made at the unit price provided in the Schedule of Values per linear foot measured in the horizontal (not slope) actually installed, complete in place.

2. Measurement of length will be made for these items in the field with a representa-tive of the Owner present. No deductions will be made in the measured length in the manholes.

3. The unit price provided per linear foot shall include all labor, materials, tools, equipment and services for connection to the existing sanitary sewer system includ-ing, but not limited to; traffic control, excavation, pavement removal, excavation including rock if required, dewatering, sheeting and shoring, tracer wire, testing, cleanouts, connection to trunk sewer and appurtenance at depth indicated, cleanup, removal and disposal of all unsuitable and excess material, replacement of grass, sod, shrubs, backfill and surface materials, including the replacement of gravel, as-phalt, and concrete driveways, and other incidental items required for the proper operation of the sanitary sewer.

O. 8-foot Diameter Manhole:

1. Payment for pre-cast concrete sanitary sewer manholes of the specified diameter and depth with watertight frame and cover (or standard frame and cover where specified), with inside drop where specified and with manhole vent where specified shall be made at the unit price provided per vertical foot, actually installed, com-plete in place.

2. Measurement of length will be made for these items in the field with a representa-tive of the Owner present. The pay depth shall be the vertical depth from the top of the manhole top to the lowest invert plus 8 inches.

3. The unit price provided per each manhole shall include all labor, materials, tools, equipment and services for furnishing and installing the specified 8 foot-0 inches diameter pre-cast concrete manholes of the specified depth including, but not lim-ited to; traffic control, unclassified excavation and pavement removal, excavation including rock if required, trench support, dewatering, handling and placing of manhole sections, watertight bolt-down frames and covers (where specified), inter-nal drop connections (where specified), manhole air vent (where specified), outside coating, flexible pipe connections, connections to existing pipes, transition cou-plings, and appurtenances, temporary blocking, stone bedding (No. 57 stone per County Utilities Manual Standards), testing, cleanup, removal and disposal of all unsuitable and excess material, backfill and surface materials, including the re-placement of gravel, asphalt, and concrete driveways, and seeding and mulching and all restoration required to restore disturbed areas to a condition equal to or bet-ter than pre-construction conditions, and other incidental items required for the proper operation of the manholes.

Route 1 Sewer Replacement Section No. 01 29 01-9

P. 6-foot Diameter Manhole:

1. Payment for pre-cast concrete sanitary sewer manholes of the specified diameter and depth with watertight frame and cover (or standard frame and cover where specified), with inside drop where specified and with manhole vent where specified shall be made at the unit price provided per vertical foot, actually installed, com-plete in place.

2. Measurement of length will be made for these items in the field with a representa-tive of the Owner present. The pay depth shall be the vertical depth from the top of the manhole top to the lowest invert plus 8 inches.

3. The unit price provided per each manhole shall include all labor, materials, tools, equipment and services for furnishing and installing the specified 6 foot-0 inches diameter pre-cast concrete manholes of the specified depth including, but not lim-ited to; traffic control, unclassified excavation and pavement removal, excavation including rock if required, trench support, dewatering, handling and placing of manhole sections, watertight bolt-down frames and covers (where specified), inter-nal drop connections (where specified), manhole air vent (where specified), outside coating, flexible pipe connections, connections to existing pipes, transition cou-plings, and appurtenances, temporary blocking, stone bedding (No. 57 stone per County Utilities Manual Standards), testing, cleanup, removal and disposal of all unsuitable and excess material, backfill and surface materials, including the re-placement of gravel, asphalt, and concrete driveways, and seeding and mulching and all restoration required to restore disturbed areas to a condition equal to or bet-ter than pre-construction conditions, and other incidental items required for the proper operation of the manholes.

Q. 6-foot Diameter Cut-in Manhole:

1. Payment for pre-cast concrete sanitary sewer manholes of the specified diameter and depth with watertight frame and cover (or standard frame and cover where specified), with inside drop where specified and with manhole vent where specified shall be made at the unit price provided per vertical foot, actually installed, com-plete in place.

2. Measurement of length will be made for these items in the field with a representa-tive of the Owner present. The pay depth shall be the vertical depth from the top of the manhole top to the lowest invert plus 8 inches.

3. The unit price provided per each manhole shall include all labor, materials, tools, equipment and services for furnishing and installing the specified 6 foot-0 inches diameter pre-cast concrete manholes of the specified depth including, but not lim-ited to; traffic control, unclassified excavation and pavement removal, excavation including rock if required, trench support, dewatering, handling and placing of manhole sections, watertight bolt-down frames and covers (where specified), inter-nal drop connections (where specified), manhole air vent (where specified), outside

Route 1 Sewer Replacement Section No. 01 29 01-10 coating, flexible pipe connections, connections to existing pipes, transition cou-plings, and appurtenances, temporary blocking, stone bedding (No. 57 stone per County Utilities Manual Standards), testing, cleanup, removal and disposal of all unsuitable and excess material, backfill and surface materials, including the re-placement of gravel, asphalt, and concrete driveways, and seeding and mulching and all restoration required to restore disturbed areas to a condition equal to or bet-ter than pre-construction conditions, and other incidental items required for the proper operation of the manholes.

R. Clay Dam:

1. Payment for furnishing and installing of Clay Dams shall be made at the unit price provided in the Schedule of Values for each Dam installed.

2. No measurement will be made for this item.

3. The unit price for Clay Dam shall include all labor, materials, tools, equipment and services for furnishing and installing Clay Dams as specified on the plans. This is included, but not limited to; all materials, including stone, concrete grout, suitable material and filter fabric, all site preparation for the installation of clay dams.

S. Pipe Concrete Encasement:

1. Payment for concrete shall be made at the unit price provided in the Schedule of Values per linear foot of concrete encasement measured horizontal (not slope) ac-tually installed, complete in place.

2. Measurement of lengths will be made horizontally, along the centerline of the pipe-line and will account for pipe diameter with a minimum thickness of 8 inches.

3. The unit price for concrete shall include all labor, materials, tools, equipment and services for furnishing and placing cast in place concrete. This is including, but not limited to furnishing, excavating, testing, installing and removing as applicable all forms, form ties, reinforcing steel and mesh, control joints and expansions joints, inserts, waterstops, anchors, sleeves, bolts, plates and all other miscellaneous items associated with and required to complete the work.

T. 56-inch Diameter (minimum) Steel Casing:

1. Payment for casing shall be made at the unit price provided in the Schedule of Val-ues per linear foot for lengths of steel casing actually installed, as directed by the engineer, complete in place.

2. Measurements of lengths will be made horizontally, along the centerline of the steel casing.

3. The unit price provided per linear foot shall include all labor, materials, tools, equipment, and services for furnishing and installing the steel casing including all

Route 1 Sewer Replacement Section No. 01 29 01-11 excavation including for boring and receiving pits, excavation of rock if required, trench support, any backfill, the casing pipe, boring, jacking, spacers, drain pipe, drain, end seals, grout, brick, blocking, design of support system, seal slab, de-watering, ground monitoring system, clean up, removal and disposal of all unsuit-able and excess material and all restoration required to restore disturbed areas to a condition equal to or better than pre-construction conditions, and all other appurte-nances required to properly install the steel casing. No additional payment shall be made for failures and subsequent withdrawals and boring attempts.

U. 50-inch Diameter (minimum) Steel Casing:

1. Payment for casing shall be made at the unit price provided in the Schedule of Val-ues per linear foot for lengths of steel casing actually installed, as directed by the engineer, complete in place.

2. Measurements of lengths will be made horizontally, along the centerline of the steel casing.

3. The unit price provided per linear foot shall include all labor, materials, tools, equipment, and services for furnishing and installing the steel casing including all excavation including for boring and receiving pits, excavation of rock if required, trench support, any backfill, the casing pipe, boring, jacking, spacers, drain pipe, drain, end seals, grout, brick, blocking, design of support system, seal slab, de-watering, ground monitoring system, clean up, removal and disposal of all unsuit-able and excess material and all restoration required to restore disturbed areas to a condition equal to or better than pre-construction conditions, and all other appurte-nances required to properly install the steel casing. No additional payment shall be made for failures and subsequent withdrawals and boring attempts.

V. Gravity Sewer Abandonment:

1. Payment for abandoning the sanitary sewer infrastructure as shown on the plans.

Payment shall be lump sum.

2. No measurement for these items is anticipated

3. The lump sum price provided shall include all labor, materials, tools, equipment and services for furnishing, installing, flowable fill to abandon sanitary sewer pipes, seal/plug connections at manholes, and abandon manholes as shown on plans in-cluding, but not limited; traffic control, additional excavation including rock if re-quired, pavement removal, removal and disposal of existing pipe and manholes, trench support, dewatering, cleanup, removal and disposal of all unsuitable and ex-cess material, backfill and surface materials, including replacement of gravel, as-phalt, and concrete driveways and seeding and mulching, all restoration to restore disturbed areas to a condition equal to or better than pre-construction conditions and other incidental items required for the abandoning of the existing system.

Route 1 Sewer Replacement Section No. 01 29 01-12

W. Stream Restoration:

1. Payment for all labor, material, and equipment necessary to restore natural stream banks to preconstruction contours and seeded in accordance with the contract draw-ings.

2. Measurement for square yards stream bank and bed restoration and seeding shall be made in the field.

3. The unit price provided for each square yard of stream restoration shall include all labor, materials, tools, equipment, and services for reconstructing stream banks and bed to preconstruction contours and furnishing and installing seeding and fertilizing including, but not limited to; handling and placing of topsoil, fine grading, handling and placing of permanent seed, temporary seeding as required to stabilize disturbed areas, handling and placing of fertilizer and lime, watering, testing and any other incidental items required for proper growth in the seeded area.

X. Wetland Seed Mix (Permanent Conversion Impacts / Permanent Easements):

1. Payment for furnishing and installing recovered wetland topsoil, wetland seed mix, and straw mulch shall be made at the unit price provided per square yard of recov-ered wetland topsoil, wetland seed mix, and straw mulch installed, complete in place, for permanent conversion wetland impacts in accordance with the Wetland Permit Special Conditions.

2. Measurement for square yards of recovered wetland topsoil, wetland seed mix, and straw mulch shall be made in the field.

3. The unit price provided for each square yard of recovered wetland topsoil, wetland seed mix, and straw mulch shall include all labor, materials, tools, equipment, and services for furnishing and installing recovered wetland topsoil, wetland seed mix, and straw mulch including, but not limited to; handling and placing of recovered wetland topsoil, fine grading, handling and placing of wetland seed mixture, han-dling and placing of straw mulch, watering, testing and any other incidental items required for proper growth in the seeded area.

Y. Wetland Seed Mix (Temporary Wetlands Impacts / Temporary Easements):

1. Payment for furnishing and installing recovered wetland topsoil, wetland seed mix, and straw mulch shall be made at the unit price provided per square yard of recov-ered wetland topsoil, wetland seed mix, and straw mulch installed, complete in place, for temporary wetland impacts in accordance with the Wetland Permit Spe-cial Conditions.

2. Measurement for square yards of recovered wetland topsoil, wetland seed mix, and straw mulch shall be made in the field.

Route 1 Sewer Replacement Section No. 01 29 01-13

3. The unit price provided for each square yard of recovered wetland topsoil, wetland seed mix, and straw mulch shall include all labor, materials, tools, equipment, and services for furnishing and installing recovered wetland topsoil, wetland seed mix, and straw mulch including, but not limited to; handling and placing of recovered wetland topsoil, fine grading, handling and placing of wetland seed mixture, han-dling and placing of straw mulch, watering, testing and any other incidental items required for proper growth in the seeded area.

Z. Wetland Plantings (Temporary Wetlands Impacts / Temporary Easements):

1. Payment for furnishing and installing wetland planting shall be made for each wet-land plant at the unit price provided in the Schedule of Values for each plant in-stalled, for temporary wetland impacts in accordance with the Wetland Permit Spe-cial Conditions.

2. Measurement for each wetland plant shall be made in the field.

3. The unit price provided for each wetland plant shall include all labor, materials, tools, equipment, and services for furnishing and installing wetland plants includ-ing, but not limited to; handling and placing of wetland plantings, watering, testing and any other incidental items required for proper growth in the planted area.

1.05 PAYMENT FOR MATERIALS NOT INCORPORATED INTO THE WORK

A. Storage of Materials

1. Payment for equipment and materials stored on the site, or elsewhere as specified in the General Conditions, and not actually incorporated in the Work will be made on the basis of 95 percent of the amount of paid invoices submitted to the Owner for incorporation in the monthly estimate.

B. Authorization for Payment

1. Payment will be authorized after the delivery to the construction site or other ap-proved location and after being certified by the Owner as being stored in confor-mation with the manufacturer’s recommendations and satisfactory evidence is pro-vided that the items are as specified.

2. Title to all items of equipment and materials upon which payment has been made shall be vested in the Owner and documents transferring title shall be executed by the Contractor. Transfer of ownership shall not relieve the Contractor of continuing insurance coverage and of protecting stored items against damage, deterioration, theft, or loss of any kind.

3. Should materials or equipment become damage or be stored improperly or contrary to the manufacturer’s recommendations, being therefore subject to later damage, then the Owner will reduce the next following monthly payment by an amount suf-ficient to repair or replace such units.

Route 1 Sewer Replacement Section No. 01 29 01-14

4. To initiate a request for partial payment the Contractor shall submit his request in writing to the Owner with all necessary evidence.

5. Items of material or equipment to which partial payment applies includes and is limited to the following:

a. Pipes, valves, and fittings are allowed for stored materials.

PART 2 – PRODUCTS (not used)

PART 3 – EXECUTION (not used)

END OF SECTION 01 29 01

Construction Photographs Route 1 Sewer Replacement Section No. 01 32 33-1

SECTION 01 32 33

CONSTRUCTION PHOTOGRAPHS

PART 1 - GENERAL

1.01 DESCRIPTION:

A. Provide construction photographs pertinent to the Contract Work during the Contract period as indicated and in compliance with Contract Documents.

1. Section includes administrative and procedural requirements for the following:

a. Preconstruction photographs.

b. Periodic construction photographs.

c. Final completion construction photographs.

1.02 SUBMITTALS:

A. Submit the following shop drawings in accordance with Section D - General Conditions.

B. Key Plan: Submit key plan of Project site with notation of vantage points marked for location and direction of each photograph. Include same information as corresponding photographic documentation.

C. Digital Photographs: Submit image files within five days of taking photographs.

1. Digital Camera: Minimum sensor resolution of 8 megapixels.

2. Format: Minimum 3200 by 2400 pixels, in unaltered original files, with same aspect ratio as the sensor, uncropped, date and time stamped, in folder named by date of photograph, accompanied by key plan file.

3. Identification: Provide the following information with each image description in file metadata tag:

a. Name of Project and Owner’s project number.

b. Name of photographer.

c. Name of Engineer.

d. Name of Contractor.

e. Date photograph was taken.

Route 1 Sewer Replacement Section No. 01 32 33-2

f. Description of vantage point, indicating location, direction by compass point of construction.

g. Unique sequential identifier keyed to accompanying key plan.

1.03 QUALITY ASSURANCE:

A. Comply with the requirements specified in Section D - General Conditions.

1.04 USAGE RIGHTS:

A. Obtain and transfer copyright usage rights from photographer to Engineer and Owner for unlimited reproduction of photographic documentation.

1.05 DELIVERY STORAGE AND HANDLING:

A. Comply with the requirements specified in Section 01 66 10 “Deliver, Storage and Handling”.

PART 2 - PRODUCTS

2.01 PHOTOGRAPHIC MEDIA:

A. Digital Images: Provide images in JPG format, produced by a digital camera with minimum sensor size of 8 megapixels, and at an image resolution of not less than 3200 by 2400 pixels.

PART 3 - EXECUTION

3.01 CONSTRUCTION PHOTOGRAPHS:

A. Photographer: Engage a qualified photographer to take construction photographs.

B. General: Take photographs using the maximum range of depth of field, and that are in focus, to clearly show the Work. Photographs with blurry or out-of-focus areas will not be accepted.

1. Maintain key plan with each set of construction photographs that identifies each photographic location.

C. Digital Images: Submit digital images exactly as originally recorded in the digital camera, without alteration, manipulation, editing, or modifications using image-editing software.

1. Date and Time: Include date and time in file name for each image.

D. Preconstruction Photographs: Before commencement of excavation, commencement of demolition and starting construction, take photographs of Project site and surrounding

Route 1 Sewer Replacement Section No. 01 32 33-3 properties, including existing items to remain during construction, from different vantage points, as directed by Owner.

1. Flag excavation areas before taking construction photographs.

2. Take additional photographs as required to record settlement or cracking of adjacent structures, pavements, and improvements.

E. Final Completion Construction Photographs: Take color photographs after date of Substantial Completion for submission as Project record documents. Owner will inform photographer of desired vantage points.

3.02 ROUTE PHOTOGRAPHY REQUIRED:

A. Provide progressive photographs of route before commencement of construction:

1. Progressive photographs of route starting at one end of route and progressing to other end, then reverse progressive photography back to point of beginning.

2. Each exposure to overlap preceding exposure by 1/4 to 1/3 of the frame.

3. Additional photographs of features along route as directed by Owner.

B. In the portions of the route where clearing is required make an additional set of progress photographs in similar manner specified for the initial route photography after all clearing work completed and before any other work commences in the cleared portion of the route.

C. During Construction:

1. At least once per month to illustrate state of project, condition of construction and progress in the previous month. Work photographed in previous sessions only photographed again sufficiently to provide progressive continuity of work unless otherwise directed by Owner.

2. Such special photographs required by Owner.

D. Upon Completion of All Construction Work:

1. Progressive photographs of route in same manner as that specified before commencement of Contract Work.

2. The route may be photographed in increments when work in that increment is completed and when approved by Owner. Each increment photography to overlap other increment photography sufficiently such that all photographs provide progressive views of the route throughout.

END OF SECTION 01 32 33

Protection of Environment Route 1 Sewer Replacement Section No. 01 35 43-1

SECTION 01 35 43

PROTECTION OF ENVIRONMENT

PART 1 - GENERAL

1.01 SUMMARY:

A. Contractor, in executing Work, shall maintain Work areas on- and off-site free from environmental pollution that would be in violation of federal, state or local regulations as indicated and in compliance with Contract Documents.

B. The control of environmental pollution requires consideration of air, water, and land, and involves management of noise and solid waste, as well as other pollutants.

C. Any contamination shall be reported by the Contractor to the appropriate agencies, Owner and the Engineer, and cleaned up as per requirements.

D. The Contractor shall be responsible for the protection of the natural environment of the Site and surrounding areas, both land and water. Protection of the environment must start with avoidance and prevention, and then control/mitigation, compensation, or enhancement (in order of descending preference).

E. Schedule and conduct all work in a manner that will minimize the erosion of soils in the area of the Work. Provide erosion control measures such as diversion channels, sedimentation or filtration systems, berms, staked hay bales, seeding, mulching, or other special surface treatments as are required to prevent silting and muddying of streams, rivers, impoundments, lakes, etc. All erosion control measures shall be in place in an area prior to any construction activity in that area.

F. Ensure that construction is achieved with a minimum of disturbance to the existing ecological balance between a water resource and its surroundings. It is the Contractor's responsibility to determine the specific construction techniques to meet these guidelines.

G. Schedule and conduct all work in a manner that will minimize the level of noise escaping the site, especially at night and on weekends.

H. Payment:

1. Consider Work specified in this Section incidental and include payment as part of appropriate lump sum or unit prices specified in Bid Form.

1.02 REFERENCES:

A. United States Environmental Protection Agency (USEPA):

1. EPA-72-015: Guidelines for Erosion and Sedimentation Control Planning and Implementation

Route 1 Sewer Replacement Section No. 01 35 43-2

2. EPA 43019-73-007: Processes, Procedures, and Methods to Control Pollution Resulting from All Construction Activity

B. Federal Environmental Protection Act and applicable regulations.

C. Virginia Erosion and Sediment Control Handbook, Third Edition, 1992.

1.03 SUBMITTALS

A. Submit shop drawings in accordance with the requirements of Section D - General Conditions.

B. Prior to commencing any Work on this Contract and not later than ten (10) Working Days following receipt of the Notice to Proceed, the Contractor shall submit Environmental Protection shop drawings for the Owner’s and/or Engineer’s review and approval. Submit shop drawings for the following:

1. Plans and sketches showing areas proposed to be used for construction storage, the Contractor’s Site office, vehicle cleaning, equipment fueling and associated access routes.

2. Surface drainage and storm sewer control plan.

3. Erosion and sediment control plan

4. Waterways control plan.

5. Tree protection plan.

6. Mud and dust control plan.

7. Noise control plan.

8. Spills response and spills reporting plan.

9. Erosion and sediment control contingency plan.

10. Fire contingency plan.

11. Contaminated site contingency plan.

12. Historical resources contingency plan.

13. Fuel spills contingency plan

Route 1 Sewer Replacement Section No. 01 35 43-3

1.04 PROTECTION OF STORM SEWERS:

A. Prevent construction material (including volatile liquid wastes such as oil, chemicals, paints), pavement, concrete, earth, or other debris from entering existing storm sewer or sewer structure.

1.05 PROTECTION OF WATERWAYS:

A. Observe rules and regulations of Commonwealth of Virginia and Federal agencies of U.S. government prohibiting pollution of lakes, streams, rivers or wetlands by dumping of refuse, rubbish, dredge material or debris.

1. Permits obtained by Owner are included in the Contract Documents.

2. Other permits shall be obtained by Contractor at Contractor’s cost.

B. The Contractor shall not cause or permit action to occur which would cause an overflow to existing waterways. Provide holding ponds or accepted method which will divert flows, including storm flows and flows created by construction activity, to prevent excessive silting of waterways or flooding damage to property.

C. Comply with procedures outlined in U.S. EPA manuals entitled, “Guidelines for Erosion and Sedimentation Control Planning and Implementation”, Manual EPA-72-015 and “Processes, Procedures, and Methods to Control Pollution Resulting from All Construction Activity”, Manual EPA 43019-73-007. In cases of conflicts, the most stringent requirements will govern this contract.

1.06 STORM WATER DISCHARGE:

A. Contractor shall comply with Virginia Environmental Protection Agency’s National Pollution Discharge Elimination System, (NPDES) Storm Water permit for construction site activities. As minimum Contractor is required to prepare, submit, and comply with following.

1. Notice of Intent (NOI).

2. Storm Water Pollution Plan.

B. Comply with procedures outlined in U.S. EPA manuals entitled, “Guidelines for Erosion and Sedimentation Control Planning and Implementation”, Manual EPA-72-015 and “Processes, Procedures, and Methods to Control Pollution Resulting from All Construction Activity”, Manual EPA 43019-73-007. In cases of conflicts, the most stringent requirements will govern this contract.

Route 1 Sewer Replacement Section No. 01 35 43-4

1.07 EROSION AND SEDIMENT CONTROL:

A. Apply appropriate soil conservation measures to protect project area and adjacent lands.

These measures may include, but not be limited to, mulching, rapid growth vegetation, fabric mat, hay bales, filter barriers, sediment traps, and basins.

B. Select methods of erosion and sediment control for specific job site.

1. Adjust sediment control measures in field to meet conditions encountered.

C. Provide erosion control measures, in place, before commencing work on project site.

1. Maintain erosion control measure during course of construction.

2. Remove erosion control measures upon establishment of permanent, surface stabilization.

D. Complete temporary or permanent stabilization of surface of perimeter controls, dikes, swales, ditches, perimeter slopes, and slopes greater than 3:1 within seven (7) calendar days following initial soil disturbance. Stabilize other disturbed or graded areas within forteen (14) calendar days.

1.08 PROTECTION OF AIR QUALITY:

A. Minimize air pollution by requiring use of properly operating combustion emission control devices on construction vehicles and equipment and encourage shutdown of motorized equipment not in use.

B. Do not burn trash on or adjacent to construction site.

C. If temporary heating devices are necessary for protection of Work, they shall not cause air pollution.

D. The Contractor shall conduct operations of dumping rock and of carrying rock away in trucks in such a way as to minimize dust. Give unpaved streets, roads, detours, or haul roads used in construction area a dust-preventive treatment or periodically water them to prevent dust. Strictly adhere to all applicable environmental regulations for dust prevention.

1.09 NOISE CONTROL:

A. Conduct operations to cause least annoyance to residents in vicinity of Work, and comply with applicable local ordinances.

B. Equip compressors, hoists, and other apparatus with mechanical devices necessary to minimize noise and dust. Equip compressors with silencers on intake lines.

C. Equip gasoline or oil-operated equipment with silencers or mufflers on intake and exhaust lines.

Route 1 Sewer Replacement Section No. 01 35 43-5

D. Conduct operation of dumping rock and of carrying rock away in trucks so as to cause minimum of noise and dust.

E. Route vehicles carrying rock, concrete or other material over such streets as will cause least annoyance to public and do not operate on public streets between hours of 5:00 p.m.

and 7:00 a.m., or on Saturdays, Sundays or legal holidays unless accepted by Owner.

F. No excessive idling of motorized equipment is permitted.

G. Submit a plan to mitigate construction noise and to comply with noise control ordinances, including methods of construction, equipment to be used, and acoustical treatments.

1.10 MUD AND DUST CONTROL:

A. Due to close geographic location of Project to other off-site facilities and residential homes take special care in providing and maintaining temporary site roadways, Owner’s existing roads, and public roads used during construction operations in clean, dust free condition.

B. Comply with local environmental regulations for dust control. If Contractor’s dust control measures are considered inadequate by Owner, Owner may require Contractor to take additional dust control measures.

C. The Contractor shall employ only wet type equipment for saw cutting and concrete grinding to control dust nuisance. There shall be no cutting prior to the Engineer’s and Owner’s approval.

D.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .