This file contains architectural as-built drawings for roofing systems at the Central Heat and Power Plant (CHPP) facility, showing detailed roof plans, elevations, and construction details dated November 5, 2015. The drawings include specifications for a Firestone RubberGard Platinum EPDM membrane roofing system with a 20-year warranty, featuring .090" EPDM membrane, bonding adhesive BA-2004, polyiso insulation boards, vapor retarders, and various flashing and drainage details.

The drawings provide comprehensive technical details including ground level plans, equipment level plans, roof framing plans, and securement patterns for field, perimeter and corner zones. Key components shown include roof drains, scuppers, expansion joints, parapets, and tie-in details to existing structures. Specific architectural elements include slope requirements of 1/4" per foot, insulation fastening patterns, and detailed cross-sections of roof assemblies. The drawings were prepared by A & A Roofing Co., Inc. of Fairbanks, AK and appear to be part of an Air Force facility improvement project at Eielson AFB.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FIRESTONE INSULATION

NOTES:

1.

END LAPS OF QUICKSEAM SPLICE TAPE MUST2.

OVERLAP A MINIMUM OF 1" (25.4 mm).

QUICKPRIME PLUS

.090" PLATINUM EPDM MEMBRANE

3" QUICKSEAM SPLICE TAPE

.090" PLATINUM EPDM MEMBRANE

SUBSTRATE

(SEE NOTES)

FIRESTONE BONDING ADHESIVE

REFER TO FIRESTONE WEBSITE FOR MOST

CURRENT INFORMATION.

1/8" (3.2 mm) TO 1/2" (12.7 mm)

A

A R oo fin g C o.

, I nc

PO

B ox

Fa irb an ks

, A K

(9

) 4

-3 f (

7)

-2

A

A R oo fin g@ aa ro of in g.

bi z

A

A R oo fin g C o.

, I nc

PO

B ox

Fa irb an ks

, A K

(9

) 4

-3 f (

7)

-2

A

A R oo fin g@ aa ro of in g.

A R oo fin g C o.

, I nc

PO

B ox

Fa irb an ks

, A K

(9

) 4

-3 f (

7)

-2

A

A R oo fin g@ aa ro of in g.

A R oo fin g C o.

, I nc

PO

B ox

Fa irb an ks

, A K

(9

) 4

-3 f (

7)

-2

A

A R oo fin g@ aa ro of in g.

RPF STRIP ATTACHED

W

AL

L / C

UR

B

TO WALL/CURB

WALL / CURB

4.8 mm ) O

.C . M

AX

1-1/2" (38mm)

6" (152.4 mm) MAX.

1" (25.4 mm) MAX. & 1/8" (3 mm) MIN.

FIRESTONE QUICKSEAM

RPF STRIP (TYPICAL)

FIRESTONE FASTENER AND 2" METAL

PLATE AT 12" (304.8 mm) O.C. MAX.

(SEE NOTES)

WALL / CURB

W

AL

L / C

UR

B

12" (304.8mm) O.C. MAX.6" (152.4mm) 1-1/2" (38mm)

1" (25.4 mm) MAX. & 1/8" (3 mm) MIN.

1/2" (12.7 mm) 1-1/2" (38 mm)

FIRESTONE FASTENER AND 2"

METAL PLATE AT 12" (304.8 mm)

O.C. MAX. (SEE NOTES)

RPF STRIPW

AL

L / C

UR

B

ATTACHED

6" (152.4 mm) 1-1/2" (38.1 mm)

TO WALL/CURB

A

A R oo fin g C o.

, I nc

PO

B ox

Fa irb an ks

, A K

(9

) 4

-3 f (

7)

-2

A

A R oo fin g@ aa ro of in g.

A R oo fin g C o.

, I nc

PO

B ox

Fa irb an ks

, A K

(9

) 4

-3 f (

7)

-2

A

A R oo fin g@ aa ro of in g.

A R oo fin g C o.

, I nc

PO

B ox

Fa irb an ks

, A K

(9

) 4

-3 f (

7)

-2

A

A R oo fin g@ aa ro of in g.

A R oo fin g C o.

, I nc

PO

B ox

Fa irb an ks

, A K

(9

) 4

-3 f (

7)

-2

A

A R oo fin g@ aa ro of in g.

A R oo fin g C o.

, I nc

PO

B ox

Fa irb an ks

, A K

(9

) 4

-3 f (

7)

-2

A

A R oo fin g@ aa ro of in g.

A R oo fin g C o.

, I nc

PO

B ox

Fa irb an ks

, A K

(9

) 4

-3 f (

7)

-2

A

A R oo fin g@ aa ro of in g.

2 - ROOF PLAN - SOUTH AND NORTH ELEVATIONS
EAST FILTRATION BUILDING GROUND - EQUIPMENT LEVEL AND ROOF PLANS
EAST FILTRATION BUILDING ROOF AND PLUMBING PLAN
Filtration BLDG ROOF PLAN
FILTRATION BUILDINGS ROOF FRAMING PLANS
SWITCHGEAR BLDG ROOF FRAMING PLANS
Thaw Shed Roofing Plan
EPDM-1 Roof Plan
EPDM-2 Roof Plan
EPDM-3 Roof Plan
EPDM-4 Securement Plan
EPDM-5 EPDM Details
EPDM-6 EPDM Details
EPDM-7 EPDM Details
EPDM-8 EPDM Details
EPDM-9 EPDM Details
EPDM-10 CAT Shed Roof Plan
WEST FILTRATION BUILDING GROUND - EQUIPMENT LEVEL AND ROOF PLANS
WEST FILTRATION BUILDING ROOF AND PLUMBING PLAN

File details come from the government source that posted it. Updated .